Foundation and Slab Progress
Overall Progress
View of Pods A thru D
Overall Progress
Pod A – Wall Construction
Concrete Slab on Deck
Pod B – 1st Slab on Deck pour
Pod B – Slab on Deck
Pod B – Slab on Deck
Mechanical Systems prep
Structural Steel – Pod A
Lower South Demo complete
Building pad prep for building area E1/E1
Modular Classrooms at South
Modular classrooms at North
Westerly Crossing
Storm Water utility crossing at Westerly needed following West Penn relocation of their street light.
Photo Credit: Dan Hawbaker August 2016
Scheduled Work for Upcoming Month • School Start • Occupancy of modular classrooms • Structural Steel Pod C • Slab on Deck L2 Pod A • Start of MEP overhead rough-ins • Foundations at Area E1/E2
Project Stats • Safety = 74 Days with Zero Recordable Accidents • Schedule = Currently on schedule