State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5...

11
Conflict Summary Sheet.xls Item # P&P Sh # Approx. Sta. From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable MC01 2 17452+30. to 17452+30. NA NA NA Median In Right of way No Conflict NDDOT Should be able to avoid Midcontinent Communications Fiber Optic Line 2 Not reimbursable MC02 3 107+20. to 107+20. 125 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Midcontinent Communications Fiber Optic Line 2 Not reimbursable NE01 3 106+60. to 106+60. 150 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Nodak Electric Electric Line Buried 2 Not reimbursable CL01 1 17450+25. to 17450+25. NA NA NA Median In Right of way No Conflict NDDOT Should be able to avoid Centurylink Fiber Optic Line 2 Not reimbursable CL02 3 101+50. to 101+50. NA NA Cut Crossing In Right of way No Conflict NDDOT Should be able to avoid Centurylink Fiber Optic Line 2 Not reimbursable CL03 3 106+45. to 106+45. 150 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Centurylink Fiber Optic Line 2 Not reimbursable Contact information for Utility Facilities with or without Conflicts Utility Company Name and Address Contact Name Phone Number Email Midco - 5030 Gateway Dr. Suite B., Grand Forks, ND 58203 Robert Johnson (701) 335-4228 [email protected] Nodak Electric Coop. Inc. - PO Box 13000, Grand Forks, ND 58208-3000 Steven Breidenbach (701)-746-4461 [email protected] Centurylink - 125 S Dakota Ave, Sioux Falls, SD 57194 Dan Kaiser (605) 339 5656 [email protected] Centurylink - 409 First Ave. North, Fargo, ND 58102 Caleb Walters (701) 241-3214 [email protected] Approx. Maximum Cut/Fill

Transcript of State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5...

Page 1: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

Conflict Summary Sheet.xls

Item #P&P Sh

#Approx. Sta.

From Approx. Sta. To

Approx. Qty Offset Location Comments Utility Type of Facility

1 State,

2 Utility Not/Reimbursable

MC01 2 17452+30. to 17452+30. NA NA NA Median In Right of way No Conflict NDDOT Should be able to avoid Midcontinent Communications Fiber Optic Line 2 Not reimbursable

MC02 3 107+20. to 107+20. 125 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Midcontinent Communications Fiber Optic Line 2 Not reimbursable

NE01 3 106+60. to 106+60. 150 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Nodak Electric Electric Line Buried 2 Not reimbursable

CL01 1 17450+25. to 17450+25. NA NA NA Median In Right of way No Conflict NDDOT Should be able to avoid Centurylink Fiber Optic Line 2 Not reimbursable

CL02 3 101+50. to 101+50. NA NA Cut Crossing In Right of way No Conflict NDDOT Should be able to avoid Centurylink Fiber Optic Line 2 Not reimbursable

CL03 3 106+45. to 106+45. 150 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Centurylink Fiber Optic Line 2 Not reimbursable

Contact information for Utility Facilities with or without ConflictsUtility Company Name and Address Contact Name Phone Number EmailMidco - 5030 Gateway Dr. Suite B., Grand Forks, ND 58203 Robert Johnson (701) 335-4228 [email protected] Electric Coop. Inc. - PO Box 13000, Grand Forks, ND 58208-3000 Steven Breidenbach (701)-746-4461 [email protected] - 125 S Dakota Ave, Sioux Falls, SD 57194 Dan Kaiser (605) 339 5656 [email protected] - 409 First Ave. North, Fargo, ND 58102 Caleb Walters (701) 241-3214 [email protected]

Approx. Maximum

Cut/Fill

Page 2: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

R 5

4W

R 5

5W

R 5

3W

R 5

4W

T 151N

T 152N

OFFICE OF PROJECT DEVELOPMENT

Larimore

PCN 20140

SHE-6-002(113)330

Project

SHE-6-002(133)330 0.45 0.45

DESIGNERS

ND DEPARTMENT OF TRANSPORTATION

__________________________________________

APPROVED DATE _________________________

GRAND

FORKS

GO

LD

EN

VA

LLE

Y

CASS

RIC

HLA

ND

RANSOM

SARGENTDICKEY

LA MOURE

BARNES

KIDDER

LOGAN

MC IN

TOSH

BU

RLEIG

H

MORTON

GRANT

SIOUXADAMS

HETTINGER

SLOPE

BOWMAN EM

MO

NS

OLIVER

MERCER

STARKBIL

LIN

GS

DUNN

MC KENZIE

MC LEAN

SHERID

AN

WELLS

EDDY

FOSTER

GRIG

GS

STEELE

TRAILL

DIVIDE

WILLIAMS

BURKE

MO

UNTR

AIL

RE

NVIL

LE

WARD

MC H

EN

RY

BOTTINEAU

ROLLE

TTE

TO

WNER

CAVALIER

RA

MSEY

WALSH

PE

MBIN

A

NELS

ONBENSONP

IER

CE

STUTSMAN

STATE COUNTY MAP

11

SHE-6-002(113)330 20140

DESIGN DIVISION

SHE-6-002(113)330

Intersection of US 2 with ND 18

Grand Forks County

DESIGN DATA

Traffic Average Daily

Limited Access Control

Current 2013

Forecast 2033

Pass: 7320

Pass: 11001

Trucks: 770

Trucks: 1255

Total: 8090

Total: 12256

Design Speed: 70

Bridges:

Pavement Design Life 20 (years)

Minimum Sight Dist. for Stopping: 1616’

Clear Zone Distance: 32’

Design Accumulated One-way Flexible ESALs: 576455

STATE PROJECT NO.

ND

PCNNO.

SHEET

NO.

SECTION

DEPARTMENT OF TRANSPORTATION

NORTH DAKOTA

__________________________________________

APPROVED DATE _________________________

engineer under the laws of the state of ND.

and that I am a duly registered professional

prepared by me or under my direct supervision

I hereby certify that the attached plans were

3/10/2016 mdockter R:\project\60002330.113\design\DOTSC\Plan\001TS_Title Sheet.dgn4:11:28 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

JOB # 27

GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION

effective on the date the project is advertised.

Department of Transportation and the Supplemental Specifications

2014 Standard Specifications adopted by the North Dakota

GOVERNING SPECIFICATIONS:

Rest Area & Intersection Improvements

RP 330.300 to RP 330.750

Page 3: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

Rest Area Improvements

US 2 WB

US 2 EB

ND 1

8

ND 1

8

US 2 WB

US 2 EB

Turn Lane Improvements

20199sf

4795sf3960sf

5359sf

5172 sf

10812 sf

3141 sf

939 sf

2011 sf

R: 54WT: 152NS: 30

R: 54WT: 152NS: 30

R: 55WT: 152NS: 36

R: 54WT: 152NS: 31

Rest A

rea

SHE-6-002(113)330 4 1

Scope of Work

US 2 & ND 18

Rest Area & Intersection Improvements

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\design\DOTSC\Plan\004SW_Scope of Work.dgn4:11:32 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

Page 4: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

Utility Conflict Legend Sheet

at own expenserelocate or adjustutility company to Buried telephone,Conflict with

at own expenserelocate or adjustutility company to Fiber optic line,Conflict with

at own expenserelocate or adjustutility company to Buried electric line,Conflict with

billable to NDDOTrelocate or adjustutility company to Utility Pole,Conflict with

billable to NDDOTrelocate or adjustutility company to Utility Pole anchor,Conflict with

at own expenserelocate or adjustutility company to Utility Pole,Conflict with

at own expenserelocate or adjustutility company to Utility Pole anchor,Conflict with

earth around poleto leave existing NDDOT contractorNo Conflict

at own expenserelocate or adjustutility company to Gas line,Conflict with

billable to NDDOTrelocate or adjustutility company to Fiber optic line,Conflict with

billable to NDDOTrelocate or adjustutility company to Buried telephone,Conflict with

billable to NDDOTrelocate or adjustutility company to Buried electric line,Conflict with

billable to NDDOTrelocate or adjustutility company to Gas line,Conflict with

at own expenserelocate or adjustutility company to Cable/TV facality,Conflict with

billable to NDDOTrelocate or adjustutility company to Cable/TV facality,Conflict with

3/10/2016 R:\project\60002330.113\utilities\004UC_001_utility conflict legend.dgn

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

NA 1SHE-6-002(113)330

Page 5: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

to avoid fiber opticNDDOT contractorNo Conflict

17445

+00

17450

+00

Tel Ped

25.7’ near 17443+45 EB

26.1’ near 17443+32 EB

24.2’ near 17443+42 WB

24.9’ near 17443+27 WB

OH clerance @ ‘

NDDOT

CE

NT

UR

Y LIN

K

CENTURY LINK

CE

NT

UR

Y LIN

K

Ped

Tel

Lg\S

m trees

Lg\Sm trees

Lg\Sm trees

US 2 WB

US 2 EB

15:124’ RT

+9.5724’ RT

+5.20

4’

12’

15:1

R 75’

80’ RT

+41.47

64’ RT

+52.71

40’ RT

+29.30

36’ RT

+29.30

ND 1

8

80’ RT

+32.5871’ RT

+52.58

ND 1

8

7.2’ LT

+72.75

15:1

R 75’

4’12’

16’

Ex. ROW

Ex. ROW

Inv 1126.40

Sta +14, OS 13.6’ Lt

24" RCP w/ TES

Sta +72.6, OS 5’ Lt

24" RCP bend

Inv 1123.59

Sta +75, OS 116.3’ Rt

24" RCP w/ TES

- 6.0570 %

1,129.22

1,128.40

+ 0.2500 %

VPI 17447+97.67

EL 1,125.66

VPI 17448+21.71

EL 1,127.70

+

8.50

00 %

VPI 17447+50.00

EL 1,127.81

- 4.5000 %

- 0.8112 %

VPI 17446+02.82

EL 1,129.00

- 0.2357 %

VPI 17443+69.43

EL 1,129.55

- 0.0505 %1,129.67

Proposed Ditch

Proposed 24" Pipe

Existing 18" CSP

+ 0.3663 %

Invert: 1126.40

Offset: 13.6 LT

STA: 17448+14

Invert: 1122.60

Offset: 1.8 LT

STA: 17450+74

Invert: 1122.72

Offset: 4.3 RT

STA: 17450+76.7

Invert: 1122.76

Offset: 4.3 RT

STA: 17450+88.9

Existing WB ‘

Existing EB ‘

- 1.4615 %Existing Ditch

17441+00 17442+00 17443+00 17444+00 17445+00 17446+00 17447+00 17448+00 17449+00 17450+00 17451+00 17452+0017442+00 17443+00 17444+00 17445+00 17446+00 17447+00 17448+00 17449+00 17450+00 17451+00 17452+00

1,128.40

1,128.15

1,127.90

1,125.86

1,128.21

1,129.01

1,129.24

1,129.48

1,129.59

1,129.64

- 1.4615 %

17441+00 17442+00 17443+00 17444+00 17445+00 17446+00 17447+00 17448+00 17449+00 17450+00 17451+00 17452+00

1,129.16

1,128.38

1,130.49

1,126.80

1,126.22

1,125.30

1,124.98

1,124.56

1,124.96

1,127.14

1110

1115

1120

1125

1130

1135

1140

1145

1110

1115

1120

1125

1130

1135

1140

1145

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\060PP_001.dgn4:11:35 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SHE-6-002(113)330 1

Plan & Profile

US 2 & ND 18

Rest Area & Intersection Improvements

Sta 17441+00 to 17452+00

21239+24RCPF GF

1122.47

2 RCES(Fair)

24" X 98’ RCP(Good)

17450+76 - 6’ LT to S end

(Chain: SCL02)

21241+24RCPF GF

1122.58

21240-24RCPF GF

1122.62

20920+18CSPF FG

1122.76

2 R

CE

S(G

ood)

24"

X 6

4’ R

CP(G

ood)

8773+73 - ‘

(Chain: S

CL18)

21629TFO

20921-18CSPF FP

1123.22

2 CSES(Poor)

18" X 125’ CSP(Fair)

17451+52 - 5’ RT

(Chain: SCL02)

21689TFO

21242-24RCPF GP1123.25

2 RCES(Poor)

24" X 82’ RCP(Good)

17450+75 - 11’ RT to N end

(Chain: SCL02)

215772.65FT EW X 1.5FT NS BOX. PHOTO CJK126

Ped

TV

21568TVFO

21685TFO

21567TVFO

21576MIDCO

Mkr

TV

21569TVFO

21575-TVFO TO BOX

21688TFO

21580TVFO

21696TFO

1996UEC

2000UEC

21578+TVFO MIDCO FROM BOX

CA

BLE

MID-C

ON

T

MID-C

ON

T C

AB

LE

CE

NT

UR

Y LIN

K

21579TVFO

21574TVFO

21626TFO

21686TFO

21628TFO

21591+TVFO MIDCO

21693TFO

21592TVFO

21687TFO

2027WM

21583TVFO

21625TFO

2028WM

21630-TFO

21593

21638T

21690-TFO

21573TVFO

2026WM

21691+TFO CENTURY LINK

21586TVFO

21566TVFO

21641CENTURY LINK

Tel Ped21644

+T CENTURY LINK

CENTURY LINK

21640-T

21692TFO

21639T

21631CENTURY LINKPed

Tel

21642+T CENTURY LINK

CE

NT

UR

Y LIN

K

21637T

21695TFO

21645T

1997UEC

21627TFO

21643-T NO FURTHER MARKINGS

2001-UEC 3PHASE

21648T

21587TVFO

21649T

21650T

NDDOT

21683TFO

21646T

21647T

21681TFO

21459+TRM

Lg\S

m trees

21651T

21565TVFO

21460TRM

21461TRM

21462TRM

21466-TRM

21463TRM

21465TRM

21480+GRV1

21464TRM

21478+GRV

Gr

21671-TFO NO FURTHER MARKINGS

51728SGN

21652T

51713SGN

51704-SGNS

21675NO FURTHER MARKINGS

21674T

21672+T CENTURY LINK

CE

NT

UR

Y LIN

K

21481GRV1

1081TRM

1077TRM

51672-SGNS

51707-SGNS

51690SGN

1079TRM

21483GRV

21570TVFO

21673T

21251+18CSPF PP COMPLETELY BURIED

1126.98

Buried

2 CSES(Poor)

18" X 81’ CSP(Poor)

17443+74 - 98’ LT

(Chain: SCL02)

21564TVFO

51714SGN

1075TRM

51671+SGNS

Sign

21037-18CSPF GG

1127.2

8

2 CSES(Good)

18" X 68’ CSP(Good)

17443+74 - 2’ LT

(Chain: SCL02)

21653T

51705SGN

51691SGN

20271TRM

21036+18CSPF GG

1127.49

51703+SGNS

Sign

21677-T NO FURTHER MARKINGS

21498GRV1

21496GRV

21670TFO

CE

NT

UR

Y LIN

K

CENTURY LINK

1073TRM

21252-18CSPF PP COMPLETELY BURIED

1127.8

1

21585TVFO

1566ASP2

21584TVFO

1572ASP2

1569ASP2

21581TVFO

21510TRM

1570ASP1

50188ASP

21684TFO

21694TFO

1573ASP1

1589+ASP2

1575-ASP2

1567ASP1

21572TVFO

51712SGN

50280ASP

20414ASP1

20413ASP2

20425ASP2

50273ASP

20431ASP2

1998UEC

21654T

21582TVFO

20428ASP2

50187ASP

1592ASP2

214403"T W/ REFLECTOR

1071TRM

20422ASP2

209223"T W/ REFLECTOR

1576-ASP1

50310ASP

51729SGN

51706+SGNS

Sign

51727SGN

1590+ASP1

21024GRV

20432ASP1

50274ASP

1595ASP2

21016ASP2

20416ASP2

50279ASP

20412ASP2

51266ASP

21029GRV

51450ASP

20426ASP1

21019ASP2

1593ASP1

21020-ASP1

21676+T CENTURY LINK

21021+GRV

20427ASP1

21521TRM

51267-ASP

20419ASP2

20421ASP1

51449+ASP TOE

50186+ASP TOE

50278+ASP TOE

21499GRV1

1999UEC

51560+ASP TOP

21571TVFO

51268+ASP TOP

21032GRV

50275ASP

51711SGN

51265ASP

21501GRV

51451ASP

21015ASP2

21025GRV

50276ASP

51269ASP

1596ASP1

20415ASP1

51262ASP

20775ASP2

21026ASP

21028GRV

50277-ASP

21027ASP

21507-GRV1

51263ASP

20764GRV

21505-GRV

20420ASP1

21022-ASP1

50311ASP

20924+ASP2

21508+TRM

51458ASP

21023+ASP

Asph

Asph

207683"T W/ REFLECTOR

20763GRV

1057TRM

51264ASP

21509TRM

51461ASP

50312-ASP

51261ASP

21522TRM

51271ASP

1598ASP2

51459ASP

51456ASP

51455ASP

51270ASP

51457ASP

51258ASP

21034-GRV

51452ASP

51272ASP

20411ASP1

51259ASP

20774ASP2

20773-GRV

51460ASP

1069TRM

51462ASP

51260ASP

51454ASP

51273ASP

51453ASP

51463ASP

1055TRM

51274ASP

51561ASP

21030ASP

21017ASP1

21018ASP1

51275ASP

1053TRM

21682TFO

51569ASP

51464ASP

21031ASP

20410ASP1

1059TRM

20772GRV

51465ASP

51276ASP

21012ASP2

51277ASP

51280ASP

51570ASP

51567ASP

51279ASP

1051TRM

21014ASP1

51568ASP

20777+ASP1

51565ASP

51564ASP

51566ASP

20765ASP2

51571ASP

51278ASP

20925ASP2

51466ASP

51281ASP

21011ASP2

51572ASP

20769GRV

21008ASP2

51562ASP

20767GRV

1604ASP2

21033-ASP20923

+ASP1

20766ASP2

51563ASP

51725SGN

20762ASP2

20771ASP2

51467ASP

20770ASP2

1599ASP1

51573ASP

1601ASP2

1607ASP2

51574ASP51468

ASP

51575ASP

MID-CONT CABLE

20928ASP2

Lg\Sm trees

51710-SGNS

21007ASP221004

ASP2

20761-ASP1

51576ASP

21523TRM

20926ASP1

1610ASP2

21013ASP1

51469ASP

51577ASP

20999ASP2

1602ASP1

21010ASP1

20929ASP2

1049TRM

1374+ASP2

1605ASP1

1613ASP2

1067TRM

1608ASP1

1061TRM

51470ASP

21009ASP1

20927ASP1

20932ASP2

1616-ASP2

51579ASP

51578ASP

20998ASP2

20933ASP2

20936ASP2

1611ASP1

1045TRM

1377ASP2

21561TVFO

21669TFO

1047TRM

20930ASP1

51471ASP

20937ASP2

21534-TRM

21006ASP1

1614ASP1

21003ASP1

51580ASP

21000ASP1

51472ASP

1380ASP2

1668+OH1

25.7’ near 17443+45 EB

26.1’ near 17443+32 EB

24.2’ near 17443+42 WB

24.9’ near 17443+27 WB

OH clerance @ ‘

1375+ASP1

1617-ASP1

1913-TRM

20931ASP1

20940ASP2

1383ASP2

20993ASP2

20997ASP1

1378ASP1

1912TRM

51581ASP

20941ASP2

1667+OH

20934ASP1

1063TRM

20935ASP1

1911TRM

1043TRM

1381ASP1

51582-ASP

1065TRM

1041TRM

51473ASP

1386ASP2

20938ASP1

1900+TRM

Lg\Sm trees

1384ASP1

20994ASP1

20944ASP2

20992ASP2

1389ASP2

1899-GRV1898

GRV

20939ASP1

21560TVFO

1039TRM

51583+ASP TOP

51709+SGNS

Sign

51751-OH

1910TRM

51474ASP

1901TRM

20942ASP1

51584ASP

20945ASP2

1387ASP1

1897GRV

20991ASP1

20987ASP2

1392ASP2

1908!HG

20943ASP1

1037TRM

1902TRM

1903TRM

1390ASP1

21563TVFO

51475ASP

20948ASP2

1909TRM

21562TVFO

51585ASP

1905+HG

21655T

1904TRM

1395ASP2

21657T

20946ASP1

20988ASP1

208533"T W/ REFLECTOR

20949ASP2

1398ASP2

1393ASP1

20986ASP2

1896GRV

1894GRV

21668TFO

211723"T W/ REFLECTOR

51476ASP

20947ASP1

1396ASP1

51586ASP

20952ASP2

20964GRV

1907HG

1401ASP2

51726SGN

1906HG

Bush

1035TRM

1895GRV

20985ASP1

21180GRV

21177GRV

1816GRV

20950ASP1

1399ASP1

20961GRV

51484ASP

1805ASP

20963ASP

20969GRV

1404ASP2

1893GRV

51587ASP

20981ASP2

20953ASP2

20974-GRV

51598ASP

1815GRV

21178ASP

21179ASP

51477ASP

1402ASP1

20970GRV

20951ASP1

20973GRV

20968ASP

51708SGN

20962ASP

51483ASP

1804ASP

21181GRV

20956ASP2

21176GRV

21656T

1407ASP2

1807ASP

51588ASP

1892GRV

20980ASP2

1405ASP1

51599ASP

20982ASP1

1806ASP51499

ASP

51597ASP

51498ASP

20957-ASP2

20960+GRV

51601ASP

20975+ASP2

20954ASP1

1814GRV

21667TFO

51482ASP

21175ASP

1803ASP

1891+GRV

21658T

51478ASP

21182ASP

51600ASP

20972-ASP

21184-GRV

51481ASP

21173GRV

20971ASP

20959+ASP

51596ASP

51602ASP

1410ASP2

20955ASP1

51480ASP

21186+ASP2

1817GRV

1808ASP

51589ASP

1408ASP1

51595ASP

51479ASP

20958-ASP1

1827-GY

1802ASP

20979ASP1

51500ASP

51594ASP

1828+GY

1801+ASP

21183-ASP

1826+GY

20976+ASP1

51750+OH

51603ASP

1413ASP2

51593ASP

51592ASP

51590ASP

1411ASP1

1829-GY

1669-OH1

21174ASP

1809ASP

21187ASP2

51591ASP

1813GRV

21185+ASP1

21666TFO

1416ASP2

51604ASP51501

ASP

21146-ASP2

1818GRV

21166+GRV21144

ASP2

1414ASP1

51502ASP

1810ASP

21190ASP2

1812+GRV

Gr

1419ASP2

21188ASP1

1819GRV

1811-ASP

21167+ASP

51605ASP

1670-OH

21665+TFO CENTURY LINK

CENTURY LINKCENTURY LINK

51606ASP

1417ASP1

21191ASP2

51503ASP

51607ASP

1422ASP2

21141ASP2

21189ASP1

1420ASP1

1820-GRV

1425ASP2

21194ASP2

21145-ASP1

51504ASP

21192ASP1

21138ASP2

51608ASP

1423ASP1

21195ASP2

21140ASP1

21193ASP1

51505ASP

1426ASP1

51609ASP

21135ASP2

21196ASP1

21132ASP2

21139ASP1

51506ASP

51610ASP

51507ASP

21134ASP1

51611ASP

51508ASP

51612ASP

21133ASP1

Asph

51613ASP

Page 6: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

to avoid fiber opticNDDOT contractorNo Conflict

17455

+00

17460

+00

B wire

EL

WSV

TV Mkr Tel Ped

E Mtr

ND

DO

T

NDDOT

CENTURY LINK

CENTURY LINK

LIN

K lines

2 C

EN

TU

RY

LIN

K lines

2 C

EN

TU

RY

2 CENTURY LINK lines

CENTURY LINK

Mkr

TV Ped

TV

line

pro

pane

ND

DO

T

Lg\Sm trees

TRI-CNTY WU

TRI-

CN

TY W

U

US 2 WB

US 2 EB

R 75’

15:1

15:1

16’

4’

12’

4’

22’ LT

+56.00

78’ LT

+48.99

22’ LT

+86.05

34’ LT

+66.05

38’ LT

+66.05

78’ LT

+84.45

69’ LT

+64.45

ND 1

8

6.9’ RT

+23.00

ND 1

8

62’ LT

+64.45

15:1

Ex. ROW

Ex. ROW

R 75’

Inv 1125.4

Sta +22.2, OS 14.6’ Rt

18" CMP w/ TES

1,126.50

+ 0.0452 %

VPI 17454+65.00

EL 1,126.18

VPI 17454+41.45

EL 1,125.32

VPI 17454+22.26

EL 1,126.86

+ 3.6

612

%

- 8.0000 %

- 0.1766 %

VPI 17452+16.00

EL 1,127.22

- 6.0570 %

1,129.22

Proposed 18" Pipe

Proposed Ditch

Invert: 1122.72

Offset: 4.3 RT

STA: 17450+76.7

Invert: 1122.76

Offset: 4.3 RT

STA: 17450+88.9 Invert: 1125.40

Offset: 14.6’ RT

STA: 17454+22.2

Existing WB ‘

Existing EB ‘

Invert: 1123.22

Offset: 5.8’ RT

STA: 17452+14.5

1.000%Existing Ditch

17452+00 17453+00 17454+00 17455+00 17456+00 17457+00 17458+00 17459+00 17460+00 17461+00 17462+0017452+00 17453+00 17454+00 17455+00 17456+00 17457+00 17458+00 17459+00 17460+00 17461+00

1,126.47

1,126.42

1,126.38

1,126.33

1,126.29

1,126.24

1,126.20

1,126.90

1,127.07

1,128.19

1.000%

17452+00 17453+00 17454+00 17455+00 17456+00 17457+00 17458+00 17459+00 17460+00 17461+00 17462+00

1,127.70

1,125.08

1,123.78

1,123.51

1,123.80

1,127.71

1,123.49

1,123.34

1,123.02

1,123.06

1,124.09

1110

1115

1120

1125

1130

1135

1140

1145

1110

1115

1120

1125

1130

1135

1140

1145

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\060PP_002.dgn4:11:37 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

SHE-6-002(113)330 2

Plan & Profile

US 2 & ND 18

Rest Area & Intersection Improvements

Sta 17452+00 to 17462+00

TV Mkr

1123.01

2 CSES(Poor)

18" X 75’ CSP(Poor)

17456+82 - 0’ LT

(Chain: SCL02)

1123.07

1123.13

18" X 46’ CSP(Fair) - 2 CSES(Poor)

17456+88 - 164’ LT to NE end

17456+46 - 145’ LT to SW end

(Chain: SCL02)

1123.221123.30

Tel Ped

Ped

TV

2 CENTURY LINK lines

Mkr

TV

GMW

CA

BLE

MID-C

ON

T

MID-C

ON

T C

AB

LE

1123.76

MID-CONT CABLE

pad

Conc

CENTURY LINK

Asph

TRI-CNTY WU

TRI-

CN

TY W

U

CENTURY LINK

Conc

NDDOT

Sign

Conc

line

pro

pane

ND

DO

T WSV

CENTURY LINK

LIN

K lines

2 C

EN

TU

RY

LIN

K lines

2 C

EN

TU

RY

Conc

ND

DO

T

E Mtr

Sign

Sign

EL

Sign

Sign

Gr

CENTURY LINK

Gr

B wire

Asph

AsphAsph

Page 7: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

Item Sta. Offset Elev. (ft)

A 103+59.19 26’ LT 1125.17

B 103+69.43 42’ LT 1124.08

C 104+46.35 77’ LT 1124.69

D 106+22.74 77’ LT 1124.95

E 106+28.37 78’ LT 1124.94

F 107+10.93 22’ LT 1125.18

G 106+50.93 38’ RT 1125.36

H 106+39.27 38’ RT 1125.34

I 105+89.25 29’ RT 1125.44

J 105+91.23 11’ LT 1126.29

K 105+31.53 29’ RT 1125.35

L 105+31.53 0’ 1125.96

M 105+31.53 11’ LT 1125.81

N 103+59.19 11’ LT 1125.56

O 102+23.30 39’ RT 1123.77

P 101+21.84 23’ RT 1125.23

Q 100+72.96 28’ RT 1126.11

R 100+28.00 75’ RT 1126.72

at own expenserelocate or adjustutility company to Mid-Cont. facality,Conflict with

at own expenserelocate or adjustutility company to Buried electric line,Conflict with

avoid buried cableshould be able to NDDOT contractorNo Conflict

12.0

000

at own expenserelocate or adjustutility company to Fiber optic line,Conflict with

US 2 W

B

US 2 E

B

ND 18

R 50’

R 50’

R 100’

R 60’

R 60’

A

B

CD E

F

GHI

J

K

L

MN

O

P

Q

R

Elev: 1126.62

+50.93, 22.5’ LT

Center of Bulb

Ex. ROW

17450+00

17455+00

17460+00

8780+00

POT 100+00.00 100+00

PC 101+18.94

PT 101

+97.43

PI 101

+60.34

105

+00

PO

T 108

+30.56

Curve R_AREA-1

PI = 101+60.34 Simple Curve

R = 100.00

T = 41.39

L = 78.49

EL

EL

TV M

kr

Tel Ped

Tel Ped

E Mtr

ND

DOT

ND

DOT

ND

DOT

MID-C

ONT C

ABLE

MID-C

ONT C

ABLE

CABLE

MID-C

ONT

MID-C

ONT C

ABLE

CENTUR

Y LIN

K

CENTUR

Y LIN

K

CENTUR

Y LIN

K

CENTUR

Y LIN

K

CE

NT

UR

Y LIN

K

CENTUR

Y LIN

K

CENTURY LINK

CENTUR

Y LIN

K

CENTUR

Y LIN

K

2 CENTURY L

INK lines

CENTURY LINK

2 CENTURY LINK lines

CENTUR

Y LIN

K

CENTURY LIN

K

CENTUR

Y LIN

K

LINK lines

2 CENTUR

Y

MkrT

V

PedTel

PedT

V

line

propane

NDDOT

TRI-C

NTY W

U

TRI-C

NTY W

U

TRI-C

NTY W

U

Inv 11

25.4

Sta +22.2, O

S 14.6’ Rt

18" C

MP w/ T

ES

Inv 1123.06

Sta +55, OS 62.4 Lt (SCL18)

18" CMP w/ FES

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\060PP_003.dgn4:11:38 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

SHE-6-002(113)330 60 3

US 2 & ND 18

Rest Area & Intersection Improvements

Plan & Profile

Sta 100+00 to 108+00

1121.81

1122.29

1122.41

1122.47

CENTURY LINK

CENTURY LINK

1122.55

1122.58

1122.62

1122.67

1122.76

TV M

kr

1123.01

1123.07

1123.13

1123.22

1123.30

Tel Ped

PedT

V

2 CENTURY L

INK lines

2 CENTURY LINK lines

MkrT

V

GM

W

CABLE

MID-C

ONT

MID-C

ONT C

ABLE

CENTUR

Y LIN

K

CENTUR

Y LIN

K

1123.76

MID-C

ONT C

ABLE

padConc

CENTUR

Y LIN

K

Tel Ped

CE

NT

UR

Y LIN

K

PedTel

CENTUR

Y LIN

K

1124.41

Asp

h

24" Type 1

TRI-C

NTY W

U

TRI-C

NTY W

U

Tel Ped

CENTUR

Y LIN

K

CENTURY LIN

K

EL

Lg\S

m trees

Conc

ND

DOT

ND

DOT

CENTUR

Y LIN

K

LINK lines

2 CENTUR

Y

Asp

h

Lg\S

m tre

es

Sign

Gr

Conc

line

propane

NDDOT

Sign

WSV

Sign

Conc

TRI-C

NTY W

U

Lg\S

m trees

CENTUR

Y LIN

K

CENTUR

Y LIN

K

Conc

ND

DOT

E Mtr

Sign

Sign

EL

Sign

Sign

CENTUR

Y LIN

K

Asp

h

Asp

h

Asp

h

Asp

h

MID-C

ONT C

ABLE

Page 8: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150

150

1125 1125

100+50.00

1125 1125

100+63.00

1125 1125

100+75.00

1125 1125

101+00.00

1125 1125

101+25.00

1125 1125

101+50.00

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-T_EOP_R

RA_access-DG_Tie

RA_access-B1_EOP_R

RA_access-T_3

RA_access-EOP_1_R

RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-B1_EOP_1_R

RA_access-DG_EOSB2_R

RA_access-

RA_access-DG_EOP_1_R

RA_access-B1_EOP_L

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-B1_CL

RA_access-T_CL

RA_access-T_EOP_R

RA_access-DNC_1_L

RA_access-DG_Tie

RA_access-DNC_2_L

RA_access-B1_EOP_R

RA_access-T_3 RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-DG_EOP_L

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-T_EOP_L

RA_access-DG_EOSB2_R

RA_access-DG_CL

RA_access-B1_EOP_L

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-B1_CL

RA_access-T_CL

RA_access-T_EOP_R

RA_access-DNC_1_L

RA_access-DG_Tie

RA_access-DNC_2_L

RA_access-B1_EOP_R

RA_access-T_3 RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-DG_EOP_L

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-T_EOP_L

RA_access-DG_EOSB2_R

RA_access-DG_CL

RA_access-B1_EOP_L

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-B1_CL

RA_access-T_CL

RA_access-T_EOP_R

RA_access-DNC_1_L

RA_access-DG_Tie

RA_access-DNC_2_L

RA_access-B1_EOP_R

RA_access-T_3 RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-DG_EOP_L

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-T_EOP_L

RA_access-DG_EOSB2_R

RA_access-DG_CL

RA_access-B1_EOP_L

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-B1_CL

RA_access-T_CL

RA_access-T_EOP_R

RA_access-DNC_1_L

RA_access-DG_Tie

RA_access-DNC_2_L

RA_access-B1_EOP_R

RA_access-T_3 RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-DG_EOP_L

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-T_EOP_L

RA_access-DG_EOSB2_R

RA_access-DG_CL

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-T_EOP_R

RA_access-DG_Tie

RA_access-B1_EOP_R

RA_access-T_3

RA_access-EOP_1_R

RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-B1_EOP_1_R

RA_access-DG_EOSB2_R

RA_access-

RA_access-DG_EOP_1_R

4:1

4:1

4:1

4:1

4:14:1

4:1 4:1

4:14:1

4:14:1

approximate

telephone line

crossing

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:24 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 1

Page 9: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150

150

1125 1125

101+75.00

1125 1125

102+00.00

1125 1125

104+00.00

1125 1125

104+25.00

1125 1125

104+50.00

1125 1125

104+75.00

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-T_EOP_R

RA_access-DG_Tie

RA_access-B1_EOP_R

RA_access-T_3

RA_access-EOP_1_R

RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-B1_EOP_1_R

RA_access-DG_EOSB2_R

RA_access-

RA_access-DG_EOP_1_R

RA_access-DG_EOP_R

RA_access-T_Tie

RA_access-T_EOP_R

RA_access-DG_Tie

RA_access-B1_EOP_R

RA_access-T_3

RA_access-EOP_1_R

RA_access-T_4 RA_access-T_5

RA_access-T_1_R

RA_access-DG_3

RA_access-B1_EOSP_RRA_access-B1_EOSB1_R

RA_access-DNC_1_R

RA_access-DG_4

RA_access-DNC_2_R

RA_access-DG_5

RA_access-B1_EOP_1_R

RA_access-DG_EOSB2_R

RA_access-

RA_access-DG_EOP_1_R

4:14:1

4:14:1

ParkLot-DNC_21_L

ParkLot-B1_EOP_L

ParkLot-DNC_11_L

ParkLot-T_1_L

ParkLot-DG_Tie_L

ParkLot-T_3_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-T_Tie_L

ParkLot-DG_EOSB2_LParkLot-DG_3_L

ParkLot-DG_CL_L

ParkLot-DG_5_L

ParkLot-EOP1_L

ParkLot-DG_EOP_L

ParkLot-B1_CL_LParkLot-T_EOP_L

ParkLot-

4:14:1

1.5%

ParkLot-DNC_21_L

ParkLot-B1_EOP_L

ParkLot-DNC_11_L

ParkLot-T_1_L

ParkLot-DG_Tie_L

ParkLot-T_3_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-T_Tie_L

ParkLot-DG_EOSB2_L

ParkLot-DG_3_L

ParkLot-DG_CL_L

ParkLot-DG_5_L

ParkLot-EOP1_L

ParkLot-DG_EOP_L

ParkLot-B1_CL_L

ParkLot-T_EOP_L

ParkLot-

4:1 4:11.5%

ParkLot-DNC_21_L

ParkLot-B1_EOP_L

ParkLot-DNC_11_L

ParkLot-T_1_L

ParkLot-DG_Tie_L ParkLot-T_3_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-T_Tie_L

ParkLot-DG_EOSB2_L

ParkLot-DG_3_L

ParkLot-DG_CL_L

ParkLot-DG_5_L

ParkLot-EOP1_L

ParkLot-DG_EOP_L

ParkLot-B1_CL_L

ParkLot-T_EOP_L

ParkLot-

4:14:1

1.5%

ParkLot-DNC_21_L

ParkLot-B1_EOP_L

ParkLot-DNC_11_L

ParkLot-T_1_L

ParkLot-DG_Tie_LParkLot-T_3_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-T_Tie_L

ParkLot-DG_EOSB2_L

ParkLot-DG_3_L

ParkLot-DG_CL_L

ParkLot-DG_5_L

ParkLot-EOP1_L

ParkLot-DG_EOP_L

ParkLot-B1_CL_L

ParkLot-T_EOP_L

ParkLot-

4:1 4:11.5%

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:24 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 2

Page 10: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150

150

1125 1125

105+00.00

1125 1125

105+25.00

1125 1125

105+50.00

1125 1125

105+75.00

1125 1125

106+00.00

ParkLot-DNC_21_L

ParkLot-B1_EOP_L

ParkLot-DNC_11_L

ParkLot-T_1_L

ParkLot-DG_Tie_LParkLot-T_3_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-T_Tie_L

ParkLot-DG_EOSB2_LParkLot-DG_3_L

ParkLot-DG_CL_L

ParkLot-DG_5_L

ParkLot-EOP1_L

ParkLot-DG_EOP_L

ParkLot-B1_CL_L

ParkLot-T_EOP_L

ParkLot-

ParkLot-DNC_21_L

ParkLot-B1_EOP_L

ParkLot-DNC_11_L

ParkLot-T_1_L

ParkLot-DG_Tie_L

ParkLot-T_3_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-T_Tie_L

ParkLot-DG_EOSB2_LParkLot-DG_3_L

ParkLot-DG_CL_L

ParkLot-DG_5_L

ParkLot-EOP1_L

ParkLot-DG_EOP_L

ParkLot-B1_CL_L

ParkLot-T_EOP_L

ParkLot-

ParkLot-DG_EOP_R

ParkLot-B1_EOP_L

ParkLot-B1_CL

ParkLot-T_1_L

ParkLot-T_EOP_R

ParkLot-T_CL

ParkLot-DG_Tie_L

ParkLot-T_3_L

ParkLot-B1_CROWN_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-B1_EOP_R

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-DG_CROWN_L

ParkLot-T_Tie_L

ParkLot-T_1_R

ParkLot-DG_EOSB2_LParkLot-DG_3_L

ParkLot-DG_Tie_R

ParkLot-T_3_R

ParkLot-DG_5_L

ParkLot-DNC_1_R

ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R

ParkLot-DG_EOP_L

ParkLot-T_5_R

ParkLot-DNC_2_R

ParkLot-T_Tie_R

ParkLot-DG_EOSB2_R

ParkLot-T_CROWN_L

ParkLot-DG_3_R

ParkLot-T_EOP_L

ParkLot-DG_CL

ParkLot-DG_5_R

ParkLot-DG_EOP_R

ParkLot-B1_EOP_L

ParkLot-B1_CL

ParkLot-T_1_L

ParkLot-T_EOP_R

ParkLot-T_CL

ParkLot-DG_Tie_LParkLot-T_3_L

ParkLot-B1_CROWN_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-B1_EOP_R

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-DG_CROWN_L

ParkLot-T_Tie_L

ParkLot-T_1_R

ParkLot-DG_EOSB2_L

ParkLot-DG_3_L

ParkLot-DG_Tie_R

ParkLot-T_3_R

ParkLot-DG_5_L

ParkLot-DNC_1_R

ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R

ParkLot-DG_EOP_L

ParkLot-T_5_R

ParkLot-DNC_2_R

ParkLot-T_Tie_R

ParkLot-DG_EOSB2_R

ParkLot-T_CROWN_L

ParkLot-DG_3_R

ParkLot-T_EOP_L

ParkLot-DG_CL

ParkLot-DG_5_R

ParkLot-DG_EOP_R

ParkLot-B1_EOP_L

ParkLot-B1_CL

ParkLot-T_1_L

ParkLot-T_EOP_R

ParkLot-T_CL

ParkLot-DG_Tie_L

ParkLot-T_3_L

ParkLot-B1_CROWN_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-DNC_1_L

ParkLot-B1_EOP_R

ParkLot-T_5_L

ParkLot-DNC_2_L

ParkLot-DG_CROWN_L

ParkLot-T_Tie_L

ParkLot-T_1_R

ParkLot-DG_EOSB2_L

ParkLot-DG_3_L

ParkLot-DG_Tie_R

ParkLot-T_3_R

ParkLot-DG_5_L

ParkLot-DNC_1_R

ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R

ParkLot-DG_EOP_L

ParkLot-T_5_R

ParkLot-DNC_2_R

ParkLot-T_Tie_R

ParkLot-DG_EOSB2_R

ParkLot-T_CROWN_L

ParkLot-DG_3_R

ParkLot-T_EOP_L

ParkLot-DG_CL

ParkLot-DG_5_R

4:14:1

1.5%

4:14:1

1.5%

4:14:1

4:1 4:1

4:1 4:14:14:1

4:1 4:14:1 4:1

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:25 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 3

Page 11: State, 2 Location Comments Utility Type of Facility ... 27/SHE-6-002(113)330 Utility...r 5 4 w r 5 5 w r 5 3 w r 5 4 w t 151n t 152n office of project development larimore pcn 20140

00

00

1010

1010

2020

2020

3030

3030

4040

4040

5050

5050

6060

6060

7070

7070

8080

8080

9090

9090

100100

100100

110110

110110

120120

120120

130130

130130

140140

140140

150

150

1115 1115

1120 1120

1125 1125

106+25.00

1120 1120

1125 1125

106+50.00

1115 1115

1120 1120

1125 1125

106+75.00

1115 1115

1120 1120

1125 1125

107+00.00

ParkLot-DG_EOP_R

ParkLot-B1_EOP_L

ParkLot-B1_CL

ParkLot-T_1_L

ParkLot-T_EOP_R

ParkLot-T_CL

ParkLot-T_3_L

ParkLot-B1_CROWN_L

ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L

ParkLot-B1_EOP_R

ParkLot-DG_CROWN_L

ParkLot-T_1_R

ParkLot-DG_EOSB2_L

ParkLot-DG_3_L

ParkLot-DG_Tie_R

ParkLot-T_3_R

ParkLot-DNC_1_R

ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R

ParkLot-DG_EOP_L ParkLot-T_5_R

ParkLot-DNC_2_R

ParkLot-T_Tie_R

ParkLot-DG_EOSB2_R

ParkLot-T_CROWN_L

ParkLot-DG_3_R

ParkLot-T_EOP_L

ParkLot-DG_CL

ParkLot-DG_5_R

Bulb-target

Bulb-DG_Tie_L

Bulb-T_5_L

Bulb-T_Tie_L

Bulb-DG_5_L

Bulb-DNC_1_R

Bulb-DNC_2_R

crossing

Exst Line Fiber Optic

approximate

ParkLot-DG_EOP_R

ParkLot-B1_CL

ParkLot-T_EOP_R

ParkLot-T_CLParkLot-B1_CROWN_L

ParkLot-B1_EOP_RParkLot-DG_CROWN_L

ParkLot-T_1_R

ParkLot-DG_Tie_R

ParkLot-T_3_R

ParkLot-DNC_1_R

ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R

ParkLot-T_5_R

ParkLot-DNC_2_R

ParkLot-T_Tie_R

ParkLot-DG_EOSB2_R

ParkLot-T_CROWN_L

ParkLot-DG_3_R

ParkLot-DG_CL

ParkLot-DG_5_R

Bulb-B1_EOP_L

Bulb-target

Bulb-T_1_L

Bulb-DG_Tie_L

Bulb-T_3_L

Bulb-B1_EOSB1_LBulb-B1_EOSP_L

Bulb-T_5_L

Bulb-T_Tie_L

Bulb-DG_EOSB2_L

Bulb-DG_3_LBulb-DG_5_L

Bulb-DNC_1_R

Bulb-DG_EOP_L

Bulb-DNC_2_R

Bulb-T_EOP_L

crossing

Exst Line Fiber Optic

approximate

US 2 WB LT-DG_Tie_L

US 2 WB LT-DNC_1_L

US 2 WB LT-DG_Break

US 2 WB LT-DNC_2_L

US 2 WB LT-T_Tie_L US 2 WB LT-T_Break

Bulb-B1_EOP_L

Bulb-B1_EOP_L

Bulb-target

Bulb-target

Bulb-T_1_L

Bulb-T_1_L

Bulb-DG_Tie_L

Bulb-T_3_L

Bulb-T_3_L

Bulb-B1_EOSB1_L

Bulb-B1_EOSB1_L

Bulb-B1_EOSP_L

Bulb-B1_EOSP_L

Bulb-T_5_L

Bulb-T_Tie_L

Bulb-DG_EOSB2_L

Bulb-DG_EOSB2_L

Bulb-DG_3_L

Bulb-DG_3_LBulb-DG_5_L

Bulb-DNC_1_R

Bulb-DG_EOP_L

Bulb-DG_EOP_L

Bulb-DNC_2_R

Bulb-T_EOP_L

Bulb-T_EOP_L

crossing

Exst Line Fiber Optic

approximate

US 2 WB LT-DG_Tie_L

US 2 WB LT-DNC_1_L

US 2 WB LT-DG_Break

US 2 WB LT-DNC_2_L

US 2 WB LT-T_Tie_LUS 2 WB LT-T_Break

Bulb-B1_EOP_L

Bulb-B1_EOP_L

Bulb-target

Bulb-target

Bulb-T_1_L

Bulb-T_1_L

Bulb-DG_Tie_L

Bulb-T_3_L

Bulb-T_3_L

Bulb-B1_EOSB1_L

Bulb-B1_EOSB1_L

Bulb-B1_EOSP_L

Bulb-B1_EOSP_L

Bulb-T_5_L

Bulb-T_Tie_L

Bulb-DG_EOSB2_L

Bulb-DG_EOSB2_L

Bulb-DG_3_L

Bulb-DG_3_LBulb-DG_5_L

Bulb-DNC_1_R

Bulb-DG_EOP_L

Bulb-DG_EOP_L

Bulb-DNC_2_R

Bulb-T_EOP_L

Bulb-T_EOP_L

crossing

Exst Line Fiber Optic

approximate

4:14:14:1 4:1

approximate

electric line

crossing

approximate

electric line

crossing

approximate

electric line

crossing

approximate

electric line

crossing

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:26 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 4