Conflict Summary Sheet.xls
Item #P&P Sh
#Approx. Sta.
From Approx. Sta. To
Approx. Qty Offset Location Comments Utility Type of Facility
1 State,
2 Utility Not/Reimbursable
MC01 2 17452+30. to 17452+30. NA NA NA Median In Right of way No Conflict NDDOT Should be able to avoid Midcontinent Communications Fiber Optic Line 2 Not reimbursable
MC02 3 107+20. to 107+20. 125 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Midcontinent Communications Fiber Optic Line 2 Not reimbursable
NE01 3 106+60. to 106+60. 150 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Nodak Electric Electric Line Buried 2 Not reimbursable
CL01 1 17450+25. to 17450+25. NA NA NA Median In Right of way No Conflict NDDOT Should be able to avoid Centurylink Fiber Optic Line 2 Not reimbursable
CL02 3 101+50. to 101+50. NA NA Cut Crossing In Right of way No Conflict NDDOT Should be able to avoid Centurylink Fiber Optic Line 2 Not reimbursable
CL03 3 106+45. to 106+45. 150 2 ft Cut Crossing In Right of way Adjust Utility Crossing for revised ditch Centurylink Fiber Optic Line 2 Not reimbursable
Contact information for Utility Facilities with or without ConflictsUtility Company Name and Address Contact Name Phone Number EmailMidco - 5030 Gateway Dr. Suite B., Grand Forks, ND 58203 Robert Johnson (701) 335-4228 [email protected] Electric Coop. Inc. - PO Box 13000, Grand Forks, ND 58208-3000 Steven Breidenbach (701)-746-4461 [email protected] - 125 S Dakota Ave, Sioux Falls, SD 57194 Dan Kaiser (605) 339 5656 [email protected] - 409 First Ave. North, Fargo, ND 58102 Caleb Walters (701) 241-3214 [email protected]
Approx. Maximum
Cut/Fill
R 5
4W
R 5
5W
R 5
3W
R 5
4W
T 151N
T 152N
OFFICE OF PROJECT DEVELOPMENT
Larimore
PCN 20140
SHE-6-002(113)330
Project
SHE-6-002(133)330 0.45 0.45
DESIGNERS
ND DEPARTMENT OF TRANSPORTATION
__________________________________________
APPROVED DATE _________________________
GRAND
FORKS
GO
LD
EN
VA
LLE
Y
CASS
RIC
HLA
ND
RANSOM
SARGENTDICKEY
LA MOURE
BARNES
KIDDER
LOGAN
MC IN
TOSH
BU
RLEIG
H
MORTON
GRANT
SIOUXADAMS
HETTINGER
SLOPE
BOWMAN EM
MO
NS
OLIVER
MERCER
STARKBIL
LIN
GS
DUNN
MC KENZIE
MC LEAN
SHERID
AN
WELLS
EDDY
FOSTER
GRIG
GS
STEELE
TRAILL
DIVIDE
WILLIAMS
BURKE
MO
UNTR
AIL
RE
NVIL
LE
WARD
MC H
EN
RY
BOTTINEAU
ROLLE
TTE
TO
WNER
CAVALIER
RA
MSEY
WALSH
PE
MBIN
A
NELS
ONBENSONP
IER
CE
STUTSMAN
STATE COUNTY MAP
11
SHE-6-002(113)330 20140
DESIGN DIVISION
SHE-6-002(113)330
Intersection of US 2 with ND 18
Grand Forks County
DESIGN DATA
Traffic Average Daily
Limited Access Control
Current 2013
Forecast 2033
Pass: 7320
Pass: 11001
Trucks: 770
Trucks: 1255
Total: 8090
Total: 12256
Design Speed: 70
Bridges:
Pavement Design Life 20 (years)
Minimum Sight Dist. for Stopping: 1616’
Clear Zone Distance: 32’
Design Accumulated One-way Flexible ESALs: 576455
STATE PROJECT NO.
ND
PCNNO.
SHEET
NO.
SECTION
DEPARTMENT OF TRANSPORTATION
NORTH DAKOTA
__________________________________________
APPROVED DATE _________________________
engineer under the laws of the state of ND.
and that I am a duly registered professional
prepared by me or under my direct supervision
I hereby certify that the attached plans were
3/10/2016 mdockter R:\project\60002330.113\design\DOTSC\Plan\001TS_Title Sheet.dgn4:11:28 PM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
JOB # 27
GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION
effective on the date the project is advertised.
Department of Transportation and the Supplemental Specifications
2014 Standard Specifications adopted by the North Dakota
GOVERNING SPECIFICATIONS:
Rest Area & Intersection Improvements
RP 330.300 to RP 330.750
Rest Area Improvements
US 2 WB
US 2 EB
ND 1
8
ND 1
8
US 2 WB
US 2 EB
Turn Lane Improvements
20199sf
4795sf3960sf
5359sf
5172 sf
10812 sf
3141 sf
939 sf
2011 sf
R: 54WT: 152NS: 30
R: 54WT: 152NS: 30
R: 55WT: 152NS: 36
R: 54WT: 152NS: 31
Rest A
rea
SHE-6-002(113)330 4 1
Scope of Work
US 2 & ND 18
Rest Area & Intersection Improvements
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\design\DOTSC\Plan\004SW_Scope of Work.dgn4:11:32 PM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
Utility Conflict Legend Sheet
at own expenserelocate or adjustutility company to Buried telephone,Conflict with
at own expenserelocate or adjustutility company to Fiber optic line,Conflict with
at own expenserelocate or adjustutility company to Buried electric line,Conflict with
billable to NDDOTrelocate or adjustutility company to Utility Pole,Conflict with
billable to NDDOTrelocate or adjustutility company to Utility Pole anchor,Conflict with
at own expenserelocate or adjustutility company to Utility Pole,Conflict with
at own expenserelocate or adjustutility company to Utility Pole anchor,Conflict with
earth around poleto leave existing NDDOT contractorNo Conflict
at own expenserelocate or adjustutility company to Gas line,Conflict with
billable to NDDOTrelocate or adjustutility company to Fiber optic line,Conflict with
billable to NDDOTrelocate or adjustutility company to Buried telephone,Conflict with
billable to NDDOTrelocate or adjustutility company to Buried electric line,Conflict with
billable to NDDOTrelocate or adjustutility company to Gas line,Conflict with
at own expenserelocate or adjustutility company to Cable/TV facality,Conflict with
billable to NDDOTrelocate or adjustutility company to Cable/TV facality,Conflict with
3/10/2016 R:\project\60002330.113\utilities\004UC_001_utility conflict legend.dgn
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
NA 1SHE-6-002(113)330
to avoid fiber opticNDDOT contractorNo Conflict
17445
+00
17450
+00
Tel Ped
25.7’ near 17443+45 EB
26.1’ near 17443+32 EB
24.2’ near 17443+42 WB
24.9’ near 17443+27 WB
OH clerance @ ‘
NDDOT
CE
NT
UR
Y LIN
K
CENTURY LINK
CE
NT
UR
Y LIN
K
Ped
Tel
Lg\S
m trees
Lg\Sm trees
Lg\Sm trees
US 2 WB
US 2 EB
15:124’ RT
+9.5724’ RT
+5.20
4’
12’
15:1
R 75’
80’ RT
+41.47
64’ RT
+52.71
40’ RT
+29.30
36’ RT
+29.30
ND 1
8
80’ RT
+32.5871’ RT
+52.58
ND 1
8
7.2’ LT
+72.75
15:1
R 75’
4’12’
16’
Ex. ROW
Ex. ROW
Inv 1126.40
Sta +14, OS 13.6’ Lt
24" RCP w/ TES
Sta +72.6, OS 5’ Lt
24" RCP bend
Inv 1123.59
Sta +75, OS 116.3’ Rt
24" RCP w/ TES
- 6.0570 %
1,129.22
1,128.40
+ 0.2500 %
VPI 17447+97.67
EL 1,125.66
VPI 17448+21.71
EL 1,127.70
+
8.50
00 %
VPI 17447+50.00
EL 1,127.81
- 4.5000 %
- 0.8112 %
VPI 17446+02.82
EL 1,129.00
- 0.2357 %
VPI 17443+69.43
EL 1,129.55
- 0.0505 %1,129.67
Proposed Ditch
Proposed 24" Pipe
Existing 18" CSP
+ 0.3663 %
Invert: 1126.40
Offset: 13.6 LT
STA: 17448+14
Invert: 1122.60
Offset: 1.8 LT
STA: 17450+74
Invert: 1122.72
Offset: 4.3 RT
STA: 17450+76.7
Invert: 1122.76
Offset: 4.3 RT
STA: 17450+88.9
Existing WB ‘
Existing EB ‘
- 1.4615 %Existing Ditch
17441+00 17442+00 17443+00 17444+00 17445+00 17446+00 17447+00 17448+00 17449+00 17450+00 17451+00 17452+0017442+00 17443+00 17444+00 17445+00 17446+00 17447+00 17448+00 17449+00 17450+00 17451+00 17452+00
1,128.40
1,128.15
1,127.90
1,125.86
1,128.21
1,129.01
1,129.24
1,129.48
1,129.59
1,129.64
- 1.4615 %
17441+00 17442+00 17443+00 17444+00 17445+00 17446+00 17447+00 17448+00 17449+00 17450+00 17451+00 17452+00
1,129.16
1,128.38
1,130.49
1,126.80
1,126.22
1,125.30
1,124.98
1,124.56
1,124.96
1,127.14
1110
1115
1120
1125
1130
1135
1140
1145
1110
1115
1120
1125
1130
1135
1140
1145
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\060PP_001.dgn4:11:35 PM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
SHE-6-002(113)330 1
Plan & Profile
US 2 & ND 18
Rest Area & Intersection Improvements
Sta 17441+00 to 17452+00
21239+24RCPF GF
1122.47
2 RCES(Fair)
24" X 98’ RCP(Good)
17450+76 - 6’ LT to S end
(Chain: SCL02)
21241+24RCPF GF
1122.58
21240-24RCPF GF
1122.62
20920+18CSPF FG
1122.76
2 R
CE
S(G
ood)
24"
X 6
4’ R
CP(G
ood)
8773+73 - ‘
(Chain: S
CL18)
21629TFO
20921-18CSPF FP
1123.22
2 CSES(Poor)
18" X 125’ CSP(Fair)
17451+52 - 5’ RT
(Chain: SCL02)
21689TFO
21242-24RCPF GP1123.25
2 RCES(Poor)
24" X 82’ RCP(Good)
17450+75 - 11’ RT to N end
(Chain: SCL02)
215772.65FT EW X 1.5FT NS BOX. PHOTO CJK126
Ped
TV
21568TVFO
21685TFO
21567TVFO
21576MIDCO
Mkr
TV
21569TVFO
21575-TVFO TO BOX
21688TFO
21580TVFO
21696TFO
1996UEC
2000UEC
21578+TVFO MIDCO FROM BOX
CA
BLE
MID-C
ON
T
MID-C
ON
T C
AB
LE
CE
NT
UR
Y LIN
K
21579TVFO
21574TVFO
21626TFO
21686TFO
21628TFO
21591+TVFO MIDCO
21693TFO
21592TVFO
21687TFO
2027WM
21583TVFO
21625TFO
2028WM
21630-TFO
21593
21638T
21690-TFO
21573TVFO
2026WM
21691+TFO CENTURY LINK
21586TVFO
21566TVFO
21641CENTURY LINK
Tel Ped21644
+T CENTURY LINK
CENTURY LINK
21640-T
21692TFO
21639T
21631CENTURY LINKPed
Tel
21642+T CENTURY LINK
CE
NT
UR
Y LIN
K
21637T
21695TFO
21645T
1997UEC
21627TFO
21643-T NO FURTHER MARKINGS
2001-UEC 3PHASE
21648T
21587TVFO
21649T
21650T
NDDOT
21683TFO
21646T
21647T
21681TFO
21459+TRM
Lg\S
m trees
21651T
21565TVFO
21460TRM
21461TRM
21462TRM
21466-TRM
21463TRM
21465TRM
21480+GRV1
21464TRM
21478+GRV
Gr
21671-TFO NO FURTHER MARKINGS
51728SGN
21652T
51713SGN
51704-SGNS
21675NO FURTHER MARKINGS
21674T
21672+T CENTURY LINK
CE
NT
UR
Y LIN
K
21481GRV1
1081TRM
1077TRM
51672-SGNS
51707-SGNS
51690SGN
1079TRM
21483GRV
21570TVFO
21673T
21251+18CSPF PP COMPLETELY BURIED
1126.98
Buried
2 CSES(Poor)
18" X 81’ CSP(Poor)
17443+74 - 98’ LT
(Chain: SCL02)
21564TVFO
51714SGN
1075TRM
51671+SGNS
Sign
21037-18CSPF GG
1127.2
8
2 CSES(Good)
18" X 68’ CSP(Good)
17443+74 - 2’ LT
(Chain: SCL02)
21653T
51705SGN
51691SGN
20271TRM
21036+18CSPF GG
1127.49
51703+SGNS
Sign
21677-T NO FURTHER MARKINGS
21498GRV1
21496GRV
21670TFO
CE
NT
UR
Y LIN
K
CENTURY LINK
1073TRM
21252-18CSPF PP COMPLETELY BURIED
1127.8
1
21585TVFO
1566ASP2
21584TVFO
1572ASP2
1569ASP2
21581TVFO
21510TRM
1570ASP1
50188ASP
21684TFO
21694TFO
1573ASP1
1589+ASP2
1575-ASP2
1567ASP1
21572TVFO
51712SGN
50280ASP
20414ASP1
20413ASP2
20425ASP2
50273ASP
20431ASP2
1998UEC
21654T
21582TVFO
20428ASP2
50187ASP
1592ASP2
214403"T W/ REFLECTOR
1071TRM
20422ASP2
209223"T W/ REFLECTOR
1576-ASP1
50310ASP
51729SGN
51706+SGNS
Sign
51727SGN
1590+ASP1
21024GRV
20432ASP1
50274ASP
1595ASP2
21016ASP2
20416ASP2
50279ASP
20412ASP2
51266ASP
21029GRV
51450ASP
20426ASP1
21019ASP2
1593ASP1
21020-ASP1
21676+T CENTURY LINK
21021+GRV
20427ASP1
21521TRM
51267-ASP
20419ASP2
20421ASP1
51449+ASP TOE
50186+ASP TOE
50278+ASP TOE
21499GRV1
1999UEC
51560+ASP TOP
21571TVFO
51268+ASP TOP
21032GRV
50275ASP
51711SGN
51265ASP
21501GRV
51451ASP
21015ASP2
21025GRV
50276ASP
51269ASP
1596ASP1
20415ASP1
51262ASP
20775ASP2
21026ASP
21028GRV
50277-ASP
21027ASP
21507-GRV1
51263ASP
20764GRV
21505-GRV
20420ASP1
21022-ASP1
50311ASP
20924+ASP2
21508+TRM
51458ASP
21023+ASP
Asph
Asph
207683"T W/ REFLECTOR
20763GRV
1057TRM
51264ASP
21509TRM
51461ASP
50312-ASP
51261ASP
21522TRM
51271ASP
1598ASP2
51459ASP
51456ASP
51455ASP
51270ASP
51457ASP
51258ASP
21034-GRV
51452ASP
51272ASP
20411ASP1
51259ASP
20774ASP2
20773-GRV
51460ASP
1069TRM
51462ASP
51260ASP
51454ASP
51273ASP
51453ASP
51463ASP
1055TRM
51274ASP
51561ASP
21030ASP
21017ASP1
21018ASP1
51275ASP
1053TRM
21682TFO
51569ASP
51464ASP
21031ASP
20410ASP1
1059TRM
20772GRV
51465ASP
51276ASP
21012ASP2
51277ASP
51280ASP
51570ASP
51567ASP
51279ASP
1051TRM
21014ASP1
51568ASP
20777+ASP1
51565ASP
51564ASP
51566ASP
20765ASP2
51571ASP
51278ASP
20925ASP2
51466ASP
51281ASP
21011ASP2
51572ASP
20769GRV
21008ASP2
51562ASP
20767GRV
1604ASP2
21033-ASP20923
+ASP1
20766ASP2
51563ASP
51725SGN
20762ASP2
20771ASP2
51467ASP
20770ASP2
1599ASP1
51573ASP
1601ASP2
1607ASP2
51574ASP51468
ASP
51575ASP
MID-CONT CABLE
20928ASP2
Lg\Sm trees
51710-SGNS
21007ASP221004
ASP2
20761-ASP1
51576ASP
21523TRM
20926ASP1
1610ASP2
21013ASP1
51469ASP
51577ASP
20999ASP2
1602ASP1
21010ASP1
20929ASP2
1049TRM
1374+ASP2
1605ASP1
1613ASP2
1067TRM
1608ASP1
1061TRM
51470ASP
21009ASP1
20927ASP1
20932ASP2
1616-ASP2
51579ASP
51578ASP
20998ASP2
20933ASP2
20936ASP2
1611ASP1
1045TRM
1377ASP2
21561TVFO
21669TFO
1047TRM
20930ASP1
51471ASP
20937ASP2
21534-TRM
21006ASP1
1614ASP1
21003ASP1
51580ASP
21000ASP1
51472ASP
1380ASP2
1668+OH1
25.7’ near 17443+45 EB
26.1’ near 17443+32 EB
24.2’ near 17443+42 WB
24.9’ near 17443+27 WB
OH clerance @ ‘
1375+ASP1
1617-ASP1
1913-TRM
20931ASP1
20940ASP2
1383ASP2
20993ASP2
20997ASP1
1378ASP1
1912TRM
51581ASP
20941ASP2
1667+OH
20934ASP1
1063TRM
20935ASP1
1911TRM
1043TRM
1381ASP1
51582-ASP
1065TRM
1041TRM
51473ASP
1386ASP2
20938ASP1
1900+TRM
Lg\Sm trees
1384ASP1
20994ASP1
20944ASP2
20992ASP2
1389ASP2
1899-GRV1898
GRV
20939ASP1
21560TVFO
1039TRM
51583+ASP TOP
51709+SGNS
Sign
51751-OH
1910TRM
51474ASP
1901TRM
20942ASP1
51584ASP
20945ASP2
1387ASP1
1897GRV
20991ASP1
20987ASP2
1392ASP2
1908!HG
20943ASP1
1037TRM
1902TRM
1903TRM
1390ASP1
21563TVFO
51475ASP
20948ASP2
1909TRM
21562TVFO
51585ASP
1905+HG
21655T
1904TRM
1395ASP2
21657T
20946ASP1
20988ASP1
208533"T W/ REFLECTOR
20949ASP2
1398ASP2
1393ASP1
20986ASP2
1896GRV
1894GRV
21668TFO
211723"T W/ REFLECTOR
51476ASP
20947ASP1
1396ASP1
51586ASP
20952ASP2
20964GRV
1907HG
1401ASP2
51726SGN
1906HG
Bush
1035TRM
1895GRV
20985ASP1
21180GRV
21177GRV
1816GRV
20950ASP1
1399ASP1
20961GRV
51484ASP
1805ASP
20963ASP
20969GRV
1404ASP2
1893GRV
51587ASP
20981ASP2
20953ASP2
20974-GRV
51598ASP
1815GRV
21178ASP
21179ASP
51477ASP
1402ASP1
20970GRV
20951ASP1
20973GRV
20968ASP
51708SGN
20962ASP
51483ASP
1804ASP
21181GRV
20956ASP2
21176GRV
21656T
1407ASP2
1807ASP
51588ASP
1892GRV
20980ASP2
1405ASP1
51599ASP
20982ASP1
1806ASP51499
ASP
51597ASP
51498ASP
20957-ASP2
20960+GRV
51601ASP
20975+ASP2
20954ASP1
1814GRV
21667TFO
51482ASP
21175ASP
1803ASP
1891+GRV
21658T
51478ASP
21182ASP
51600ASP
20972-ASP
21184-GRV
51481ASP
21173GRV
20971ASP
20959+ASP
51596ASP
51602ASP
1410ASP2
20955ASP1
51480ASP
21186+ASP2
1817GRV
1808ASP
51589ASP
1408ASP1
51595ASP
51479ASP
20958-ASP1
1827-GY
1802ASP
20979ASP1
51500ASP
51594ASP
1828+GY
1801+ASP
21183-ASP
1826+GY
20976+ASP1
51750+OH
51603ASP
1413ASP2
51593ASP
51592ASP
51590ASP
1411ASP1
1829-GY
1669-OH1
21174ASP
1809ASP
21187ASP2
51591ASP
1813GRV
21185+ASP1
21666TFO
1416ASP2
51604ASP51501
ASP
21146-ASP2
1818GRV
21166+GRV21144
ASP2
1414ASP1
51502ASP
1810ASP
21190ASP2
1812+GRV
Gr
1419ASP2
21188ASP1
1819GRV
1811-ASP
21167+ASP
51605ASP
1670-OH
21665+TFO CENTURY LINK
CENTURY LINKCENTURY LINK
51606ASP
1417ASP1
21191ASP2
51503ASP
51607ASP
1422ASP2
21141ASP2
21189ASP1
1420ASP1
1820-GRV
1425ASP2
21194ASP2
21145-ASP1
51504ASP
21192ASP1
21138ASP2
51608ASP
1423ASP1
21195ASP2
21140ASP1
21193ASP1
51505ASP
1426ASP1
51609ASP
21135ASP2
21196ASP1
21132ASP2
21139ASP1
51506ASP
51610ASP
51507ASP
21134ASP1
51611ASP
51508ASP
51612ASP
21133ASP1
Asph
51613ASP
to avoid fiber opticNDDOT contractorNo Conflict
17455
+00
17460
+00
B wire
EL
WSV
TV Mkr Tel Ped
E Mtr
ND
DO
T
NDDOT
CENTURY LINK
CENTURY LINK
LIN
K lines
2 C
EN
TU
RY
LIN
K lines
2 C
EN
TU
RY
2 CENTURY LINK lines
CENTURY LINK
Mkr
TV Ped
TV
line
pro
pane
ND
DO
T
Lg\Sm trees
TRI-CNTY WU
TRI-
CN
TY W
U
US 2 WB
US 2 EB
R 75’
15:1
15:1
16’
4’
12’
4’
22’ LT
+56.00
78’ LT
+48.99
22’ LT
+86.05
34’ LT
+66.05
38’ LT
+66.05
78’ LT
+84.45
69’ LT
+64.45
ND 1
8
6.9’ RT
+23.00
ND 1
8
62’ LT
+64.45
15:1
Ex. ROW
Ex. ROW
R 75’
Inv 1125.4
Sta +22.2, OS 14.6’ Rt
18" CMP w/ TES
1,126.50
+ 0.0452 %
VPI 17454+65.00
EL 1,126.18
VPI 17454+41.45
EL 1,125.32
VPI 17454+22.26
EL 1,126.86
+ 3.6
612
%
- 8.0000 %
- 0.1766 %
VPI 17452+16.00
EL 1,127.22
- 6.0570 %
1,129.22
Proposed 18" Pipe
Proposed Ditch
Invert: 1122.72
Offset: 4.3 RT
STA: 17450+76.7
Invert: 1122.76
Offset: 4.3 RT
STA: 17450+88.9 Invert: 1125.40
Offset: 14.6’ RT
STA: 17454+22.2
Existing WB ‘
Existing EB ‘
Invert: 1123.22
Offset: 5.8’ RT
STA: 17452+14.5
1.000%Existing Ditch
17452+00 17453+00 17454+00 17455+00 17456+00 17457+00 17458+00 17459+00 17460+00 17461+00 17462+0017452+00 17453+00 17454+00 17455+00 17456+00 17457+00 17458+00 17459+00 17460+00 17461+00
1,126.47
1,126.42
1,126.38
1,126.33
1,126.29
1,126.24
1,126.20
1,126.90
1,127.07
1,128.19
1.000%
17452+00 17453+00 17454+00 17455+00 17456+00 17457+00 17458+00 17459+00 17460+00 17461+00 17462+00
1,127.70
1,125.08
1,123.78
1,123.51
1,123.80
1,127.71
1,123.49
1,123.34
1,123.02
1,123.06
1,124.09
1110
1115
1120
1125
1130
1135
1140
1145
1110
1115
1120
1125
1130
1135
1140
1145
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\060PP_002.dgn4:11:37 PM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
SHE-6-002(113)330 2
Plan & Profile
US 2 & ND 18
Rest Area & Intersection Improvements
Sta 17452+00 to 17462+00
TV Mkr
1123.01
2 CSES(Poor)
18" X 75’ CSP(Poor)
17456+82 - 0’ LT
(Chain: SCL02)
1123.07
1123.13
18" X 46’ CSP(Fair) - 2 CSES(Poor)
17456+88 - 164’ LT to NE end
17456+46 - 145’ LT to SW end
(Chain: SCL02)
1123.221123.30
Tel Ped
Ped
TV
2 CENTURY LINK lines
Mkr
TV
GMW
CA
BLE
MID-C
ON
T
MID-C
ON
T C
AB
LE
1123.76
MID-CONT CABLE
pad
Conc
CENTURY LINK
Asph
TRI-CNTY WU
TRI-
CN
TY W
U
CENTURY LINK
Conc
NDDOT
Sign
Conc
line
pro
pane
ND
DO
T WSV
CENTURY LINK
LIN
K lines
2 C
EN
TU
RY
LIN
K lines
2 C
EN
TU
RY
Conc
ND
DO
T
E Mtr
Sign
Sign
EL
Sign
Sign
Gr
CENTURY LINK
Gr
B wire
Asph
AsphAsph
Item Sta. Offset Elev. (ft)
A 103+59.19 26’ LT 1125.17
B 103+69.43 42’ LT 1124.08
C 104+46.35 77’ LT 1124.69
D 106+22.74 77’ LT 1124.95
E 106+28.37 78’ LT 1124.94
F 107+10.93 22’ LT 1125.18
G 106+50.93 38’ RT 1125.36
H 106+39.27 38’ RT 1125.34
I 105+89.25 29’ RT 1125.44
J 105+91.23 11’ LT 1126.29
K 105+31.53 29’ RT 1125.35
L 105+31.53 0’ 1125.96
M 105+31.53 11’ LT 1125.81
N 103+59.19 11’ LT 1125.56
O 102+23.30 39’ RT 1123.77
P 101+21.84 23’ RT 1125.23
Q 100+72.96 28’ RT 1126.11
R 100+28.00 75’ RT 1126.72
at own expenserelocate or adjustutility company to Mid-Cont. facality,Conflict with
at own expenserelocate or adjustutility company to Buried electric line,Conflict with
avoid buried cableshould be able to NDDOT contractorNo Conflict
12.0
000
at own expenserelocate or adjustutility company to Fiber optic line,Conflict with
US 2 W
B
US 2 E
B
ND 18
R 50’
R 50’
R 100’
R 60’
R 60’
A
B
CD E
F
GHI
J
K
L
MN
O
P
Q
R
Elev: 1126.62
+50.93, 22.5’ LT
Center of Bulb
Ex. ROW
17450+00
17455+00
17460+00
8780+00
POT 100+00.00 100+00
PC 101+18.94
PT 101
+97.43
PI 101
+60.34
105
+00
PO
T 108
+30.56
Curve R_AREA-1
PI = 101+60.34 Simple Curve
R = 100.00
T = 41.39
L = 78.49
EL
EL
TV M
kr
Tel Ped
Tel Ped
E Mtr
ND
DOT
ND
DOT
ND
DOT
MID-C
ONT C
ABLE
MID-C
ONT C
ABLE
CABLE
MID-C
ONT
MID-C
ONT C
ABLE
CENTUR
Y LIN
K
CENTUR
Y LIN
K
CENTUR
Y LIN
K
CENTUR
Y LIN
K
CE
NT
UR
Y LIN
K
CENTUR
Y LIN
K
CENTURY LINK
CENTUR
Y LIN
K
CENTUR
Y LIN
K
2 CENTURY L
INK lines
CENTURY LINK
2 CENTURY LINK lines
CENTUR
Y LIN
K
CENTURY LIN
K
CENTUR
Y LIN
K
LINK lines
2 CENTUR
Y
MkrT
V
PedTel
PedT
V
line
propane
NDDOT
TRI-C
NTY W
U
TRI-C
NTY W
U
TRI-C
NTY W
U
Inv 11
25.4
Sta +22.2, O
S 14.6’ Rt
18" C
MP w/ T
ES
Inv 1123.06
Sta +55, OS 62.4 Lt (SCL18)
18" CMP w/ FES
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\060PP_003.dgn4:11:38 PM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
SHE-6-002(113)330 60 3
US 2 & ND 18
Rest Area & Intersection Improvements
Plan & Profile
Sta 100+00 to 108+00
1121.81
1122.29
1122.41
1122.47
CENTURY LINK
CENTURY LINK
1122.55
1122.58
1122.62
1122.67
1122.76
TV M
kr
1123.01
1123.07
1123.13
1123.22
1123.30
Tel Ped
PedT
V
2 CENTURY L
INK lines
2 CENTURY LINK lines
MkrT
V
GM
W
CABLE
MID-C
ONT
MID-C
ONT C
ABLE
CENTUR
Y LIN
K
CENTUR
Y LIN
K
1123.76
MID-C
ONT C
ABLE
padConc
CENTUR
Y LIN
K
Tel Ped
CE
NT
UR
Y LIN
K
PedTel
CENTUR
Y LIN
K
1124.41
Asp
h
24" Type 1
TRI-C
NTY W
U
TRI-C
NTY W
U
Tel Ped
CENTUR
Y LIN
K
CENTURY LIN
K
EL
Lg\S
m trees
Conc
ND
DOT
ND
DOT
CENTUR
Y LIN
K
LINK lines
2 CENTUR
Y
Asp
h
Lg\S
m tre
es
Sign
Gr
Conc
line
propane
NDDOT
Sign
WSV
Sign
Conc
TRI-C
NTY W
U
Lg\S
m trees
CENTUR
Y LIN
K
CENTUR
Y LIN
K
Conc
ND
DOT
E Mtr
Sign
Sign
EL
Sign
Sign
CENTUR
Y LIN
K
Asp
h
Asp
h
Asp
h
Asp
h
MID-C
ONT C
ABLE
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1125 1125
100+50.00
1125 1125
100+63.00
1125 1125
100+75.00
1125 1125
101+00.00
1125 1125
101+25.00
1125 1125
101+50.00
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-T_EOP_R
RA_access-DG_Tie
RA_access-B1_EOP_R
RA_access-T_3
RA_access-EOP_1_R
RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-B1_EOP_1_R
RA_access-DG_EOSB2_R
RA_access-
RA_access-DG_EOP_1_R
RA_access-B1_EOP_L
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-B1_CL
RA_access-T_CL
RA_access-T_EOP_R
RA_access-DNC_1_L
RA_access-DG_Tie
RA_access-DNC_2_L
RA_access-B1_EOP_R
RA_access-T_3 RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-DG_EOP_L
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-T_EOP_L
RA_access-DG_EOSB2_R
RA_access-DG_CL
RA_access-B1_EOP_L
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-B1_CL
RA_access-T_CL
RA_access-T_EOP_R
RA_access-DNC_1_L
RA_access-DG_Tie
RA_access-DNC_2_L
RA_access-B1_EOP_R
RA_access-T_3 RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-DG_EOP_L
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-T_EOP_L
RA_access-DG_EOSB2_R
RA_access-DG_CL
RA_access-B1_EOP_L
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-B1_CL
RA_access-T_CL
RA_access-T_EOP_R
RA_access-DNC_1_L
RA_access-DG_Tie
RA_access-DNC_2_L
RA_access-B1_EOP_R
RA_access-T_3 RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-DG_EOP_L
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-T_EOP_L
RA_access-DG_EOSB2_R
RA_access-DG_CL
RA_access-B1_EOP_L
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-B1_CL
RA_access-T_CL
RA_access-T_EOP_R
RA_access-DNC_1_L
RA_access-DG_Tie
RA_access-DNC_2_L
RA_access-B1_EOP_R
RA_access-T_3 RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-DG_EOP_L
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-T_EOP_L
RA_access-DG_EOSB2_R
RA_access-DG_CL
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-T_EOP_R
RA_access-DG_Tie
RA_access-B1_EOP_R
RA_access-T_3
RA_access-EOP_1_R
RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-B1_EOP_1_R
RA_access-DG_EOSB2_R
RA_access-
RA_access-DG_EOP_1_R
4:1
4:1
4:1
4:1
4:14:1
4:1 4:1
4:14:1
4:14:1
approximate
telephone line
crossing
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:24 PM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1125 1125
101+75.00
1125 1125
102+00.00
1125 1125
104+00.00
1125 1125
104+25.00
1125 1125
104+50.00
1125 1125
104+75.00
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-T_EOP_R
RA_access-DG_Tie
RA_access-B1_EOP_R
RA_access-T_3
RA_access-EOP_1_R
RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-B1_EOP_1_R
RA_access-DG_EOSB2_R
RA_access-
RA_access-DG_EOP_1_R
RA_access-DG_EOP_R
RA_access-T_Tie
RA_access-T_EOP_R
RA_access-DG_Tie
RA_access-B1_EOP_R
RA_access-T_3
RA_access-EOP_1_R
RA_access-T_4 RA_access-T_5
RA_access-T_1_R
RA_access-DG_3
RA_access-B1_EOSP_RRA_access-B1_EOSB1_R
RA_access-DNC_1_R
RA_access-DG_4
RA_access-DNC_2_R
RA_access-DG_5
RA_access-B1_EOP_1_R
RA_access-DG_EOSB2_R
RA_access-
RA_access-DG_EOP_1_R
4:14:1
4:14:1
ParkLot-DNC_21_L
ParkLot-B1_EOP_L
ParkLot-DNC_11_L
ParkLot-T_1_L
ParkLot-DG_Tie_L
ParkLot-T_3_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-T_Tie_L
ParkLot-DG_EOSB2_LParkLot-DG_3_L
ParkLot-DG_CL_L
ParkLot-DG_5_L
ParkLot-EOP1_L
ParkLot-DG_EOP_L
ParkLot-B1_CL_LParkLot-T_EOP_L
ParkLot-
4:14:1
1.5%
ParkLot-DNC_21_L
ParkLot-B1_EOP_L
ParkLot-DNC_11_L
ParkLot-T_1_L
ParkLot-DG_Tie_L
ParkLot-T_3_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-T_Tie_L
ParkLot-DG_EOSB2_L
ParkLot-DG_3_L
ParkLot-DG_CL_L
ParkLot-DG_5_L
ParkLot-EOP1_L
ParkLot-DG_EOP_L
ParkLot-B1_CL_L
ParkLot-T_EOP_L
ParkLot-
4:1 4:11.5%
ParkLot-DNC_21_L
ParkLot-B1_EOP_L
ParkLot-DNC_11_L
ParkLot-T_1_L
ParkLot-DG_Tie_L ParkLot-T_3_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-T_Tie_L
ParkLot-DG_EOSB2_L
ParkLot-DG_3_L
ParkLot-DG_CL_L
ParkLot-DG_5_L
ParkLot-EOP1_L
ParkLot-DG_EOP_L
ParkLot-B1_CL_L
ParkLot-T_EOP_L
ParkLot-
4:14:1
1.5%
ParkLot-DNC_21_L
ParkLot-B1_EOP_L
ParkLot-DNC_11_L
ParkLot-T_1_L
ParkLot-DG_Tie_LParkLot-T_3_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-T_Tie_L
ParkLot-DG_EOSB2_L
ParkLot-DG_3_L
ParkLot-DG_CL_L
ParkLot-DG_5_L
ParkLot-EOP1_L
ParkLot-DG_EOP_L
ParkLot-B1_CL_L
ParkLot-T_EOP_L
ParkLot-
4:1 4:11.5%
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:24 PM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 2
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1125 1125
105+00.00
1125 1125
105+25.00
1125 1125
105+50.00
1125 1125
105+75.00
1125 1125
106+00.00
ParkLot-DNC_21_L
ParkLot-B1_EOP_L
ParkLot-DNC_11_L
ParkLot-T_1_L
ParkLot-DG_Tie_LParkLot-T_3_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-T_Tie_L
ParkLot-DG_EOSB2_LParkLot-DG_3_L
ParkLot-DG_CL_L
ParkLot-DG_5_L
ParkLot-EOP1_L
ParkLot-DG_EOP_L
ParkLot-B1_CL_L
ParkLot-T_EOP_L
ParkLot-
ParkLot-DNC_21_L
ParkLot-B1_EOP_L
ParkLot-DNC_11_L
ParkLot-T_1_L
ParkLot-DG_Tie_L
ParkLot-T_3_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-T_Tie_L
ParkLot-DG_EOSB2_LParkLot-DG_3_L
ParkLot-DG_CL_L
ParkLot-DG_5_L
ParkLot-EOP1_L
ParkLot-DG_EOP_L
ParkLot-B1_CL_L
ParkLot-T_EOP_L
ParkLot-
ParkLot-DG_EOP_R
ParkLot-B1_EOP_L
ParkLot-B1_CL
ParkLot-T_1_L
ParkLot-T_EOP_R
ParkLot-T_CL
ParkLot-DG_Tie_L
ParkLot-T_3_L
ParkLot-B1_CROWN_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-B1_EOP_R
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-DG_CROWN_L
ParkLot-T_Tie_L
ParkLot-T_1_R
ParkLot-DG_EOSB2_LParkLot-DG_3_L
ParkLot-DG_Tie_R
ParkLot-T_3_R
ParkLot-DG_5_L
ParkLot-DNC_1_R
ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R
ParkLot-DG_EOP_L
ParkLot-T_5_R
ParkLot-DNC_2_R
ParkLot-T_Tie_R
ParkLot-DG_EOSB2_R
ParkLot-T_CROWN_L
ParkLot-DG_3_R
ParkLot-T_EOP_L
ParkLot-DG_CL
ParkLot-DG_5_R
ParkLot-DG_EOP_R
ParkLot-B1_EOP_L
ParkLot-B1_CL
ParkLot-T_1_L
ParkLot-T_EOP_R
ParkLot-T_CL
ParkLot-DG_Tie_LParkLot-T_3_L
ParkLot-B1_CROWN_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-B1_EOP_R
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-DG_CROWN_L
ParkLot-T_Tie_L
ParkLot-T_1_R
ParkLot-DG_EOSB2_L
ParkLot-DG_3_L
ParkLot-DG_Tie_R
ParkLot-T_3_R
ParkLot-DG_5_L
ParkLot-DNC_1_R
ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R
ParkLot-DG_EOP_L
ParkLot-T_5_R
ParkLot-DNC_2_R
ParkLot-T_Tie_R
ParkLot-DG_EOSB2_R
ParkLot-T_CROWN_L
ParkLot-DG_3_R
ParkLot-T_EOP_L
ParkLot-DG_CL
ParkLot-DG_5_R
ParkLot-DG_EOP_R
ParkLot-B1_EOP_L
ParkLot-B1_CL
ParkLot-T_1_L
ParkLot-T_EOP_R
ParkLot-T_CL
ParkLot-DG_Tie_L
ParkLot-T_3_L
ParkLot-B1_CROWN_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-DNC_1_L
ParkLot-B1_EOP_R
ParkLot-T_5_L
ParkLot-DNC_2_L
ParkLot-DG_CROWN_L
ParkLot-T_Tie_L
ParkLot-T_1_R
ParkLot-DG_EOSB2_L
ParkLot-DG_3_L
ParkLot-DG_Tie_R
ParkLot-T_3_R
ParkLot-DG_5_L
ParkLot-DNC_1_R
ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R
ParkLot-DG_EOP_L
ParkLot-T_5_R
ParkLot-DNC_2_R
ParkLot-T_Tie_R
ParkLot-DG_EOSB2_R
ParkLot-T_CROWN_L
ParkLot-DG_3_R
ParkLot-T_EOP_L
ParkLot-DG_CL
ParkLot-DG_5_R
4:14:1
1.5%
4:14:1
1.5%
4:14:1
4:1 4:1
4:1 4:14:14:1
4:1 4:14:1 4:1
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:25 PM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 3
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1115 1115
1120 1120
1125 1125
106+25.00
1120 1120
1125 1125
106+50.00
1115 1115
1120 1120
1125 1125
106+75.00
1115 1115
1120 1120
1125 1125
107+00.00
ParkLot-DG_EOP_R
ParkLot-B1_EOP_L
ParkLot-B1_CL
ParkLot-T_1_L
ParkLot-T_EOP_R
ParkLot-T_CL
ParkLot-T_3_L
ParkLot-B1_CROWN_L
ParkLot-B1_EOSP_LParkLot-B1_EOSB1_L
ParkLot-B1_EOP_R
ParkLot-DG_CROWN_L
ParkLot-T_1_R
ParkLot-DG_EOSB2_L
ParkLot-DG_3_L
ParkLot-DG_Tie_R
ParkLot-T_3_R
ParkLot-DNC_1_R
ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R
ParkLot-DG_EOP_L ParkLot-T_5_R
ParkLot-DNC_2_R
ParkLot-T_Tie_R
ParkLot-DG_EOSB2_R
ParkLot-T_CROWN_L
ParkLot-DG_3_R
ParkLot-T_EOP_L
ParkLot-DG_CL
ParkLot-DG_5_R
Bulb-target
Bulb-DG_Tie_L
Bulb-T_5_L
Bulb-T_Tie_L
Bulb-DG_5_L
Bulb-DNC_1_R
Bulb-DNC_2_R
crossing
Exst Line Fiber Optic
approximate
ParkLot-DG_EOP_R
ParkLot-B1_CL
ParkLot-T_EOP_R
ParkLot-T_CLParkLot-B1_CROWN_L
ParkLot-B1_EOP_RParkLot-DG_CROWN_L
ParkLot-T_1_R
ParkLot-DG_Tie_R
ParkLot-T_3_R
ParkLot-DNC_1_R
ParkLot-B1_EOSB1_RParkLot-B1_EOSP_R
ParkLot-T_5_R
ParkLot-DNC_2_R
ParkLot-T_Tie_R
ParkLot-DG_EOSB2_R
ParkLot-T_CROWN_L
ParkLot-DG_3_R
ParkLot-DG_CL
ParkLot-DG_5_R
Bulb-B1_EOP_L
Bulb-target
Bulb-T_1_L
Bulb-DG_Tie_L
Bulb-T_3_L
Bulb-B1_EOSB1_LBulb-B1_EOSP_L
Bulb-T_5_L
Bulb-T_Tie_L
Bulb-DG_EOSB2_L
Bulb-DG_3_LBulb-DG_5_L
Bulb-DNC_1_R
Bulb-DG_EOP_L
Bulb-DNC_2_R
Bulb-T_EOP_L
crossing
Exst Line Fiber Optic
approximate
US 2 WB LT-DG_Tie_L
US 2 WB LT-DNC_1_L
US 2 WB LT-DG_Break
US 2 WB LT-DNC_2_L
US 2 WB LT-T_Tie_L US 2 WB LT-T_Break
Bulb-B1_EOP_L
Bulb-B1_EOP_L
Bulb-target
Bulb-target
Bulb-T_1_L
Bulb-T_1_L
Bulb-DG_Tie_L
Bulb-T_3_L
Bulb-T_3_L
Bulb-B1_EOSB1_L
Bulb-B1_EOSB1_L
Bulb-B1_EOSP_L
Bulb-B1_EOSP_L
Bulb-T_5_L
Bulb-T_Tie_L
Bulb-DG_EOSB2_L
Bulb-DG_EOSB2_L
Bulb-DG_3_L
Bulb-DG_3_LBulb-DG_5_L
Bulb-DNC_1_R
Bulb-DG_EOP_L
Bulb-DG_EOP_L
Bulb-DNC_2_R
Bulb-T_EOP_L
Bulb-T_EOP_L
crossing
Exst Line Fiber Optic
approximate
US 2 WB LT-DG_Tie_L
US 2 WB LT-DNC_1_L
US 2 WB LT-DG_Break
US 2 WB LT-DNC_2_L
US 2 WB LT-T_Tie_LUS 2 WB LT-T_Break
Bulb-B1_EOP_L
Bulb-B1_EOP_L
Bulb-target
Bulb-target
Bulb-T_1_L
Bulb-T_1_L
Bulb-DG_Tie_L
Bulb-T_3_L
Bulb-T_3_L
Bulb-B1_EOSB1_L
Bulb-B1_EOSB1_L
Bulb-B1_EOSP_L
Bulb-B1_EOSP_L
Bulb-T_5_L
Bulb-T_Tie_L
Bulb-DG_EOSB2_L
Bulb-DG_EOSB2_L
Bulb-DG_3_L
Bulb-DG_3_LBulb-DG_5_L
Bulb-DNC_1_R
Bulb-DG_EOP_L
Bulb-DG_EOP_L
Bulb-DNC_2_R
Bulb-T_EOP_L
Bulb-T_EOP_L
crossing
Exst Line Fiber Optic
approximate
4:14:14:1 4:1
approximate
electric line
crossing
approximate
electric line
crossing
approximate
electric line
crossing
approximate
electric line
crossing
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
3/10/2016 mdockter R:\project\60002330.113\utilities\lxsec utility RA.dgn4:22:26 PM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. SHE-6-002(113)330 XS 4