Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200...

19
Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20 years, added Home Appliances, Kitchen tools, Furniture and Leisure tools Leading market player in Russia for Home appliances, now in India market too Started Infrastructure focussed business in 2010 through the new group company STAR PLUS GLOBAL Star Plus Group: Introduction

Transcript of Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200...

Page 1: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Started in 1993 based out of Hong Kong

• Group Turn Over in last 3 years

• US$ 150 Million FY 11• US$ 200 Million FY 12• US$ 250 Million FY13

• Over the last 20 years, added Home Appliances, Kitchen tools, Furniture and Leisure tools

• Leading market player in Russia for Home appliances, now in India market too

• Started Infrastructure focussed business in 2010 through the new group company STAR PLUS GLOBAL

Star Plus Group: Introduction

Page 2: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Group Companies: • Star plus HK Limited:- Flag Ship, Specialising in Home Electronics & Appliances for Russian market

• Star Line Traders Limited:– Merchandisers & Traders , Sourcing specialists for small appliances, machine parts & paper products

•Star plus Global Limited – Focussed on Infrastructure needs

Pre-engineered steel structures & Pre engineered buildings Solar Panels, Panel support structuresSteel & Aluminium formed members Equipment supplies to Power & Infrastructure projects

Star Plus Group: Introduction

Page 3: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Businesses focussed on delivering customised solutions to the steel, steel structure and metal forming needs of Infrastructure Companies involved in

Power projects – Thermal, Gas & Solar EPCsRefinery & Chemical Industry projectRoad/Bridge projectsTransmission line Towers

• Relationship with some of the largest Chinese steel fabricators for– Heavy structures suitable for Power, steel plant construction– Light structures for commercial & residential High rises

Star Plus Group: Introduction

Page 4: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Steel Fabricators in China have evolved over the last 15 years to attain International Quality standards and scale

• Fabricators posses capabilities to successfully execute large project orders for heavy structures like Trusses, Build up Sections (Beams, Columns)

• SPG is in regular engagement with many large fabricators in China

• Together these suppliers have capability to deliver for practically any form of fabricated steel/sheet metal structure for all Infrastructure projects

• Quality Monitoring and Testing to ensure “What we get is what we ordered”

Star Plus Global: Fabrication in China

Page 5: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Backed by the most competitive and dynamic domestic market in the world for Steel raw material and skilled work force:-

• Steel Raw Material makes upto 70% of the total cost for Heavy fabricated structures, even higher % Light/Medium strictures

• China is the largest producer and consumer of steel in the world , produces over 50% of world’s steel

• Supply far in excess of demand for products like HR Plates, H-Beams and sections, allowing fabricators access to one of the cheapest steel prices for all parts of the year, for years to come

• Large Fabrication capacities established during the last decade, per ton fixed costs are the lowest in the world

• Powering Chinese infrastructure growth in the last 20 years have made many of the top fabricators world class in Quality and execution of orders

Competitive advantage

Page 6: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Arbitrage through Competitive Imports

• Significant cost saving with reliability of supply will be crucial to capturing maximum value

• Project Pricing

• Average price for the full length of supplies• Comprehensive Supply Advantage

• Regular tracking of International & China steel prices enables us to tap price advantages at right times from China

• Index based pricing possible for hedging raw material and currency fluctuations

• Quality Control & Shipping to destination by arranging suitable vessel

Star Plus Global Edge

Page 7: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Supplying pre-fabricated steel structures to large Indian Power/Infrastructure projects

• Heavy & Medium Structures– Lanco International Pte Limited

» Babandh (2 x 660 MW) - 22,500 MT, 70% Completed

» Vidharba (2 x 660 MW) - 22,500 MT, 70% Completed

» MB Power, Annupur (2 x 600 MW) Successfully completed

– Abir Engineering, Hyderabad» East Coast Power (2 x 660 MW) - 19,100MT; Started deliveries

» Singhitarai TPP (2 x 660MW) - 22,000MT; Successfully completed

Star Plus Global: Credentials

Page 8: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Credentials

Trial Assembly at Chinese Factory before port dispatch

Page 9: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Credentials

Packing & Storage at Load port

Page 10: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Light & Medium Structures– Lanco International Pte Limited

» Babandh (2 x 660 MW) – 5,000 MT

Structures of Pipe Racks, ESP control room, CHP structures & Pump Houses

» Vidharba (2 x 660 MW) – 5,000 MT,

Structures of Pipe Racks, ESP control room, CHP structures & Pump Houses

Star Plus Global: Credentials

• Local Knowledge and relationships in China

Over a decade of close working with Suppliers for various engineering products 75+ cumulative years of working with China by Star Plus Group’s Key Executives Well versed with Chinese business culture, local environment & integrating the differing working styles of factories & the project team

Page 11: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Group: Credentials

Page 12: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

• Dedicated team of technically qualified front line executives in China

» Design Drawing & Detailing for Fabricator/Project Liaison» Team of Quality Assurance (QA) experts with hands-on

experience in Welding, Fabrication, painting and packing Inspection, including Radiography, UT

• Organise Internal and ocean Logistics to provide CFR Indian port offer for project cargo requirements, including discharge onto Wharf at Indian Port

• Competitiveness further enhanced by the Group's presence in steel products exports /imports in China, SE Asia and India, which allows SPG to closely study, forecast near term supply/demand conditions to customers and add value to their purchase decisions

Star Plus Global: Credentials

Page 13: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Credentials

Hopper Fabrication for 2 x 600 MW Sub-Critical Power Plant in India

Page 14: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Credentials

Hopper Fabrication for 2 x 600 MW Sub-Critical Power Plant in India

Page 15: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Credentials

Hopper segment trial assembly, real time Inspection by SPG at Factory shop

Page 16: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Remarks:

SPG DAILY FLASH REPORT

Star Plus Global: Client Reports

Project: 2 X 600 MW THERMAL POWER PLANT INDIARef No : Date 07.05.2013

Client : …………

Manufacturer :Jinan Lai gang Steel Structure.

Place of Inspection: XXXX ,Jinan

Inspection Request By: XXX Factory, PR China

Sl.No Stage of Inspection Description Drawing No/Part No Qty

1 Welding Inspection Bunker beam STPP-U2BM-31B9 1

2Welding Inspection Bunker column STPP-U2AM-2CF-21

1

3UT test Bunker column

STPP-U2AM-2CF-21 1

Sl.No Date Scope of work

Findings Action Required

Manufacture response Result

1 07.05.2013Welding Inspection

Surface of the weld checked & found ok .Dimension checked & found ok.

Ok

2 07.05.2013 UT testUT test was done on the column & the result was found ok.

Ok

Page 17: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Remarks:Star Plus Global: Detailing Support

  

• Due to site welding of Hopper- BURP1 in Segment -1, we suggest double groove spot weld instead of Single groove .

• Snapshot and detail drawing is attached for reference. Please kindly check and confirm (After discussions with production unit in China by our site team)

Page 18: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Detailing Support

  

• Stub Columns is shop welded to heavy part of Hopper-segment-1

• While erecting it to beam the bolt clearance is just 2 mm, which will cause alignment difficulty in erection.

• The vertical bracings in between the Stub Columns have insufficient space for erecting at site

Likely problem during site erection

Suggested Solution

Shell Supporting Stub Columns in Hopper for Site welding

• After erecting the beams the Stub Columns may be bolted easily• Vertical bracings can be erected.• Finally the Hopper segment -1 can be erected to the stub columns and welded at site • Punch marks of stub column numbers will be provided at the bottom of segment -1 for easy identification and alignment 

Suggested site welded procedure

Page 19: Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Star Plus Global: Logistics  

• Can offer the product CFR Indian Port basis to all major ports in India, delivered to Wharf or to port warehouse

• Ability to offer smaller lots by container wherever it makes more commercial value for the project

• Advantage of working directly with major carriers & operators in China/India trade

• Over 100,000 CBM of project cargoes shipped in last 6 months to East India Port (s), some of the vessels handled by us include

MV Joyful Fortune MV Han Ren MV Wise MV Paragon Pescadores MV Ocean Concord

• Advantage of daily, real time monitoring of internal transportation, port storage and loading at load port