DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GA 30260-1777 REPLY TO JUN 2 6 2015 ATTENTION OF Regulatory Division SAS-2015-00333 JOINT PUBLIC NOTICE Savannah District/State of Georgia The Savannah District has received an application for a Department of the Army Permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C. 1344), as follows: Application Number: SAS-2015-00333 Applicant: Mr. Frank Bishop Oconee 316 Associates, LLC 6445 Powers Ferry Road, Suite 120 Atlanta, Georgia 30339 Agent: Mr. Barney Crooks Corblu Ecology Group, LLC 1305 Lakes Parkway, Suite 11 O Lawrenceville, Georgia 30043 Location of Proposed Work: The project site is located north of and adjacent to the intersection of the Oconee Connector at Plaza Parkway, within the Upper Oconee Watershed (HUC: 03070101), in Athens, Oconee County, Georgia (latitude: 33.9194, longitude: -83.4541). Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers: To impact 1,760.3 linear feet of perennial stream channel, 168.7 linear feet of intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the 48-acre Epps Bridge Centre 2/3 commercial/retail development site. This construction would include an inter-connected commercial/retail development with 370,490 square feet of retail space, as well as attendant infrastructure necessary to support the development, such as roads, parking areas, ingress/egress, stormwater infrastructure, utilities and pedestrian walkways. The existing development plan incorporates an on-site stormwater management system. The project site has been planned for construction within the Regional Center section of Oconee County. As a result of these impact s, the applicant would provide compensatory mitigation by purchasing 2.73 wetland credits from the Goat Farm Mitigation Bank and 11,070.1 stream credits from the Greensboro !Vlitigation Bank, both of which service this project area. Goat Farm Mitigation Bank is the only bank within the

Transcript of Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet...

Page 1: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT CORPS OF ENGINEERS

1590 ADAMSON PARKWAY SUITE 200 MORROW GA 30260-1777

REPLY TO

JUN 2 6 2015ATTENTION OF

Regulatory Division SAS-2015-00333

JOINT PUBLIC NOTICE Savannah DistrictState of Georgia

The Savannah District has received an application for a Department of the Army Permit pursuant to Section 404 of the Clean Water Act (33 USC 1344) as follows

Application Number SAS-2015-00333

Applicant Mr Frank Bishop Oconee 316 Associates LLC 6445 Powers Ferry Road Suite 120 Atlanta Georgia 30339

Agent Mr Barney Crooks Corblu Ecology Group LLC 1305 Lakes Parkway Suite 11O Lawrenceville Georgia 30043

Location of Proposed Work The project site is located north of and adjacent to the intersection of the Oconee Connector at Plaza Parkway within the Upper Oconee Watershed (HUC 03070101) in Athens Oconee County Georgia (latitude 339194 longitude -834541)

Description of Work Subject to the Jurisdiction of the US Army Corps of Engineers To impact 17603 linear feet of perennial stream channel 1687 linear feet of intermittent stream channel 310 linear feet (0021-acre) of ephemeral stream channel and 0364-acre of wetland areas to construct the 48-acre Epps Bridge Centre 23 commercialretail development site This construction would include an inter-connected commercialretail development with 370490 square feet of retail space as well as attendant infrastructure necessary to support the development such as roads parking areas ingressegress stormwater infrastructure utilities and pedestrian walkways The existing development plan incorporates an on-site stormwater management system The project site has been planned for construction within the Regional Center section of Oconee County As a result of these impacts the applicant would provide compensatory mitigation by purchasing 273 wetland credits from the Goat Farm Mitigation Bank and 110701 stream credits from the Greensboro Vlitigation Bank both of which service this project area Goat Farm Mitigation Bank is the only bank within the

primary service area that currently has wetland credits for purchase at the time of this Public Notice and would be utilized by the applicant unless additional wetland credits become available for purchase at other banks within the primary service area

BACKGROUND

This Joint Public Notice announces a request for authorizations from both the US Army Corps of Engineers and the State of Georgia The applicants proposed work may also require local governmental approval

STATE OF GEORGIA

Water Quality Certification The Georgia Department of Natural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Permit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative to a specific application will be available for review and copying at the office of the Georgia Department of Natural Resources Environmental Protection Division Water Protection Branch 4220 International Parkway Suite 101 Atlanta Georgia 30354 during regular office hours A copier machine is available for public use at a charge of 25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 30 days of the States receipt of application in writing and state the reasons or basis of objections or request for a hearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division 1590 Adamson Parkway Suite 200 Morrow Georgia 30260-1777

State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease permit or other appropriate instrument

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance of a Department of the Army Permit

Cultural Resources Assessment A literature review was performed by the applicant which resulted in two archaeological sites and two architectural properties being recommended as eligible for listing in the National Register of Historic Places however would not be impacted as a result of this undertaking In addition a Phase I Cultural Resources Survey titled Proposed Athens Highway 78 Development Tract Oconee County Georgia dated Year 2006 resulted in one archaeological site which is recommended ineligible for the NRHP The applicants proposed Review of the latest published version of the National Register of Historic Places indicates that registered properties or properties listed as eligible for inclusion are located at the site or in the

2

area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 USC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Oceanic and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or p~oposed for listing may be present in the area

Public Interest Review The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards flood plain values land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration of Public Comments The US Army Corps of Engineers is soliciting comments from the public federal state and local agencies and officials Native American Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing ~nd to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

3

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Joseph N Rivera 1590 Adamson Parkway Suite 200 Morrow Georgia 30260-1777 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

If you have any further questions concerning this matter please contact Mr Joseph Rivera Regulatory Specialist of the Piedmont Branch at (678) 422-6571

Enclosures 1 Figure 1 Location Map 2 Figure 6 Jurisdictional Areas Map 3 Appendix B Project Plan Sheets (C-1 C-2 and C-3)

4

- -I r

6_

Legend

Epps Bridge Centre 23 Oconee County Georgia

Figure 1 Location Map

0 25000 ---=====-----Feet

6250 12500

1 inch =12500 feet

~

corbl J ECOLOGY GROUP

-- Perennial

-- lnterm ittent

Ephemeral

Erosional Gully

O wetlands

Figure 6 Jurisdictional Areas Map

Epps Bridge Centre 23 Development Oconee County Georgia

0 1625 325 650 ~ ---====-----Feet corbl1J ECOLOGY GROUP 1 inch =325 feet

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 2: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

primary service area that currently has wetland credits for purchase at the time of this Public Notice and would be utilized by the applicant unless additional wetland credits become available for purchase at other banks within the primary service area

BACKGROUND

This Joint Public Notice announces a request for authorizations from both the US Army Corps of Engineers and the State of Georgia The applicants proposed work may also require local governmental approval

STATE OF GEORGIA

Water Quality Certification The Georgia Department of Natural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Permit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative to a specific application will be available for review and copying at the office of the Georgia Department of Natural Resources Environmental Protection Division Water Protection Branch 4220 International Parkway Suite 101 Atlanta Georgia 30354 during regular office hours A copier machine is available for public use at a charge of 25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 30 days of the States receipt of application in writing and state the reasons or basis of objections or request for a hearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division 1590 Adamson Parkway Suite 200 Morrow Georgia 30260-1777

State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease permit or other appropriate instrument

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance of a Department of the Army Permit

Cultural Resources Assessment A literature review was performed by the applicant which resulted in two archaeological sites and two architectural properties being recommended as eligible for listing in the National Register of Historic Places however would not be impacted as a result of this undertaking In addition a Phase I Cultural Resources Survey titled Proposed Athens Highway 78 Development Tract Oconee County Georgia dated Year 2006 resulted in one archaeological site which is recommended ineligible for the NRHP The applicants proposed Review of the latest published version of the National Register of Historic Places indicates that registered properties or properties listed as eligible for inclusion are located at the site or in the

2

area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 USC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Oceanic and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or p~oposed for listing may be present in the area

Public Interest Review The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards flood plain values land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration of Public Comments The US Army Corps of Engineers is soliciting comments from the public federal state and local agencies and officials Native American Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing ~nd to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

3

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Joseph N Rivera 1590 Adamson Parkway Suite 200 Morrow Georgia 30260-1777 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

If you have any further questions concerning this matter please contact Mr Joseph Rivera Regulatory Specialist of the Piedmont Branch at (678) 422-6571

Enclosures 1 Figure 1 Location Map 2 Figure 6 Jurisdictional Areas Map 3 Appendix B Project Plan Sheets (C-1 C-2 and C-3)

4

- -I r

6_

Legend

Epps Bridge Centre 23 Oconee County Georgia

Figure 1 Location Map

0 25000 ---=====-----Feet

6250 12500

1 inch =12500 feet

~

corbl J ECOLOGY GROUP

-- Perennial

-- lnterm ittent

Ephemeral

Erosional Gully

O wetlands

Figure 6 Jurisdictional Areas Map

Epps Bridge Centre 23 Development Oconee County Georgia

0 1625 325 650 ~ ---====-----Feet corbl1J ECOLOGY GROUP 1 inch =325 feet

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 3: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 USC 1531 et seq) we request information from the US Department of the Interior Fish and Wildlife Service the US Department of Commerce the National Oceanic and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or p~oposed for listing may be present in the area

Public Interest Review The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards flood plain values land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration of Public Comments The US Army Corps of Engineers is soliciting comments from the public federal state and local agencies and officials Native American Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the US Army Corps of Engineers to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing ~nd to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

3

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Joseph N Rivera 1590 Adamson Parkway Suite 200 Morrow Georgia 30260-1777 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

If you have any further questions concerning this matter please contact Mr Joseph Rivera Regulatory Specialist of the Piedmont Branch at (678) 422-6571

Enclosures 1 Figure 1 Location Map 2 Figure 6 Jurisdictional Areas Map 3 Appendix B Project Plan Sheets (C-1 C-2 and C-3)

4

- -I r

6_

Legend

Epps Bridge Centre 23 Oconee County Georgia

Figure 1 Location Map

0 25000 ---=====-----Feet

6250 12500

1 inch =12500 feet

~

corbl J ECOLOGY GROUP

-- Perennial

-- lnterm ittent

Ephemeral

Erosional Gully

O wetlands

Figure 6 Jurisdictional Areas Map

Epps Bridge Centre 23 Development Oconee County Georgia

0 1625 325 650 ~ ---====-----Feet corbl1J ECOLOGY GROUP 1 inch =325 feet

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 4: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army Permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Joseph N Rivera 1590 Adamson Parkway Suite 200 Morrow Georgia 30260-1777 no later than 30 days from the date of this notice Please refer to the applicants name and the application number in your comments

If you have any further questions concerning this matter please contact Mr Joseph Rivera Regulatory Specialist of the Piedmont Branch at (678) 422-6571

Enclosures 1 Figure 1 Location Map 2 Figure 6 Jurisdictional Areas Map 3 Appendix B Project Plan Sheets (C-1 C-2 and C-3)

4

- -I r

6_

Legend

Epps Bridge Centre 23 Oconee County Georgia

Figure 1 Location Map

0 25000 ---=====-----Feet

6250 12500

1 inch =12500 feet

~

corbl J ECOLOGY GROUP

-- Perennial

-- lnterm ittent

Ephemeral

Erosional Gully

O wetlands

Figure 6 Jurisdictional Areas Map

Epps Bridge Centre 23 Development Oconee County Georgia

0 1625 325 650 ~ ---====-----Feet corbl1J ECOLOGY GROUP 1 inch =325 feet

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 5: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

- -I r

6_

Legend

Epps Bridge Centre 23 Oconee County Georgia

Figure 1 Location Map

0 25000 ---=====-----Feet

6250 12500

1 inch =12500 feet

~

corbl J ECOLOGY GROUP

-- Perennial

-- lnterm ittent

Ephemeral

Erosional Gully

O wetlands

Figure 6 Jurisdictional Areas Map

Epps Bridge Centre 23 Development Oconee County Georgia

0 1625 325 650 ~ ---====-----Feet corbl1J ECOLOGY GROUP 1 inch =325 feet

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 6: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

-- Perennial

-- lnterm ittent

Ephemeral

Erosional Gully

O wetlands

Figure 6 Jurisdictional Areas Map

Epps Bridge Centre 23 Development Oconee County Georgia

0 1625 325 650 ~ ---====-----Feet corbl1J ECOLOGY GROUP 1 inch =325 feet

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 7: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

Appendix B Project Plan Sheets

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 8: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

--- ~ ff 1 f~ middotmiddot 1

4I

middot I

-middot-~

_ LOCATION MAP

llt1t~ WAtl-middot

iOrt ~0CC WU BE ltlAstU StrCtt IH M1 NlA WU 9t DSVliO

CJs~~1 r_n~~~~vdiftgt~~~~ ~Ait I AlSO loJCl1)0poundS ct(OQ A PliJ ~()ft vfSmiddot llROCC CQflli 1t numiddot wu at o~Cft to r1t-1~ CAlo)t p- 11 wu oc 011L lVW ~~ u- tJ15- 1~1lCL CSM t

ioOlt POLCt s1vir 0Alt 1$ m~~11QY ~1 tno PROJC~ COMllt~ OATt IS APPlOlllllAlEY WAilCri li07

lflo(IUY CJ

t VfLYNAN1f1Af(

ltiORbYFAVI(Y LI tJIC middot bull

lltttlt t VFt l N NiO FRAHK rmuwmiddot11J11Lv LP ~ _

~i1 ~~~

PHASE 1 EPPS BRIDGE CENTRE II )

SITE DATA BLDV ARpound~ CEVpoundLOPEl) AREA I SllE bullREA

SF) (ACRES) (A_ltjl_ s

2S029D I plusmn335bull ACJgtES I plusmnJJ75 ACRES

PHASE 2 (EPPS BRIDGE CENTRE Ill )

SIJE DATA ewe ARCA IorvtLoro AREA I snr AREA

Sf) (ACRES (ACRES~

802)0 I tll30 ACRES I plusmn 1JO ACRES

RW AREA (DEDICATED ROADWAY )

SITE DATA 61CG AREA IOSVELCPD AREA I Sil( AREA

SF) (ACRES) (ACRES

NA I plusmn241 ACRES I plusmn241 ACRES

tlfl~r11$

WbullJ(JHT~M()(lgtWAfll

CRAPHIC SCALE

I

~-~ - i tllftCI)

1 lhtllbullI0011

~

~

~ ~ ~I= 11 hUh11 11gt middot middot fii I lt ~=~ IJI

It

~ ~ 0 ()

p 0 IZI fll iil

~

~ ~secte1 11 I

-n1-shy--shy08UH

lltlUllllamp

lllllUlllldlll

C-1

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 9: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

Ti--middotmiddotshy~ - r~--- f

Silt middot middot J t ~t ~t_4 -----

LOCATION MAP

~

WE JLANO

smEAM

STATE BUITTR

JURISDICTIONAL FEATURES DATA

NAMpound _ElCalt I AREA

SO PD plusmn941

SC L plusmn684

SCt 1t t20

SCL YI plusmn97

StM plusmn42

Set p plusmn 266

EPH YY plusmnJtO

iorAL STR(Agt4S i2333

WET CC ~O~Oi 3 AC

WET EE plusmn0IB~ ~C

WET 0 plusmn0017 AC

WE T If -1002J ~c

WET Y plusmn0~64 AC

TOlAL vrLANDS plusmn0402 AC

~ ~tt MllAN)s ~ZI OMR WoTtRS Of ftpound VS Allaquo tlOOI iM1

JJIJ~Cfj()H OF Tl1t middotos )RM( CORPSmiddotOf f)IQNtllS OIS~aANct gf I or t)($t JClti WJftlOU ~ AVlhOlIZAfQH _yec SOampICCI ro lENAoJY BllAW ~~ 11

-OTC~AH) CCUN(AlQU 8V COJfampU [COlOQ(~OIJP middot middoti~~~t 1 u~ I r( xn 12I ~ ii 8 ~ ~ gi ~

i ~ s

pd H I~ i

-~~- I I I I I I 11 I

~I~ 081~1middot

llSIIlllU

i C-2

--____z--r- --J

GitAPMIC SCAIA

k-bullW- shy(CllflttI)

1 tO middot~

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3

Page 10: Standard Individual Permit · 2015-06-26 · intermittent stream channel, 310 linear feet (0.021-acre) of ephemeral stream channel, and 0.364-acre of wetland areas to construct the

L JURSDICTICNAL IMPAC T DATA

NA~C I LENCfti I AREA MigtACEO ~EMANfC

set oo middot94bull O plusmn9lti

St l

= 684

~20middot

gt684

t20

cmiddot omiddot

SCI w plusmn917 plusmn97 SCtM t42 I plusmn l2 omiddot set P plusmn266 plusmn266 omiddot EPH YY

TOTAi ST~EAMS

~poundT CC

plusmnllO

plusmn2J53

plusmn00 JJ AC

tJ~cmiddot

22J9

0 AC

()

plusmn94

plusmn 0013 Alt

~u bullbull io 1e5 bullc t0150 AC t00Z5 N in o plusmn0017 AC tC0 7 AC 0 AC

yfflt I plusmn002j AC T002) AC 0 AC-

NOit wro MO Onvt WoTERS ()( us Mir I~ ~trade~1 I~- - LECENO MSClCllCW Of 111[_gt$ ~WY (OffS or (NOMCRl OllSIJA9A-ct U- IHtSE io-tRS bull 1-11)lf FRICR 41llriQf7UJti MAY fl( SUMCf 10 POIAJY fl1 LAW

~ ~ - ~TlArltO i lAPACmgt tlO~Mr_AtitI JnttlEAfOli ev ~Ul rcctOOY aO~

SIRfAM( i middotc illE -- _ ~~ i $1Aif RtfffB SMMA3JSTAlt 6UfFER~

s rA tE OOfffJf t DICnt bull iS171 - --middot+_shy SJAT BUff(R AAA - J24 2 AC I SrArt BUFF~ tE~CH 1wgtACttgt - i40$r

SfAlE BUFFE~ fRpoundA tMPACTEO bull =216 AC STAI( EltJfEJ( E~CCH R(lh~tfl o81lt4 SJlTC BFF~ AtftA ~ampIANNNO - t016 AtI

LOCAVQN MAP

t0US4 AC

a ~

ltbullmiddot ~ 1 ~ ~i~ ~bullfi B

~~uumiddotmiddot I ii ~~ I

~

~ ~ 0 u Jl

~ fl IQ

i ~

m lt

g II

~ ~ ff ~

IS f I 88 ~ oe ~ sect

~I~ fraquo l116

IHUlJlllICRAPHtC SCAtr

~I I i ltlUUillCI

( 1M 1rrt ) 1 1 11 ffO ll C-3