BROOKS BRIDGE REPLACEMENT STUDY March 3, 2016 Stakeholder Advisory Group Meeting #2

Transcript of Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o...

Page 1: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

BROOKS BRIDGE REPLACEMENT STUDYMarch 3, 2016

Stakeholder Advisory GroupMeeting #2

Page 2: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

WelcomeIntroductionsRecap: Project Overview & ProcessProject Status Updateo Environmental Agency Coordinationo Engineering Analysis (Traffic & Typical Section)o Environmental AnalysisOpen DiscussionAdjourn

Agenda

2 of 15

Page 3: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

What is the Purpose of the Study?Identify the best solution and location for replacement of the existing Brooks Bridge and secure federal approvals

Why is the Project Needed? Structurally deficient Does not meet current design standards Does not meet Americans with Disabilities Act (ADA) pedestrian/bike requirements

Recap: Purpose and Need

3 of 15

Page 4: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Brooks Bridge Replacement Study –Project Location Map

Page 5: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Brooks Bridge Replacement Study –Project Schedule

Alternatives Analysis

AlternativesPublic

WorkshopPublic

Hearing

Environmental & Engineering

Documents

Final FHWA Project

Approval

Environmental Analysis

Jan May Jan Feb Dec

Community Outreach

43 5 76 8Project Initiation

Environmental & Engineering Data Collection

2 0 1 82 0 1 72 0 1 6

Apr

PublicKickoff

Meeting

Feb

2 0 1 521

5 of 20

Jul

Page 6: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Status Update

6 of 20

Completed initial environmental agency coordination (ETDM)Completed Navigation Study Completed traffic modelingBegan alternatives analysisBegan environmental evaluationContinued public outreach activities Determine Recommended

Replacement Alternative

Evaluate Alternatives5S T E P

Develop Alternatives4S T E P

Analyze Typical Sections3S T E P

Analyze Current and Future Traffic2S T E P

Determine Bridge Height1S T E P

Page 7: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Summary Degrees of EffectETDM Review

7

PHYSICAL NATURAL CULTURAL COMMUNITY

Air

Qua

lity

Con

tam

inat

ed S

ites

Infra

stru

ctur

e

Noi

se

Nav

igat

ion

Coa

stal

& M

arin

e

Farm

land

s

Floo

dpla

ins

Spec

ial D

esig

natio

ns

Wat

er Q

ualit

y &

Qua

ntity

Wet

land

s

Wild

life

& H

abita

t

His

toric

Arch

eolo

gica

l Site

s

Rec

reat

ion

Area

s

Sec

tion

4(f)

Pot

entia

l

Aes

thet

ic E

ffect

s

Eco

nom

ic

Land

Use

Mob

ility

Rel

ocat

ion

Soc

ial

2 3 2 2 4 3 N/A 3 3 3 3 4 3 3 3 2 1 2 2 2 3

N/A No Involvement 3 Moderate

1 Enhanced 4 Substantial For additional information on the FDOT Efficient Transportation Decision Making (ETDM) and Environmental Technical Advisory Team (ETAT) process, visit: http://www.dot.state.fl.us/emo/ETDM.shtm(project number 14214).0 None 5 Dispute Resolution

2 Minimal

Page 8: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Summary of Primary ETAT Reviewer ConcernsSocial/Cultural Resourceso Potential right-of-way acquisition of commercial, residential, or recreation propertieso Potential to impact parks and historic properties, considered Section 4(f) resourcesNatural Resourceso Stormwater runoff has potential to impact surface waters and wetlands o Gulf Islands National Seashore is a Florida Outstanding Water requiring high protectiono Valuable habitats including estuarine salt marsh and sea grass beds in project areao Multiple Federal and State threatened and endangered species potentially present and

protection measures must be in place for each o Essential Fish Habitat within project area and will require coordination with NMFSPhysical Resourceso Potentially contaminated sites near the corridor must be evaluated o Bridge must meet required clearances and obtain USCG permit

ETDM Review

8

Page 9: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Determine Bridge HeightUS Coast Guard Required Clearances

1

9 of 20

Page 10: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

ADA RequirementsDetermine Bridge Height1

10 of 20

Page 11: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Analyze Current & Future Traffic

2040 Traffic58,700 vehicles per day crossing Brooks Bridge

2

11 of 20

Page 12: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

12

Analyze Typical Sections3

12 of 20

Page 13: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

13

Analyze Typical Sections3

13 of 20

Page 14: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Bridge Construction Phasing

14

EXISTING CONDITION

14 of 20

Page 15: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Bridge Construction Phasing

15

PHASE I CONSTRUCTION

15 of 20

Page 16: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Bridge Construction Phasing

16

PHASE IIA CONSTRUCTION

16 of 20

Page 17: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Bridge Construction Phasing

17

PHASE IIB CONSTRUCTION

17 of 20

Page 18: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Bridge Construction Phasing

18

FINAL CONDITION

18 of 20

Page 19: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Develop Alternatives

4

19 of 20

Page 20: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Engineeringo Purpose and Needo Alternatives Analysiso Structureso Traffic o Right-of-Wayo Safetyo Bicycles/Pedestrianso Drainageo Utilitieso Cost

Environmentalo Air Qualityo Noiseo Social and Communityo Wetlandso Wildlife and Habitato Visual and Aestheticso Parks and Recreational Facilitieso Water Qualityo Cultural Resourceso Land Useso Economicso Contaminationo Construction

Public Involvemento Public Meetingso Agency and Elected Official

briefingso Stakeholder/Small group meetingso Websiteo Newsletterso Social Media

Evaluate Alternatives5

20 of 20

Page 21: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Okaloosa-Walton TPO Briefings o April 16, 2015; February 18, 2016Efficient Transportation Decision Making (ETDM) Agency Reviewo April 17, 2015 – October 27, 2015Public Kickoff Meeting o April 23, 2015Stakeholder Advisory Group Meetings o September 10, 2015o March 3, 2016

Outreach Activities

21 of 20

Page 22: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Local and agency coordinationo City of Fort Walton Beacho Chamber of Commerceo Okaloosa County (Commissioners, Convention Center, Fire District, Public Works) o Eglin Air Force Baseo National Park Service / Gulf Islands National Seashoreo U.S. Fish and Wildlife Service / National Marine Fisheries Service o Florida Department of Environmental Protection o Coast Guardo Gulf Intracoastal Canal Association / Warrior Tombigee Waterway Association

Outreach Activities

22 of 20

Page 23: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

What would you like this project to achieve?o Ex., Less traffic, improved connectivityWhat elements would you like to see incorporated into the project?o Ex., sidewalks, bike lanes, multi-use path, bridge overlooksWhat concerns do you have?o Ex., business impacts, construction, access, safety

Open Discussion

23 of 15

Page 24: Stakeholder Advisory Group Meeting #2 · Stakeholder Advisory Group Meetings o September 10, 2015 o March 3, 2016 Outreach Activities 21 of 20

Stay Involved

http://www.nwflroads.com

Date:Tuesday, May 17, 2016

Time:5:30 - 6:30 p.m.

Location:Emerald Coast Convention Center1250 Miracle Strip Pkwy SE,Fort Walton Beach, Florida 32548

Alternatives Public Meeting:

Can’t attend the meeting?

Follow us onStay Involved:[email protected] Us: 24