St. Louis RelocationSt. Louis, MO 63123, will be hosting audits until the end of May 2017. In order...
Transcript of St. Louis RelocationSt. Louis, MO 63123, will be hosting audits until the end of May 2017. In order...
Alcami. Connected at every level. 6200 S. Lindbergh Blvd. Saint Louis, MO 63123
St. Louis Relocation
Edition 3
In this Edition...• Site Audits... 1• Ribbon Cutting... 1• Change Control... 2• Milestone Schedule... 3• Community Involvement... 3• Contact Us... 3
Since January 2016, Alcami has been working to relocate its St. Louis site. The new facility, located at 4260 Forest Park Ave., Suite 201, St. Louis, MO 63108, will be part of the state-of-the-art Cortex Innovation Center. The countdown begins as we get closer to receiving the keys to our new building.
Are you interested in auditing our St. Louis location?
Our current site, located at 6200 S. Lindbergh Boulevard, St. Louis, MO 63123, will be hosting audits until the end of May 2017.
In order to accommodate all move-related activities, we will begin allowing audits at our new location in Q4 2017.
Please follow these steps to schedule an audit for either site:
Alcami. Connected at every level. 6200 S. Lindbergh Blvd. Saint Louis, MO 63123
Site Audits
Audit Request Form available
here
1 Download the Audit Request Form.
2 Complete the form. Please include the dates you wish to visit.
3 Email the form to Jenny Pavlovsky at [email protected].
Ribbon Cutting
Construction is well underway at our new site! Do you want to take a look once it’s complete?
Join us for a ribbon cutting ceremony to commemorate the opening of our new facility!
The official date for the ribbon cutting ceremony will be announced soon.
If you are interested in attending our ribbon cutting ceremony, click here. Once the date is confirmed, an email notification will be sent with RSVP details. We hope to see you there!
1
Overarching Change Control for
Relocation Project
PHASE 1Utility / Facility Change Controls
PHASE 2
Our internal change control procedure and associated protocols will be used to manage the installation of new equipment and the relocation of existing equipment and associated software.
• The change controls will detail the steps required to complete relocation activities
• Protocols will be drafted, approved and executed for each type of equipment, instrument, utility, software and stability chambers.
Change Control
PHASE 3
PHASE 4Decommission
New Lab is Functional
Old Site is Decommissioned
Overall Change Control
Utility Change Controls
Facility Change Controls
PHASE 2Equipment/ Instruments
PHASE 3Equipment/ Instruments
Decommission Equipment at Current Site
Individual Change Controls
Individual Change Controls
Individual Change Controls
Alcami. Connected at every level. 6200 S. Lindbergh Blvd. Saint Louis, MO 631232
American Red CrossAlcami donated $500 to help those affected by a tornado that occurred near St. Louis in February 2017.
Milestone Schedule
Contact Us!
Headquarters Phone2320 Scientific Park Drive Toll Free: (800) 575-4224Wilmington, NC 28405 Headquarters: (910) 254-7000
Email Follow us on Social Media!General: [email protected] Twitter Sales: [email protected] LinkedInSite Director of Operations: [email protected] Facebook Commercial Development: [email protected] Quality Director: [email protected]
Alcami. Connected at every level. 6200 S. Lindbergh Blvd. Saint Louis, MO 631233
Community Involvement
TechShopTechShop, a community-based workshop located within the Cortex Center, offers a summer camp program for students. Alcami awarded a $500 scholarship for a student to attend the summer camp.
Venture CaféEvery Thursday the Venture Café opens its doors to those who work in the Cortex Center. Café nights offer networking, office hours and workshops, along with corporate presentations designed to educate attendees on a specific company. Alcami plans to be involved in the Cortex community and present at the Venture Café.
* Subject to change depending on construction progress
Construction Contract Signed
Complete Core / Shell
HVAC Upgrades
Interior Rough-in
ConstructionInterior
Finishes
Lab Casework and Office/
Cubicle Furniture
Install
New Equipment/Instruments
Validated Move Initiated
(3 – 6 Month Transition)SEPT
2016DEC 2016
FEB 2017
MAR 2017
APR 2017
MAY 2017
JUN 2017
Above-Ceiling Construction
© Copyright 2017 Alcami Corporation. All rights reserved.
Websitewww.alcaminow.com