ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

47
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell

Transcript of ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Page 1: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

ST JAMES THE GREAT, PETTS WOODForum Presentation 16th September 2010

Grayston Alan Durtnell

Page 2: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

Existing Setting

Page 3: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

The Existing Setting

Easement

Church Entrance

Linkage

Social Centre Entrance

Garden

Parish Office remote

Grayston Alan Durtnell

Page 4: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

Existing Social Centre

Page 5: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Existing Plan

Grayston Alan Durtnell

Page 6: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

The Existing Social Centre

Clash between use of Hall and Pre school

Lacks focus or gathering space

Hall acts as circulation and so lacks flexibility

Grayston Alan Durtnell

Page 7: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

The Existing Social Centre

Sacristy facilities poor

Main entrance little used and unwelcoming - no

views into building

Limited storage

Limited meetingspace

Small Hall has no external access & lacks dedicated

facilities

Potential viewsto garden closed off

Poor kitchen

Hall lacks daylight & external access

Poor décor and furnishings

Grayston Alan Durtnell

Stage Under utilised

Poor toilet facilities

Page 8: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Refurbish”

Page 9: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Refurbish”

Objectives:

•Repairs: pressing problems with the building fabric

RoofRear building settlement Main Hall building fabric and décorWindows poor state of repair and single glazed

•Services: outdated heating and electrical installation

•Daylight: lack of daylight generally

•Kitchen: upgrade to meet current food preparation standards

•Toilets: lack of direct access

•Storage: lack of storage; poor accessibility

Grayston Alan Durtnell

Page 10: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Refurbish” - Concept

Page 11: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Refurbish” - Details

Page 12: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Refurbish” Benefits:

•Lowest cost

•Deals with most pressing repairs

•Upgrades toilets & kitchen etc.

•Small Hall and storage improved

Disadvantages:

•Short term solution only

•Broader needs of parish groups not fully addressed

•Spaces remain inflexible for general use

Grayston Alan Durtnell

Page 13: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Refurbish” – Proposals Summary

•Repairs: Roof Repair or renewalRebuild rear part of building subject to settlement Refurbish Main Hall roof; RooflightsRenew Windows

•Services: Renew heating and wiring installation

•Kitchen: refit to meet current food preparation standards

•Toilets: relocated centrally to provide direct access

•Storage: increased by making better use of Stage/Green Room

Grayston Alan Durtnell

Page 14: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

Some Further Objectives?

Page 15: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Further Objectives

Increase visibility of entrance & consider shared entrance

Provide external access

Bring admin across

Rationalise split access and

ramped access for disabled & free up space

Grayston Alan Durtnell

Page 16: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Further Objectives

Create single access with increased visibilityAccess retained for

processional services

Grayston Alan Durtnell

Open up frontage to the welcome the visitor

Open up to provide gathering space &

views to garden

Page 17: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Modify”

Page 18: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” - Objectives

•Amenity: improve general amenity and setting of the Church

•Access: improve parking & pedestrian safety

•Entrance: rationalize entrances and improve visibility

•Internal Circulation: central Lobby to serve all areas

•Large Hall: refurbish to requirements of Uniformed and other groups

•Small Hall: enlarge; flexible use in conjunction with Lobby; external access & daylight

•Admin & Sacristies: group together in same building

•Kitchen & Toilets: upgrade, improve access; security for Pre-School

•Storage: increase size & accessibility

Grayston Alan Durtnell

Page 19: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” -Site Layout Issues

Grayston Alan Durtnell

Page 20: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” - Site Layout Concept

Grayston Alan Durtnell

Page 21: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Modify” - Internal Concept

Page 22: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” Benefits:

•Phasing advantages - float accommodation can be created at outset

•Rationalize entrances and improve visibility

•Lobby/Gathering area provides focus & good circulation

•Kitchen and toilets are central and serve both Halls and Lobby

•Both halls improved

•Efficient use of east end of Church

Disadvantages:

•Moderate to high cost

•Increased circulation required to adapt to existing plan

•Main hall has no external access; limited daylight

Grayston Alan Durtnell

Page 23: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify”- details

Grayston Alan Durtnell

Page 24: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” – Roof Plan

Grayston Alan Durtnell

Page 25: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Modify” – Approach

Page 26: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” – Showing meeting rooms and Link

Grayston Alan Durtnell

Page 27: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Modify” – Garden View

Page 28: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” – Proposals Summary

•Amenity: improvements to landscaping & Memorial Garden

•Access: parking increased from 21 to 30 bays; pedestrian/vehicle segregation

•Entrance: Single entrance for Church & Social Centre; provision for funerals etc. retained

•Internal Circulation: independent access to all areas

•Large Hall: refurbished to uniformed groups requirements; rooflights

•Small Hall: relocated to offer external access & daylight; flexibility of use

•Admin & Sacristies: moved to East end of Church •Kitchen & Toilets: central location; secure provision for pre school

•Storage: increased & more accessible

Grayston Alan Durtnell

Page 29: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“A Further Opportunity?”

Page 30: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” – A Further Opportunity The link between the East end of the Church & the Social Centre will provide:

• A convenient access to the Church Office and Priest’s Sacristy/Server’s Sacristy without having to pass through the Church.

•Allow late comers to join services in the worship area unobtrusively.

Alternatively:

•The link could be omitted by “reordering” the Church so that the Sanctuary is reorientated to the east end of the worship space.

•Although not part of the original brief, this would be a logical extension of it.

•Access to the Church from the Central Lobby would be a natural progression.

•The symmetrical plan form of the worship space lends itself to this change.

Grayston Alan Durtnell

Page 31: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Modify” – Concept with Reordering of Church

Page 32: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Modify” – with Reordering of the Church

Page 33: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Modify” – site layout

Grayston Alan Durtnell

Page 34: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Rebuild”

Page 35: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild” - Objectives

•Amenity: improve general amenity and setting of the Church

•Access: improve parking & pedestrian safety

•Entrance: new single entrance with improved visibility

•Internal Circulation: central Lobby to serve all areas; “Gathering” space

•Large Hall: new facility with daylight and external access to requirements of Uniformed and other groups

•Small Hall: daylight; flexible use in conjunction with Lobby

•Admin & Sacristies: group together in same building

•Kitchen & Toilets: new central facilities; flexibility; security for Pre-School

•Storage: increased size & accessibility

Grayston Alan Durtnell

Page 36: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild” – Concept

Grayston Alan Durtnell

Page 37: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Rebuild” – Concept with reordering of Church

Page 38: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild” Benefits:

•Phasing advantages - float accommodation can be created at outset

•More efficient plan; reduced footprint; better use made of site.

•Flexibility maximised with “Gathering space”, optimum location for toilets, kitchens and storage.

•Better sustainability and reduced carbon footprint

•Main Hall has external access and better daylight

•Efficient use of East end of Church

•Lower long term running and maintenance costs

Disadvantages:

•Slightly higher cost than “Modify” option

•Demolition of existing buildings

Grayston Alan Durtnell

Page 39: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild” - Details

Grayston Alan Durtnell

Page 40: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Grayston Alan Durtnell

“Rebuild” – roof plan

Page 41: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild”- approach

Grayston Alan Durtnell

Page 42: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild”- Street scene

Grayston Alan Durtnell

Page 43: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild”- Chapel and Meeting Rooms

Grayston Alan Durtnell

Page 44: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild”- Entrance

Grayston Alan Durtnell

Page 45: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Coffee Area & Garden beyondToplit drop in/gathering

area

Grayston Alan Durtnell

“Rebuild”

Page 46: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

Entrance & Coffee area in foreground

“Rebuild”- Garden entrance

Grayston Alan Durtnell

Page 47: ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.

“Rebuild” – Proposals Summary•Amenity: improvements to landscaping & Memorial Garden

•Access: parking increased from 21 to 30 bays; pedestrian/vehicle segregation

•Entrance: Single entrance for Church & Social Centre; provision for funerals etc. retained

•Circulation: flexible “Gathering” space; independent access to all areas

•Large Hall: built to Uniformed Groups & Pre-School requirements; daylight and external access

•Small Hall: new facility offering daylight; flexibility of use

•Admin & Sacristies: moved to East end of Church •Kitchen & Toilets: central location; secure provision for Pre-School

•Storage: increased & more accessible