S.No E.Code Name 1 1387 Sanat Kumar Bhatt 2 1229 9 953 14 1394 15 196 Devendra Agrawal 16 1388 Chander Pal Singh 17 965 18 1171 Rajeev Pandey 19 1212 20 601 Dalip Kumar Verma 21 1284 Pawan Singh Saini 22 1347 23 966 Ramakant Verma 24 1476 25 970 Pradyot Kumar Mitra Anami Saran Srivastava Suman Kumar Pant Yogendra Pratap Singh Shiv Kumar Singh Bimlendu Prakash Jain Swarupananda Maji Vinod Kumar Kesharwani

Transcript of Sspbml- Kra Plant Jan-mar 15-2-13 v7

Page 1: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plant KRA Review on 27/28 December

S.No E.Code Name Designation

1 1387 Sanat Kumar Bhatt Senior General Manager (Producti

2 1229 Senior Manager(Production)

9 953 Senior Manager (E.T.P)

14 1394 Deputy General Manager (Mechani

15 196 Devendra Agrawal Senior Manager (Mechanical)

16 1388 Chander Pal Singh Manager (Mechanical)

17 965 Manager (Mechanical)

18 1171 Rajeev Pandey Deputy General Manager (Electrica

19 1212 Manager(Electrical)

20 601 Dalip Kumar Verma Senior Manager(Instrumentation)

21 1284 Pawan Singh Saini Senior Manager (Quality Control)

22 1347 General Manager (Mill Developme

23 966 Ramakant Verma General Manager (Mill Developme

24 1476 Head Management Service (Mill D

25 970 Senior Manager (Mill Developmen

Pradyot Kumar Mitra

Anami Saran Srivastava

Suman Kumar Pant

Yogendra Pratap Singh

Shiv Kumar Singh

Bimlendu Prakash Jain

Swarupananda Maji

Vinod Kumar Kesharwani

Page 2: Sspbml- Kra Plant Jan-mar 15-2-13 v7

26 1336 General Manager (Mill Developme

27 1409 Mohd. Gufran Manager (Mill Development)

28 11 Manager IT/ERP (I.T.)

29 1392 Vijai Veer Prakash Manager (Fire & Safety)

30 1373 Dharmendra Singh Manager (Accounts)

31 1326 Ashok Kumar Sharma Manager (Store)

32 756 General Manager (Administration)

Anoop Kumar Saxena

Shamim Ahmed Khan

Manjeet Singh Sandhu

Page 3: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plant KRA Review on 27/28 December

Department GradeDOB

DOJ Qul.

Production G4 1/7/1953 24/04/2012M.SC.

Production G5 8/4/1955 15/10/2011B.Sc

E.T.P. G5 2/12/1947 15/12/2010M.Sc Chemistry

Mechanical G4 16/06/1970 3/5/2012

Mechanical G5 23/02/1967 17/11/2006 B.Tech ( Mech.)

Mechanical G5 20/09/1968 26/04/2012

Mechanical G5 1/10/1958 31/12/2010

Electrical G4 26/01/1972 8/7/2011

Electrical G5 18/01/1972 1/10/2011

Instrumentation G5 12/4/1980 18/04/2009

Quality Control G5 13/12/1952 7/4/2011B.Sc

Mill Development G4 15/07/1950 12/3/2012

Mill Development G4 15/08/1956 31/12/2010

Mill Development G5 5/7/1973 7/9/2012

Mill Development G5 4/8/1970 25/10/2010B.E, Civil

12th,Diploma Mechanical

BSc,Diploma Mechanical

AMI degree Machanical12th,Diploma Electrical Engg.,Diploma Energy Mannegment12th, Diploma Electrical Engg.

Diploma Instrumantation

M.SC.PG Diploma Pulp & PaperDiploma Pulp & Paper Tech.

B.Tech Chemical Engg.

Page 4: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Mill Development G4 30/06/1967 15/02/2012B. Tech Machanical

Mill Development G5 24/06/1969 1/6/2012

I.T. G5 15/06/1969 1/6/2006

Fire & Safety G5 1/12/1953 1/5/2012

Accounts G5 1/7/1976 6/4/2012

Store G5 4/1/1954 15/01/2012M.A

Administration G4 1/3/1979 12/7/2010B.A.

BSc, Diploma Mechanical Engg.B.A.PG Dipoma Computer SoftwereDiploma Electrical Engg,Post graduat deploma in indaction SafetyM.COM, C.A

Page 5: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plant KRA Review on 27/28 December

Pre.Exp. Rating Remarks

22 Yrs. 50

34 Yrs. 33

35 YRs. 38

19 Yrs. 50

15 YEARS LEFT

17 Yrs. NA

67

18 Yrs. 75

10 Yrs. 60

8 Yrs. 60

26 Yrs. 71

10 Yrs. 83

71

12 Yrs. 100

18 Yrs. ?

to be reassed with data from Pande-Provided

Initiatives were Jul - sep only

To be resubmitted as no dates in sheet

Page 6: Sspbml- Kra Plant Jan-mar 15-2-13 v7

21 Yrs 75

9 Yrs. 62

15 YEARS NOT DONE

24 Yrs. 100

8 Yrs. NOT DONE

LEFT

5 Yrs. NA

ONLY JD GIVEN NO INITIATIVE

Page 7: Sspbml- Kra Plant Jan-mar 15-2-13 v7

S.No E.Code Name

1 151

2 813

3 1468

4 1190 Balwinder Singh

5 1199 Raman Karir

6 1500

7 1205 Lalit Singh

8 1477 Shohrab Akmal

9 1202

10 1499 Jeevesh Kumar

11 1292

12 1502 Manish Srivastav

13 118

Radhey Shyam Singh

Vinod Kumar Rana

Dr.Sudhir Kumar Singh Chauhan

Shiv Narayan Khushawaha

Yogesh Kumar Saini

Sachin Kumar Verma

Rajeev Mohan Saxena

Page 8: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Designation Department

Assistant Manager(Pulp Mill) Pulp Mill

Assistant Manager (Stock Preparation) Stock Preparation

Deputy Manager (E.T.P) E.T.P.

Deputy Manager(Power Plant) Power Plant

Deputy Manager(Power Plant) Power Plant

Deputy Manager(Power Plant) Power Plant

Assistant Manager(Electrical) Electrical

Assistant Manager (Instrumentation) Instrumentation

Deputy Manager (Mill Development) Mill Development

Assistant Manager (Power Plant) Mill Development

Deputy Manager(Human Resource) Human Resource

Deputy Manager (Human Resource) Human Resource

Assistant Manager (Human Resource) Human Resource

Page 9: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Grade DOB DOJ Qul. Pre.Exp.

G6 1/1/1963 21/10/1999B.Sc

14 YEARS

G6 31/07/1972 27/08/2010B.Sc

18 Yrs.

G6 1/7/1977 30/08/2012MSc,Phd

12 Yrs.

G6 1/4/1958 1/8/2011 34 Yrs.

G6 20/08/1950 16/08/2011 29 Yrs.

G6 2/9/1979 22/10/201212Years

G6 1/3/1984 29/08/2011B.Tech (Electical)

6 Yrs.

G6 4/8/1981 17/09/2012B.Sc

6 Yrs.

G6 21/04/1984 22/08/2011 5 Yrs.

G6 5/2/1980 22/10/201214Years

G6 15/07/1973 1/1/2012 5 Yrs.

G6 18/4/1979 22/10/2012M.L.P.M,L.L.B 7Years

G6 26/03/1965 5/6/2000B.A.L.L.B

16 YEARS

I class Boiler Attendent,Diploma Mechanical Engg12th,Diploma Mechanical Engg.B.E Electrical Engg.Diploma Electronics Engg.

B.Tech Chamical Engg. Spacalization inpulp & paperDiploma Mechanical Engg.B.COM, Manager course HMP, MBA

Page 10: Sspbml- Kra Plant Jan-mar 15-2-13 v7

33

25

100

25

25

Page 11: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2012Name : Anup Kumar

Designation: DGM - HR

S No KRA KPI

Page 12: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Identification & proposal of new guest House

1 Identification and separation of low performers from executive and workman category2 Study of optimum Manpower requirement in various functions/departments in workmen grade. Priority to be given to Technical functions in the mill3 Draft placement of workmen in Grade structure , as already discussed

4

5 Associate with PBOPlus in setting out KRA/KPIs of various functions departments including HR (HO and Kashipur) and conducting periodical review of status of progress6 Sourcing and recruitment drive of it is in different technical departments7 Facilitate implementation annual performance appraisal system for 2012-2013 for executives8 expoeditious completion of relocating company's guest house at kashipur and improvements in canteen

9

Page 13: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action 0/1

1. Advertise in local papers20-Jan-13

15-Feb-13

3. Finalise recruitments

28-Feb-13

31-Jan-13

Stores Personnel overhaul50% in January and 50% by 15th Feb. 2013

25-Jan-131. Creation of Calendar

3. Implement by schedule 100% compliance

15-Feb-13

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Recruitments(Non- executives)

Within 30 days on board

2. Conduct interviews with dept heads

Identification of low performing employees

1.Consultation with Dept heads and finalisation

2. Execution for separation of 50% nos out of list of low performers

31 March 2013 (10% in Jan. 20% in Feb. and 20% in March)

Manage exit of 15 employees in Store department and their

replacement.

Planning of Foundation day celebration on 22nd & 23rd Feb.

2. Inform all shareholders of the same

Proposal for improvement of Factory Canteen

Page 14: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Identification & proposal of new guest House 31-Mar-13

Identification and separation of low performers from executive and workman categoryStudy of optimum Manpower requirement in various functions/departments in workmen grade. Priority to be given to Technical functions in the mill

Draft placement of workmen in Grade structure , as already discussed

Associate with PBOPlus in setting out KRA/KPIs of various functions departments including HR (HO and Kashipur) and conducting periodical review of status of progressSourcing and recruitment drive of it is in different technical departments

Facilitate implementation annual performance appraisal system for 2012-2013 for executivesexpoeditious completion of relocating company's guest house at kashipur and improvements in canteen

Achieving the executive manpower strength , recommended by PBOPlus

, by expeditious deployment of newly recruited engineer/engineer

trainee in slotted regular assignment and segregating the existing

executives by name

send status reports on 1,2,3,4,6, in march

Page 15: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department:

Review 1 - (DATE)

Feedback Weightage

L-5 L-4 L-3 L-2 L-1

50% in January and 50% by 15th Feb. 2013

Suggested KPI for Jan-Mar

Target Date(To be given under column L3)

Page 16: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 17: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 18: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 19: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2012Name : Anup Kumar

Designation: DGM - HR

S No KRA KPI

1 Job Performance Monitoring Performance of Engineer

Training of Engineer Trainees

Page 20: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Management of Trainees

Promotion/Upgradation of Engineers

3 Training

4 Security

5 KRA/KPI MonitoringCompliance to commitments made by personnel at Plant via KPI sheets

Assignment of dept to Engineers/Trainees

Growth of Executives in Organisation

Duty Roster of Security personnel

Page 21: Sspbml- Kra Plant Jan-mar 15-2-13 v7

6 QC Officers

Page 22: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action 0/1

3.Monitor Performance

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

In association with HODs monitor the performance according to a

template and schedule , the performance of all Engineers below

the grade of Deputy Manager

1. Create criteria and template of performa after discussion with HODs

2. Inform all shareholders of performance monitoring process

4. Create list of High Performers and Low Performers and create an action

plan to address them

Monitoring the Training Program for and the progress made in the

same by Engineer trainees

1. Create formalised training program template to be followed on a departmental level for the training of engineer trainees by their HODs

2. Monitor the compliance to the template

3. Maintain record of Special Projects assigned to Trainees along with completion dates and grade of

work

5. Flag high performers and low performers

6. Create reward program and remedial program ,as the case may

be

Page 23: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4.Finalise with all Shareholders

3. Roll out action plan

Compliance to commitments made by personnel at Plant via KPI sheets

Based on evaluation / acquisition of requisite learning by them during

training period

1. Create criteria for evaluation of Engineers/trainees.

2. Evaluate the learning and training period performance according to

criteria

3. Assign personnel based on findings

4.Meet with HODs to ensure that their needs are being met by the

correct candidate

5. Assign personnel and monitor progress on a weekly basis for 3

months.

Promote Engineers or upgrade their responsibilities based on an

evaluation of Job Performance

1. Create criteria for evaluation of Engineers/trainees.

2. Evaluate performance in consultation with HODs

3. Create proposal list of Engineers to be promoted with corresponding

reward

Identify training inputs required for executives keeping in view

their potential

1. Consult with HODs to identify department and grade specific training inputs for executives

2. Create action plan for training modules along the suggestions

made by HODs

Provide HR concurrence to duty roster of Security personnel

prepared by GM ( Vigilance and Security) in accordance to

company guidelines

1. Collect KRA/KPI sheets of Plant personnel for Jan-March

Page 24: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2. Review the same for quality of KPI commitments made

3. Review faulty KPIs with concerned personnel and PBOPlus to rectify

during monthly reviews

4.Follow up with defaulters and commitments due in close future to

ensure compliance

5. Flagging of Low performers and high performers and corresponding action to be taken. Create SOP for

the same.

Page 25: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department:

Review 1 - (DATE)

Feedback Weightage

L-5 L-4 L-3 L-2 L-1

Suggested KPI for Jan-Mar

Target Date(To be given under column L3)

Page 26: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 27: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 28: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 29: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 30: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 31: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Oct - Dec, 12

Name :Shiv Kumar Singh

Designation: Manager

S NoKRA KPI Initiatives/Action

1

2

3

4

Signature of App

To reduce the number of breakdowns

TO REDUCE THE BREAKDOWN

REPLACE AND REPAIR OLD AND DEFECTIVE SWITCHGEARS.

TO REDUCE THE BURNING OF MOTORS

PREPARED A MAINTENACE SCHEDULE, AND RUN THE

MAINTENANCE PROGRAM ACCORDING TO THE SCHEDULE.

MOTORS OF 3000 RPM IN 3 MTHS., 1500 RPM IN 6 MTHS, 1000 RPM IN 9 MTHS AND 750

RPM IN 12 MTHS IS TO BE OVERHAULED.

Reduce Production Loss due to Electrical

Failures

TO REDUE THE BREAKDOWN COMING

DUE TO OVER TEMPERATURE.

CHECKING AND RECORD MAINTENANCE OF THE

TEMPERATURE OF 6MW TG, 2MW TG, TRANSFORMERS, ESP,

ACBS, CABLE JOINTS.

Provide continuous power

PROJECT WORK IN 16MW TG AND 110 TPH

BOILER

PROPER CO-ORDINATION WITH CONTRACTORS, PROCESS

DEPARTMENT.

Reduce the electrical maintenance cost

Page 32: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013

Name :Shiv Kumar Singh

Designation: Manager

S NoKRA KPI Initiatives/Action

1 To reduce the number of breakdowns

To reduce the breakdown

Replace and repair old defective switchgears

Motors of 3000 RPMin 3 mnths., 1500 RPM in 6 mnths, 1000 RPMin 9 mnths and 750

RPM in 12 mnths is to be overhauled

Page 33: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2

3

Inventory Management

Reduce Production Loss due to Electrical

Failures

Provide continuous power

Project work in 16MW TG and 110 TPH boiler

Reduce the electrical maintenance cost

Page 34: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 20120/1 Feedback

Plan, Execute,Audit Machine Hours per year

1

Plan, Execute,Audit

1

Done

Plan, Execute,Audit

0

Plan, Execute,Audit Tonnes per year

1

Plan,Do,Check0

Number of 0 ( Red Buttons) 2Number of 1 (Green Buttons) 3

Total number of Activities 5Achievement Percentage 60

Steps to achieve the Initiative/Action

Measures/Performance Indicator

10 ACBs repaired.

Planned 14 Actual 26

Planned 15 and Actual 12

Done. Record to be checked

Planned 9 jobs. Completed 6 jobs

Page 35: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 2

0/1

10 % reduction over Oct-Dec (20 hrs ) Jan: 21 hrs ( 16 hrs due to transformer breakdown)

28-Jan-13

5-Feb-13

5-Feb-13

8-Feb-13

report by 5th of next month

28-Jan-13

2. Raise all PR's According to Calendar

Steps to achieve the Initiative/Action

Measures/Performance Indicator

Estimated Financial Impact

Actual Financial Impact

1.Create a full plan month wise listing the

equipment to be replaced with by-date.

2. Identify obsolete and irreperable equipment

3. Proposal for disposal and replacement list.

5. No of equipments to be repaired

6. Track breakdown hours

1. Finalise PM schedule monthwise and Zone

wise with all stakeholders

Page 36: Sspbml- Kra Plant Jan-mar 15-2-13 v7

First Week of every Subsequent Month

First Week of every Subsequent Month

100% compliance to Plan

15-Mar-13

15-Nov-12

15-Nov-12

100% compliance to Plan

100% compliance to Plan

10 % reduction in stores value

10-Feb-13

Update Final PR list 10-Feb-13

Number of 0 ( Red Buttons)

3. Create comparison report for before and

after changes. Breakdown hrs before replacement vs After.

4. Track breakdown hours with Why Why

Completion of 3 pending jobs from Oct to Dec

1.All Purchase Requisitions to be placed

with Expected Date of Delivery linked to

schedule

2. Number of Purchase orders to be placed.

3.Number of Equipments to be received

monthwise

4. Erection and commissiong of all

equipments

Finalise ROL/ROQ of spares

Page 37: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

Page 38: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1212 Ed. Qual.Department: Electrical

Review 1 - 26 Dec 2012 Data by RameshTarget Date(To be given under column L3)

Suggested KPI for Jan-Mar L-5 L-4 L-3

October

New KPI to be prepapred by making a full plan month wise listing the respective parts to be repaired/replaced.

New KPI to be prepapred by making a full plan month wise listing the respective parts to be repaired/replaced.

Page 39: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1212 Ed. Qual.Department: Electrical

Review 2Target Date(To be given under column L3)

Feedback Suggested KPI for April-JuneL-5 L-4

Jan: 21 hrs ( 16 hrs due to transformer breakdown)

Done.

Being done.

Being done.

Being done.

NOT DONE. 8 Feb-2013

NOT DONE. 8 Feb-2013

Page 40: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Awaiting Material

Page 41: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)Weightage

L-2 L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)

Perfromance score

Page 42: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)Weightage

L-3 L-2 L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)

Perfromance score

Page 43: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 44: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Vijai Veer PrakashDesignation: Head ( Fire and Safety )

S No KRA KPI

1Number of Accidents

2 Training Fulfillment of Training Calendar

1.1 Critical Accidents ( Death/ Loss more than 25 Lakhs)

1.2 Major Accidents ( Absent more than 3 Days)

1.3 Minor Accidents ( Absent for less than 3 days or no absence )

Page 45: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Formation of Advisory Panel on Safet

2 Inspection Timely Submission of Reports

Signature of Appraisee:

Page 46: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Jan-Mar 2013Name : Vijai Veer PrakashDesignation: Head ( Fire and Safety )

S No KRA KPI

1 Maintenance and Repair Old Cooling TowerCD # 2Machine #3 Paper Godown Gate

2 Installations Water Hydrant pipelines with hydrant 3 Personnel Conctractor's workers are working un

Page 47: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12

Review 1 - 26 Dec 2012

Initiatives/Action0/1 Feedback

Date

1

Measures/Performance

Indicator

Suggested KPI for Jan-Mar

Training programs 30 Mins in duration for 4 Hazardous Depts.

Records maintained from 16 July 2012 until date

1)PowerPlant 1,3,4,5 - Total workman = 64

2) Pulp Mill ( CD, Chlorine Yard Total Workman = 15, Washer) - Total

workman = 38

3) Recovery Boiler - Total number of Workman = 23

Page 48: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1

Date 1

Daily inspections of all depts 1

3

3

4) Yard Total Number of Workman = 15

Central Safety Committee to be formed

MOMs available and all records. Meetings every 3 months.

%Reduction in number of accidents/ incidents of negligence

70% of all suggestions are implemented since May 2012. 5 instances of major accident reduced to 1 ( As on Date )

Next KPI :Initiatives to identify Hazardous areas and implement Safety measures.

Next KPI : Identify at risk workers and compile list , so as to be effectively train them in Safety measaures.

Number of 1 (Green Buttons)

Total number of Activities

Page 49: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Jan-Mar 2013

Review 2

Initiatives/Action

0/1

PVC Sheets of roof cooling towers are 1-MarFour supports of conveyor CD #2 are 15-Mar-13Are shaking loose, resulting in a safe 28-Feb-13Sufficient number of water hydrants v 28-Feb-13Corrective action to be taken against 28-Feb-13

Achievement Percentage

Measures/Performance

Indicator

Estimated Financial Impact

Actual Financial Impact

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 50: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department:

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

25-Dec-12

17-Nov-12

31-Oct-12

18-Dec-12

29-Nov-12

24-Nov-12

24-Oct-12

6-Dec-12

8-Nov-12

12-Oct-12

Page 51: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2-Oct-12

24-Oct-12

Page 52: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department:

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Suggested KPI for April-June

Page 53: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Weightage %age/ Level

Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 54: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 55: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)

Weightage L-2 L-1

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 56: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Mohammad Mazharul HaqueDesignation: Production Manager

KRAKPI

1Production ( Shared with Senior)

2

x%OTIF- ( Assigned to senior )

x

x x

3

5

Timely Completion

6

Timely Completion

7 Project AssignedTimely Completion

9 Project Assigned

Timely Completion

Target Production acheivement ( Shared with Senior)

Cost of production ( Shared with Senior)

Target cost of production ( Shared with Senior)

Employee Engagement Index ( Assigned to senior )

Project Assigned (Quality Improvement )

Project Assigned ( Quality Imporvement )

Page 57: Sspbml- Kra Plant Jan-mar 15-2-13 v7

11 Project Assigned

Timely Completion

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Mohammad Mazharul Haque

Page 58: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Designation: Production Manager

KRA

KPI

1

Production Target

Target Production Achievement for Line 3

Jan: 1650 TFeb: 1500 TMar: 1650 T

Page 59: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2Cost of production

Reduction of Power Consumprtion

3% OTIF

4 Employee Engagement

Page 60: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

1

Date 1

x x

x x

Date

1

Date

1

Date

1

Date

1

Overall Measures/Perform

ance Indicator

New Ceramic top fitted on four chamber wire flat boxes

New ceramic top fitted on low vacuum boxes

Wire manifold area cleaning provision made

Holley Roll Shift toward slice 20 mm

Paper deckle on pope reel increased to 291 cm

Vacuum Pump nash taken and operated

Page 61: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Date

1

0Number of 0 ( Red Buttons) 1

Number of 1 (Green Buttons) 7Total number of Activities 8Achievement Percentage 87.5

Shree Shyam Pulp & Board Mills Ltd.

One ball floatation provided in wire seal fit

Page 62: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Review 1

Initiatives/Action Steps to Achieve initiative 0/1

25-Jan-13

20-Jan-13

3. Changing of dryer siphon . At first boiler shut

1. Create work schedule 25-Jan-13

5-Feb-13

Measures/Performance

Indicator

100% compliance to Target

1. Cleaning of Manifold 4 times a month

100% Compliance to schedule

1. Compile schedule and finalise with all shareholders

2. Implement measures according to plan

3. Track performance after implementation

2. Cleaning of entire system once a month by boilout

100% Compliance to schedule

1. Compile schedule and finalise with all shareholders

2. Implement measures according to plan

3. Track performance after implementation

2. Confirm possession of all required parts and materials

3. Track performance after implementation

Page 63: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4. RCC beam to be repaired 28-Feb-13

1. Inform Civil dept of issue 5-Feb-132. Fix work schedule with Civil 8-Feb-13

15-Feb-13

100% compliance

5. Track performance after repair.

31-Jan-13

20-Jan-13

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

3.Ensure indent of all required materials and spares

4. Implement activities according to plan

10 % reduction over last 6 months avg

1. Compile baseline date for previous six months of power

consumption

2. Create action plan for change of vacuum pump and cleaning

3. Implemeant activities as per schedule

4. Track performance through monthly report

100% compliance to Plan

100 % compliance to weekly Plan

Page 64: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Feedback Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5

Data to be validated

x

x

Completed in Sept/Oct 2012. Drag

load on wire is reduced. Increasing

the wire life.

Next KPI: To monitor the power consumption saving of

Oct- Dec. With baseline of Sept consumption.

Consumption numbers to be taken from Mr Rajiv Pande.

Should be cleaned every 5 days.

Machine needs downtime of 2-3 hrs

of downtime. Formation of slime leads to breakages. No formal schedule

in place for cleaning. Done only on basis

of estimation of slime formation.

Next KPI : Formal schedule of cleaning to be formed and

follwed in Jan-March.

Improvement in Tear Factor ( 36- 37 to 38 ). Runability of

machine improved.

Next KPI : Figures to be procured from lab indicating

increased performance in terms of runability and tear

factor, etc. Till Sept : 288- 289 .

Currently : 291 ( Max possible) . Increased

production.

Next KPI : Production data to be submitted with exact

figure of increase.

Shaft problems in PM 3. Addressed by

usage of Vauum Pump nash. Increase

in production . Runability increase.

Page 65: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:

Runability affected due to fluctuation in water level in seal fit.

Production-

Sept: 1534 Oct : 1802 Nov :

1599 Dec ( till date ) : 1384 Challenges to

be addressed:Availability of felt at the right time as a priority.

Fans introduced in Hood System to

combat condensation due to

winter season. Finishing Loss

(Currently): 6% ; Target ( Jan-March) :

5.5%

Next KPI : Listing of initiatives that will lead to reduction in finishing loss. Flow meter to be requested for Steam and

Power Consumption monitoring. Quality control of

helpers to be ensured to reduce finishing loss via incentives and training.

Page 66: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Department:Review 1

Actual Financial Impact Feedback

Being done.

Being done.

Being done.

Estimated Financial Impact

TPM initiatives to be outlined in consultation with PBOPlus . To be establish timelines and responsibility centers

Oct-Dec : 5070 TAvg PD: 55.1 TPD

As on 29-JanJan: 1577 T

Avg PD: 56.32 TPD

Schedule made with Mech Foreman.

Schedule made on 22 Jan. Detailed activity wise plan to be

made with timelines.

Made without timelines as linked to boiler shutdown.

Page 67: Sspbml- Kra Plant Jan-mar 15-2-13 v7

To be compiled.

Yes

To be made .Not done as yet since it is linked to boiler

shutdown.

Cleaning and pump change done.

Reduction in breakages to be tracked

OTIF reports to be plotted for Planned versus Actual.

Page 68: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

720 Ed. Qual. Post Graduate Diploma in Pulp and Paper technologyPaper M/C 3

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

x x x x x

x x x x x

4-Jul-12

Sept, Oct

25-Aug-12

August

18-Sep-12

Page 69: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Sept

Shree Shyam Pulp & Board Mills Ltd.

720 Ed. Qual. Post Graduate Diploma in Pulp and Paper technology

Page 70: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Paper M/C 3

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

Suggested KPI for April-June

Page 71: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 72: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Post Graduate Diploma in Pulp and Paper technology

x x x

x x x

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Drag load on wire reduced

Breakage for slime reduced

Surface properties of paper increased

Finish deckle increased

M/C runability improved

Page 73: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Post Graduate Diploma in Pulp and Paper technology

Vacuum fluctuation on wire reduced

Page 74: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Target Date(To be given under column L3)

Weightage

L-1

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 75: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 76: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : JN Tiwari

Designation: Head Pulp Production

S No KRA KPI

1 Pulp Production

2 Cost of production Target cost of production

3434.60 MT/month(Avg. of Jan-Oct 2012) to be increased as per plan

Page 77: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 Delivery to internal Customer %OTIF4 Employee Engagement Employee Engagement Index

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Jan-Mar 2013Name : JN Tiwari

Designation: DGM Recovery

S No KRA KPI

1 Production Achievement Traget Production Achievement

Page 78: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Cost of production

Steam consumption

Power Consumption

Chemicals In effluent

3 % OTIF4 Employee Engagement Index

3

Reduction in effluent discharge from cauticizing pit to zero effluent

Reduction in furnace oil consumption

Page 79: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4

Page 80: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

Initiatives/Action 0/1

N/A

2) Timely change C.D. throat. Plan fulfillment %

1

NA

Saving of Caustic by 2%

INR per metric tonne1

Steam Consumption

1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

1) Using cooking aid along with Caustic (Uniform cooking,

Unbleached Brightness will be improved and bleach chemical will

be reduced)

1) Adding Cooking Aid 5MT/month (Cost of cooking Aid – Rs 150/Kg)

Metric tonnes per month

2) Changing C.D. Throat after six months(Cost of C.D. throat Rs 6 Lacs;

cost of Maintenance -Rs 25000/month)

3) Increase of Pulp Production by approximately 17MT/day.

Increase in metric tonnes per day

1) Cost of Caustic 40000/MT 2) Caustic consumption reduced by 2% 3) INR 30.8

lacs per month

1) Cost of steam - INR 1000/MT 2) Saving of Steam - INR 19.25 Lacs per month Net Saving - 41.3

lacs per month

Page 81: Sspbml- Kra Plant Jan-mar 15-2-13 v7

% NA% 0

1

3

4

75

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

SCBL from evaporators to ensure 50% conc min

Cleaning of evaporator bodies of 1,2,3rde twice a month

Firing liquor conc to ensure at 60-61% conc min

Checking of firing liquor sample in each shift for solids conc

Page 82: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Feb-13

31-Jan-13

31-Jan-13

Reduction in steam consumption 30-Jan-13

No color water to go into drain

Ensure complete combustion of BL fired in the bioler

Recovery boiler secondary air dampers to be set to get 150 mmWC wind box pressure at 13 Tons/Hr air flow and ensure all the primary and

secondary air ports cleaned

Ensure 40 Tons of WL production daily maintaining all the thickners

load in normal condition

Ensure 24 hrs running of lime mud filter and timely removal of mud

from all the thickners

Take all the water from causticizing pit to LMW-2

Reduce Furnace oil consumption from 46 TPM to 40 TPM

Maintain high solid conc of firing liquor and reduce oil consumption

during soot blowing

SHE-Proper segregation of BL spillage water and condensate and

keep the recovery boiler ground floor area fully cleared

Gland cooling water to be taken separately to the main drain and colored water to the recovery pit

Clear water entering the system to be prevented

All the condensate line and water spillage to be taken to clear water

I dentify the non working steam traps and get them in proper

working order

Monitor weekly the consumption of steam with reasons for variance

Identify points of unrequired power consumption

Reduction of 10 Units/ Ton of WL

Reduce chemical discharge down to standard levels

Page 83: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 84: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 26 Dec 2012

Feedback Target Date(To be given under column L3)

L-5 L-43850 3900

Suggested KPI for Jan-MarSept : 3273.59

MT/month Oct: 3961.48

MT/Month Nov: 3590.17

MT/Month Currently : Nil

cooking aid ( since Oct)

Challenges to be Addressed : Difficult to

manage performance of

cooking aid because of

quality. Hence not enforced. When Paper machines

run dry , this measure will be

encouraged.

Difficult to manage

performance of cooking aid because of

quality. Hence not enforced. When Paper

machines run dry , this

measure will be encouraged.

Challenges to be addressed:Cost of

chemicals is rising. Caustic

consumption has risen . Steam and

power consumption has

also risen.Maintenance is not properly done by the dept

itself. Maintenance

previously outsorced. Throat

has to come by 18-Jan-2013 else

Pulp mill performance will

deteriorate.

Next KPI : Caustic

Consumption to be 38% in Jan-March against

39.5% (Current). Reduction in

Chlorine consumption to

10% against 10.7% (Current)Next KPI : Target

of Steam Consumption : 2.5 Ton/Ton of Pulp against 3 Tons/Ton of

Pulp at presentNext KPI: PHE has to be

employed. In order to use it,soft water

supply required. This is a Cross-

Functional initiative with PowerPlant.

Page 85: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Feedback

Being done in Jan. Currently 48-49%.

Next KPI : Add an initiative in Oct- Dec about

reduction in chemicals going

into effluent treatment

Estimated Financial Impact

Actual Financial Impact

Suggested KPI for April-Jun

Being done in Jan. Currently is 58-59%. This is due to economiser leakage. Will

be completed by end of Feb.

Page 86: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done

Done

Being Done

Not Done. Will be done by 20-Feb-2013

Currently 120mmWC. Air tuning being done to ensure that it reaches

150mmWC at 12.5 T/hr

Currently 40-41.5 tons of WL . Being done as per schedule

Being done. Drain will be closed. As a result Pulp mill will receive more water to better the quality of washing being

done there.

Identification complete. Awaiting first shut opportunity.

Require flowmeter. PR raised, installation in April

Done. Currently Zero color water in drain.

Page 87: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 88: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.Production ( Pulp )

Target Date(To be given under column L3) Weightage

L-3 L-2 L-14000

%age/ Level Achieved

Actual Performance (By

Appraiser)

Page 89: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.Production ( Pulp )

Target Date(To be given under column L3) Weightage

L-5 L-4 L-3 L-2 L-1

Page 90: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 91: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 92: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Perfromance score

Page 93: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By Appraise

r)

Perfromance score

Page 94: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 95: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 96: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : V.K.THARADDesignation: GM

S No KRA KPI

1 Target Production acheivement

SCBL Production to be increased

2 Target cost of production

Increase in WL production by 25% ( from 854 ton to 1068 Ton per

month ave.)

Increase in Steam generation by 20%(from 9797 tons/month to 11760

tons/month)

Increase in power generation in 1.9 MWTG Set by 25% (from 361752

KWH/Month to 452200 KWH/month)

Reduce Furnace Oil consumption from 46 Ton/month to 39Tons/month (15%)

Page 97: Sspbml- Kra Plant Jan-mar 15-2-13 v7

x x

x x

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : V.K.THARADDesignation: GM

S No KRA KPI

%OTIF ( To be assigned to his Senior - Head )

Employee Engagement Index ( To be assigned to his Senior )

Page 98: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1 Production Target Production achievement

Boiler Breakdown

2 Cost of Production Target cost of production

Page 99: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5S

3 %OTIF Weekly

4 Employee Engagement Index

Page 100: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 101: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action 0/1

Date

1

Date

1

Increase evaporator feed rate Date

1

Increase plant availability Date

1

Date

1

Reduce dependability on FO Firing at >60% conc Date0

Oil burner cleaning and checking Burner nozzle cleaning frequently Date

1

Review 1 - 26 Dec 2012

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Reduce Recovery boiler down time from 16% to 6%

Effective soot bowing & regular air port cleaning.

Increase Liquor firing rate from 6Ton/Hr to 8 Tons/Hr dry solids.

Effective soot bowing & regular air port cleaning.

Body cleaning, PHE Cleaning, Precooler in circuit continuously.

Soot Blowing,air port cleaning,firing liq conc.

90 % steam generation to be supplied to 1.9 MWTG Set.

LP Steam PRDS controller to be set on auto mode.

Page 102: Sspbml- Kra Plant Jan-mar 15-2-13 v7

x x x

x x x

0

6

7

85.71

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Page 103: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Tuesdays

15-Jan-13

31-Jan-13

12/1/2013

Maintain the Achieved Targets of 1200 TPM of WL

100% compliance to Target

% cost saving over Oct - Dec

Zero repeat of Oct 2012 boiler breadown till the major

modification of the boiler 1.Reduction of Boiler Pressure from

42 - 36 kgs/ cm2100% compliance

to Target

Reduce Effluent Discharge from Evaporator Plant

From 30 m3/hr to 10 m3/hr from 1-

Feb-2013

1. Monitor weekly and file report with number of instances of excess

discharge and analysis of reasons for the same.

2. Recirculation of vacuum pump sealing water and pre-cooler water

3. Recirculation of Gland Cooling Water

1 % reduction over avg of Oct - Dec

Sit with all stakeholders to arrive at correct steam cons nos

Reduce Furnace Oil consumption from 46 Ton/month to 41.5Tons/month (10%)

10% reduction and Cost Saving

Page 104: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Detailed Plan

28-Feb-13

15-Jan-13

2. Implementation of measures

28-Feb-13

1. Implementation Plan for 5S 31-Jan-13

2. Implementation of measures

12-Jan-13

2. Weekly report

1 Program

12-Jan-13

2. Training Program as per plan 100% Compliance

Conc of black liquor to be increased from 10-Jan-2013

2 % increase( 61% from 59% and Cost

Saving

Firing of the same to be increased to 7.5 T/hr from 7 T/hr from 15-Jan-

2013

5.8% increase in Production and

Cost Saving

The drive to improve level of insulation in the plant needs to be

increased

1. Identification and rectification plan of steam losses.

100% Compliance to Plan

SHE- Proper segregation, housekeeping. FIFO

100% compliance to Plan

100 % compliance to weekly plan

1. Not done in the past. Finalise weekly plan with PPC ( Vivek

Shrotriya)

10% variance over plan allowed

Training program for PHE Maintenance

1. Training programme schedule finalisation

Page 105: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 106: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1344Department: Chemical recovery

Feedback Target Date(To be given under column L3)

L-5 L-4

Review 1 - 26 Dec 2012

Suggested KPI for Jan-Mar

WL Production Oct : 1104 T Nov : 1047 T. De-bottlenecking of turbines to reduce Recovery Boiler downtime ( From 6 MW to 2 MW )

Next KPI : Steps to be taken to ensure that there is no repitition of major boiler breakdown as happened in Oct (?) 2012 till the major modification of the boiler

Current Firing Rate : 7- 7.5 T/hr. Firing Rate ( July ) : 6 T/hr

Earlier WBL feed rate : 60 m3/hr Current ( Oct-Dec) : 75 m3/hr. Estimated prod inc is 25%.

New KPI : Training program for PHE Maintenance leading to savings in coal due to reduced steam consumption.( % cost saving )

Oct: 12573 T/Month Nov:11410 T/MonthNew Initiative implemented.Recovery boiler runabiliity is increased by linking it's power to the turbine.

Oct : 42 T/Month

Nov : 41.2 T/Month

Conc of black liquor to be increased., Firing of

the same to be increased. Further

reduction is difficult. But attempts are

being made.The drive to improve level of insulation in

the plant needs to be increased.Detailed

plan to be added as a new KPI

New KPI related to SHE- Proper segregation,

housekeeping. FIFO

Page 107: Sspbml- Kra Plant Jan-mar 15-2-13 v7

x x

x x

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1344Department: Chemical recovery

Review 2

FeedbackEstimated Financial Impact

Actual Financial Impact

Suggested KPI for April-June

Page 108: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Currently running at 36kgs/cm2

Currently running at 10 m3/hr. By 15 feb will be zero m3/hr. Savings in fresh water consumption. Zero wastage of fresh water although consumption itself may reduce from 10m3/hr currently to 5 m3/hr

As on 15-Feb the weekly reports will be filed. No instances of excess discharge.

Done.

Done.

Steam/Power consumption nos have been gotten for Jan. Oct-Dec will be compiled by 8 Feb 2013

Jan: 1050 TPM (Power breakdown twice in month leading to lower production. 1 Jan - 11 hrs 22 Jan-12 hrs. Fire in cables and transformer respectively). 11/18 Jan lower paper production.

4-5% reduction in

Power Generation

Jan: 40 TPMFeb (Expected) : 39 TPM. Savings of INR 45000 per ton of furnace oil.

Page 109: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Currently 60% . Economiser leakage slowed down progress. By end of month will reach 61%

Currently 7.5 T/hr . Will be maintained till March.

Identification of area is done. Proposal and plan of work complete. Contractor called in. Lack of funds .

Done.

Done.

Not done. 10-Feb plan will be finalised after meeting.

Plan made. External training personnel to be brought in. Awaiting commitment of time from that side.

Savings will be reflected in

Steam Generation and Furnace

Oil consumption

Reduction in Loss of

Production by 5.8%

Page 110: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 111: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual. PG DIPLOMA (PULP & PAPER)

Target Date(To be given under column L3)Weightage

L-3 L-2 L-1

1/10/2012-31/12/2012

1/10/2012-31/12/2012

1/10/2012-31/12/2012

1/10/2012-31/12/2012

1/10/2012-31/12/2012

1/10/2012-31/12/2012

1/10/2012-31/12/2012

%age/ Level Achieved

Page 112: Sspbml- Kra Plant Jan-mar 15-2-13 v7

x x x x x

x x x x x

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual. PG DIPLOMA (PULP & PAPER)

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Page 113: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Currently running at 10 m3/hr. By 15 feb will be zero m3/hr. Savings in fresh water consumption. Zero wastage of fresh water although consumption itself may reduce from 10m3/hr currently to 5 m3/hr

Steam/Power consumption nos have been gotten for Jan. Oct-Dec will be compiled by 8 Feb 2013

Page 114: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Currently 60% . Economiser leakage slowed down progress. By end of month will reach 61%

Identification of area is done. Proposal and plan of work complete. Contractor called in. Lack of funds .

Plan made. External training personnel to be brought in. Awaiting commitment of time from that side.

Page 115: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 116: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Actual Performance (By

Appraiser)Perfromance

score

Page 117: Sspbml- Kra Plant Jan-mar 15-2-13 v7

x x

x x

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Weightage %age/ Level

Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 118: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Currently running at 10 m3/hr. By 15 feb will be zero m3/hr. Savings in fresh water consumption. Zero wastage of fresh water although consumption itself may reduce from 10m3/hr currently to 5 m3/hr

Page 119: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 120: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 121: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12

Name :S.K.Pant

Designation: DGM Project

S NoKRA/Equipment KPI Initiatives/Action

Weighted average of value of projects completed on timePAPER MACHINE #3

PAPER MACHINE #4

VERTICAL DIGESTER

ROTARY DIGESTER

220TPD BLEACH PLANT

FINALIZATION OF SCHEDULE, FINALIZATION OF BOM & ORDER

PLACEMENT

FINALIZATION OF SCHEDULE, FINALIZATION OF BOM & ORDER

PLACEMENT

COMMISSIONING OF VERTICAL DIGESTER IN 1ST WEEK OF NOV.

COMMISSIONING OF ROTARY DIGESTER

DOUBLE WET WASHING FOR CD#1&2

REVISED DRAWING FINALIZATION, BOM FINALIZATION

BOM & SCHEDULE FINALIZATION, CONTRACTOR FOR MECH. WORK

FINALIZATION

Page 122: Sspbml- Kra Plant Jan-mar 15-2-13 v7

ODL PLANT

CLO2

Weighted average of value of projects completed within budgets

Credit management and payments

Vendor satisfaction

Signature of Appraisee:

DRAWINGS & BOM FINALIZATION, SCHEDULING WORK IS UNDER

PROGRESS

CONSULTANT FOR DRAWING & DETAIL ENGINEERING FINALIZATION

Page 123: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-mar 2013

Name :S.K.Pant

Designation: DGM Project

S No

KRA/Equipment KPI Initiatives/Action

1 PAPER MACHINE #3Weighted average of

value of projects completed on time

Bottlenecks Identified by Nayyar for PM3/4. Which calls for additional

investments. After the factoring of President and Nayyar, de-bottlenecking is a priority.

Page 124: Sspbml- Kra Plant Jan-mar 15-2-13 v7

PAPER MACHINE #4

220TPD BLEACH PLANT

Bottlenecks Identified by Nayyar for PM3/4. Which calls for additional

investments. After the factoring of President and Nayyar, de-bottlenecking is a priority.

DOUBLE WET WASHING FOR CD#1&2

Number of activities to be completed by 31 Jan 2013 ( CD 1 )

Number of activities to be completed by 15 Mar 2013 ( CD 2 )

Number of activities to be completed by 31 Mar 2013

Page 125: Sspbml- Kra Plant Jan-mar 15-2-13 v7

ODL PLANT

CLO2

110 TPD

CLO2 Planned Project Cost

3 Credit management and paymentsCash flow requirements

4 Vendor satisfaction

Fornightly meeting with vendors

Signature of Appraisee:

Number of activities to be completed by 31 Mar 2013

Number of activities to be completed by 31 Mar 2013

DOUBLE WET WASHING FOR CD#1&2

Planned Project Cost Vs Actual Project Cost

Clearance of Vendor Bills within 3 days of receipt.

Page 126: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 127: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

0/1 Feedback

DATE N/A

DATE N/A

PLAN,EXECUTE,AUDIT DATE 1

PLAN,EXECUTE,AUDIT DATE 1

DATE 0

DATE 1

Steps to achieve the Initiative/Action

Measures/Performance Indicator

MONITORING THE MECH. WORK PROGRESS ON DAILY BASIS AND

FINALIZATION OF APPROCHFLOW SYSTEM DRAWINGS

SS Material not received as per plan. Requisition given in Nov. Order yet to be placed. Challenges to

be addressed: Bottlenecks Identified by Nayyar for PM3/4.

Which calls for additional investments.

After the factoring of President and Nayyar, de-bottlenecking is a

priority.

FABRICATION WORK IS ALMOST COMPLETED AND DRAWINGS ARE

FINALTotal fabrication done.

SS remaining.

MONITORING OF CIVIL & MECH. WORK ON DAILY BASIS, WEEKLY REVIEW WITH TEAM MEMBERS

Underwent major modification in interest of improved layout. Not critical so not coming in

way of other project delays. Will be

completed by 31 Jan ( CD 1) and 15 Mar ( CD

2 )

MONITORING OF GANTRY PLATE ERRECTION & AGITATOR WORK ON REGULAR BASIS & WEEKLY REVIEW

OF PROJECT

Trusses completed as per revised plan

( 17 Nov ).

Page 128: Sspbml- Kra Plant Jan-mar 15-2-13 v7

DATE 0

DATE 0

Number of 0 ( Red Buttons) 3Number of 1 (Green Buttons) 3

Total number of Activities 6Achievement Percentage 50

DRAWING & DETAIL ENGINEERING WORK IS GOING ON

Dismantling and shifting of pipeline completed.

Civil works delayed. Pipeline marterial required , delayed.

INQUIRY PLACEMENT WORK IS GOING ON

Pant and Saini to finalise the schedule

based on data provided by the

consultants.

Page 129: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 2

0/1

20-Jan-13

2. Finalise implementation schedule 25-Jan-13

25-Jan-13

Steps to achieve the Initiative/Action

Measures/Performance Indicator

Estimated Financial Impact

1. Submission and Approval of the de-bottlenecking plan.

3. Number of activities to be completed by 31 Mar 2013

Page 130: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2. Finalise implementation schedule

Completed in Oct-Nov

Completed in Oct-Nov

Number

Date

Completed in Oct-Dec

Completed before Oct-Dec

Number

Date

1. Submission and Approval of the de-bottlenecking plan.

3. Number of activities to be completed by 31 Mar 2013

1. Number of Purchase Requisitions to be placed

2. Number of Purchase orders to be placed.

3.Number of Equipments to be received

4. Erection and commissioning of all equipments

5. Weekly follow up meeting with purchase/Vendors

Number of occasions where follow up scheduled but not

completed. ( Records to be kept )

1. Number of Purchase Requisitions to be placed

2. Number of Purchase orders to be placed.

3.Number of Equipments to be received

4. Erection and commissioning of all equipments

5. Weekly follow up meeting with purchase/Vendors

Number of occasions where follow up scheduled but not

completed. ( Records to be kept )

Page 131: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1 Finalise implementation schedule

2. Finalise implementation schedule

1. Finalise P&I 20-Jan-132. Create work schedule 28-Feb-13

3. Implement according to schedule 100% compliance

28-Feb-13

10-Mar-13

% Variance ( 10 % over Planned )

Approx cost of INR 5.42 crores

15-Feb-13

% Variance ( 10 % over Planned )

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

2. Number of Purchase Requisitions to be Finalised and Sent

3. Purchase orders to be placed by 31 Mar

4. Number of Equipments to be received and erected by 31 Mar

1. Receipt of Information from consultant

Number Days after receipt from Consultant

1. Clear all pending bills of vendors ( For CD 1)

2. Release of Payments to Vendors ( For CD 1)

3. Total actual cost Vs Original Planned Cost

NOTE : CD 2 to start after completion of CD 1

Finalise monthly cash flow requirements based on

implementation schedule

Monthly monitoring of Actual Vs Planned Cashflow

Number of occasions where Vendor Bills not cleared within 3

days

Record of all meetings with vendors and documentation of all issues

raised by them Number of occasions where was

not held( against schedule.)

Page 132: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5

Page 133: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Acknowledgement of all Communications sent from Plant to HO with tentative

timelines. Work biforcation between the project team

members. Challenges to be addressed:Workshop tools

if not available will be outsourced to maintain

compliance with timeline.

Page 134: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Actual Financial Impact Feedback

Done. 24-Jan-2013Get specific activities from SK Pant

that are being overseen bby RK Verma

Being Done. To be finished by 5-Feb-2013.

Multiple activities waiting for material. Not received.

Being Done. To be finished by 5-Feb-2013

Page 135: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done. 24-Jan-2013

Erection completed for most items.

Being Done. To be finished by 5-Feb-2013.

Multiple activities waiting for material. Not received.

Being Done. To be finished by 5-Feb-2013

Not done as yet. Estimated completion at 8 Feb 2013. Material

not received.

Updated in 24-Dec-2013. Blow tank material only new addition to list.

Being done. To be given on 5-Feb-2013

Records being kept. All previous communications to be updated to

record format bby 10-Feb-2013

Redrawing on 14-Jan-2013. Mech has passed onto Civil. Civil design

under progress. To be passed by 2-Feb-2013

PO for 8 out of 27 items created. 19 still pending.

List completed and submitted. Equipment still pending.

Records being kept. All previous communications to be updated to

record format bby 10-Feb-2013

Page 136: Sspbml- Kra Plant Jan-mar 15-2-13 v7

All Required PR filed.

Received 1 Dec 2012 - 28 Jan 2013. Corresponding PRs have been generated.

To be done by 10-Feb-2013

To be finalised on 2-Feb-2013

Being done.

All vendors go through Delhi

All vendors go through Delhi

Redrawing on 14-Jan-2013. Mech has passed onto Civil. Civil design

under progress. To be passed by 2-Feb-2013

Submitted and updated as on 24 Jan 2013

Page 137: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Emp. Code: 1394 Diploma Mech. Engineering ProductionDepartment: Project

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

20% 50%

20% 50%

10%

10%

10%

10% 50%

Ed. Qual.

%age/ Level

Achieved

Actual Performance

(By Appraiser)Perfromance

score

Page 138: Sspbml- Kra Plant Jan-mar 15-2-13 v7

10% 50%

10% 50%

Page 139: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Emp. Code: 1394 Diploma Mech. Engineering ProductionDepartment: Project

Target Date(To be given under column L3)

Weightage L-5 L-4 L-3 L-2 L-1

Ed. Qual.

Suggested KPI

for April- Jun

%age/ Level Achieved

Page 140: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 141: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 142: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 143: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Actual Performance (By Apprais

er)

Perfromance score

Page 144: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 145: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 146: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : RAJEEV PANDE

Designation: DGM ELECTRICAL

S No KRA

1 Reduction of Unplanned shut down/ Break down

2 Improvement in Grid Power Factor

Page 147: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Improvement in Grid Power Factor

3 Timely completion of projects of different areas and section

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan - Mar 2013Name : RAJEEV PANDE

Designation: DGM ELECTRICAL

Page 148: Sspbml- Kra Plant Jan-mar 15-2-13 v7

S No KRA

1 Unplanned Breakdowns

Page 149: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Under the Mill Survival Plan to provide reliable power to ETP

Page 150: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 Improve information sharing and documenting system

4 Timely completion of all expansion projects

5 Cross Functional Intiatives

Page 151: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 152: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

KPI Initiatives/Action

0.93(existing) to 0.97 Adding 1000kvar capacitors

10% reduction ( present 10.45 Hrs to 9.30 Hrs per month) - For paper machines

Increasing critical equipments route checking

Scheduled Preventive maintenance of critical

equipment having no stand-by , will be increased.

To identify route cause of break down and prevent re-occurance.

Page 153: Sspbml- Kra Plant Jan-mar 15-2-13 v7

0.93(existing) to 0.97 Adding 1000kvar capacitors

Shree Shyam Pulp & Board Mills Ltd.

As per set targets by project team under the guidance of president

Proper co-ordination with entire project team, purchase and

vendors

Daily monitoring of work progress

Page 154: Sspbml- Kra Plant Jan-mar 15-2-13 v7

KPI Initiatives/Action

Reduction in Unplanned Breakdowns

Implementation Plan of measures

Root -Cause and Why-Why Analysis of Downtime in Oct-Dec

No. of activities completed monthwise

Preventive Maintenance Schedule

Page 155: Sspbml- Kra Plant Jan-mar 15-2-13 v7

No Downtime due to lack of Critical Spares

Zero loss due to machine failure

Record of Breakdown of Equipments whose preventive

maintenance already done.

New 11 KV distribution system commission

To provide reliable and constant power to the ETP for the better

performance from TG.

Page 156: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Ensure all ongoing projects to make sure there are no surprises .Expand horizontally to include Instrumentation and some elements of Civil.

Integration of Preventive maintenance system in IT systems

To discuss with Mr Anoop Srivastva for facility and options

avalable in REMCO

Daily monitoring of work progress

Awarding erection job to well equipped and professional

contractor

Identification of 10 Major Causes for Breakdown in consultation

with Mechanical/Electrical/Process

Page 157: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1. Water leakage in roof.

2

Page 158: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

0/1

Date 1

Date 1

Date 0

Date 1

Date

1

Date

% increase in PGF 1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Identifing critical equipments of each section and a format to

devlope for on line checking of critical parameter. The check list to

be filled by electrician daily and verifyed by section engineer.

Off line check list to be devloped for, scheduled preventive maintenance

equipments.

Date to be fixed after consultation with process as per their monthly

planned shut plan.

History records of equipments to be devloped.

A format of why- why analysis to be devloped and analysis of each break

down will be done.

Entry of each break down and analysis in the history record

1000KVAR capacitors will be installed.

Page 159: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Date 1

Date N/A

Date N/A

Date 0

2

6

8

75

Shree Shyam Pulp & Board Mills Ltd.

A format will be developed for weekly monitoring of capacitor's

performance analysis.

Awarding erection job to well equipped and professional

contractorNumber of 0 ( Red

Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 160: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Review 2

0/1

12-Jan-13

12-Jan-13

15-Jan-13 1

15-Jan-13 1

20-Jan-13

Steps to achieve the Initiative/Action

Measures/Performance

IndicatorEstimated Financial

ImplactActual Financial

Impact

9 hrs 40 mins for all machines and hrs for

pulp

100 % Compliance to Plan

100% Compliance to Plan

Finalise plan of requirements with all stakeholders.

Ensure availability of spares and consumables

Finalise equipment-wise work under preventive maintenance

Page 161: Sspbml- Kra Plant Jan-mar 15-2-13 v7

31-Mar-13

10-Jan-13

25-Jan-13

28-Feb-13

9-Jan-13

PR to be generated 1 day after approval

To float inquiryPO to be released

Monitor weekly. Format to be finalised.

100% compliance to Plan

History Card to be Maintained. ISO Documents

Number of such cases. Allowed 5%.

1. Costing and scheduling for work to be done.

2. Ensuring availability of materials and parts by raising of PR on time.

3. Implement activities as per schedule

4,. Monitor Performance after installation

Finalisation of Consumption Pattern over the last 3 months data of

Spares

Identifying critical list of spares to be kept in stock. Raising purchase

requisitions.

To prepare Technical Feasibility Report

BOM and estimate to be submitted to the President for approval

Page 162: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Monitor recipt of material Erection and commissioning 28-Feb-13

20-Feb-13

31-Jan-13 Preventive module has not been taken. Along with other modules. To be added to RAMCO. Ravi Tandon to discuss with Amit Gupta

100% Compliance

29-Jan-13 Comparitive statements sent to Purchase on 28 Jan-2013

Offer of SN consultant is with management for their approval

1. Finalise implementation schedule along with estimated cost

2. Number of activities to be completed by 31 Mar 2013

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

7. Monitoring and recording of progress on fortnightly basis

8. Summary of action plan for removing bottlenecks

1. Meeting of all heads to identify the 10 major causes per dept

2. Finalisation of measures to mitigate each major cause from each

individual dept.

Page 163: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1. Formalise plan of work with Civil

2. Indent for material

3. Implementation of Measures by plan

4. Tracking and monitoring of major causes to confirm positive effect of

measures.

3. Implement activity according to schedule

4. Track amount of water leakage over next 6 months

Page 164: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department: Electrical

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5 L-4

Confirmed by President

Route checking format has been made.Identification of critical

equipments done. Oct : 4 hrs 15 mins. Nov : 9 hrs 15 mins ( VFD failure

increased figure.) Dec: Exceeded as on date.

Schedule finalised for preventive maintenance for next months. Not currently implemented. Shutdown

schedule from Process Dept required. Major shuts in all depts to be compiled

by Process and Maintenance Dept. Take target of 15% reduction in rewinding of

2900 rpm motors for next quarter.

Oct : 0.95 Nov:0.98 Dec: 0.97 Life cycle cost of capacitor should be

analysed as an Initiative for next quarter. Baseline to be established in Dec 2012 for Cost and Life Cycle Run and number of capacitors changed.

Page 165: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department: Electrical

Oct : 0.95 Nov:0.98 Dec: 0.97 Life cycle cost of capacitor should be

analysed as an Initiative for next quarter. Baseline to be established in Dec 2012 for Cost and Life Cycle Run and number of capacitors changed.

0% equipment received as per original project plan. Since site is not ready.

Cooling towers have to be shifted but electrical work pending. Challenges to

be addressed:Equipment planning. (Projects): Funds flow for procurement.

Capital used in Revenue.

On 25 Jan , next order to be released to registered contractor.Major contributor

in TPM planning.

Page 166: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Review 2

Feedback Feedback

Jan breakdown is 21 hrs.

Suggested KPI for April-June

On jan-29:Cooling tower is ready for

commissioning. Shut required to finish shift.

0% equipment received as per original project plan. Since site is not ready.

Cooling towers have to be shifted but electrical work pending. Challenges to

be addressed:Equipment planning. (Projects): Funds flow for procurement.

Capital used in Revenue.

Prepared. Will be submitted by 19-Jan- 2013 to President- DONE

To be submitted and finalised on 1/24/2013 - DONE

Memos dispatched to Power Plant and Recovery. However Pulp and Paper

machine will be completed by 26-Jan-2013. NOT DONE - BY 15 Feb

Under process. To be Completed by 26-Jan-2013 - DONE

Under process. To be Completed by 31-Jan-2013. NOT DONE. To be done by 10

Feb

Page 167: Sspbml- Kra Plant Jan-mar 15-2-13 v7

DONE

Done

Done

Done

To be done after commissioning.

DONE

DONE

DONE

DONE

AwaitingAwaiting

Formats already developed by PBOPlus. To be shared with Rajeev Pandey. Abhilash to confirm the same ASAP

through an email to RP with a copy to Manjit Singh.

Regular Items consumption listed.All communications must be recorded. Final consumption database to be

compiled by 22-Jan-2013.

Under process. To be Completed by 26-Jan-2013. DONE.

Page 168: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Awaiting

Preventive module has not been taken. Along with other modules. To be added to RAMCO. Ravi Tandon to discuss with Amit Gupta

Comparitive statements sent to Purchase on 28 Jan-2013

Approval gotten 22-Jan-2013Order Pending with Purchase.

Page 169: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 170: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.

Target Date(To be given under column L3)Weightage

L-3 L-2 L-1

1 Oct - 20 Oct

1 Oct - 31 Oct

1 Oct - 31 Dec

1 Oct - 31 Dec

On going

1 Oct - 31 Dec

1 Oct -31 Oct

%age/ Level Achieved

Actual Performance (By

Appraiser)

Page 171: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1 Oct - 15 Nov

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.

Page 172: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Target Date(To be given under column L3)

Weightage

L-5 L-4 L-3 L-2 L-1

1 Oct - 20 Oct

Page 173: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1 Oct - 31 Oct

Page 174: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1 Oct - 31 Dec1 Oct - 31 Dec

On going

1 Oct - 31 Dec

1 Oct - 15 Nov

Page 175: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 176: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Perfromance score

Page 177: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Page 178: Sspbml- Kra Plant Jan-mar 15-2-13 v7

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 179: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 180: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 181: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 182: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Oct - Dec, 12Name : Dalip VermaDesignation: Sr. Manager

S No KRA KPI

1 Breakdown Reduction by 5 %

2 5 % Reduction in Cost

3 Reducing Air Compressor Failure

4

Reduce Breakdowns due to Instrumentation

Reduce instrumentation maintenance cost

Completion of Project of different areas and sections.

Page 183: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4

*NOTE: The individual will get the credit as long as he has done the activity whether the parameter improves or not . If we follow this model , management may not see any benefit. It is better to link to breakdown time saving and cost saving at least for his senior

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan- Mar 13Name : Dalip VermaDesignation: Sr. Manager

S No KRA KPI

1 Unplanned Breakdowns

Completion of Project of different areas and sections.

5 % Reduction in Unplanned Breakdowns

Page 184: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Inventory Management

3

4 Porject Assigned Listing of all Ongoing Projects

Reducing air leakage in plant. Identify the air leakage & rectify it.

Page 185: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5 Cross Functional Intiatives

Page 186: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action0/1

TPM Listing of all Instruments Date

1

Date

1

TPM Date

0

Date

0

TPM

Date

1

Project Management

Date

NA

Date

NA

Steps to achieve the Initiative/Action

Measures/Performance Indicator

Scheduled preventive maintenance of critical equipment

Analyzing Critical spare Consumption in 3 month & listing

Transmitter Failure to be reduced by providing Knopy & Cover with plastic sheet.

Reducing air leakage in plant. Identify the air leakage & rectify it.

Proper coordation with entire project team, purchase and vendors.

Awarding erection job to well equipped and professional contractor.

Page 187: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Project Management

Date

NA

*NOTE: The individual will get the credit as long as he has done the activity whether the parameter improves or not . If we follow this model , management may not see any benefit. It is better to link to breakdown time saving and cost saving at least for his senior

Number of 0 ( Red Buttons) 2Number of 1 (Green Buttons) 3

Total number of Activities 5Achievement Percentage 60

Shree Shyam Pulp & Board Mills Ltd.

Review 1

Initiatives/Action

0/1

5 % reduction over Oct-Dec

Daily monitoring of work progress.

Steps to achieve the Initiative/Action

Measures/Performance Indicator

Page 188: Sspbml- Kra Plant Jan-mar 15-2-13 v7

12..01.2013

15.01..2013

100 % compliance to Plan

21.01.2013

90% compliance to schedule

28.01.2013

Monitor weekly 100% compliance to Plan

21..01.2013

28.01.2013

Tracking the individual section 100% compliance to Plan

15.01.2013

Project

100% compliance to Plan

100 % compliance to Plan

Root -Cause and Why-Why Analysis of Downtime in Oct-Dec

Implementation Plan of measures

Preventive Maintenance Schedule

Finalise plan of requirements with all

stakeholders.

Ensure availability of spares and consumables

Finalise equipment-wise work under preventive

maintenance

Record of Breakdown of Equipments whose preventive

maintenance already done. Number of such cases. Allowed

5%.

No Downtime due to lack of Critical Spares

Finalisation of Consumption Pattern over the last 3 months data of

Spares

Identifying critical list of spares to be kept in stock

raising purchase requisitions

1. Finalise implementation tracking schedule

1. Finalise implementation schedule along with

estimated cost

2. Number of activities to be completed by 31 Mar

2013

3. Number of Purchase Requisitions to be placed

Page 189: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100 % compliance to Plan

100% compliance to Plan

100 % compliance to Plan

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

6. Erection and commissioning of all

equipments

7. Monitoring and recording of progress on

fortnightly basis % variance over agreed dates as

per plan.

8. Summary of action plan for removing bottlenecks

Identification of 10 Major Causes for Breakdown in

consultation with Mechanical/Electrical/Process

1. Meeting of all heads to identify the 10 major

causes per dept

2. Finalisation of measures to mitigate each major

cause from each individual dept.

3. Implementation of Measures by plan

4. Tracking and monitoring of major causes to confirm

positive effect of measures.

Page 190: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - (DATE)

Feedback Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5

NOT INITIATIVES

Breakdown- July+Aug+Sept: 24 hr 15 min Oct+Nov+Dec(Till date ) : 20 hr 55 mins. ( 14.9% reduction)

Next KPI : Further 5% reduction. Materials not being procured. Critical list with date of PR to be compiled and addressed to President.

No equipment was nspected beyond date.

Analysis not complete. However, critical spare listing submitted.

Next KPI : To be completed by 31 Jan.

Data from stores to be submitted .Review pending.

CD - 3 points . Bleach Plant - 1 point. M/C - Regular. PM 3 - To be rectified after all machines are shutdown.Temporary arrangement made. Compressor loading has been dreduced as a result of it.

Next KPI :Flowmeters to be requested and installed

Page 191: Sspbml- Kra Plant Jan-mar 15-2-13 v7

NOT INITIATIVES

*NOTE: The individual will get the credit as long as he has done the activity whether the parameter improves or not . If we follow this model , management may not see any benefit. It is better to link to breakdown time saving and cost saving at least for his senior

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1

Actual Financial Impact Feedback

Next KPI :100% Compliance to Preventive Maintenance Schedule. Number of occurences where Schedule was not followed. Next KPI: Segregation and Storage of Spares.

Estimated Financial Impact

Oct: 10 hrs 55 minsNov: 4 hrs 5 minsDec: 6 hrs 25 mins

Jan:15 Hrs 25 mins

Page 192: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done.

Not done. Will be completed by 4-Feb-2013

Plan finalised at Dept level. Still to be communiated to all shareholders by 1 - Feb

60% of all spares and consumables , PR raised. Remainder to be completed 7-Feb

Done.

Done. Jan to be complied by 7-Feb-2013

To be sepaatly compiled by 10-Feb-2013

Activities have been listed in schedule. Dates to be added. 1-Feb-2013

Costing has been completed. Schedule of work for all ongoing is compiled. Final date to be decided upon release of funds.

Page 193: Sspbml- Kra Plant Jan-mar 15-2-13 v7

In progress. Being done in consultation with President.

Page 194: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

601 Ed. Qual. Diploma Instrumentation Tech.Instrumentation

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

01.10.12-31.10.12

01.11.12-10.11.12

01.10.12-31.12.2012

01.10.12-30.11.2012

01.10.12-31.12.2012

Page 195: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

601 Ed. Qual. Diploma Instrumentation Tech.Instrumentation

Suggested KPI for April-June Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

Page 196: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plan finalised at Dept level. Still to be communiated to all shareholders by 1 - Feb

60% of all spares and consumables , PR raised. Remainder to be completed 7-Feb

Activities have been listed in schedule. Dates to be added. 1-Feb-2013

Costing has been completed. Schedule of work for all ongoing is compiled. Final date to be decided upon release of funds.

Page 197: Sspbml- Kra Plant Jan-mar 15-2-13 v7

In progress. Being done in consultation with President.

Page 198: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

5% Reduction

5 % Reduction

10 % Reduction

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

As per set targets by project team under

the guidance of president

Page 199: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)

Weightage L-1

As per set targets by project team under

the guidance of president

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 200: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 201: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 202: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Oct - Dec, 12Name : R.K. VermaDesignation: G.M. Production

S NoKRA KPI

1

Production achievement Target Production achievement

Page 203: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2

Cost of production Target cost of production

3

%OTIF-Q Quality

Page 204: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4 Employee Engagement Index

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013

Name : R.K. Verma

Designation:G.M. Production

S NoKRA KPI

1Production achievement PM 3 - Project Assigned

* Feed back column to be independently filled by R.K.Verma

regarding work done Oct-Dec.

Page 205: Sspbml- Kra Plant Jan-mar 15-2-13 v7

PM 4 - Project Assigned

2 Cost of production Target cost of production

4 Employee Engagement Index Coordination with all Inter-

Functional Depts

Page 206: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 207: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative/Action

Prevent breakage loss due to slime

Cleaning of approach flow system after pressure screen providing cleaning dummy (In head box and its taper

header. 5 No. of dummies fitted to clean the pipe was beyond approach earlier )

Final dummy was fitted on 25 August 2012 ( Earlier breakage because of slime was 18- 20 per day. After

providing this dummy and cleaning the system initial six days has breakage due to slime, as nearly zero. Then

again, we have to clean the system. Time taken to clean the system is almost two and a half hours. Increase in

production of 2.5- 3 tonnes per day.)

Control AKD consumption and avoid intermittent soft size

paper rejection

Change the AKD dosing point at appropriate point. Note: This change we have done in PM-1 and PM- 2 also.

(Earlier AKD and Retention Aid was at interval of 400mm before pressure screen then AKD partially precipitated before mixing up with pulp. Dosing point was given in

accept line dummy of primary c.c. consumption reduced to 2 kg/ton. Also soft size rejection substantially reduced)

In summer season before changing dosing point , AKG consumption was 50 +- 2 kg/hr. After changing dosing

point it has reduced to 45+- 2 kg/hr . Rejection of paper due to soft size paper was almost 10 tonnes/

month/machine. Which has gone down to 0.4 tonnes

Increase the deckle at pope reel to get 380-387 cms deckle

utilization

Adjusting the sealing strip of wire and press felt, making it plain. And other small exercises.(Earlier deckle at pope

reel we used to get 391 cms but because of some reasons , deckle at pope reel has gone down to 386 cms. After

given exercse, we started to get 390-391 cms and utilization upto 387 cms.)

Page 208: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Cleaning of cut reels from side by old cloth

Timely cleaning of dryer fluff accumulated on dryer doctor

Avoid reel damage complaint

Increase the deckle at pope reel to get 380-387 cms deckle

utilizationBefore 28-July 2012, our average deckle utilization was 377.5 and at present we are utilizing at average upto

384.48 cms

Exluding down time we are getting production rate of 2.69

tonnes/hr in PM-3. To be increased to 2.8 tonnes/hr

Timely system cleaning. Guiding machine man to reduce paper reeling time after each break . Keep constant watch

to avoid unwanted breakdown and attend the job as preventive maintenance. (We attended 2 jobs during

boiler breakdown. Ie: Pressroll B/S sleevechange and 2nd press roll change that was causing downtime due to

coupling bolts breaking . We and the team are giving similar attention to avoid such time loss)

Reduce the drag load on wire and increase the wire life

Convince management to invest in ceramic tipped suction box top. (We communicate to the management and procured IBS ceramic tipped top fitted in dry suction

boxes of PM- 3 & 4. Consequently the drive load reduced by 20- 25 amp. The total fitting be completed from 4-July-

2012 to 20-Aug-2012)

Saving power when 20 Tonnes or more order in higher

grammage.

We will stop 160 kw vacuum pump and take 110 kw vacuum pump in operation. (If we get 68 gsm or higher order 20 or more than that we follow the practice and

save the power.)

To avoid creasing complain in sheet order paper

To add 2-3 kg/tn UF Resin in winter season and 1-2 kg/ton in balance months on regular basis. (To use UF Resin

without fail.)

Control the fluff complaint from printer

Sharp cutting of circular knife.(We are always keeping grinded knife on R/W and cutter. So that operation may

change in odd hours also. Keep regular watch on working of rewinder cutter whether they are following or not.)

Proper packaging of reels. (To insert and tighten core plug by hammer .Edge protector quality to check and see

whether packers are tightening or not.Proper stitching of reels by HDP cloth)

Page 209: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative/Action

Preshut Activities

1. Receipt of Vacuum Pump from China ( PO Placed )

3. Overheaed Crane ( Funds to be released )

Factoring Comments of President and Nayyar.

2. Press Frame from China ( Funds to be released by 10 Jan 2013 )

Page 210: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Civil Works

Erection

Commissioning

Preshut Activities

1. Receipt of Vacuum Pump from China ( PO Placed )

Civil Works

Erection

Commissioning

Avoid reel damage complaint

Shifting of all Equipments to Outside

Factoring Comments of President and Nayyar.

2. Press Frame from China ( Funds to be released by 10 Jan 2013 )

Shifting of all Equipments to Outside

Budget To be Provided by Head Office

Coordination Meetings to be done Weekly ( Fridays)

1. Minutes of meeting to be maintained with Pending Issues ,Timelines and Responsibility Centers

1. Record to be kept of all complaints ragrding reel damage, split machine wise with Why Why analysis

2. Ensure proper packaging of reels

Page 211: Sspbml- Kra Plant Jan-mar 15-2-13 v7

13. Track machine complaints over 3 months period

weekly.

Page 212: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

0/1 Feedback

1

0

1

1

1

Measures/Performance Indicator

Suggested KPI for Jan-Mar

Log book to be maintained in plant.

Data regarding total breakages due to slime , monthwise ( Oct-Dec) to

be submitted. As well production increase

( PM-3 ).

in 2010 : 26 kg/ton brought down in 2012:

23 kg/ton (In Summers).

Reduction less than 0.4 is not possible.

Reduction achieved due to good climatic

conditions.

Page 213: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1

1

NA

NA

NA

1

0

Increase from 384.48 to 386 ( Max achieved in PM-3 ). President and

Shamim will validate the numbers regarding

Deckle.

Submit data on current achor values for Low

GSM and High GSM. To be attached in Ja-March

KPI along with suggested

imporvements.

Encouraging results. Continued in current

quarter.

Page 214: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Detailed Project schedule for PM-3 and PM-4 completed.

Number of 0 ( Red Buttons) 2

Number of 1 (Green Buttons) 5

Total number of Activities 7

Achievement Percentage 71.43

Shree Shyam Pulp & Board Mills Ltd.

Review 2

0/1 Actual Financial Impact

25-Apr-13

17-Dec-12

2/10/2013 ((60 Days )

16-Jan-13

7-Feb-13

10-Jan-13

Measures/Performance Indicator

Estimated Financial Impact

Page 215: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3/15/2013 (27 Days )

3/25/2013 (30 Days )

21-April-2013 ( 55 Days )

25-Apr-13

25-Apr-13

17-Dec-12

2/10/2013 ((60 Days )

16-Jan-13

7-Feb-13

3/15/2013 (27 Days )

3/25/2013 (30 Days )

21-April-2013 ( 55 Days )

25-Apr-13

Variance against Budgeted Cost Budget prepared and discussed with top management on 25-Jan-2013

% Variance over plan

% Variance pending issues

5th of next month

0% complaint received

Page 216: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Every Tuesday

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Page 217: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 966Department: Paper M/C

Target Date(To be given under column L3)

L-5 L-4 L-3

Page 218: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 219: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 966

Department: Paper M/C

Feedback Suggested KPI for April-June Target Date(To be given under column L3)

L-5

Done

Not received.

Funds not released.

Funds not released.

Page 220: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Received.

Done.

Budget prepared and discussed with top management on 25-Jan-2013

Being done.

Page 221: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 222: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual. Pulp and Paper Tech from I.P.T Saharanpur

Target Date(To be given under column L3)Weightage

L-2 L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)

Page 223: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 224: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual. Pulp and Paper Tech from I.P.T Saharanpur

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

Page 225: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 226: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 227: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Perfromance score

Page 228: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 229: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 230: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 231: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 232: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Pawan Kumar SainiDesignation: Sr. Manager

S NoKRA KPI

1 Reduction of Customer complaints Zero Customer Complaints

2 Loss due to quality problems Zero loss due to quality problems

3 Standardization of Quality norms

4 Improve Quality Enabling Processes

Page 233: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan- Mar 2013Name : Pawan Kumar SainiDesignation: Sr. Manager

S No

KRA KPI

1 Zero Customer ComplaintsImprove Quality of Pre-Dispatch and Online Inspection

Page 234: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Standardization of Quality norms

3 Improve Quality Enabling Processes

4 Measures to improve Pulp Quality

Efficient working of testing equipment and procure new as per

requirement

Timely alerts on Brightness variation from backend

Timely alerts on Cleanliness from backend

Timely alerts on presence of residual hypo in bleached pulp.

Page 235: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

Analysis of Past Complain

1

0

NA

NA

Reduced time in reporting & testing result1

Number of errors found

0

Analysed the Inventory Of Stock 1

1

Steps to achieve the Initiative/Action

Measures/Performance Indicator

Try to Reduction of Customer Complain of 50%.

Number of Complaints Processed/Analysed

Preventive action to be taken to minimise

complaints.

Generate MIS & Testing Report

To Train Subordinates & Accuracy of The Report

Analysis Of Stock Chemical Consumption On the Basis Of Last Six Month Record

Stock Planning As per Production Plan

Page 236: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Efficient Working Of testing Equipment 1

Number of 0 ( Red Buttons)2

5

Total number of Activities7

Achievement Percentage71

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

Identified The External Vendors For Calibration Of

Lab Testing Equipment

Timely Maintenance Of Testing Equipment

Calibration All The Lab Equipment

Number of 1 (Green Buttons)

Steps to achieve the Initiative/Action

Measures/Performance Indicator

To give training and more supervision in Finishing House also to reduce customer complaint

Page 237: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1. Root -Cause and Why-Why Analysis of complaints

received in Oct-Dec

To work along with Mr Vivek Shrotriya for developing weekly MIS on PDI

For improving online inspection shop floor chemists' (at Paper Machines) JDs to be defined by Mr Saini

Ensure all Lab instruments are certified and calibrated.

Find number of errors % wise and subsequent reduction in errors.

1. Timely feedback to Pulp Mill shift-in-charge

2. Corrective action in co-ordination with respective machine In-Charges to avoid

greater losses at Paper MachineGeneral : Ensure clear records in Log Books for compliance of the above

Page 238: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Feedback Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5Complaints Received : 30 Major Complaints: 1) Shade (1)2) GSM (4)3) Reel damage (6) 4) Rough cutting and dust (4)5) Creasing (4)6) Paper breakage (4) 7) Short size (4)

1)Core pipe resolution through training.2) Checking increase of knifes to reduce rough cutting.

1)Incoming reports are almost immediate but time has reduced from 2 pm to 11 am

Training provided on KRAs but errors remain.

Next KPI : Find number of errors % wise and subsequent reduction in errors.

Page 239: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Actual Financial Impact Feedback

Calibration of all equipment done. Done after a year since last check.

Estimated Financial Impact

Page 240: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Get added initiatives from PK Saini after consultation with Manjit Singh

Page 241: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

1284 Ed. Qual. B. Sc.Quality Control(P.C Lab)

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

15 Oct - 31 Dec

15 Oct - 31 Dec

15 Oct - 31 Dec

Page 242: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15 Oct - 31 Dec

Shree Shyam Pulp & Board Mills Ltd.

1284 Ed. Qual. B. Sc.Quality Control(P.C Lab)

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

Suggested KPI for Jan-Mar

Page 243: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Get added initiatives from PK Saini after consultation with Manjit Singh

Page 244: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 245: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)

Weightage L-1

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 246: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 247: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Oct- Dec 2012Name : Anoop Kumar Saxena

Designation: General Manager

S No KRA KPI

1 Projects Assigned

2 Projects Assigned

3 Projects Assigned

4 Projects Assigned

To make a system for consumption of RO reject water in wet washing.

To avoid multi discharge of ash from Boiler 3 & make single discharge point. It will reduce the ash

transport cost & Fly ash.

Maintaining of Co-ordination with Boiler-Turbine erector

Coordination with Purchase department and stores for material supply.

Page 248: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : AK Saxena

Designation:

S No KRA KPI

1 Breakdown Reduce boiler breakdown time by 5%

General Manager Projects

Page 249: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Projects Assigned

3 Projects Assigned Hydraulic Testing of Boiler

4 Projects Assigned Commissioning of new cooling tower

Coordination with Purchase department and stores for material supply.

Page 250: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5 Projects Assigned FBR Commissioning

6 Projects AssignedTo avoid consumption of fresh water in the vacuum pump and the pre-cooler of the evaporator. for this

to make arrangement for water circulation

Page 251: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 252: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives Steps to achieve the Initiative/Action

Plan,Get it done,Check

Plan,Get it done,Check

Meet,Review,Decide,Act

Meet,Review,Decide,Act

Setting up of 250 mtr. of 4" line. All material used from the scrap.

Setting up separate screw conveyor from scrap

Arranging a meeting at 5:30 PM daily to review day's achievement and

plan next day's schedule

Maintainence of coherence in needs & supply by checking bills. Preparing requests and personal Inspections.

Page 253: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative/Action

Economiser performance

1. Economiser performance to be monitored and reported.

Page 254: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4. Implementation measures for causes of Breakdown

5. Monitoring

No of equipments to be recdFinalise vendor wise schedule of meetings

Weekly coordination meetings. MOM issued on same day

Installation and Procurement

2. Number of activities to be completed by 31 Mar 2013

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

8. Summary of action plan for removing bottlenecks

2. Number of activities to be completed by 31 Mar 2013

2. WHY-WHY analysis of each breakdown in the period of Oct-Dec ( 3 Nos. )

3. Analysis of Planned vs Actual Time of rectifying the problem.

Maintainence of coherence in needs & supply.

Analysis of October -Dec of meetings to be provided in terms of % delay beyond plan.

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed with expected schedule of delivery

4. Number of Purchase orders to be placed.

7. Monitoring and recording of progress on fortnightly basis with areas of concern

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed with expected schedule of delivery

Page 255: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

8. Summary of action plan for removing bottlenecks

2. Number of activities to be completed by 31 Mar 2013

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

8. Summary of action plan for removing bottlenecks

2. Number of activities to be completed by 31 Mar 2013

5..Number of Equipments to be received

4. Number of Purchase orders to be placed.

7. Monitoring and recording of progress on fortnightly basis with areas of concern

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed with expected schedule of delivery

4. Number of Purchase orders to be placed.

7. Monitoring and recording of progress on fortnightly basis with areas of concern

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed with expected schedule of delivery

4. Number of Purchase orders to be placed.

Page 256: Sspbml- Kra Plant Jan-mar 15-2-13 v7

6. Erection and commissioning of all equipments

8. Summary of action plan for removing bottlenecks

7. Monitoring and recording of progress on fortnightly basis with areas of concern

Page 257: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

0/1 Feedback Suggested KPI for Jan-Mar

1

1

1

0

Measures/Performance

Indicator

Number of Delays against date give to

top management Completed in first week of November.

Number of Delays against date give to

Board

Completed in the end of Oct. Saving of 35000 INR /month ( approx) + Benefit of reduction in pollution.

Number of times meeting cancelled or

delayed

Analysis of October and November of meetings to be provided in terms of % delay beyond plan.

Number of times, per month, failed to meet timelines agreed on. No formal record

maintainedNew KPI : Maintain record of communication

New KPI : Hydraulic testing of Boiler by 25 Jan.

New KPI : FBR project to be started by February 15. Detailed listing of major activities and timelines to be provided.

New KPI: New cooling tower to start by Jan 25. Detailed listing of major activities to be given.

New KPI : Economiser performance to be monitored and reported. There should be zero breakdown in boiler due to economiser.

Page 258: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons) 1Number of 1 (Green Buttons)3

Total number of Activities 4Achievement Percentage 75

Shree Shyam Pulp & Board Mills Ltd.

Review 2

0/1 Actual Financial Impact

31-Jan-13

New KPI: WHY-WHY analysis of each breakdown in the period of Oct-Dec ( 3 Nos. ) . Also the analysis of Planned vs Actual Time of rectifying the problem.

Measures/Performance

IndicatorEstimated Financial

Impact

50 % reduction over Oct-Dec

1 Day production PM. 24 hrs. 180

Tons

Page 259: Sspbml- Kra Plant Jan-mar 15-2-13 v7

31-Jan-13

31-Jan-13

5-Feb-13

5-Feb-135-Feb-13

15-Feb-13

15-Oct-13

31-Jan-13

15-Oct-13

100 % compliance to Plan

100 % compliance to Plan

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

By 17th and 2nd of next month

100% compliance to Plan

100% compliance to Plan

Page 260: Sspbml- Kra Plant Jan-mar 15-2-13 v7

28-Feb-13

31-Jan-13

15-Nov-12

Zero Consumption

30-Jan-13

All inhouse

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

By 17th and 2nd of next month

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

By 17th and 2nd of next month

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

100% compliance to Plan

Page 261: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100% compliance to Plan

By 17th and 2nd of next month

100% compliance to Plan

Page 262: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1336 Ed. Qual. B.Tech(Mechanical)Department: Utility projects

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

10 Oct-6 Nov

6 Oct-8 Nov

1 Oct-Ongoing

1 Oct-Ongoing

Page 263: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1284 Ed. Qual. B. Sc.

Department: Quality Control(P.C Lab)

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Suggested KPI for April-June

Oct-Dec: Nil ( Except for economiser breakdown)Jan: Nil

Being done. Zero breakdown.

Page 264: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Zero Breakdown.

Zero Breakdown.

Zero Breakdown.

Zero Breakdown.

DoneDoneDone

Done

Done

Done. Awaiting material

Done. Awaiting material

Done. Awaiting material

Done.

Done.

Done.

Page 265: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done.

Done.

Done.

Done.

Done.

Done.

Done

Done

Done

Done

Done

Page 266: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done

Done

Page 267: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

B.Tech(Mechanical)

Weightage

100%

100%

100%

100%

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 268: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)

Weightage L-2 L-1

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 269: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 270: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 271: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 272: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Oct - Dec, 12Name : Dr. Sudhir K. Singh ChauhanDesignation: Deputy Manager

S No KRA KPI

1 Plantation as per business plan

2

3

Development of Hi-tech clonal nursery and R&D Centre.

Boundary plantation as per business plan

Boundary plantation at main gate/cycle stand area, ETP & Oxygen tank area.

Seasonal Flowering, Herbal, ornamental plants , Hedge planted and vegetable, new Bore well at Garden and Guest house area

Agriculture crop model and agro forestry crop model

Agriculture crop model and Agro forestry crop model

1) Development of Agricultural - crop model of Sugarcane irrigated by ETP water of the mill

Page 273: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4 Plantation as per business plan FSC –coc certification

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Dr. Sudhir K. Singh ChauhanDesignation: Deputy Manager

S No KRA KPI

2) Intercropping agro forestry model development irrigated by ETP water

Page 274: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1

Development of green belt through pla

Agro forestry models for farmers under

Development of Hi-Tech Clonal Productiob and R&D center ( Nursery)

Page 275: Sspbml- Kra Plant Jan-mar 15-2-13 v7

To promote ETP water and clonal pla

Page 276: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Social & Farm forestry initiatives like promotion of clonal plantation,development of nursery of both Eucalyptus and Bamboo with certif

Page 277: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Maintaing documentation work and crea

Page 278: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action0/1

Plan,Implement,Check

1Plan,Implement,Check

0Plan,Implement,Check

0

Plan,Implement,Check

1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Establishment of Green house, net house , open nursery and CMA for large scale up plantations through farmers and mills. Work will be started of Hi-Tech Clonal Nursery and R&D Centre after sanction of project/budget. Project already has been submitted.

Number of Days delay against annual commitment

Clonal Eucalyptus, Ashoka, Kadam, Silver oak, Gold Mohar, Shisham, Amaltas and Acacia Species for greenery development and balancing environment.

Number of Days delay against annual commitment

Oranamental and flowering plants planted in scrubbed Plastics drums at ETP. Medicinal, ornamental and Flowering plants will be planted accordingly seasons.

Number of Days delay against annual commitment

Model develop for using ETP water as a irrigation for agriculture crop and compare with farmers crop within adjoining mills area

Number of Days delay against annual commitment

Page 279: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plan,Implement,Check

0Plan,Implement,Check

0

Number of 0 ( Red Buttons) 4Number of 1 (Green Buttons) 2

Total number of Activities 6Achievement Percentage 33

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action

0/1

Develop Agro- Forestry model with Clonal Eucalyptus and Poplar irrigation by ETP water for demo to farmers. Meeting held with adjoining farmers regarding use of ETP water as a irrigation in crops

Number of Days delay against annual commitment

Preparation of documents for FSC-coc at Kashipur. For Global marketing of our products

Number of Days delay against annual commitment

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Page 280: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Under this project , SSPBML will be able to rpdouce 6 Lac plants in a year. Of which ,m 4-5 lacs of clonal plants will be distributed/on sale to farmers at a rate of INR 8/ Plant. Nursery generates revenue from this project of approimately 20 Lacs/Yr after meeting the expenses. These plants will cover a green belt of 200-250 hectare area. This plantation shall generate sufficient raw material ( wood pulpp) bas per future requirements within 5-6 years. It will alsp provide a positive impact to prreserve our environment, which is a major challeneg today.

10-Jan2. Get approval 15-Jan-13

5-Feb-13

As per calendar

100% compliance

10-Feb-13

Chemical properties of sugarcane and ither content will be tested from Pant Nagar University and Govt Sugarcane Research center.

28-Feb-13

15-Feb-13

28-Feb-2013 on wards.

1. Development of Gene Bank/CMA/Mini Hedge Garden for coppice shoots for clonal production. Size of Gene bank will be 320 m2.

1. Submit proposal listing costings, benefits and estimated workplan

3.Created detailed calendar with project activities and planned dates for each

4. Indent all required consumables/materials

5.Monitor Receipt of materials

Block and line/boundary plantation of Clonal Eucalyptus , Poplar, and other avenue plants and species

1. Created detailed calendar with project activities and planned dates for each

2. Indent all required consumables/materials

We will prepare data of our sugarcane crop and compile with adjoining farmers' sugarcane crop. We will analyse chemical properties of our sugarcane with GB pant University and sugarcane research center and compare with normal farmer's crop

A meeting will be conducted with the adjoining farmers at the time of harvesting at sugarcane plot.

1. Compilation of Date of Sugarcane crop

2. Analysis of Data as well as Chemical Propoerties of crop

3. Meetings with adjoining farmers

Page 281: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1. Completion of Survey 28-Feb-13

5-Mar-13

10-Mar-13

As per report to be completed by 31-March-2013

Agro forestry intercropping model develop for poplar and Eucalyptus with Sugarcane

1. Submit projected model in form of proposal

2. Create calendar for demonstrations/meetings with farmers

2. Demonstrate plot for adjoining farmers according to date.

Conduct close survey in adjoining villages and feedback will be taken from the farmers then prepare a policy after discussion with management

2. Meetings for discussion with farmers

3. Submission of report listing feedback from farmers and agreements if any

4. Implemenatation of measures listed in report

Page 282: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Social & Farm forestry initiatives like promotion of clonal plantation,development of nursery of both Eucalyptus and Bamboo with certif

20-Feb-13

10-Feb-13

20-Feb-13

5-Mar-13

1. Identification of 10 Farmers for establishing seed nursery of eucalyptus and bamboo.

2. Create calendar for all activities including but not limited to the provision of good quality seeds by the mills and technical guidance to growers free of cost

3. Conduct survey to gauge effectiveness of program

4. Implementation of all CAPA measures gotten from survey

Page 283: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100% Compliance

23-Jan-13

2. Create training calendar 8-Feb-13

100% compliance

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

5. Follow through on all initiatives taken by company for enviromental protectionb as per guidelines of MoEF

Implement and prepare documents as per FSC standards and conducting monthly trainings to mills staffs at Kashipur regarding FSC_COC under supervision of President

1. Preparation of documents

3. Carry out training modules as per calendar

Page 284: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1468Department: Plantation

Review 1 - 27 Dec 2012

Feedback Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5 L-4 L-3

Oct - Mar

Oct - Dec

Sept - Feb

Modified proposal submitted in December.

Yield (estimated) : 100 quintals

Page 285: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1468Department: Plantation

Review 2

Actual Financial Impact Feedback Target Date(To be given under column L3)

L-5

Next KPI: Submission of feasibility report on use of Eucalyptus and Poplar as fuel for boiler.

Dec Onwards

Next KPI : Inform all villagers in surrounding areas of the effluent and that it is not dangerous or harmful.

Next KPI : Agro data required with referenc eto Input, harvest, yield data etc.

Estimated Financial Impact

Suggested KPI for April-Jun

Page 286: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Under this project , SSPBML will be able to rpdouce 6 Lac plants in a year. Of which ,m 4-5 lacs of clonal plants will be distributed/on sale to farmers at a rate of INR 8/ Plant. Nursery generates revenue from this project of approimately 20 Lacs/Yr after meeting the expenses. These plants will cover a green belt of 200-250 hectare area. This plantation shall generate sufficient raw material ( wood pulpp) bas per future requirements within 5-6 years. It will alsp provide a positive impact to prreserve our environment, which is a major challeneg today.Approval of project and release of first installemnt of INR 6 Lac up to 15-Jan-2013 for Gene Bank/CMA/MiniGedge garden.

DonePending

Chemical properties of sugarcane and ither content will be tested from Pant Nagar University and Govt Sugarcane Research center.

Page 287: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Decrease pressure of pollution control board if farmers using our ETP water as an alternative source of irrigation

As per report to be completed by 31-March-2013

Page 288: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Practice will be helpful to obtain various certificates related to environment safety and management ie: ISO EMS 14001(2004) Bank Loan benefits in taxation and other environmental consents with this effort. Our plantation activities will also be helpful to claim carbon credit and FSC certification

Page 289: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Get recognition , value addition and for leg Pre-Assesment was done on 29-Nov-2012 . Final audit has been completed by SSGS auditor on 23-Jan-2013

Page 290: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual. M.Sc. Ph.D.- Forestry

Target Date(To be given under column L3)Weightage

L-2 L-1

100%

100%

100%

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 291: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100%

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual. M.Sc. Ph.D.- Forestry

Target Date(To be given under column L3)

Weightage L-4 L-3 L-2 L-1

%age/ Level Achieved

Page 292: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Approval of project and release of first installemnt of INR 6 Lac up to 15-Jan-2013 for Gene Bank/CMA/MiniGedge garden.

Page 293: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Decrease pressure of pollution control board if farmers using our ETP water as an alternative source of irrigation

Page 294: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Pre-Assesment was done on 29-Nov-2012 . Final audit has been completed by SSGS auditor on 23-Jan-2013

Page 295: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Actual Performance (By Apprais

er)

Perfromance score

Page 296: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 297: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 298: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Raman KarirDesignation: Deputy Manager

S No KRA KPI

xx

xx

x %OTIF (To be assigned to senior) x

x Employee Engagement Index ( To be asx

1 Housekeeping of Turbines 5S Score

2 Breakdown Hours Zero Break Down

3 Hydraulic Cylinder leakage Frequency of Leakage

Power Production ( To be assigned to senior)

Cost of Power Production( To be assigned to senior)

Page 299: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of A

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Raman KarirDesignation: Deputy Manager

S No KRA KPI

1 Power Production

2Cost of Power Production Cost of Consumables

Reduce Hydraulic Cylinder leakage

Page 300: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 %OTIF4 Employee Engagement Index

Page 301: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

x xx

x xx

x x x

x x x

1-Nov to Dec 2012 5S Score % 1

2. Listing of spares in stockDate 1

INR Lakhs 0

1-Nov to 31 Dec 2012

0

1. Indent of spares 29-Oct-12

02. Review of spares One month ( 30-Nov)

3. Change the cylinder One day ( 1-Dec)

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

1. Proper stacking and segregation

3. Consumption of last six months against budget

Analysis of breakdown in last six months

Breakdown Hours per year

Number of occasions of Leakage per year

Page 302: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4. Monitoring

0

Number of 0 ( Red Buttons) 3Number of 1 (Green Buttons) 2

Total number of Activities 5Achievement Percentage 40

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Listing of spares in stock

1. Indent of spares2. Review of spares

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

To reduce the consumption of consumables/spares by 10%

1. Finalisation of Consumption Pattern over the last 3 months data

of Spares

2. Identify trends in spares usage and highlight critical items

3.Daily updation of issues,receipts and consumption.

Minimise frequency of leakage by maintaining spares

Page 303: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3. Change the cylinder4. Monitoring

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Page 304: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Feedback Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5 L-4

x x

x x

x x

x x

Scrap/Obsolete items tobe

removed after re-checking by

concerned dept. Elec,mech etc.

Spares listing to be updated in

subsequent KPI

Next KPI: Daily updation of issues,receipts and

consumption. ( Common for Boiler)

Data not submitted. Next KPI: To reduce the

consumption of consumables/spares by 10%

( Same for boiler )

Failure to make contact with

personnel who have relevant information

Next KPI : Eliminate the leakage from hydraulic

cylinder . Same subpoints/initiatives.

Page 305: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Actual Financial Impact FeedbackEstimated Financial Impact

Suggested KPI for April-Mar

Page 306: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 307: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

1199 Ed. Qual. Inter + Mech Diploma PP/ Turbine

Target Date(To be given under column L3) Weightage

L-3 L-2 L-1

x x x x x x

x x x x x x

x x x x x x

x x x x x x

1 Nov - Dec

1 Nov - Dec

29-Oct

%age/ Level Achieved

Actual Performance (By

Appraiser)

One Month (30 Nov)

One Month (1 Dec)

Page 308: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

1199 Ed. Qual. Inter + Mech Diploma PP/ Turbine

Target Date(To be given under column L3) Weightage

L-5 L-4 L-3 L-2 L-1

Page 309: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 310: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

x

x

x

x

Perfromance score

Page 311: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 312: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 313: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : YOGESH KMR. SAINIDesignation: Deputy Manager

S No KRA KPI

1 Projects Assigned

2 Projects Assigned

3 Any other project assigned Meet timelines

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Perfoemance Planning and Assesment for the Quarter Jan-Mar 2013Name : YOGESH KMR. SAINIDesignation: Deputy Manager

S No KRA KPI

Design of new cooling tower so that online one sump out of 4 may be

cleaned

Co-ordination with FBR boiler errector

Page 314: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 315: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1 Feedback

Plan,Do,Check Number of days delay

1

Meet,Review, Decide,Act

1

0Number of days delay

Number of 0 ( Red Buttons) 0Number of 1 (Green Buttons) 2

Total number of Activities 2Achievement Percentage 100

JAN-MAR TARGETS TO BE MORE SUBSTANTIVE

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Study of existing and new design, Prepration of drawings, Supervised on site progress.

Arrangement of meeting at 5:30 PM to review day's progress and plan next day's schedule.

Number of occasions of missed timelines

Data to be validated

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Estimated Financial Impact

Page 316: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Page 317: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1202 Ed. Qual.Department: Utility Projects

Review 1 - 27 Dec 2012

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

4 Oct-15 Nov

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1202 Ed. Qual.Department: Utility Projects

Review 2

Feedback Target Date(To be given under column L3)

L-5 L-4

Suggested KPI for Jan-Mar

1 Oct-Ongoing

Daily

Actual Financial Impact

Suggested KPI for April-Jun

Page 318: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 319: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

B.Tech (Chemical)

Target Date(To be given under column L3) Weightage

L-1

100%

100%

Shree Shyam Pulp & Board Mills Ltd.Annexure I

B.Tech (Chemical)

Target Date(To be given under column L3) Weightage

L-3 L-2 L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

%age/ Level Achieved

Actual Performance (By Apprais

er)

Page 320: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 321: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Perfromance score

Page 322: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 323: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Manish SrivastavaDesignation: Dy. Manager HR

S No KRA KPI

1 Implement HR Processes Deployment of Right Manpower

2 Implement HR Processes

3 Implement HR Processes Encouragement of employees

4 Classification of Workmen

Initiate Employee Engagement Activity

Grading of Workmen into Grade 8 and Grade 9.

Page 324: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Sachin Verma/Manish SrivastavaDesignation: Dy. Manager HR

S No KRA KPI

1Employee Satisfaction Index Satisfaction Index

2 Administrative Processes TCEC TCEC %3 Satisfaction of A level Players To be introduced next year4 Satisfaction of other Players To be introduced next year

5 Implement HR Processes Deployment of Right Manpower

6 Implement HR Processes Encouragement of employees

Page 325: Sspbml- Kra Plant Jan-mar 15-2-13 v7

7 Classification of Workmen Grading of Workmen into Grade 8 and Grade 9.

Page 326: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

0

0

0

1

1

0

0

Meet with Dept Heads and finalise.

0

Number of 0 ( Red Buttons) 6Number of 1 (Green Buttons) 2

Total number of Activities 8

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

1. Provide the required Manpower within 30 days

Number of times missed agreed upon

timelines

2. Recruitment of qualified manpower as per job requirements within time

Number of times missed agreed upon

timelines

3. Identify the job description for designated position

Number of times missed agreed upon

timelines

1. Organize and Get together any other activities

Number of times missed agreed upon

timelines

3. Organize different committees including workers & staff

Number of times missed agreed upon

timelines

1. Introduce PMS in phases, in the factory for workmen

Number of times missed agreed upon

timelines

2. Identify the employee training needs and inputs fror the same.

Number of times missed agreed upon

timelines

Page 327: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Achievement Percentage 25

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

%? Measured monthly

Identfication to be done by Jan 31.

Identify 5 categories per month

Steps to achieve the Initiative/Action for Jan-

March

Measures/Performance

Indicator

Implement the reward recognition processes in the Engagement

Activities % (Measured

annually )

Criteria for Employee Awards program and different awards to be finalised for foundation Day

1. Provide the required Manpower within 30 days

2. Recruitment of qualified manpower as per job requirements within time3. Identify the job description for designated position

1. Introduce PMS in phases, in the factory for workmen

Format and processes for workmen appraisal to be firmed up by 31 Mar

2. Identify the employee training needs and inputs fror the same.

Target dates for workman level to be finalised by 31 Jan, for all depts.

Page 328: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Meet with Dept Heads and finalise. 9 Depts to be covered by 31 Mar

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Page 329: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

1 Oct-31 Dec

1 Oct-31 Dec

1 Oct-31 dec

Suggested steps for Jan-Mar

Data to be provided

Next KPI : Identfication to be done by Jan 31.

Identify 5 categories per month

2 events organisedKaizen committee created. Initiatives received from it.

Next KPI : Implement the reward recognition

processes in the Engagement Activities

Next KPI: Format and processes for workmen

appraisal to be firmed up by 31 Mar

Next KPI : Target dates for workman level to be

finalised by 31 Jan, for all depts.

3 Departments a month.

Next KPI : 9 Depts to be covered by 31 Mar

Next KPI: Criteria for Employee Awards

program and different awards to be finalised

for foundation Day

Page 330: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Actual Financial Impact Feedback Target Date(To be given under column L3)

L-5

Estimated Financial Impact

Suggested KPI for April-Jun

Page 331: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 332: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.

Target Date(To be given under column L3) Weightage

L-2 L-1

40% 100%

25% 100%

25% 100%

%age/ Level Achieved

Actual Performance (By

Appraiser)

Page 333: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.

Target Date(To be given under column L3) Weightage

L-4 L-3 L-2 L-1

Page 334: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 335: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Perfromance score

Page 336: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 337: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 338: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : S.Maji

Designation: Manager - Stores

S No KRA KPI

1 Production loss due to materials

2 Loss of materials in storage

3 Customer Satisfaction Internal customer satisfaction index

4 5S Implementation of 5S

Elimination of Production loss due to material

Prevention of Loss of material in stroage

Page 339: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Ashok Sharma/S.Maji

Designation: Manager - Stores

S No KRA KPI

1 Production loss due to materials Reduction of Production Loss

Timely Lifting of Goods from Local transport

2 Prevention of Loss of material in storage

Elimination of Production loss due to material

Page 340: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Modifications and work in Storage

3 Customer Satisfaction Loss of materials in storage

Internal customer satisfaction index

4 5S Implementation of 5S

Page 341: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 342: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

1 Oct-31 Dec

d) Issue Material of FIFO basis

31 Dec-31 Jan

Steps to achieve the Initiative/Action/ Timeline

Measures/Performance

Indicator

a) Classification of items and fixation of ROL/ROQ

Tonnes of Production lost

b) Finalise Critical Items list and placement

c) Increase no of items under ROL from existing 500 to 1000

a) Zero availability in stock of expiry date items

Number of items where shortage was found

b) Finalise plane of usage of shelf life items

c) Reduction of Non-Moving Items by 20 %

a) To provide summary sheet of orders placed to Engg depts on

weekly basis% Satisfaction as per

feedback

b) Sending list of pending PRs to Purchase dept

c) Weekly meeting with internal customers

To be implemented dept wide in Stores.

Page 343: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Timely Lifting of Goods from Local transport

31-Mar-13

Bearings, Oil seals and Sleeves to come under purview of 5S in Jan-

Mar

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Steps to achieve the Initiative/Action/ Timeline

Measures/Performance

Indicator

Tonnes of Production lost- 5% reduction over

loss for Oct-dec

1. Identifying Materials getting Stocks Out on Daily basis

Daily report to be Submitted

2. Critical Material List to be given to purchase daily

1. Compile list of all obsolete/unusable materials still in

storage

Page 344: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Mar-13

31-Jan-13

31-Jan-13

28-Feb-13

Daily Submission

28-Feb-13

15-Mar

7-Mar-13

15-Mar-13

d) Issue Material of FIFO basis 100% compliance

Tuesday

Tuesday

Friday

2. Create an At-Risk Sheet for materials

3. Conduct Monthly Meeting with HODs

last week of every month

1. Create calendar of work with timelines and responsibility centers

2. Create action plan and raise indents

3. Meet with all stakeholders and finalise as well as circulate plan

4. Follow through with plan as per schedule

a) Classification of items and fixation of ROL/ROQ

b) Finalise Critical Items list and placement

c) Increase no of items under ROL from existing 500 to 750

a) Zero availability in stock of expiry date items

b) Finalise plan of usage of shelf life items

c) Reduction of Non-Moving Items by 5 %

% Satisfaction as per feedback

a) To provide summary sheet of orders placed to Engg depts on

weekly basis

b) Sending list of pending PRs to Purchase dept

c) Weekly meeting with internal customers . MoM issued same

day with timelines and responsibility centers

To be implemented dept wide in Stores.

Page 345: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1. Create final implementation plan 31-Jan-13

2. Implementation of all 5S activities 100% Compliance to plans

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 346: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Suggested KPI for Jan-Mar

Resigned hence could

not be reviewed. New

incumbent taken over few

days back

Next KPI : By January end complete ROL/ROQ list for all consumables to be compiled.

Page 347: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Feedback Target Date(To be given under column L3)

L-5

Data for Oct-Dec not compiled. Will be done by 5-Feb 2013

Being done

Being done.

Work has started.

Estimated Financial Impact

Actual Financial Impact

Suggested KPI for April-Jun

Page 348: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Work has started.

Being done but no official record being maintained. All meetings from here on will be recorded and monthly MoM circulated

Will be done by 15-Feb. All work done so far will be updated.

Will be done by 15-Feb

Physical stock taking in prgress. Will be completed on 28 Feb

Physical stock taking in prgress. Will be completed on 28 Feb

Will be completed once physical stock taking is complete. Expiry date items list will be compiled by end of Feb.

Shelf life items list will be compiled by 15-Feb. Plan of usage will be subsequently formed in consultation with all stakeholders.

Non-Moving items list will be compiled after stock taking. ie by 18-FebBeing done

Not Done. Summary sheet will be prepared from now all and updated for Jan by 18-Feb

Not Done. Will be prepared from now all and updated for Jan by 18-Feb

Meetings taking place. But record being maintained.

Page 349: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Done. To be submitted by 5-Feb. Only have TPM measures received from Neeraj Singhal so far.

Page 350: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.

Target Date(To be given under column L3) Weightage

L-2 L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)

Page 351: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.

Target Date(To be given under column L3) Weightage

L-4 L-3 L-2 L-1

Page 352: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Being done but no official record being maintained. All meetings from here on will be recorded and monthly MoM circulated

Will be completed once physical stock taking is complete. Expiry date items list will be compiled by end of Feb.

Shelf life items list will be compiled by 15-Feb. Plan of usage will be subsequently formed in consultation with all stakeholders.

Not Done. Summary sheet will be prepared from now all and updated for Jan by 18-Feb

Page 353: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Done. To be submitted by 5-Feb. Only have TPM measures received from Neeraj Singhal so far.

Page 354: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Perfromance score

Page 355: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 356: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 357: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 358: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Khatra Mohan SatapathyDesignation: Manager - Production

S No KRA KPI

1

2 Better product quality Number of occasions quality failed

Target Production acheivement ( To be shared with senior )

To increase production by 5% in P.M/C No. 4 . Carrier rope should be fitted in dryer group no. 3 which is

not there now. For which paper passing is being delayed. M/C should

run with Turbine power so that stoppage due to Hydl. Power Failure

should be avoided.

Page 359: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3

4 Employee Engagement Index

x %OTIF ( To be assigned to senior ) x

Signature of A

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Khatra Mohan SatapathyDesignation: Manager - Production

S No KRA KPI

1 Target Production Achievement Increase Production by 5 % in PM 4

Target cost of production ( to be shared with senior )

Page 360: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Target cost of production Achieve Target Cost

3 Employee Engagement Index Increase Employee engagement

Page 361: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4 %OTIF To be taken up next year

Page 362: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1 Feedback

Effective management

0

Plan,Execute,Check Date

1

Plan,Execute,Check

Plan,Execute,Check

Plan,Execute,Check

Steps to achieve the

Initiative/Action

Measures/Performance

Indicator

Plan,Implement,Review

% Increase in production

Production Sept : ? Oct : 1087 Nov : 989.15

Vacuum system should be modified so that M/C speed can be increased.

Vacuum Pressure(earlier)(?) : 150 mmHG Current : 250 mm HG

By providing Consistency reg water in stock line can be minimised

Plan,Implement,Review

Date ( Later on more appropriate measure)

Better smoothness, cluster calendar is to be modified. Cluster roll should

be fitted in bottom side.Date ( Later on more appropriate measure)

To avoid water dripping, mainly in winter season exhaust fans are to be

fitted in both side walls which is affecting quality of paper

Date ( Later on more appropriate measure)

Mainly complaints come to P.M/C regarding variation in GSM and less

smoothness. To avoid both complaints reasons are given above.

Date ( Later on more appropriate measure)

Page 363: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plan,Execute,Check

x x

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Crews of the Machine should be motivated and educated

Plant Head feedback in %

Steps to achieve the

Initiative/Action

Measures/Performance

IndicatorEstimated

Financial Impact

Page 364: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Jan-13

31-Jan-13

15-Feb-13

Collect Base Data and set Target INR / T of Paper

25-Jan-13

28-Jan-13

100% Compliance

19-Feb-13

100% Compliance

100% Compliance

1. Establish target Production Value

against last 3 month's value

2.Create detailed action plan

3. Implement all activities by target

date given

1. Collect baseline data for the last 6

months

2. Set target for reduction with

detailed action plan

3. Implement all activities by target

date given and monitor porgress in a

monthly basis

Increase Employee Morale through motivation

1. Create schedule for Motivational

Seminars and Special Initiatives

2. Ensure 100% compliance with

schedule

3. Maintain record of all meetings and initiatives with description of

meeting.

Measure and Track effectiveness of Training of Employees

Page 365: Sspbml- Kra Plant Jan-mar 15-2-13 v7

20-Jan-13

15-Feb-13

1-Mar-13

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

.1. Establish Criteria to measure

effectiveness of training to be listed.

2. Create template for Training evaluation

3. Track training scores for all

employees over a 3 months period ,

monthly. Make report of emerging trends.

Page 366: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1055 Ed. Qual.Department: Production ( Paper Machine )

Review 1 - 27 Dec 2012

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Suggested steps for Jan-Mar

Page 367: Sspbml- Kra Plant Jan-mar 15-2-13 v7

x x x x x

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1055 Ed. Qual.Department: Production ( Paper Machine )

Review 2

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Next KPI : Record to be maintained that logs all training and motivation sessions. Criteria to measure effectiveness of training to be listed.

Actual Financial Impact

Suggested KPI for April-Jun

TPM initiatives to be outlined in consultation with PBOPlus . To be establish timelines and responsibility centers

Page 368: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not yet ready as on 29-Jan-2013. To be followed up on.

Cannot be assessed.Not Done

Not Done

Not Done

Oct - Dec (Act) : 3122 T

Targetted Value ( 5 % increase over 3122 T): 3278 T

Jan: 1250 TFeb: 1030 TMarch : Nil ( Machine 4 closed from 18-Feb )

Page 369: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Done

Page 370: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Production ( Paper Machine )

Weightage %age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 371: Sspbml- Kra Plant Jan-mar 15-2-13 v7

xx x x x

x x x x

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Production ( Paper Machine )

Target Date(To be given under column L3) Weightage

L-2 L-1

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 372: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 373: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 374: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Sanat Kumar BhattDesignation: Line Head

S No KRA KPI

1 Production (To be shared with subordinate )

Finishing Loss

AKD Consumption

2 Target cost of production

Target Production achievement (2280 MT)

Cost of Production ( To be shared with subordinate)

Page 375: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 %OTIF

4

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Sanat Kumar BhattDesignation: Line Head

KRA KPI

1 Target Production acheivement

Employee Engagement Index

Modifications of Machine/Set-Up

Page 376: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Reduction in finishing loss

Page 377: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Project Assigned

3 Training On-The-Job training

Time , Cost, Quality Commissioning of Vacuum

Pump

Page 378: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action

(i) Cleaning with Boil out the system twice in a month and total time required is five hrs

(ii) By Cleaning the Vacuum Pumps with for de-scaling to increase vac. in pressure & wire to reduce breakage at least once in week.

(i)By Improving the housekeeping of finishing area.(ii)Maximum deckle utilization with marketing people.

(iii)To Reduce Quality change frequency by coordinating with marketing people.(iv) 5% Sheet Size order along with Reel Order.

(i)Dosing of Fixing Agent to be increased 50 gm.(ii) Regular Checking the metering pump.

(iii)At the time of M/c shut the line of AKD must be properly flushed.

Cost of Dynacog- 180 Rs/ KgCost of AKD- 30.75 Rs/Kg

Page 379: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action

To reduce the number of bends in LP Steam line in PM 1.

Page 380: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Modifying the crown of Press Rolls in both stages of PM 1 ( Press part ).

Modifying the crown of Press Rolls in both stages of PM 2 ( Press part ).

Hood to be mounted on PM-1 to control water dripping problem.

Maximise deckle utilization with Marketing

Page 381: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Commissioning of One Vacuum Pump .

Monthly meeting with the officers and On Job Training being scheduled every week

Page 382: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

0/1 Feedback

Tonnes

1

1

Data to be validated

%

0

gm/T

1

0

Steps to achieve the Initiative/Action

Measures/Performance

IndicatorSuggested Steps for Jan-

Mar

Open and clean the Headbox, Centricleaners and Pressure Screen.Schedule: every month 8 to 15 and

23 to 30

Sept : 1676 TOct: 1473.73 T

Nov:2056 TNo reduction in

downtime due to boil time measures since

this is already a measure in practice

before taking baseline data. Estimated impact of 6-8 hrs of additional

production time of paper.

Next KPI : PM 1 ( Steam Line ) : To reduce the

number of bends in LP Steam line in PM

1.Modifying the crown of Press Rolls in both stages

of PM 1 ( Press part ) . Similar job to be done for

PM-2. Activitity timelines to be given for line laying, crowns and

vacuum pump.

Schedule: Every Monday Cleaning by keeping one stand by.

Next KPI : Requisition of One Vacuum Pump .100

tonnes increase in production per month

PM-1 . 50 Tonnes in PM-2.

Schedule: (i)Check the Finishing house register every week for

finishing loss.(ii) Checking the Ream Weight every

day.

Present : 7% finishing loss. Data from week to

week of finishing loss for Sep-Dec to be

tabulated and trends to be identified. Measures to be taken

to further reduce finishing loss over the next three months to

be added with estimated date of

installation in next KPI. Challenges to be

addressed:Shortage of weight from customer (

four complaints registered)

Schedule: After every 15 days increase as 300-350-400 gm/T

dosing of fixator (Dynacog). (Gain of Rs22)

AKD Consumption, Sept: Oct : 20 kg, Nov : 18.5- 19 Dec: 17.5 kgs ( To be verified with

Mr V.K.Saxena )

Page 383: Sspbml- Kra Plant Jan-mar 15-2-13 v7

NA

0

Number of 0 ( Red Buttons) 3Number of 1 (Green Buttons) 3

Total number of Activities 6Achievement Percentage 50

Shree Shyam Pulp & Board Mills Ltd.

Review 2

0/1 Actual Financial Impact

1. Prepare detailed action plan 28-Jan-13

At a later point , when there is

interdepartmental working. There must be a

jointly arranged target between Powerplant and

PM 1/2. So as to prove that if one machine is

stopped , the remianing are running at capacity

steam pressure.

CNMD: Why can't we anticipate actions to be

taken for imporvements?

Steps to achieve the Initiative/Action

Measures/Performance

IndicatorEstimated Financial

Impact

Page 384: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2-Jan-13

3. Receipt of Materials

1. Prepare detailed action plan 28-Jan-13

15-Feb-13

3. Receipt of Materials

1. Prepare detailed action plan 28-Jan-13

21-Dec-12

3. Receipt of Materials

7-Jan-13

1. Implement measure 5-Jan-132.Track the performance 5-Jan-13

5-Feb-13

Weekly

2. Create Indent list for spares and materials

100% Compliance

4. Implement plan according to calendar

100% Compliance

5. Monitor change in performance on a weekly basis and create

monthly report100%

Compliance Steam pressure no longer incosistent

2. Create Indent list for spares and materials

100% Compliance

4. Implement plan according to calendar

100% Compliance

5. Monitor change in performance on a weekly basis and create

monthly report100%

Compliance

2. Create Indent list for spares and materials

100% Compliance

4. Implement plan according to calendar

5. Monitor change in performance on a weekly basis and create

monthly report100%

Compliance

10 % Reduction in finishing loss

3. Create summary report on reduction figures with suggestions

for further measures

1. Conduct weekly meetings with Marketing in charge ( Vivek

Shrotriya)

Page 385: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100% compliance

1. Prepare detailed action plan 28-Jan-13

2-Jan-13

3. Receipt of Materials

1. Prepare detailed calendar 5-Feb-13

00% compliance

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

2. Record meetings and submit monthly proposal for changes and

measures

100 tonnes increase in production per month

PM-1 . 50 Tonnes in PM-2.

2. Create Indent list for spares and materials

100% Compliance

4. Implement plan according to calendar

100% Compliance

5. Monitor change in performance on a weekly basis and create

monthly report100%

Compliance

2. Record MoM for all meetings and submit monthly report for all

measures and suggestions along with timelines and responsibility

centers.

Page 386: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department: Production

Data by Ramesh Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Page 387: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department: Production

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Suggested KPI for April-Jun

Page 388: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 389: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 390: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Weightage

60%

5.60% 30%

23 Kg /T 50%

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

67% efficiency ( Currently)

Page 391: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3) Weightage

L-2 L-1

%age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 392: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 393: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 394: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : V.K.SaxenaDesignation: Manager ( Stock )

S No KRA

Page 395: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 396: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : V.K.SaxenaDesignation: Manager ( Stock )

S No KRA

1 Cost of Production

Page 397: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Quality of Paper

Page 398: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 399: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12

KPI

Page 400: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 401: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013

KPI

AKD consumption

Page 402: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Ash consumption

Shade Variation

Page 403: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 404: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative/Action

Page 405: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 406: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative/Action

Decrease consumption of AKD . Currently 23 kg/ton

1. Monitoring the dosage of AKD twice in a shift daily.

Page 407: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Increase Ash consumption

2. Create action plan for all actvities

3. Implementation of measures

Minimise shade variation

2. Create action plan for all actvities

3. Implementation of measures

2. At time of M/C shut the line of AKD must be properly flushed

3. By increasing the dosage of fixator ( Dynacog) 300-350-400 gm/ton

1. Compile baseline data for Oct-Dec

4. Tracking of production machine wise to monitor ash value with

monthly report

1. Compile baseline data for Oct-Dec

4. Tracking of production machine wise to monitor shade variation with

monthly report

Page 408: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 409: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

0/1 Feedback Suggested KPI for Jan-MarMeasures/Performance Indicator

Page 410: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 411: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons) 1

Number of 1 (Green Buttons) 5

Total number of Activities 6Achievement Percentage 83

Shree Shyam Pulp & Board Mills Ltd.

Review 2

0/1 Actual Financial Impact

Reduction by 1 kg

Measures/Performance Indicator

Estimated Financial Impact

Page 412: Sspbml- Kra Plant Jan-mar 15-2-13 v7

With immediate effect,

Monitor the dosage for 15 days

28-Jan-13

5-Feb-13

100% Compliance

100% Compliance

'B' Value Measurement

28-Jan-13

5-Feb-13

100% Compliance

100% Compliance

Increse from 8-9% to a target of 10%

Page 413: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 414: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1347 Ed. Qual. M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.Department: Unit-II

Target Date(To be given under column L3) Weightage

L-5 L-4 L-3 L-2 L-1

Page 415: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 416: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1347 Ed. Qual. M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.Department: Unit-II

Feedback Target Date(To be given under column L3)

Done. Daily dosage monitoring also being recorded

Suggested KPI for Jan-Mar

Page 417: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Prepared for awaiting Shut

Monitoring Dosage

Not done. Will be done by 10-Feb-2013

Being done

Not Done

Will be started and completed by 5-Feb-2013

Page 418: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 419: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 420: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 421: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.

Target Date(To be given under column L3) Weightage %age/ Level Achieved

Actual Performance (By Appraise

r)

Perfromance score

Page 422: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 423: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 424: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : B.P.JainDesignation: G.M. (PRODUCTION)

S No KRA

1 Target Production acheivement

2 Target cost of production

Page 425: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 %OTIF- Quality

4 Labour Engagement

Page 426: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : B.P.JainDesignation: G.M. (PRODUCTION)

Page 427: Sspbml- Kra Plant Jan-mar 15-2-13 v7

S No KRA

1 Target Production Achievement

Page 428: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4

2 Target cost of production

Page 429: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 %OTIF- Quality

4

Page 430: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12

KPI

Cost reduction. Vetting to be done by President and Ramesh Kumar at HO.

Increase machine production by 2.00% *Note : To confirm whether that production has been achieved.

Page 431: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Further improvement in quality of paper

Employee Engagement Index

Page 432: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013

Page 433: Sspbml- Kra Plant Jan-mar 15-2-13 v7

KPI

Target Production Achievement

Reduce instances of breakage

Page 434: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 435: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Paper quality complaints from market must be reduced.

Excess Weight

Smoothness Variation

Reel Joint/Collapsed Core Pipe

Page 436: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action

c)Improve deckle utilization

Steps to achieve the Initiative/Action

a)Maintain vac pumps health in a good condition

1)Checking of its water sealing line at least once in a week and

take corrective actions.

b)Checking of glands packing and if required to be changed

c)Clearing pumps with acid once in one month

b)Increase the frequency of cleaning of all fresh water/backwater filter/showers

a)Minimum once in a week or whenever opportunity of

available

Close liasion with Sh. Samim Khan almost daily

a)Reduce 25 kw per ton of paper in power consuption

b)100kgs steam per ton of paper. c)AKD- 2kg/tn of paper consumption

d)Reduce finishing house related problems 1.Sheet/Yield Size Variation 2.Core Pipe

collapse 3. Rough Edge cutting

c)Holding meeting of all shift incharge initally weekly and then

fortnightly.

Page 437: Sspbml- Kra Plant Jan-mar 15-2-13 v7

a)Reduction specks level in paper.

i)Develope cost consciousness

ii)Maintain production with quality

a)Modification of III rd stage centri-cleaner line

a)Holding meeting up to supervisory level - and discuss the following.

a)Holding regular meeting with finishing house supervisors,and

all shift incharges to avoid finishing house related

complaints and quality and production problems . Holding

once time fortnightly.

Initially weekly and then twice in a month.

Page 438: Sspbml- Kra Plant Jan-mar 15-2-13 v7

iii)To avoid finishing related problems

i) Cost consciousness

ii) Stop wastage

iii) Benefit of regularity and punctuality

iv) Factory discipline etc.etc

Shree Shyam Pulp & Board Mills Ltd.

b) Meeting with workers and Develop.

Page 439: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Initiatives/Action

Improving of machine runability

2. Summary report to be prepared

4. Weekly monitoring of Action Plan

Reduction of Loss due to Breakages

1.Improving Vacuum Pump Health

Steps to achieve the Initiative/Action

Target Production Value of -Jan : 4800 TFeb: 4350 T

March: 3500 T

1. Daily Analysis of reasons for downtime of machine with CAPA

plan

3. Action plan for eliminating causes of reduction involving all concerned

departments

1. Compile/Analyse Breakages Data for 1-15 Jan for all machines

1.Analyse Breakages Weekly and report

2. Identify top 5 reasons for breakages and finalise Action Plan

1.Checking of it's water sealing line at least once in a week and take

corrective actions.

Page 440: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2. Prevent breakage loss due to slime

2.Creation of detailed Action plan

3. Implementation of measures

3. Improve deckle utilization

4. Edge Cutter Nozzle Functioning

5. Fluff related issues

Reduction in Steam and Power Consumption

2.Checking of glands packing and if required to be changed

3.Cleaning pumps with acid once in one month

1. Create Baseline Data for Breakages due to Slime

4. Tracking of breakages due to slime over 3 month period.

Close liasion with Shamim Khan almost daily

1. Improvement of shower water quality

2. Ensure good health of nozzle tip

1. Periodic cleaning in doctors in first two groups of dryers.

Identify areas of high consumption with remedial measures action plan

Monitoring weekly with Responsibility Center and Timelines

to be compiled in Weekly report.

Page 441: Sspbml- Kra Plant Jan-mar 15-2-13 v7

CAPA Analysis

2. Daily Analysis of reasons

3. Summary report to be prepared

5. Weekly monitoring of Action Plan

Ensure GSM control in Products incidences of excess weight( from weigh bridge) going to

customer will be reduced

1. Prepare a detailed action plan for 10 major concern areas

4. Action plan for eliminating causes of reduction involving all concerned

departments

Reduce number of Instances of complaint of Smoothness

Page 442: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

0/1 Feedback Suggested KPI for Jan-Mar

% Production rate increase.

1

1

1

1

Measures/Performance Indicator

Maintenance of Log Book should be regularChecked once in a week. Vacuum no longer drops ( Nov- Dec). 1824-> 1833 kg/hr Comparison to Anchor GSM (58) for next quarter. Split % increase according to Low and High GSM in next KPI.

Checked every 15 days.

Exceeding required schedule

% increase in Deckle over previous check

Earlier 257. Current : 259.5. Target : 260.5 (Max)- Steps to achieve this target to come in January-March 2013 KPI. To be submitted - 31 Dec 2012

a) Sept- 792 kw/T consumption. Oct- 714 kw/T. Nov- 793kw/T (To be split in subsequent KPI according to Low and High GSM consumption.) b) Flow meter not functional. Accurate reading N/A. No complaint made at level of President of Steam Flow Meter. c) Sept - 20.87 kg/T paper. Oct- 19.19. Nov- 17.47

Imporvements over baseline data provided.

Fixed time meetings on Tues. No rough edge complaints. No Core pipe complaints. There are two classes of cutters ( Domestic, Imported and Duplex.) . Establish baseline Data for all three concerns. To be submitted by 31 Dec. Improvements over this in next Quarter

Page 443: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1

0

c)Holding meeting of all shift incharge initally weekly and

then fortnightly.

% improvement in database provided regarding problem areas outlined in Challenges

column.

No significant increase in productivity. But initial penetration noted. Personal interaction with

downstream process shareholders required. Presently, only meeting with No.2 in dept. For next quarter go down

to lower levels as observer in meetings

chaired by Shft In-Charges etc. with

workers. Open house for performance measure in April.

Next KPI :Machine's runability must be

improved.

Next KPI: Paper quality complaints from market

must be reduced.

Next KPI : Size and weight was a concern in

production.

Next KPI :Excess Weight in Machine 4- Ensure GSM

control in Products of PM 4 and incidences of excess weight going to customer

will be reduced and database to be created

and improvement shown in next quarter KPI

Page 444: Sspbml- Kra Plant Jan-mar 15-2-13 v7

0

Number of 0 ( Red Buttons) 1

Number of 1 (Green Buttons) 5

Total number of Activities 6Achievement Percentage 83

Shree Shyam Pulp & Board Mills Ltd.

Page 445: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Review 2

0/1 Actual Financial Impact

100% compliance to Plan

Tuesday ( Weekly )

100% compliance to Plan

18-Jan-13

31-Jan-13

Measures/Performance Indicator

Estimated Financial Impact

5% Improvement over Average Runability of the last 3 Months

for all machines.

Number of Activities still pending on a monthly basis -

Not more than 15%

5% Reduction in Breakages over Average number in 1-15

Jan 2013

To be submitted Weekly ( Tuesday) for previous week

Page 446: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Checked every 15 days.

Log book to be maintained.

2-Feb-13

2-Feb-13

100% compliance to Plan

5th of every month

15-Jan-13

100% compliance to Plan

50% reduction in breakages over Baseline data

% increase in Deckle over previous check

Number of instances of breakage due to Edge Cutter

Number of breaks in calendar and rewinder due to fluff

5% over last Quarter ( per ton of paper produced)

Page 447: Sspbml- Kra Plant Jan-mar 15-2-13 v7

25-Jan-13

25-Jan-13

25-Jan-13

31-Jan-13

Every Tuesday

10% Improvement over baseline data of number of complaints provided over 6

months.

10 % Reduction in Number of Complaints of Excess Weight

10% Improvements over baseline data of number of complaints provided over 6

months.

10% Improvements over baseline data of number of complaints provided over 6

months.

Page 448: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1347 Ed. Qual. M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.Department: Unit-II

Target Date(To be given under column L3) Weightage

L-5 L-4 L-3 L-2 L-1

Four times in a month.

Minimum two times in

a month

Once in a month

Minimum four times in

a month

On day to day basis

By 31-Oct 2012 100%

October four times . November and December - two times.

Page 449: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100%

a) By 15 November 2012 b) By November end

By 21-November 2012(Material already indented is awaited.)

Page 450: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1347 Ed. Qual. M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.Department: Unit-II

October- Four times in a month and November , December - Two times a month

Page 451: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Feedback Target Date(To be given under column L3)

Data to be analysed.

YES

To be prepared by 4-Feb-2013

Done

Suggested KPI for Jan-Mar

As on 29-Jan Jan: 4393 T

Page 452: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done only on PM-4

Not done as on 29-Jan

Page 453: Sspbml- Kra Plant Jan-mar 15-2-13 v7

To be collected on 30-Jan

To be collected on 30-Jan

Not Done. Will be completed on 4-Feb-2013Not Done. Will be completed on 4-Feb-2013

Not Done. Will be completed on 4-Feb-2013

Will be completed on 8-Feb-2013

Page 454: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 455: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 456: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Sc (Chem.)P.G. Diploma in paper & pulp & paper from Saharanpur.

Page 457: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Target Date(To be given under column L3) Weightage %age/ Level Achieved

Actual Performance (By Apprais

er)

Perfromance score

Page 458: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 459: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 460: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Yogendra Pratap SinghDesignation: Manager

S No KRA KPI

1 Unplanned Breakdown

2 Plan fulfillment level

3 In time installation

Paper M/C mechanical maintenance unplanned breakdown (OM-

1/2/3/4)

PM- 1,2,3,4 - Preventive + Predictive Maintenance

Project PM- 3,4 . Modification fabrication work

Page 461: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4 Energy Energy Saved

5 Finishing House - PM- 1,2 Reducing finishing loss

Performance enhancement

Weightage x Apraiser's Score

Shree Shyam Pulp & Board Mill Ltd

Performance Planning and Assesment for the quarter: Jan-Mar 2013Name: Yogendra Pratap Singh

Designation:

Note : 1. Attach extra Sheet, if necessary.

Page 462: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Sl No KRA KPI

1 Unplanned Breakdowns

2

10% Reduction in Unplanned Breakdowns

No Downtime due to lack of Critical Spares

Loss of Production due to Machine Failure

Zero Loss of Production due to Machine Failure

Page 463: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 Project AssignedPM3

New Core Cutter Machine

Maintenance Cost Reduction

Page 464: Sspbml- Kra Plant Jan-mar 15-2-13 v7

4 IT systems to be upgradedImprove information sharing and documenting system

Page 465: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action 0/1

% of available time 0

1

% against plan

1Greasing of gearboxes,pumps etc. Plan fulfillment %

Plan fulfillment %

1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

To reduce mechanical breakdown time by 2 %

Inventory control better spares management

Reducing downtime of emergency breakdown to maintain health of

M/C by Periodic maintenance of all mechanical equipments

Reduction in Downtime

To improve running condition of all mechanical equipment

Preventive maintenance , proper oiling of bearings

To check installed and running condition of all equipments doctor

blade, frames, stretchers etc.

Proper workforce at hand and proper supervision and guidance for

workplace worker

Page 466: Sspbml- Kra Plant Jan-mar 15-2-13 v7

0

0

Jogger installation ( Sept 2012 ) 1

Number of 0 ( Red Buttons) 2Number of 1 (Green Buttons)4

Total number of Activities 6

Achievement Percentage 67

Shree Shyam Pulp & Board Mill Ltd

Reduction in Power usage and motor breakdown

Lubrication of bearings and gearboxes. Better load control while

M/C run, steam line insulation - Leverage load control

Units of energy Saved per tonne

Rotor of duplex cutter to be changed. It being unbalanced and

not designed well. Knife spares to be maintained.

Reduction in finishing loss in %

% increase in throughput

Page 467: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Initiatives/ActionsReview 1

0/1

20-Jan-13

28-Jan-13

25-Jan-13

25-Jan-13

25-Jan-13

Availability of Critical Spares

28-Jan-13

31-Jan-13

1-Feb-13

Tuesdays

Steps to Achieve Initiatives/Actions

Measures/Performance

Indicator

10 % Reduction in breakdown Hours over Oct-Dec ( 40 hrs for all

four machines per month)

Root -Cause and Why-Why Analysis of Downtime in Oct-Dec

Identify top 10 causes of Breakdown with Plan for CAPA along with

Timelines and Responsibility Centers

No. of activities completed monthwise

100 % Compliance to Plan

Preventive Maintenance Schedule Zone-Wise

100 % Compliance to Plan

1.Finalise plan of requirements with all stakeholders.

2.Ensure availability of spares and consumables

3.Finalise equipment-wise work under preventive maintenance

Monitor weekly. Format to be finalised

100% compliance to Plan

1.Finalisation of Consumption Pattern over the last 3 months data

of Spares

2.Identifying critical list of spares to be kept in stock raising purchase

requisitions

3.PR raised with Timelines of new items

4.Weekly Monitoring of receipt of spares with Procurement along with

issues and Action Plan

Page 468: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Rebuild work 31-Mar-13

Completed

No.

28-Jan-13

No.

30-Jan-13

31-Mar-13

Tuesday

28-Feb-13

15-Jan-13

18-Jan-13

No.

28-Feb-13

Tuesday

1. Finalise implementation schedule along with estimated cost

2. Number of activities to be completed by 31 Mar 2013

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

7. Fortnightly monitoring and recording of progress

% variance over agreed dates as per

plan.

8. Weekly summary of action plan for removing bottlenecks

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

6. Erection and commissioning of core cutter

7. Fortnightly monitoring and recording of progress

% variance over agreed dates as per

plan.

8. Weekly summary of action plan for removing bottlenecks

5% over baseline data of Oct-Dec

Record of Breakdown of Equipments whose preventive maintenance

already done. History Card to be Maintained. ISO

DocumentsNumber of such cases.

Allowed 5%.

Analysis of all Such breakdowns with CAPA

Within 48 hrs of Breakdown

Page 469: Sspbml- Kra Plant Jan-mar 15-2-13 v7

31-Jan-13

10-Feb-13

1. Finalise requirements for PMS system, zone wise

2. Meetings with IT to finalise changes in PMS System

Page 470: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5

Not a Initiative

Suggested KPI for Jan-Mar

Sept ( 21 hrs )Oct(26 hrs 15 mins)/Nov(21 hrs+35 hrs) :PM-1:- 2

hrs/6 Hr 15 min/10 hrs /PM-2:6 hrs/ 7 Hr/4 hrs

PM-3 : nil/10 Hr/40hrs( 35 hr due to inavailability of Pinion)

PM-4 : 13hrs/3 hrs/2 hrsCritical holding inventory provided to

stores. To provide PR Details of critical items. Unplanned downtime in total is

low as compared to industry benchmark. however, planned

downtime is excessively high- Steam boiler and market and environment

requirements.No breakdown reported because of oil or grease. Format to be provided for

maintaning records of preventive maintenance done.( Follow the

schedule provided by Rajiv Pandey)

Prepare Preventive maintenance schedule and implement during next

quarter.

Regularly checked but no record being maintained. Frequency of checks to be

logged.

Multi skilling is at its highest in the plant. Full-time value of each worker is

2-3 times as informed by President

Page 471: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Changed

Shree Shyam Pulp & Board Mill Ltd

Emp. Code: 339Department:

Ampere value constanly monitored. Logs to be maintained about the same.

Record and map the ten highest consumption units in operation. To be reviewed in April. Format to be signed

by Y.P Singh ( Mechanical) and ( Electrical ). After the first review in January, it is possible that the list is

expanded to the top 20 or the top 30 and so on.

Innovative measure taken : Cutter replicated from smaller scale and

applied to line. To add list of initiatives to next KPI where all ongoing projects are listed with expected dates of installation.

Problem areas where housekeeping is an issue to be listed with

measures to mitigate.

Next KPI : Standard of Housekeeping to be improved through proper stacking and segregation of materials.

Page 472: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Review 1

Target

Estimated Financial Impact Feedback

Jan: 30 hrs

Done

Not done: To be submitted by 5 Feb 2013

To be done by : 2/10/2013

Being Done. Will be done by 2 Feb 2013

Being Done

Not Done. Will be done by 5 feb 2013

Not Done. Will be done by 5 feb 2013

Actual Financial Impact

Page 473: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done

Done

Done

Done

Awaiting parts.

To be done by 31- March

Will be done by 5-Feb-2013

Will be done by 10-Feb-2013

Will be done by 10-Feb-2013

Done

Done

Page 474: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Done . Will be completed by 15-Feb

Page 475: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

965 Ed. Qual.Mech

Target Date(To be given under column L3) Weightage

L-4 L-3 L-2 L-1

Page 476: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill LtdPart - I

Ed. Qual. M.Sc. ChemistryMechanical Date of Birth

Page 477: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Target

L-5 L-4L-3

L-2

Not done: To be submitted by 5 Feb 2013

Being Done. Will be done by 2 Feb 2013

Not Done. Will be done by 5 feb 2013

Not Done. Will be done by 5 feb 2013

Weightage(Total 100)

Suggested KPI for April-Jun 2

Page 478: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 479: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not Done . Will be completed by 15-Feb

Page 480: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

100%

100%

100%

%age/ Level Achieved

Actual Performance (By

Appraiser)Performance

score

Page 481: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee

Signature of Appraiser

Shree Shyam Pulp & Board Mill Ltd

Page 482: Sspbml- Kra Plant Jan-mar 15-2-13 v7

L-1

%age/ Level Achieved

Performance Assessment By Appraisee

Performance Assessment By Appraiser

Page 483: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 484: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 485: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : R N Jha

Designation: Head Pulp Production

S No KRA KPI

1 Pulp Production

2 Cost of production Target cost of production

3434.60 MT/month(Avg. of Jan-Oct 2012) to be increased as per plan

Page 486: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 Delivery to internal Customer %OTIF4 Employee Engagement Employee Engagement Index

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Jan-Mar 2013Name : R N Jha

Designation: Head Pulp Production

S No KRA KPI

1 Production Achievement

CD Production

Page 487: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Cost of Production

Cost of Caustic

Cost of Chlorine

Consumption of Steam

Power Consumption

Page 488: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Chemicals in effluent

3 Delivery to Internal Customer

4 Employee Engagement

Soft water supply required followed by commissioning of PHE

Page 489: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5 %OTIF Weekly

6 Cross Functional Intiatives

Page 490: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 26 Dec 2012

Initiatives/Action 0/1

N/A

2) Timely change C.D. throat. Plan fulfillment %

1

NA

Saving of Caustic by 2%

INR per metric tonne1

Steam Consumption

1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

1) Using cooking aid along with Caustic (Uniform cooking,

Unbleached Brightness will be improved and bleach chemical will

be reduced)

1) Adding Cooking Aid 5MT/month (Cost of cooking Aid – Rs 150/Kg)

Metric tonnes per month

2) Changing C.D. Throat after six months(Cost of C.D. throat Rs 6 Lacs;

cost of Maintenance -Rs 25000/month)

3) Increase of Pulp Production by approximately 17MT/day.

Increase in metric tonnes per day

1) Cost of Caustic 40000/MT 2) Caustic consumption reduced by 2% 3) INR 30.8

lacs per month

1) Cost of steam - INR 1000/MT 2) Saving of Steam - INR 19.25 Lacs per month Net Saving - 41.3

lacs per month

Page 491: Sspbml- Kra Plant Jan-mar 15-2-13 v7

% NA% 0

1

3

4

75

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Increase in rate of CD Production

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

100% of Machine Demand to be met

Current : 7 T/hrTarget: 7.5 T/hr

Page 492: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Improvement in Wet Washing Big Aqua changed

Change of Small Aqua by old one

On Monday

On Monday

On Monday

Steam Consumption Identify points of Steam Loss 15-Jan-13

20-Jan-13

Reduction of 10 Units

1. Improvement of Pith Separation by installation od depither basket

2% increase over baseline( 18% )

1% Increase in Consistency in Raw

Material over existing value (17-18%)

Within 12 hrs of first opportunity of

shutdown of plant

5%Reduction in Overall Cost per metric

tonne per month

Caustic Consumption to be 38% in Jan-March against 39.5% (Current).

4. Monitor Consumption levels on a week to week basis and report with

reasons for variance.Reduction in Chlorine consumption to 10% against 10.7% (Current)

Target of Steam Consumption : 2.5 Ton/Ton of Pulp against 3 Tons/Ton

of Pulp at present

Implementation plan for remdial action with Responsibility Centers

and Timelines

Page 493: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Installation for softening plant has not arrived. Soft water supply still not received from Recovery team.

Commissioning of PHE

20 hr running so 20 tons per day saving. 1000/mT of steam

Monday

Date

2. Create Action plan for reduction Date

100% compliance

100% Compliance

Complaint redressal from Customer

CAPA Analysis 2 Reports a Month

1. Identify points of high Power Consumption

2. Remedial measures plan to be created

3. Raise indents as per plan for consumables and spares

Project of Soft Water being done by Recovery Boiler Project Team

Within 24 hrs of Soft water supply

Reduction of Steam Consumption ( After Commissioning of PHE)

1 T/Hr reduction in CD

1.Monitor weekly Consumption of Steam with reasons for variance

Reduce Chemical discharge down to Standard Levels

% reduction over avg of last 6 months

1. Identify Standard for Chemical Discharge

3. Finalise Action plan and notify all shareholders

100% compliance to Plan

4. Implement strategy and monitor levels on a fortnightly basis.

Supply Pulp within Standard Quality Parameters

Within 24 hrs of complaint

Report every fortnight with Responsibility Centers and

Timelines.

Page 494: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Regular meetings with Internal Team Twice a month

2 Reports a Month

12-Jan-13

2. Weekly report

1. Record of MoM with Issues to be addressed along with timelines and

responsibility centers

100 % compliance to weekly plan

1. Not done in the past. Finalise weekly plan with PPC ( Vivek

Shrotriya)

10% variance over plan allowed

Identification of 10 Major Causes for Breakdown in consultation with Mechanical/Electrical/Process

1. Meeting of all heads to identify the 10 major causes per dept

2. Finalisation of measures to mitigate each major cause from each

individual dept.

3. Implementation of Measures by plan

4. Tracking and monitoring of major causes to confirm positive effect of

measures.

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 495: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department: Production ( Pulp )

Review 1 - 26 Dec 2012

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-13850 3900 4000

Suggested KPI for Jan-MarSept : 3273.59

MT/month Oct: 3961.48

MT/Month Nov: 3590.17

MT/Month Currently : Nil

cooking aid ( since Oct)

Challenges to be Addressed : Difficult to

manage performance of

cooking aid because of

quality. Hence not enforced. When Paper machines

run dry , this measure will be

encouraged.

Difficult to manage

performance of cooking aid because of

quality. Hence not enforced. When Paper

machines run dry , this

measure will be encouraged.

Challenges to be addressed:Cost of

chemicals is rising. Caustic

consumption has risen . Steam and

power consumption has

also risen.Maintenance is not properly done by the dept

itself. Maintenance

previously outsorced. Throat

has to come by 18-Jan-2013 else

Pulp mill performance will

deteriorate.

Next KPI : Caustic

Consumption to be 38% in Jan-March against

39.5% (Current). Reduction in

Chlorine consumption to

10% against 10.7% (Current)Next KPI : Target

of Steam Consumption : 2.5 Ton/Ton of Pulp against 3 Tons/Ton of

Pulp at presentNext KPI: PHE has to be

employed. In order to use it,soft water

supply required. This is a Cross-

Functional initiative with PowerPlant.

Page 496: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual.Department: Production ( Pulp )

Review 2

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Next KPI : Add an initiative in Oct- Dec about

reduction in chemicals going

into effluent treatment

Estimated Financial Impact

Actual Financial Impact

Suggested KPI for April-Jun

Increase of 12 TPD per production

Oct: 7.3 T/hrNov: 7.1 T/hrDec: 7.14 T/hr

Jan:7.6 T/hr

Page 497: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done. 20-21% currently

Will be done on 4-Feb-2013.

Done. No steam loss .

Savings of 20 kg/ ton of bleach

pulp. 40 rs per kg. 145 tons per day

Oct- Dec : 14-15%Jan: 17%

Work done on 25 Dec

Oct: 38.25%Nov:38.92%Dec:39.2%Jan:36.9%

As a result of aqua change and dipither

Oct: 10.74%Nov:9.93%Dec:10.46%

Jan: 10.3%

Oct: 2.71 T Nov: 2.77 TDec : 2.9 T

Jan:2.62 T

Done. No steam loss .

Preventive maintenance being

done.

Page 498: Sspbml- Kra Plant Jan-mar 15-2-13 v7

To be compiled by 10-Feb-2013

To be compiled by 10-Feb-2013

Installation for softening plant has not arrived. Soft water supply still not received from Recovery team.

20 hr running so 20 tons per day saving. 1000/mT of steam

Data unavilable for Oct-Dec. Will be compiled by 10-Feb-2013

Will be compiled by 10-Feb-2013

Will be compiled by 10-Feb-2013

Will be compiled by 10-Feb-2013

Oct: 296KW/T of Bleach

Nov: 308 KW/T of Bleach

Dec: 339 KW/T of Bleach

Jan: 311 KW/T of Bleach

Report to be compiled by 5-Feb-

2013

Page 499: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 500: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Weightage %age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 501: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3) Weightage

L-2 L-1

%age/ Level Achieved

Actual Performance (By Appraise

r)

Perfromance score

Page 502: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 503: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 504: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 505: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Mohd. Gufran

Designation: Manager Grade 5

S No KRA KPI

1 Project Assigned PM-4-General Arrangement

2 Project Assigned PM-3- General Arrangement

Page 506: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 Project Assigned PM -3 - Pope Reel Frame Detailing

4 Project Assigned

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Mohd. Gufran

Designation: Manager Grade 5

S No KRA KPI

1 Project AssignedPM-4-General Arrangement

PM- 3 -Preparation of Wire Part Drawing

Page 507: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Project Assigned PM -3 - Pope Reel Frame Detailing

3 Project Assigned PM- 3 -Preparation of Wire Part Drawing

Page 508: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative 0/1

Date

1

Date

1

Date

1

Modified Wire Part System Date

1

Date

0

Date

0

Date1

Date1

Date

1

Date

1

Review 1 - 27 Dec 2012

Measures/Performance

Indicator

Layout preparation PM-4. Approach flow, wirepart, drivers etc ( Backside)

Drives- Couch, FDR, Sue Pickup Roll, Dryers and Calendar Pope Reel

Proposal of Dryer group Uniform Part System and Detailing drawings

Wire part - delay due to material required (M.S. Plates)

Civil Drawing, inspection of fabrication

Pope reel frame detailing wire part drawing ( PM3) - (Backside)

New wire part Section and Detailing drawing of wire part ( In progress)

( delay for dimensional drawing "Binip" received from China)

Layout of drives, Couch , F.D.R , Suc. Pickup roll, Press II and III , dryers ,

Calander, Pope reel

New dryer group - Uniform Part Sytem- Detailing Drawing

Page 509: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Drum Package from China Date

0

Date

0

Date0

Number of 0 ( Red Buttons) 5Number of 1 (Green Buttons)8

Total number of Activities 13Achievement Percentage 62

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action Steps to achieve the Initiative 0/1

1Monitoring receipt of material 100% Compliance

Submission of dates of Inspection

Balance Part In-House production ( material required)

Existing wire part in out of use it and Fabricated- Machined - Cladding

Review 1 - 27 Dec

Measures/Performance

Indicator

Wire part - delay due to material required (M.S. Plates)

Identification of Critical Material required with dates

1/15/2013(With YP Singh)

Civil Drawing, inspection of fabrication

(Under VK kesharwani) Record of Inspection and report of the same to be created

Page 510: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Drum Package from ChinaFollow up with vendor 10-Jan-13

1Monitoring receipt of material 100% Compliance

1Monitoring receipt of material 100% compliance

5-Feb-13

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Balance Part In-House production ( material required)

Identification of Critical Material required with dates

1/15/2013(YP Singh)

Existing wire part in out of use it and Fabricated- Machined - Cladding

Create detailed action plan for design and fabrication

Page 511: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1409 Ed. Qual. Diploma in Mech Engg ( Production) Department: Project

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Complete as on 20 Oct

Review 1 - 27 Dec 2012

Suggested KPI for Jan-Mar

Completed as on 16 July

Completed as on 4 September

Completed as on 30 July

Completed as on 10 August

Ongoing from 29 Aug . Estimated to be complete on 8 Jan.

Complete as on 10 Sept

Complete as on 5 Oct

Complete as on 26 Oct

Page 512: Sspbml- Kra Plant Jan-mar 15-2-13 v7

75% fabricated as on 11 Nov + 25 % late due to material required

Requires to totally new design and fabrication.. Estimated time is 45 days from time of beginning of project.

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1409 Ed. Qual. Diploma in Mech Engg ( Production) Department: Project

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3

Done.Being done. PRs raised. Awaiting material.

Done. On 28-Jan-2013 8-Jan

Done. Awaiting shut to complete work.

Review 1 - 27 Dec 2012

Estimated Financial Impact

Actual Financial Impact

Suggested KPI for April-Jun

Page 513: Sspbml- Kra Plant Jan-mar 15-2-13 v7

DoneAwaiting payment. Dispatch will follow.

DoneBeing done. PRs raised. Awaiting material.

Done. PR/PO raised.

Page 514: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Diploma in Mech Engg ( Production)

Weightage %age/ Level

Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 515: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Diploma in Mech Engg ( Production)

Target Date(To be given under column L3)

Weightage L-2 L-1

%age/ Level Achieved

Actual Performance (By Appraise

r)

Perfromance score

Page 516: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 517: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : S.N Pandey Designation:

S NoKRA KPI

1 Project Assigned

2 Project Assigned

3 Project Assigned

4 Project Assigned Earlier finishing loss was 7.8 %

6

Signature of Appraisee:

Simple Center of P.M 3. Size Variation

P.M. 3= NO2. Hardly cutting 2- 3 sets in a single flow production

Core cutting machine was cutting rough. Wastage was high

Suggestion for Improvement for Area to be handled by M/C

personnel1 . Increased WID and reduction for

sheet in M1 and 2

2. Cutter of P.M # loading stand modification

Page 518: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : S.N Pandey Designation:

S No

KRA KPI

1 Production Variation in Production Run

Variation in Production Rate

2 Project Assigned

Page 519: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 Cost of Production

4 Implementation of 5S

Page 520: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

Size Variation 1

1

Quality of Cutting 1

0

Date of Installation N/A

Date of Installation N/A

1

3

4

75

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Removed press roll . Top bottom and machines overhauled gear box.

Removed drum rolls. Machines , adjusted paper roll

Change in rate of Production

Changed new core cutting M/C with circular knife

Reduced to 5.5/ 6. 0 % by best utilization. Reducing unneccesary

WIP % Change in Finishing

Loss

Presently rolls of 4.0 - 4.5 T may be loaded and has to modify so that 6-7

T rolls may be loaded.

At least 6 new set to be ordered. Also circular knife to be ordered. 50

no. in each size

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 521: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

1-Feb-13

By Tuesday

7th of next month

7-Jan-13

% errors noticed

By Tuesday

7th of next month

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Creation of report that tracks size variation every production run.

1. Create a template listing all machines , production type and

amount of production

2. Track production over 3 month period

100% compliance to Plan

3. Monitor weekly and create summary report listing type Quality variance and Number of occurences

of variance

4. Conduct monthly meetings to discuss reports

Tracking of Production rates per day.

1. Create a Template with Start Time, End Time and Production

Value (per day)

2. Track production over 3 month period

3. Monitor monthly and create summary report listing rates of

production , machine wise

4. Conduct monthly meetings to discuss reports

Modification of Cutter to be completed by Mar 31 ( To be handed

over to RK Verma)

Page 522: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Finishing Loss Reduction

% increase in 5S score

1. Finalise implementation schedule along with estimated cost

( To be handed over to RK Verma)

2. Number of activities to be completed by 31 Mar 2013

100% compliance to Plan

3. Number of Purchase Requisitions to be placed with Timelines for

expected delivery100% compliance to

Plan

4. Number of Purchase orders to be placed. 100% compliance to

Plan

5..Number of Equipments to be received

100% compliance to Plan

6. Erection and commissioning of all equipments

100% compliance to Plan

7. Monitoring and recording of progress on fortnightly basis

% variance over agreed dates as per

plan.

8. Summary of action plan for removing bottlenecks

No further reduction possible since finishing

loss will only be possible with increase

in demand for high grammage paper

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 523: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 27 Dec 2012

Feedback Suggested KPI for Jan-Mar Target Date(To be given under column L3)

L-5 L-4 L-3

Data to be Validated

Size variation of 3-5 mm. Currently : 1-2 mm . Allowed upto 3mm.

Next KPI: Creation of report that tracks size variation every

production run.

Led to production Improvement. Earlier : 25 TPD Currently : 35 TPD

Next KPI : Tracking of Production rates per day.

Template to be created with Start Time, End Time and

Production Value (per day)

Next KPI : Modification will be completed by 31 Mar of

Cutter.

Page 524: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Actual Financial Impact Feedback Target Date(To be given under column L3)

L-5

Will be done by 10-Feb-2013

Will be done by 10-Feb-2013

Done

Dec and Jan avilable. Oct and Nov will be gotten by 5-Feb-2013

Jan report will be due on 5-Feb-2013

Will be done.

Estimated Financial Impact

Suggested KPI for April-Jun

Page 525: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 526: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual.

Target Date(To be given under column L3)Weightage

L-2 L-1

1.0 - 1.5 % of loss

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Six variable problem solve. Now ruinning

smooth.

Now cutting 6-7 a shift

Smooth cutting and no loss

Page 527: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual.

Target Date(To be given under column L3)

Weightage L-4 L-3 L-2 L-1

Dec and Jan avilable. Oct and Nov will be gotten by 5-Feb-2013

%age/ Level Achieved

Page 528: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 529: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 530: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Actual Performance (By Apprais

er)

Perfromance score

Page 531: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 532: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Performance Planning and Assesment for the quarter: 1st Oct to 31st Dec 2012.Name: Anami Saran SrivastavaDesignation: Sr. Manager

Sl No KRA KPI

1 ETP Breakdown Breakdown Hours

2 Optimize dozing of chemicals

3 TrainingTrained Chemist

Trained Officer

4 Charter

All Parameters within limits

Page 533: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Weightage x Appraiser's Score

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Anami Saran SrivastavaDesignation: Sr. Manager

S No KRA KPI

1 ETP Breakdown

Assessment Scale 1 - 10 ( 1 being Lowest and 10 Highest)

Note : 1. Attach extra Sheet, if necessary.

10 % Reduction in Unplanned Breakdowns ( 40 hrs - 36 hrs )

Page 534: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 Charter All Parameters within limits

Page 535: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Review 1 - 27 Dec 2012

0/1

Initiatives/Action Steps to Achieve Target /Action

Plan, Get it done , Check

0

1Plan the process, Do it , Check Date

1

Plan the process, Do it , Check Date

Generating report as per charter Date

1

a) BOD.

0

Performance Indicator

Implement maintenance schedules

Breakdown Hours per month

Maintain O2 dozing less than 1500 kg

Plan the process, Get it done , Check

Number of hours per month outside the range.

Maintain urea dozing less than 300 kg

Plan the process, Get it done , Check

Number of hours per month outside the range.

Maintain DAP dozing less than 150 kg

Plan the process, Get it done , Check

Number of hours per month outside the range.

a) Trained one chemist for analysis and stabilization of aeration basin

b) Trained one officer for operation of the plant

Plan the process, Get it done , Check

To meet the prescribed parameters

Plan the process, Get it done , Check

Number of occasions outside limit per month

Page 536: Sspbml- Kra Plant Jan-mar 15-2-13 v7

b) COD.

0c) Flow of discharge

0

0Number of 0 ( Red Buttons) 5

Number of 1 (Green Buttons) 3

Total number of Activities 8Achievement Percentage 38

Shree Shyam Pulp & Board Mills Ltd.

Intiatives/Action0/1

% reduction

20-Feb-13

100% compliance

Plan the process, Get it done , Check

Number of occasions outside limit per month

Plan the process, Get it done , Check

Number of occasions outside limit per month

d) Specific requirements of colour as per Maha Magh Mela

Plan the process, Get it done , Check

Number of occasions outside limit per month

Steps to Achieve Initiatives/Action

Performance Indicator

Root -Cause and Why-Why Analysis of Downtime in Oct-Dec

100 % compliance with Preventive Maintenance

Schedule Zone-Wise

1. Finalise plan of requirements with all stakeholders.

Saturday/Sunday once in a month

2. Ensure availability of spares and consumables

3. Finalise equipment-wise work under preventive maintenance

Record of Breakdown of Equipments who's preventive maintenance already done.

Number of such cases. Allowed 5%.

Page 537: Sspbml- Kra Plant Jan-mar 15-2-13 v7

a) BOD.

b) COD.

c) Flow of discharge

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

To meet the prescribed parameters

Create action plan. Implement measures. Monitor BOD levels against standard

Number of occasions outside limit per month

Create action plan. Implement measures. Monitor COD levels against standard

Number of occasions outside limit per month

Create action plan. Implement measures. Monitor flow of discharge levels against standard

Number of occasions outside limit per month

d) Specific requirements of colour as per Maha Magh Mela

Create action plan. Implement measures. Monitor colour levels against standard

Number of occasions outside limit per month

Page 538: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Review 1 - 27 Dec 2012

Feedback

Completed in August.

2 occurences of BOD outside limit

Nov : 12 hrs ( instead of planned zero hrs due to clarifier breakdown). Maintenance Records

must be maintained.

Currently: 1000kg/day. BOD: 22-24 ( Should be less than 30 as per Statute)

Currently : 200 kg/day . Risk : BOD will increase . As per law , required level is 450 kg/day

Currently: 100 kg/dayRisk : BOD will increase . As per law , required level is 250 kg/da

Recruited in November. Training ongoing ( 3 Months )

Recruited in April 2012. Earlier as a chemist.Shifted to plant in November. Dual

charge ( Lab duties as well )

Page 539: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 occurences of COD outside limit

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Actual : 100 m3 per ton of paper. Earlier initiatives did not give desired results.

Target of < 500 cobalt units. Oct : 600 - 800 Nov: 500-600 Dec (15th ) : 200-250

Page 540: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 541: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

100%

100%

100%

Weightage(Total 100)

%age/ Level Achieved

Performance Assessment By Appraisee

Performance Assessment By Appraiser

Page 542: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee

Signature of Appraiser

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: - 11 Ed. Qual. :- Bsc (Math & Physics), PGDCA, Network CertificateDepartment: IT/ERP,PPC,MIS,DISPATCH

Target Weightage

Page 543: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 544: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual. :- Bsc (Math & Physics), PGDCA, Network Certificate

%age/ Level

Achieved

Actual Performance (By Appraiser)

Perfromance score

Page 545: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 546: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Performance Planning and Assesment for the quarter: 1st Oct to 31st Dec 2012.Name: R.B. Saini

Designation:

Sl No KRA KPI

1 Breakdowns Zero the number of breakdowns

3 Maintenance Reduce the maintenance cost

4 Hydraulic testing of towers Pass in the test

DGM ( Mechanical ) Pulp,Paper and ETP

Page 547: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5 Timely completion of project

6 Timely completion of project

7 CD #1 Blow Tank Work Timely completion of project

8 Timely completion of project

Tower agitator fittings and motor and support agitator works. ( 5

Nos. Towers)

Cross Gantry and Roof Truss fabrication work

CBD and Drive of CD#1 project work

Page 548: Sspbml- Kra Plant Jan-mar 15-2-13 v7

9 Timely completion of project

10 Washer Repairing ( Total 2 Nos. ) Timely completion of project

11 Timely completion of project

12 Timely completion of project

Feeding conveyors of depithers CD#1 ( 1500 mm width in place of

1000 mm conveyor )

Lathe Machine foundation work for Washer

CD#1 Pulper Shifting and feeding conveyor and aqua separator work and its pipe line work

( Project Doubhle wet washing )

Page 549: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Weightage x Apraiser's Score

Shree Shyam Pulp & Board Mill Ltd

Performance Planning and Assesment for the quarter: Jan-Mar 2013Name: R.B. Saini

Designation:

Sl No KRA KPI

1 Unplanned Breakdowns

Assessment Scale 1 - 10 ( 1 being Lowest and 10 Highest)

Note : 1. Attach extra Sheet, if necessary.

DGM ( Mechanical ) Pulp,Paper and ETP

10% Reduction in Unplanned Breakdowns

Page 550: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2

3 Project Assigned

Borewell

No Downtime due to lack of Critical Spares

Loss of Production due to Machine Failure

Zero Loss of Production due to Machine Failure

Page 551: Sspbml- Kra Plant Jan-mar 15-2-13 v7

220TPD Bleach Plant

CD 1 Double Wet Washing

Page 552: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Maintenance Cost Reduction

4 IT systems to be upgraded

6 Cross Functional Intiatives

7Weighted average of value of projects completed within budgetsVERTICAL DIGESTER

ROTARY DIGESTER

Improve information sharing and documenting system

Page 553: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 554: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Initiatives/ActionsReview 1 - 27 Dec 2012

0/1

1

1Date

0

Steps to Achieve Initiatives/Actions

Performance Indicator

% reduction in number of breakdowns compared to base period of previous 12 months

Maintenance INR saved per metric tonne

To complete up to 5/12/12 (Final Testing) after lining

All arrangement for water filling and shifting to other towers

Page 555: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Civil foundation Work of Motor

Date

NADate

NA

Arrangement of Materials

Date

1

Drawings of TussDate

Arrangement of ContractorsDate

Arrangements of Paints

Date

5 % Work Done Civil drawings

Date

1

Mechanical Drawings

Date

Materials Procurement Date

Shifting of B/L pumps foundationsDate

Date

Date

1

To complete up to 31/12/12 (25% work complete)

Civil foundation Work of Agitators

Fabrication work complete. Primer and painting work to

continue.

Note- Erection Work delayed due to civil work

Shifting of Conveyor columns ( 2 Nos. )

Reduction in erection Work (10 days)

Hydraulic Testing and arrangement of CBD

Page 556: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Date1

Civil Foundation work Date NA

Dismantling of exit drive and CBDDate NA

Civil Work

Date

1

Ramp Work DateFlooring Work Date

Belt joining DateHood Coverings Date

Drive Works ( VFD ) Date

1st Washer - 70% complete Deck Wire Change on LatheDate

02nd washer - 50% complete

Date

20% Work Lathe Machine shiftingDate

1Civil Work for Vertical Digester

Date

Activity Chart

1

Fabricate all jobs before erection

Clearance of drawings Materials Procurement

2

Coupling and other fitting arrangements

Reduction in time ( 12 Days ) - 70 % Complete

Inner Support plate welding work complete

Reduction in erection Work ( 15 Days ) - 25% Work Done

Boost up of Civil Work by Day to Day analysis

Proper Coordination with electrical dept to complete the

target

Number of 0 ( Red Buttons)

Page 557: Sspbml- Kra Plant Jan-mar 15-2-13 v7

8

10

80

Shree Shyam Pulp & Board Mill Ltd

Initiatives/ActionsReview 1

0/1

13-Jan-13

18-Jan-13

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Steps to Achieve Initiatives/Actions

Measures/Performance

Indicator

10 % Reduction in breakdown Hours over

Oct-Dec ( 20 hrs)

Root -Cause and Why-Why Analysis of Downtime in Oct-Dec

Identify top 10 causes of Breakdown with Plan for CAPA along with

Timelines and Responsibility Centers

No. of activities completed monthwise

100 % Compliance to Plan

Page 558: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Availability of Critical Spares

15-Jan-13

18-Jan-13

20-Jan-13

Tuesdays

15-Feb-13

Completed

8 Activities

Completed

Completed

15-Jan-13

Preventive Maintenance Schedule Zone-Wise

100 % Compliance to Plan

1.Finalise plan of requirements with all stakeholders.

2.Ensure availability of spares and consumables

3.Finalise equipment-wise work under preventive maintenance

Monitor weekly. Format to be finalised

100% compliance to Plan

1.Finalisation of Consumption Pattern over the last 3 months data

of Spares

2.Identifying critical list of spares to be kept in stock raising purchase

requisitions

3.PR raised with Timelines of new items

4.Weekly Monitoring of receipt of spares with Procurement along with

issues and Action Plan

New Borewell to replace older one. Shortage of water

1. Finalise implementation schedule along with estimated cost

2. Number of activities to be completed by 31 Mar 2013

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

Page 559: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Feb-13

28-Feb-13

15-Jan-13

18-Jan-13

No.

28-Feb-13

Tuesday

28-Feb-13

15-Jan-13

18-Jan-13

No.

28-Feb-13

6. Erection and commissioning of all equipments

7. Fortnightly monitoring and recording of progress on fortnightly

basis

% variance over agreed dates as per

plan.

8. Summary of action plan for removing bottlenecks

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

6. Erection and commissioning of core cutter

7. Fortnightly monitoring and recording of progress

% variance over agreed dates as per

plan.

8. Weekly summary of action plan for removing bottlenecks

1. Finalise implementation schedule along with estimated cost

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

6. Erection and commissioning of core cutter

7. Fortnightly monitoring and recording of progress

% variance over agreed dates as per

plan.

Page 560: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Tuesday

31-Jan-13

10-Feb-13

1. Clear all pending bills of vendors

2. Release of Payments to Vendors

8. Weekly summary of action plan for removing bottlenecks

5% over baseline data of Oct-Dec

Record of Breakdown of Equipments whose preventive maintenance

already done. History Card to be Maintained. ISO

DocumentsNumber of such cases.

Allowed 5%.

Analysis of all Such breakdowns with CAPA

Within 48 hrs of Breakdown

1. Finalise requirements for PMS system, zone wise

2. Meetings with IT to finalise changes in PMS System

Identification of 10 Major Causes for Breakdown in consultation with Mechanical/Electrical/Process

1. Meeting of all heads to identify the 10 major causes per dept

2. Finalisation of measures to mitigate each major cause from each

individual dept.

3. Implementation of Measures by plan

4. Tracking and monitoring of major causes to confirm positive effect of

measures.

Planned Project Cost Vs Actual Project Cost

3. Total actual cost Vs Original Planned Cost

% Variance ( 10 % over Planned )

Page 561: Sspbml- Kra Plant Jan-mar 15-2-13 v7

*NOTE : Bills for ETP environment, 220TPD,CLO2,110TPD, Wet

Washing- expected and will be dispatched on time

Page 562: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd Part - I

Emp. Code: 339Department:

Review 1 - 27 Dec 2012

Target

FeedbackL-5 L-4Suggested KPI for Jan-

Mar

Breakdown Hrs.Sept : 30 hrs Oct : 22 hrs Nov : 20 hrs

Next KPI : List of materials to be given

by 31 dec. To be procured to reach a

target of 10 hrs breakdown.

Maintenance Cost (Earlier ) : 12.5 Lacs INR ( Approx because data not avaialable from stores.) Current : 7 Lacks INR

To be completed upto 5 Dec- Done for 3/5 towers. Delay from Civil side. R.N.Jha is the Head. Tower 1 completed as per plan on 30 Nov. Tower 2 and Tower 3 on 1 Dec. Done on 3rd Dec. Tower 4 and 5 to be completed 4 days after civil work

Next KPI : Tower 4 and 5 to be completed 4 days after civil work.

Page 563: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Fabrication work started on 8 Nov 2012

Material Received

Target Completion : 31 Dec ( Status to be updated on 1 Jan )

Fabrication started on 8 Nov as per plan. Materials received on 7 Nov. Job completed on 20 Nov ( 2 Days before plan )

Fabrication work started 8/11/12 (Roof truss)

Crane Gantry Fabrication work 24/11/12

Page 564: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Start Date 05/12/12 - Complete Date 02/01/13

Start Date 7/12/12 - Complete Date 10/01/13

Page 565: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd Part - I

Emp. Code: 339Department:

Review 1

Target

Feedback

Done on 14-Jan-2013

Done on 14-Jan-2013

Not Done. To be given on 5-Feb-2013

Estimated Financial Impact

Actual Financial Impact

Suggested KPI for April-Jun 2

Oct:22 hrs Nov: 20 hrsDec: 24 hrs

Jan: 16hrs 30 mins

Page 566: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done

Done. Follow up reminders also sent.

Done

Done

Done

Not done. To be submitted on 5-Feb-2013

Received

Page 567: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Being Done. Will be completed OTIF/

Within week on completion.No material received. All spares and consumables have been indented. Work awaits arrival of materials.

Done

Done

Done

Done

Done

Done

12- Feb using old blow tank.

Work to begin on 10 Feb 2013. Electrical parts/consumables still pending. Steam Packing and Blow Tank Material still pending. Nut/Bolts still missing.

Page 568: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Format to be taken from Rajiv Pande. Being maintained.

8-Feb-2013 for previous 3 breakdowns.

To be done

To be done.

Oct: 12 lacNov: 8.6 lacDec: 10 lac

Jan:

Vertical - No Pending Bills to vendors

Rotary- No Pending Bills to vendors

Will be submitted after commissioning.

Page 569: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 570: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Ed. Qual. M.Sc. ChemistryMechanical Date of Birth

Target

L-3L-2 L-1

28 Nov - 31 Dec

Weightage(Total 100)

%age/ Level Achieved

Performance Assessment By Appraisee

Page 571: Sspbml- Kra Plant Jan-mar 15-2-13 v7

01/01/13 to 15/01/13 24/12/12 to 5/1/13 20/12/12 to 30/12/12 1/2/13 to 10/2/13

Fabrication work started on 8 Nov 2012

Started 21/12/12- Completed 31/1/13

Started 20/12/12- Completed 31/12/12 Start - 1/1/13 - Complete 31/1/13

Truss Fabrication completed on 20/11/12

Gantry Fabrication completed on 07/12/12

Page 572: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Both washer internal support changed and welded, Also gland sleeve changed. Rest work is to be done on Lathe machine.

Start Date 05/12/12 - Complete Date 02/01/13

Start Date 7/12/12 - Complete Date 10/01/13

Started -5/12/2012Completed - 20/12/12

Page 573: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee

Signature of Appraiser

Shree Shyam Pulp & Board Mill Ltd

Ed. Qual. M.Sc. ChemistryMechanical Date of Birth

Target

L-5 L-4L-3

L-2 L-1

Weightage(Total 100)

%age/ Level Achieved

Performance Assessment By Appraisee

Page 574: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 575: Sspbml- Kra Plant Jan-mar 15-2-13 v7

No material received. All spares and consumables have been indented. Work awaits arrival of materials.

Page 576: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 577: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 578: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Performance Assessment By Appraiser

Page 579: Sspbml- Kra Plant Jan-mar 15-2-13 v7

01/01/13 to 15/01/13 24/12/12 to 5/1/13 20/12/12 to 30/12/12 1/2/13 to 10/2/13

Page 580: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Both washer internal support changed and welded, Also gland sleeve changed. Rest work is to be done on Lathe machine.

Page 581: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Performance Assessment By Appraiser

Page 582: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 583: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 584: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 585: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 586: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Oct - Dec, 12Name : Satish Kumar Johar

Designation: General Manager

S No KRA KPI

1 Production Achievement Zero Breakdown

2 Cost of production Reduction of Steam Cost

Page 587: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Satish Kumar Johar

Designation: General Manager

S No KRA KPI

1 Production Achievement Zero Breakdown

Page 588: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5S

2 Cost of ProductionReduction of Steam Cost

3 %OTIF

4

Reduction of Cost of Power Generation

Employee Engagement Index

Page 589: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 590: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action 0/1

1. Identify critical problem Breakdown time % 0

15-Jan NA

3. Identify critical spares 15-Jan NA

15-Jan NA

1

Number of 0 ( Red Buttons) 1

Number of 1 (Green Buttons)1

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

2. Making schedule for preventive maintenance

4. Identify minimum level of spares- ROL/ROQ

Increase consumption of Pith. Present 60 TPD. Target 80 TPD.

Increase in quantity to 80 TPD on a daily basis

Use of RDF. Present 10 TPD. Target 15 TPD

Page 591: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Total number of Activities 2

Achievement Percentage 50

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

1. Identify critical problem 20-Jan-13

20-Jan-13

7-Feb-13

20-Jan-13

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

20% reduction over avg of 3 months

Root -Cause and Why-Why Analysis for TURBINE of Downtime in Oct-Dec

Root -Cause and Why-Why Analysis for BOILER of Downtime in Oct-Dec

Identify 10 Major reasons for Breakdown with CAPA along with

Plan for Implementation

2. Making schedule for preventive maintenance

100% Compliance to Plan

1.Finalise plan/Schedule of requirements with all stakeholders.

Page 592: Sspbml- Kra Plant Jan-mar 15-2-13 v7

31-Jan-13

31-Jan-13

3. Availibility critical spares

20-Jan-13

20-Jan-13

26-Jan-13

Every Tuesday

%5S Score

31-Jan-13

%Reduction

Jan-13

1.Prepare detailed action plan

2.Implement RDF usage measures

3.Monitor performance

15-Jan-13

2.Ensure availability of spares and consumables

3.Finalise equipment-wise work under preventive maintenance

28-Feb-2013 ( Except Long-Delivey Items :

20%)

1.Finalisation of Consumption Pattern for TURBINEover the last 6

months data of Spares

2.Finalisation of Consumption Pattern for BOILER over the last 6

months data of Spares

3.Identifying critical list of spares to be kept in stock raising purchase

requisitions

4.Monitoring of receipt of spares through weekly reports.

Identify areas of 5S for implementation

Use of RDF. Present 10 TPD. Target 15 TPD

Increase consumption of Pith. Present 60 TPD. Target 80 TPD.

INR 21 Lacs saving for Jan-Mar

Identification of Personnel to be Trained

Page 593: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Jan-13

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Identification of Training Inputs required

Page 594: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5

7 Lac INR / Month saving

Suggested KPI for Jan-Mar

Breakdown ( Avg : 24) Oct: 25 hrs Nov : 13 hrs

Dec : 34 hrs

Next KPI : 20% reduction of breakdown hours over average of Oct-Dec breakdown hrs.

Fuel substitutes can be investigated.

Dependency on coal reduced.Saving of non-renewable resources.

Next KPI: % reduction to be communicated.

Next KPI : Identification of Personnel to be Trained

Next KPI : Identification of Training Inputs.

Page 595: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

Actual Financial Impact Feedback

Done

Being done.

Estimated Financial Impact

Oct: 25 HrsNov:13 HrsDec:34 hrs ( Planned shutdown)

Jan: Nil

Not applicable due to zero breakdown from Oct-Dec

List of activities done on 15-Jan. Informed all customers,. Dates still pending.

Page 596: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done.

Nil Consumption

Oct-Dec (Avg): 7 TPD

Done on 15-Jan

Training provided to 6 people.

Done

All spares are available for preventive maintenance

No records maintain. Being done.

To finalise detailed activity plan with responsibility centers and timelines.

Average usage comiing to 12 TPD in Jan against target of 15 TPD

Pith started in December. Dec:67 TPDJan: 94 TPDFeb (Target ) : 94 TPDMar ( Target ): 94 TPD

Page 597: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Input provided to HR Team.Done.

Page 598: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

1510 Ed. Qual. B.E.MechPowerplant

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

31 Dec - 31 March

31 Dec - 31 March

31 Dec - 31 March

31 Dec - 31 March

31 Dec - 31 March

%age/ Level Achieved

Page 599: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

1510 Ed. Qual. B.E.MechPowerplant

Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Suggested KPI for April-Jun

Page 600: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 601: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 602: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Actual Performance (By Appraiser)

Perfromance score

Page 603: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Weightage %age/ Level

Achieved

Actual Performance (By Appraiser)

Perfromance score

Page 604: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 605: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 606: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : P.K.MitraDesignation: Senior Manager

S No KRA KPI

1 Production

2 Cost of Production Target cost of production

3 %OTIF - Quality

4

Signature of Appraisee:

Target Production achievement

Employee Engagement Index

Page 607: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-March 2013Name : P.K.MitraDesignation: Senior Manager

S No KRA KPI

1 Production

2 Cost of Production Target cost of production

Page 608: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3 %OTIF - Quality

4On Job Training

5 Project Assigned

Employee Engagement Index

Page 609: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action

Installation Vaccum Pump

To identify points of wastage of power and steam

Steam pressure has to be regulated

Page 610: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Initiatives/Action

Maintenance Schedule for all 4 Vacuum Pumps

Record to be kept of Breakages due to Vacuum Pump

Commissioning of new Vacuum Pump

To identify points of wastage of power and steam

Page 611: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Steam pressure has to be regulated

Finishing Loss

Conducting OJT with the Shift-Incharges and Foremen every week.

To reduce the number of bends in LP steam line in PM-1.

Modifying the crowning of Press Rolls in both stages of PM-1. Crowning has been already done in MG touch roll (Press Roll).

Page 612: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Steps to achieve the Initiative/Action

Ordering and Installation of Vaccum Pump to increase efficiency of machine

Closing of all points of loss for power and steam. Date

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Measures/Performance Indicator

Date and % Increase in Efficiency of Machine

Page 613: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Steps to achieve the Initiative/Action

1.Finalise plan of requirements with all stakeholders. 15-Feb-132.Ensure availability of spares and consumables 100% Compliance to Plan

3.Finalise equipment-wise work under preventive maintenance 28-Feb-13

2-Jan-13

1.Finalise Cost-Benefit Analysis 28-Dec-12

2.Approval of Procurement 3.Finalise Implementation Schedule 31-Jan-13

1.Prepare Action Plan for Diagnostic 2-Feb-13

10-Feb-13

3.Summary report listing points of excess consumption to be made 15-Feb-134.Eliminate trouble points 28-Feb-13

5.Monitor consumption and compare performance 100% Compliance to Plan

Measures/Performance Indicator

2.Baselines for Steam and Power Consumption to be used to compare against identified trouble points

Page 614: Sspbml- Kra Plant Jan-mar 15-2-13 v7

1.Prepare a detailed action plan for 3 major concern areas 2-Feb-132.Daily Analysis of reasons for variation 10-Feb-13

3.Summary report to be prepared 15-Feb-13

28-Feb-13

5.Weekly monitoring of Action Plan 100% Compliance to Plan

5 % Reduction

(ii)Maximise deckle utilization with marketing people.

Conducting OJT with the Shift-Incharges and Foremen every week.

31-Jan-13

1. Finalise implementation schedule along with estimated cost2. Number of activities to be completed by 31 Mar 2013

5..Number of Equipments to be received6. Erection and commissioning of all equipments

7. Monitoring and recording of progress on fortnightly basis

8. Summary of action plan for removing bottlenecks

PR details dated on 2-Jan-2013

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Tracking of data and improvement shown in next

quarter KPI with Oct-Dec for a baseline

4.Action plan for eliminating causes of reduction involving all concerned departments

(i) Hood has been mounted on PM-1 to control water dripping problem. Finishing loss has been reduced to some extent up to date.

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

% variance over agreed dates as per plan.

Page 615: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 1 - 26 Dec 2012

0/1 Feedback Target Date(To be given under column L3)

L-5 L-4

1

0

0

213

33

Suggested KPI for Jan-Mar

Current Efficiency : 85% Target Efficiency

of Machine after installation of Pump :

92%

Next KPI: Record to be kept of breakages shift

wise due to Vacuum Pump. Maintenance schedule of all four

pumps required as well as installation of new

vacuum pump.

Steam pressure is erratic. Steam power

consumption has to be reduced.

Next KPI : Flow meter for steam pressure required. Purchase order to be filed and installed by January for all three machines. As

well as data for steam pressure to be kept on record. Reduction in

steam pressure per tonne of paper using current

standard as baseline. 3.5 Tonnes (Current)

Next KPI: Condensate system needs to be

modified. Proposal for which to be completed by 30 Jan. Seek approval and create plan in KPI for Jan-

Mar

Page 616: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Review 2

0/1 Actual Financial Impact Feedback

increases the production 100 MT per month in PM-1 and 50 MT in PM-2.

PR approved on 20-Jan Not done as on 29-Jan.

Not done as on 29-Jan

Not done as on 29-Jan

Estimated Financial Impact

Suggested KPI for Jan-Mar

Plan given verbally on 1-Jan-2013. Written

communication to be sent ASAP.

Records being Maintained.

117 breakages due to Vacuum Pump ( As on

Date from 1-Jan )

Page 617: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Not done as on 29-JanNot done as on 29-Jan

Daily meetings being held informally with Viovek Shrotriya and Shamim Ahemed Khan. Message sent on mobile.

3 meetings held in January. Records being kept. Follow up with Mr Mitra to check format of record keeping . Check for imporvements.

Not done as on 29-Jan

Data not compiled for Oct-Dec. To be done.

Only Jan done.

Finishing Loss as on 29-Jan is 6%Dec: 6.6%

Page 618: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.Production

Target Date(To be given under column L3) Weightage

L-3 L-2 L-1

60%

%age/ Level Achieved

Actual Performance (By

Appraiser)

67% efficiency ( Currently)

Page 619: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Ed. Qual.Production

Target Date(To be given under column L3) Weightage

L-5 L-4 L-3 L-2 L-1

Page 620: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Daily meetings being held informally with Viovek Shrotriya and Shamim Ahemed Khan. Message sent on mobile.

3 meetings held in January. Records being kept. Follow up with Mr Mitra to check format of record keeping . Check for imporvements.

Page 621: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Perfromance score

Page 622: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By Appraise

r)

Perfromance score

Page 623: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 624: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter OCT-DEC'12Name : Shamim Ahmad KhanDesignation: Manager

S No KRA KPI

1 Customer satisfaction* Internal Customer Satisfaction Index

2 % achievement of profit target

3 IT Infrastructure up time/downtime Downtime/ Available hours

4 Service provider satisfaction* Satisfaction of ERP vendor / Partner

Quality of decision making as measured by meeting profit target

Page 625: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter OCT-DEC'12Name : Shamim Ahmad KhanDesignation: Manager

S No KRA KPI

1 Customer satisfaction* Internal Customer Satisfaction Index

Page 626: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2 % achievement of profit target

3 IT Infrastructure up time/downtime Downtime/ Available hours

4 Service provider satisfaction* Satisfaction of ERP vendor / Partner

Quality of decision making as measured by meeting profit target

Page 627: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Intiatives/ActionReview 1 - (DATE)

0/1

% Satisfaction

% Achievement

Maintain all Records as per ISO Data

% Downtime

% Satisfaction

Steps to Achieve Initiatives/Action

Performance Indicator

IT- Add 4-5 Plant user on network for Email/ERP/Daily Routine Work &

Trained for System Operation

MIS- Physical Stock Level - RawMaterial/Fuel

Every 15 days Check Phsical Qty with Book Qty - & Generate more MIS for

Management

PPC- Minimize down time for Quality Change, 100% Deckle

Utilization,

Dispatch- Reduce Finish Goods Stock level, Error Free Dispatched,

Achive 100 % FG-Dispatched as per Delivery Schdule & Loading

Minimium Error Based, Monitoring Stock Lavel Item Wise,

Page 628: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

Signature of Appraiser:

Shree Shyam Pulp & Board Mills Ltd.

Intiatives/ActionReview 1 - (DATE)0/1

% Satisfaction1. Create proposal 5-Feb-13

8-Feb-133. System purchase and Install 16-Feb-13

20-Feb-13

Steps to Achieve Initiatives/Action

Performance Indicator

IT- Add additional Plant users on network for Email/ERP/Daily Routine

Work & Trained for System Operation

2. Get approval for systems from management

4. User addition and performance tracking of system

Page 629: Sspbml- Kra Plant Jan-mar 15-2-13 v7

% Achievement

100%compliance

% Downtime

% Satisfaction

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

MIS- Physical Stock Level - RawMaterial/Fuel

Every 15 days Check Phsical Qty with Book Qty - & Generate more MIS for

Management

PPC- Minimize down time for Quality Change, 100% Deckle

Utilization,

Reduce number of times GSM changes per day to reduce

downtime

Dispatch- Reduce Finish Goods Stock level, Error Free Dispatched,

Achive 100 % FG-Dispatched as per Delivery Schdule & Loading

Minimium Error Based, Monitoring Stock Lavel Item Wise,

Maintain all Records as per ISO and FSC Data

Page 630: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: - 11 Ed. Qual. :- Bsc (Math & Physics), PGDCA, Network CertificateDepartment: IT/ERP,PPC,MIS,DISPATCH

Review 1 - (DATE)Target Weightage

FeedbackL-5 L-4 L-3 L-2 L-1

80%

70%

0.1%

70%

%age/ Level Achieved

On Leave hence not reviewed

Page 631: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: - 11 Ed. Qual. :- Bsc (Math & Physics), PGDCA, Network CertificateDepartment: IT/ERP,PPC,MIS,DISPATCH

Review 1 - (DATE)Target Weightage

Feedback L-5 L-4 L-3 L-2 L-1

80%

%age/ Level Achieved

On Leave hence not reviewed

Page 632: Sspbml- Kra Plant Jan-mar 15-2-13 v7

70%

0.1%

70%

Page 633: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual. :- Bsc (Math & Physics), PGDCA, Network Certificate

Actual Performance (By Appraiser)

Perfromance score

Page 634: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Ed. Qual. :- Bsc (Math & Physics), PGDCA, Network Certificate

Actual Performance (By Appraiser)

Perfromance score

Page 635: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 636: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Chandra Pal SinghDesignation: Manager

S No KRA KPI

1 Unplanned breakdowns

Zero unplanned breakdowns

2

3 Project

4 Cd+2 Double Wet Washing

5 Cd Tubes Steam

6 List Of Equipment

7 Rotary Digester

8 Vertical Digester Timely Commisioning of Pumps

Loss of production due to Mechanical Breakdown in Pulp Mill Zero loss of production due to

machine failure within budgets

Timely Completion of Project At Different Areas & Section

Cd+2 Double Wet Washing P.H.12 To 30.11.12

Cd Tubes Steam Consumption & Deduction

Complete Specification Of Equipment

Timely Completion of Dismantling Work

Page 637: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Chandra Pal SinghDesignation: Manager

S No KRA KPI

1 Unplanned breakdowns

Zero unplanned breakdowns

Page 638: Sspbml- Kra Plant Jan-mar 15-2-13 v7

ETP

CD#2

Loss of production due to Mechanical Breakdown in Pulp Mill Zero loss of production due to

machine failure within budgets

Page 639: Sspbml- Kra Plant Jan-mar 15-2-13 v7

CD#1 Double Wet Washing

220 TPD Bleach Plant

ODL

CD#1 Double Wet Washing P.H.12 To 30.11.12

Page 640: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Cd Tubes Steam Cd Tubes Steam Consumption & Reduction

Page 641: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action0/1

TPM Project

TPM Project

Plan,Execute,Audit Date

Plan,Execute,Audit Date

Reduction In Gland Packging Plan,Execute,Audit Date

Daily Checks Report Plan,Execute,Audit Date

1. Prepare List of Equipment Plan,Execute,Audit Date

2. Specification Of All Equipment Plan,Execute,Audit Date

Dismantilating At Rotary Digester Plan,Execute,Audit Date

Commisioning of All Pumps Plan,Execute,Audit Date

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Analysis,Root Cause, Solution, Agreement,Implementation,Audit

Hours of Unplanned Breakdowns

Analysis,Root Cause, Solution, Agreement,Implementation,Audit

Tonnes of Production Lost

Gratuity Plate Of Pipe Line & 30Tom Crane

Increase Life Of CD.Screne & Threat

Page 642: Sspbml- Kra Plant Jan-mar 15-2-13 v7

NOT AVAILABLE

Shree Shyam Pulp & Board Mills Ltd.

Review 1

Initiatives/Action

0/1

TPM Project

5-Feb-13

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Actual

Estimated

Impact

Analysis,Root Cause, Solution, Agreement,Implementation,Audit

10% reduction in Hours of Unplanned Breakdowns ( currently 20 hrs per monthy )

1. Track breakdown for previous 3 months and create report listing suggestions and critical causes

Page 643: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Feb-13

20-Feb-13

4. Implement measures 100% Compliance

5. Track performance per month 100% Compliance

TPM Project

5-Feb-13

15-Feb-13

20-Feb-13

100% Compliance

5. Track performance per month 100% CompliancePreventitive Maintenance

28-Jan-13

2. Raise all PR's

Preventitive Maintenance

2. Schedule meeting with conerned dept to discuss recurring problems. Record MoM.

3. Create action plan for changes and suggestions brought up in meeting

Tonnes of Production Lost

Analysis,Root Cause, Solution, Agreement,Implementation,Audit

1. Track breakdown for previous 3 months and create report listing suggestions and critical causes

2. Schedule for preventive maintenance .

3. Create critical list for spares and materials

4. Implement measures according to calendar

1. Finalise PM schedule monthwise and Zone wise with all stakeholders

According to Calendar

3. Create comparison report for before and after changes.

Breakdown hrs before replacement vs After.

First Week of every Subsequent Month

4. Track breakdown hours with Why Why

First Week of every Subsequent Month

Page 644: Sspbml- Kra Plant Jan-mar 15-2-13 v7

28-Jan-13

2. Raise all PR's

Plan,Execute,Audit 5-Feb

25-Jan

25-Jan

3. Complete projects by Calendar 100% compliance

100% compliance20-Feb

25-Jan

25-Jan

3. Complete projects by Calendar 100% compliance

100% compliance

25-Jan

25-Jan

1. Finalise PM schedule monthwise and Zone wise with all stakeholders

According to Calendar

3. Create comparison report for before and after changes.

Breakdown hrs before replacement vs After.

First Week of every Subsequent Month

4. Track breakdown hours with Why Why

First Week of every Subsequent Month

Increase Life Of CD.Screen & Threat

1. Create Calendar for all Project work

2. File Indents for all reauired materials and parts

4. Track performance with monthly report

1. Create Calendar for all Project work

2. File Indents for all reauired materials and parts

4. Track performance with monthly report

Pulp mill work completed. Civil work pending till 31-March-2013

1. Create Calendar for all Project work

2. File Indents for all reauired materials and parts

Page 645: Sspbml- Kra Plant Jan-mar 15-2-13 v7

3. Complete projects by Calendar 100% compliance

100% compliance

Reduction In Gland Packging Plan,Execute,AuditDaily Checks Report Plan,Execute,Audit Daily since Oct

4. Track performance with monthly report

10-Feb-2013 ( Subject to arrival of plate. Repeated indents raised)

Number of 0 ( Red Buttons)

Number of 1 (Green Buttons)

Total number of Activities

Achievement Percentage

Page 646: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1388 Ed. Qual. B. Sc.Department: Mech.(Pulp Mill)

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

15 Oct- 31 Dec

15 Oct- 31 Dec

15 Oct- 31 Dec

15 Oct- 31 Dec

15 Oct- 31 Dec

Page 647: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1388 Ed. Qual. B. Sc.Department: Mech.(Pulp Mill)

Review 1

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

Being Done

Estimated Financial

Impact

Suggested KPI for April-June

16 Tons saving PMOct: 34hrsNov:24hrsDec:26 hrs

Jan:17hrs

Page 648: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Bein Done.

Being Done

Done

Being Done

Done

Done

Page 649: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Done

Done

Done

Done

Done

Done

Not done. To be submited by 10 Feb-2013. Waiting for civil work.

Done

Page 650: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plate has arrived. May have problems.Being done.

Page 651: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)Weightage

L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 652: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Target Date(To be given under column L3)

Weightage L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 653: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 654: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 655: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 656: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 657: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 658: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 659: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Jan - Mar 2013Name : OPS ChauhanDesignation: GM - Security and Vigilance

S No KRA KPI

1 Personnel Management

Recruitment of New Personnel

Personnel to be retained during security overhaul

Page 660: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2

Security at Plant

Physical Security

Page 661: Sspbml- Kra Plant Jan-mar 15-2-13 v7

5Waste Material Management

Signature of Appraisee:

Page 662: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action 0/1

21-Jan-13

23-Jan-13

13-Jan-13

24-Jan-13

28-Feb-13

1. Establish criteria for evaluation 6-Feb-13

15-Feb-13

20-Feb-13

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Reviewing and establishing new manpower for security at Kashipur

Plant

1. Finalise list of Army Men to be interviewed and contact the same.

2. Conduct Interviews at Delhi with Ex army men

3. Walk in interviews at corporate office/Kashipur

4. Finalise short list and finish recruitment procedures

5. Create report 1 month after recruitment to monitor the

performance of new personnel

Review of personnel to be retained from existing base.

2. Conduct evaluations as per criteria according to schedule

3. Make final recommendations via report

Page 663: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Boundary Walls

20-Jan-13

8-Feb-13

Handling of Hazardous Materials

2-Jan-13

8-Jan-13

Implement measures 10-Jan-13

Improvement in In-Out systems

10-Feb-13

100% compliance

5-Feb-13

Monitoring report to be filed 28-Feb-13

10-Jan-13

1. Identify areas at Kashipur plant without boundary wall

2. Create action plan with indents and manpower requirements

3. Implement measures as per schedule

Hazardous materials like Chlorine , Lime , Caustic and waste paper to

be minimised by identifying instances of concern

Create report listing measures and circulate

Preparing a report proposing changes from existing system

Implementing the measures outlined in above report according to action

plan

Making separate well-identified systems both for permanent and

contract labour

Improving contracts execution system within Mill Area

1. Working closely with Manjit Singh, VP admin, Pradeep Pande, VP

Commerical, Ashok Taneja- VP HR and S.Maji to improve upon

vigilance/tracking of contract labour and stores materials used by them ,

create a report listing action plan.

Page 664: Sspbml- Kra Plant Jan-mar 15-2-13 v7

15-Feb-13

Disposal of Scrap at Kashipur Plant

Scrap removed and disposed of 19-Jan-13

NO INITIATIVES

Implementing the measures outlined in above report according to action

plan

Page 665: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: Ed. Qual. M.Com, C.A.Department:

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Page 666: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 667: Sspbml- Kra Plant Jan-mar 15-2-13 v7

80 Tons of scrap disposed . INR 28/kg

Page 668: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Com, C.A.

Weightage %age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 669: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 670: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 671: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Performance Planning and Assesment for the quarter: 1st Oct to 31st Dec 2012.Name: Vinod Kumar Kesharwani

Designation: Sr. Manager

Sl No KRA KPI

1 Project Assigned

2 Project Assigned

3 Project Assigned Improvement in work quality

4 Project Assigned Cost optimization

Completion of Project in Optimum Time Frame

Improvement in house keeping at civil works area

Page 672: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Assessment Scale 1 - 10 ( 1 being Lowest and 10 Highest)

Weightage x Apraiser's Score

Shree Shyam Pulp & Board Mill Ltd

Performance Planning and Assesment for the quarter: Jan-Mar 2013Name: Vinod Kumar Kesharwani

Designation: Sr. Manager

Sl No KRA KPI

1 Project Assigned16 MW TURBINE

Project Assigned BOILER CONTROL BUILDING

Note : 1. Attach extra Sheet, if necessary.

Page 673: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Project AssignedBOILER FOUNDATION(AUXILIARRY)

Project Assigned RCC CHIMNEY

Project AssignedASH SILO

Project AssignedCOAL HANDLING SYSTEM

Page 674: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Project Assigned B.FBR PLANT:-

Project Assigned C. R.O.PLANT

Project Assigned

Project Assigned E. 220 TPD BLEACH WASHER

Project Assigned F. BLOW TANK FDN.

Project AssignedG.ODL PLANT

D.WATER CONSERVATION SYSTEM AT RECOVERY PLANT

Page 675: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Project AssignedH. CLO2 PLANT

Project Assigned I. PM-3 PRESHUT JOB

Project Assigned J. PM-4 PRESHUT JOB

Project Assigned

Project Assigned

K. MAKING USABLE THE SCRAP TMT STEEL

L. BUILDING GARBAGE UTILISATION IN FLOOR BASE ,YARD & ROADS

Page 676: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

Review 1 - 27 Dec 2012

Initiatives/Action 0/1

3. Scheduling of project Date

% 5S Score

Saving in INR

Steps to Achieve Initiative/Action

Performance Indicator

1. Proper Coordination and Planning

Time and Cost within Plan

2. Submission of bill in time for prompt payment

Number of occasions when bill was late

4. Coordination with Purchase Dept.

Number of Days not interacted

1. To educate the workmen for keeping the site clean for smooth

working

1. Site checking by different site in charge before casting of any

RCC workNumber of times

rejected in one year

2. Checking of building raw material before unloading at site

Number of times rejected in one year

3. Record of Power Card and Cube Testing

Number of times rejected in one year

1. Review the consultant drawing / design

Page 677: Sspbml- Kra Plant Jan-mar 15-2-13 v7

2. In house design Saving in INR

3. Maximum work on labour rate Saving in INR

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

Shree Shyam Pulp & Board Mill Ltd

Review 2

Initiatives/Action 0/1

PANEL ROOM AT G.FLOOR

DISTRIBUTION PANEL ROOM

PANEL ROOM AT F.FLOOR

FLOORING WORK

TRANSFORMER AND PANEL ROOM FIXING OF DOORS & WINDOWS

Steps to Achieve Initiative/Action

Performance Indicator

1. Finalise implementation schedule along with estimated cost

2. Number of activities to be completed by 31 Mar 2013

TURBINE & AUXILIARRY FINAL GROUTING

3. Number of Purchase Requisitions to be placed

BRICKWORK & PLASTER(FOR BALANCE 30%WORK)

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

7. Fortnightly monitoring and recording of progress on fortnightly

basis

Page 678: Sspbml- Kra Plant Jan-mar 15-2-13 v7

STRUCTURE UPTO 25 MTR LVL

STR.UPTO 27 MTR LVL

FEED PUMP FOUNDATION

DCS ROOM

BRICKWORK AND PLASTER

FLOORING WORK

PA FAN FOUNDATION

SA FAN FOUNDATION

ROOSTER PUMP FOUNDATION

PAINTING WORK OF CHIMNEYID FAN FOUNDATION

1. Finalise implementation schedule along with estimated cost

2. Number of activities to be completed by 31 Mar 2013

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

7. Fortnightly monitoring and recording of progress on fortnightly

basis

1. Finalise implementation schedule along with estimated cost

2. Number of activities to be completed by 31 Mar 2013

3. Number of Purchase Requisitions to be placed

4. Number of Purchase orders to be placed.

5..Number of Equipments to be received

6. Erection and commissioning of all equipments

7. Fortnightly monitoring and recording of progress on fortnightly

basis

ASH SILO AREA DEVELOPMENT (BALANCE WORK)

CONVEYOR FOUNDATION(BALANCE 50%)

Page 679: Sspbml- Kra Plant Jan-mar 15-2-13 v7

CONTROL BUILING(BALANCE 30 %)

HBL TANK FDN.(BALANCE 15%)

RO BUILDING(BALANCE 15%)RO EQUIPMENT FDN.(5%)RO DRAINS(10%)RO APPROACH (50%)

WASHER VAT( CHLORINE)WASHER VAT (ALKALI)WASHER VAT (HYPO)-2HYPO-2 SEAL PIT -1 WITH PUMPHYPO-1 SEAL PIT-2 WITH PUMPALKALI SEAL PIT-3 WITH PUMPCHLORINE SEAL PIT-4 WITH PUMP

BALANCE STR. UPTO GANTRY LEVELBALANCE STR. UPTO ROOF LVLEOP REACTOR FDN.

BLOW TANK FDN AT V.DIGESTER

FOUNDATION WORK TOWER CLO2FDN.WORK ODL TOWERFDN.WORK BLOW TANKFDN. WORK REACTOR

EQUIPMENT FOUNDATION(BALANCE 20%)

FOUNDTION AND DRAIN WORK TO FACILITATE THE MECHANISM FOR RECOVERY WASTE WATER RECYCLEING.

BALANCE STR. UPTO 14 MTR.(BALANCE 20%)

DISMANTLING WORK (BALANCE 30%)

ODL PLANT BUILDING (FOUNDATION)

Page 680: Sspbml- Kra Plant Jan-mar 15-2-13 v7

GANTRY SUPPORT PEDESTALVACCUM PUMP FDN.CENTICLEANER PIT & PUMPSCENTICLEANER SHED COLUMNPANEL ROOM

PANEL ROOM

DCS ROOM & COMPRESSOR ROOMCENTICLEANER PITMISC FDN.

RO PLANT APPROACH ROADASH SILO ROAD

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

ABSORBPTION TOWER BUILDING UPTO 4.1 MTR(BALANCE 30%)

ABSORBPTION TOWER BUILDING UPTO 7.9 MTR

ABSORBPTION TOWER UPTO 12.4 MTR

APPOX 4 -5 MT TMT STORED AT YARD TO BE SHORTED OUT AND MAKING IN GOOD CONDITION FOR RCC WORK

Page 681: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd Part - I

Emp. Code: 970 Ed. Qual. M.Sc. ChemistryDepartment: Civil Date of Birth 04.08.1970

Review 1 - 27 Dec 2012

Feedback Target

L-5 L-4 L-3 L-2 L-1

1 Oct - 31 Dec 100%

100%

Suggested KPI forr Jan-Mar

Weightage(Total 100)

Avilability of funds big

constraint. To be reworded

with measureable

targets for each project

Page 682: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Assessment I Total

Shree Shyam Pulp & Board Mill Ltd Part - I

Emp. Code: 970 Ed. Qual. M.Sc. ChemistryDepartment: Civil Date of Birth 04.08.1970

Review 2

Feedback Target

L-5 L-4 L-3 L-2 L-1

Suggested KPI forr April-Jun

Weightage(Total 100)

Page 683: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 684: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mill Ltd

%age/ Level Achieved

Performance Assessment By Appraisee

Performance Assessment By Appraiser

Page 685: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee

Signature of Appraiser

Shree Shyam Pulp & Board Mill Ltd

%age/ Level Achieved

Performance Assessment By Appraisee

Performance Assessment By Appraiser

Page 686: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 687: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Devendra AgarwalDesignation: Sr Manager Mechanical Maintenance

S No KRA KPI

1 Plant availability

2 Spares

3 Recovery Boiler Availability

4 Cost of Production Reduction in cost of production

Signature of A

Minimising the breakdown/downtime for achieving 100% plant availability

Maintaining all the required spares ready in stock

Increasing recovery boiler availability for smooth running

Page 688: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Devendra AgarwalDesignation: Sr Manager Mechanical Maintenance

S No KRA KPI

Page 689: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action 0/1

2)Weekly monitoring and analysis

2)Consumption of norms of spares

3)List of critical spares to be made

Reduction in consumption by 5 %

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

1) Preparing a root chart for all the plant equipments and implementing

strictlyCondition monitoring of running

equipment daily

Number of breakdown hours

1) Prepare a list of all the psares and their inventory position

Timely indenting the required material and follow up

Number of occasions when spares not available for maintenance

Regular checking of all the soot blowers for proper working without

gland leakageReducing soot blower downtime

from 10% to 5% Number of hours recovery boiler not available

To prepare a database of lubricants and bearings consumption

% of Base cost of Lubricants and Bearings in previous 12 months

Page 690: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action 0/1

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)Total number of ActivitiesAchievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Page 691: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 196 Ed. Qual. B.Sc, B.E(Mech)Department: Chemical Recovery

Review 1 - (DATE)

Feedback Weightage

L-5 L-4 L-3 L-2 L-1

1 Oct - 31 Dec

1 Oct - 31 Dec

1 Oct - 31 Dec

1 Oct - 31 Dec

Suggested KPI for Jan-Mar

Target Date(To be given under column L3)

Resigned hence not reviewed

Page 692: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 196 Ed. Qual. B.Sc, B.E(Mech)Department: Chemical Recovery

Review 2

Feedback Weightage

L-5 L-4 L-3 L-2 L-1

Suggested KPI for April-Jun

Target Date(To be given under column L3)

Page 693: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 694: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 695: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Dharmendra SinghDesignation: Manager A/C & Finance

S No KRA KPI

1

2

3Prepare imprest advance statement

4

5 Authorisation in ERP

6

7

8

9

10

11

Fulfill A&F processes and handle exceptions

Monitoring on cash balance & cash forcasting

Fulfill A&F processes and handle exceptions

Prepaired cash flow statement for fund planning

Fulfill A&F processes and handle exceptions

Fulfill A&F processes and handle exceptions

Checking & authorisation of receipt, payment, journal, contra vouchers & cash sheet

Fulfill A&F processes and handle exceptionsFulfill A&F processes and handle exceptions

Maintain relation with Excise, banks ,financial institutions & other govt. deptt.

Fulfill A&F processes and handle exceptions

Liaisoning with excise & other govt. deptt.

Fulfill A&F processes and handle exceptions

Computation of all data related to Excise & Service tax for payment & Return filing.

Fulfill A&F processes and handle exceptions

E-Filing of Excise & Service Tax Return.

Fulfill A&F processes and handle exceptions

Freight, Claim, Salary Advance, Imprest Advance & all other expenses passing.

Fulfill A&F processes and handle exceptions

Working to get "Certificates" from Excise & Customs.

Page 696: Sspbml- Kra Plant Jan-mar 15-2-13 v7

12

All Vendors accounts Reconcilation.

13

14

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Dharmendra SinghDesignation: Manager A/C & Finance

S No KRA KPI

Fulfill A&F processes and handle exceptions

Fulfill A&F processes and handle exceptions

Arrangment of Bank & Cash payment for suppliers & others as per Management instructions on plant level.

Fulfill A&F processes and handle exceptions

Provide adequate Guidelines & full co-operation to all team members for smooth working.

Page 697: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 698: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action0/1

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA/

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Page 699: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Plan/Design,Execute,Check

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

NO INITIATIVES

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action0/1

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Follow processes as per schedule/calendar/timeline

Number of times failed to meet agreed timelines/SLA

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Page 700: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Page 701: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1373 Ed. Qual. M.Com, C.A.Department: Accounts

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

Daily

Daily

Daily

Daily

Daily

Monthly

Daily

Does work as per instructions

Monthly/Quarterly/Hlf.Yearly/Annualy

When needed.

Page 702: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Daily

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1373 Ed. Qual. M.Com, C.A.Department: Accounts

Review 2

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2 L-1

When needed.

Suggested KPIs for April-Jun

Page 703: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 704: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Com, C.A.

Weightage

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 705: Sspbml- Kra Plant Jan-mar 15-2-13 v7

100%

100%

100%

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Com, C.A.

Weightage %age/ Level

Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 706: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 707: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Energy Conservation CFTKEY: CC - Core Committee ( VK Tharad, Rajeev Pandey, SK Johar, Ranjedra Singh Nayal, RK Verma)

S No Responsibility Center Area of Impact

1 CC Organisation Efficiency

Organisation Efficiency

2 CC + President Organisation Efficiency

3 Rajeev Pandey Organisation Efficiency

Page 708: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 709: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 710: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

CC - Core Committee ( VK Tharad, Rajeev Pandey, SK Johar, Ranjedra Singh Nayal, RK Verma)

Initiative Steps to achieve the Initiative Measurable

Task Force Formation

28-Feb-13

Zone Identification

Modification of Lighting System 1. Lighting Audit to be conducted

Meetings to be conducted to finalise members of the Task Force,

Finalisation of criteria for the giving of suggestion as well as reception of

suggestions.Task Force Finalisation for each of the zones by the Individual Zonal

Heads.

Format for Energy Conservation Suggestion/Recommendation

created as first draft

Finalise guidelines for Task force for giving suggestions

Formation of Energy Conservation Policy

Page 711: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Heat loss in pipelines and ducting

Condensate RecoverySteam Losses

Audit of Pumping throughout plant

2. Submission of proposal listing precise measures and estimated savings.

Segregation of Air Lines in Production

Cleaning of Paper Machine backwater , so that it can be recirculated to shower water

Fuel costs in Transportation Equipment

1. Format for evaluation of pump in terms of rating, positioning of valves,

Criteria for Evaluation of Suggestions received

Page 712: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 713: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code:Department:

Status of InitiativeFeedback Target Date(To be given under column L3)

L-5

Proposal submitted

CFL lights toreplace existing lighting. Possibly LEDs

Consisting of -1) Decription of Existing system and

it's operation2)Description of Proposed system

and it's operation3)Energy Saving Calculations

4)Cost benefits in terms of Annual energy Saving Potential , Annual

cost SavingInvestment,Simple Payback

The plant is to be broken into 5 Zones. Is there to be sub-division within that zone ? On the basis of what? Who is to head each zone?

Page 714: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Insulation

Major costs involved.

a)Low Investment and High Gain b)Low Investment and Low gain

On what basis will priority and and weightage be assigned?- Financial Impact will receive most consideration

Page 715: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 716: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

1373 Ed. Qual. M.Com, C.A.Accounts

Target Date(To be given under column L3)Weightage

L-4 L-3 L-2 L-1

%age/ Level Achieved

Page 717: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 718: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 719: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

Actual Performance (By

Appraiser)Perfromance

score

Page 720: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 721: Sspbml- Kra Plant Jan-mar 15-2-13 v7
Page 722: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Perfromance Planning and Assesment for the Quarter Oct - Dec, 12Name : Ajay GoelDesignation: Head of Engineering

S No KRA KPI

1

Unplanned Breakdown Zero unplanned Breakdown

2Costs Maintenance Costs within Budgets

3KRA/KPI initiative

4

CFT

5

6

7

8

91011

[email protected]

Page 723: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Signature of Appraisee:

Shree Shyam Pulp & Board Mills Ltd.

Performance Planning and Assesment for the Quarter Jan-Mar 2013Name : Dharmendra SinghDesignation: Manager A/C & Finance

S No KRA KPI

Page 724: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Review 1 - (DATE)

Initiatives/Action0/1

Spares planning

Vendor Development

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Preventive Maintenance Schedules to be followed with 100% compliance and regularly reviewed and modified

Compliance to preventive maintenance schedule in terms of

Time Cost and Quality

Optimise Repair and Maintenance Cost

Ensure equipment health with major focus on leakages of Black Liquor , Caustic, Acids , Oil, Steam, Air etc

throughout the plant.

Drive the KPIs of Electrical and Mechanical Dept

Oversee energy conservation initiative being driven by Mr Rajeev

Pandey

To follow up recommendations regarding improvements in contract

management from reports generated by S.Maji

Page 725: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Total number of ActivitiesAchievement Percentage

Shree Shyam Pulp & Board Mills Ltd.

Review 2

Initiatives/Action0/1

Number of 0 ( Red Buttons)Number of 1 (Green Buttons)

Total number of ActivitiesAchievement Percentage

Steps to achieve the Initiative/Action

Measures/Performance

Indicator

Page 726: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1373 Ed. Qual.Department: Accounts

Review 1 - (DATE)

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

1)      Zone 1 : Raw Material to Pulp : RS Nayal

2) Zone 2: Stock to Finshing House : RK Verma

3) Zone 3 : Power Utilities : SK Johar

4) Zone 4 : Recovery at Balance of the Plant : VK

Tharad5) Overall coordinator : Rajeev Pandey

Page 727: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.

Emp. Code: 1373 Ed. Qual.Department: Accounts

Review 2

Feedback Target Date(To be given under column L3)

L-5 L-4 L-3 L-2

Suggested KPIs for April-Jun

Page 728: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Com, C.A.

Target Date(To be given under column L3)Weightage

L-1

100%

100%

100%

100%

100%

100%

100%

100%100%100%100%

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score

Page 729: Sspbml- Kra Plant Jan-mar 15-2-13 v7

Shree Shyam Pulp & Board Mills Ltd.Annexure I

M.Com, C.A.

Target Date(To be given under column L3)Weightage

L-1

%age/ Level Achieved

Actual Performance (By

Appraiser)Perfromance

score