Environment Impact Assessment (Draft)
May 2017
SRI: Wind Power Generation Project Maps 1-7
Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, Democratic Socialist Republic of Sri Lanka for the Asian Development Bank.
This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
MAPS Map 1: Project Boundary Map 2: Locations of Wind turbines Map 3: Laydown Areas Map 4: Locations of Access Roads Map 5: Locations of Cable trenches Map 6: Access Road design Map 7: Design of Toilets etc.
Periyakarisal
Thalvupadu
,e;j gpuNjrkhdJ fhw;W kpd;tY epiya epu;khdj;jpw;F xJf;fg;gl;Ls;sJ.
,e;j gpuNjrkhdJ fhw;W kpd;tY epiya epu;khdj;jpw;F xJf;fg;gl;Ls;sJ.
Nadukudha
GSS
A
Cable Route For UG
Cables and Fiber
Optical Network
1
2
3
4
5
6
7
8
9
10
11
34
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
35
36
37
38
39
SITE OFFICE
PROPOSED LOCATION FOR PIER
WIND PARK MAIN
ADMIN BULIDING
SITE OFFICE
6
.
8
k
m
2
.
7
k
m
7
4
0
m
5
.
3
k
m
5
0
0
m
MAP 5
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B M
WP
P
Pro
pe
rty o
f
CE
B M
WP
P
Pro
pe
rty o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARD
MANNAR WIND POWER PROJECT - PHASE 1
Project Title
Drawn
Designed
Checked
Approved PD
SignatureDate
DESCRIPTION
A 3
04.01.2017
PE (II)
PM(W)
Asanka
0101
1:50000
CEB/MWPP/T/WP/02
POWER DISTRIBUTION NETWORK
PROPOSED CABLE/ FO ROUTES FOR
CONSTRUCTION OF 100MW SEMI DISPATCHABLE WIND FARM
MANNAR WIND POWER PROJECT - PHASE 1
xx
Wind Turbine Location & No
Power Lines
D2D2
F1 F1
SEPTIC TANK
SOAKAGE PIT
MH
Scale :- 1 : 50
225mm Brick Wall
Concrete Slab
RRM Work
225mm Brick Wall
225mm Brick Wall
Concrete Slab
SEPTIC TANKSOAKAGE PIT
RRM Work
900
TUBE WELL
MH
SIZE
02
F1
DESCRIPTIONTYPE
D2
450 X 600
750 X 2100 ALUMINIUM FRAMED SINGLE SASHED ALUMINIUM DOOR
02ALUMINIUM FRAMED TOP HUNG GLAZED FANLIGHT
NO
SCHEDULE OF DOORS & FANLIGHTS
675
1500
15001500
450
450
4000
2000
2000
2000
150
3300 675675
150
225
600
2400
125
600
600
450
2700
2400
MH
450
600
100000 (Minimum Distance) Dug Well
350
350
350
350
RRM Work
3700
2700
Notes
1. Soakage pit shall be at least 100 m away from a well or other drinking water source2. Well shall be dug minimum 3m beneath the ground water table3. All dimensions are in millimeters
MAP 7
Dwg. No.
Scale - Rev. Date
Size -
Sheet of Rev.
H
G
F
E
D
C
B
A
12 11 10 9 8 7 6 5 4 3 2
H
G
F
E
D
C
B
A
1
12 11 10 9 8 7 6 5 4 3 2 1
CE
B M
WP
P
Pro
pe
rty o
f
CE
B M
WP
P
Pro
pe
rty o
f
Rev. No. Date Description Drawn Checked Approved
CEYLON ELECTRICITY BOARD
MANNAR WIND POWER PROJECT - PHASE 1
Project Title
Drawn
Designed
Checked
Approved
SignatureDate
DESCRIPTION
A 3
PD
16.01.2017
PE(IV)
PM(W)
PE(IV)
0101
1:50
CEB/MWPP/T/C-M/05
LAYOUT OF PUBLIC SANITARY FACILITY
CONSTRUCTION OF 100MW SEMI DISPATCHABLE WIND PARK
MANNAR WIND POWER PROJECT - PHASE 1