Environment Impact Assessment (Draft) May 2017 SRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, Democratic Socialist Republic of Sri Lanka for the Asian Development Bank.

Transcript of SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps...

Page 1: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...

Environment Impact Assessment (Draft)

May 2017

SRI: Wind Power Generation Project Maps 1-7

Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, Democratic Socialist Republic of Sri Lanka for the Asian Development Bank.

Page 2: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...

This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...

MAPS Map 1: Project Boundary Map 2: Locations of Wind turbines Map 3: Laydown Areas Map 4: Locations of Access Roads Map 5: Locations of Cable trenches Map 6: Access Road design Map 7: Design of Toilets etc.

Page 4: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...
Page 5: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...
Page 6: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...
Page 7: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...
Page 8: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...

Periyakarisal

Thalvupadu

,e;j gpuNjrkhdJ fhw;W kpd;tY epiya epu;khdj;jpw;F xJf;fg;gl;Ls;sJ.

,e;j gpuNjrkhdJ fhw;W kpd;tY epiya epu;khdj;jpw;F xJf;fg;gl;Ls;sJ.

Nadukudha

GSS

A

Cable Route For UG

Cables and Fiber

Optical Network

1

2

3

4

5

6

7

8

9

10

11

34

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

35

36

37

38

39

SITE OFFICE

PROPOSED LOCATION FOR PIER

WIND PARK MAIN

ADMIN BULIDING

SITE OFFICE

6

.

8

k

m

2

.

7

k

m

7

4

0

m

5

.

3

k

m

5

0

0

m

MAP 5

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B M

WP

P

Pro

pe

rty o

f

CE

B M

WP

P

Pro

pe

rty o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARD

MANNAR WIND POWER PROJECT - PHASE 1

Project Title

Drawn

Designed

Checked

Approved PD

SignatureDate

DESCRIPTION

A 3

04.01.2017

PE (II)

PM(W)

Asanka

0101

1:50000

CEB/MWPP/T/WP/02

POWER DISTRIBUTION NETWORK

PROPOSED CABLE/ FO ROUTES FOR

CONSTRUCTION OF 100MW SEMI DISPATCHABLE WIND FARM

MANNAR WIND POWER PROJECT - PHASE 1

xx

Wind Turbine Location & No

Power Lines

AutoCAD SHX Text
FOR BIDDING PURPOSE
Page 9: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...
Page 10: SRI: Wind Power Generation Project Maps 1-7 · PDF fileSRI: Wind Power Generation Project Maps 1-7 Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, ...

D2D2

F1 F1

SEPTIC TANK

SOAKAGE PIT

MH

Scale :- 1 : 50

225mm Brick Wall

Concrete Slab

RRM Work

225mm Brick Wall

225mm Brick Wall

Concrete Slab

SEPTIC TANKSOAKAGE PIT

RRM Work

900

TUBE WELL

MH

SIZE

02

F1

DESCRIPTIONTYPE

D2

450 X 600

750 X 2100 ALUMINIUM FRAMED SINGLE SASHED ALUMINIUM DOOR

02ALUMINIUM FRAMED TOP HUNG GLAZED FANLIGHT

NO

SCHEDULE OF DOORS & FANLIGHTS

675

1500

15001500

450

450

4000

2000

2000

2000

150

3300 675675

150

225

600

2400

125

600

600

450

2700

2400

MH

450

600

100000 (Minimum Distance) Dug Well

350

350

350

350

RRM Work

3700

2700

Notes

1. Soakage pit shall be at least 100 m away from a well or other drinking water source2. Well shall be dug minimum 3m beneath the ground water table3. All dimensions are in millimeters

MAP 7

Dwg. No.

Scale - Rev. Date

Size -

Sheet of Rev.

H

G

F

E

D

C

B

A

12 11 10 9 8 7 6 5 4 3 2

H

G

F

E

D

C

B

A

1

12 11 10 9 8 7 6 5 4 3 2 1

CE

B M

WP

P

Pro

pe

rty o

f

CE

B M

WP

P

Pro

pe

rty o

f

Rev. No. Date Description Drawn Checked Approved

CEYLON ELECTRICITY BOARD

MANNAR WIND POWER PROJECT - PHASE 1

Project Title

Drawn

Designed

Checked

Approved

SignatureDate

DESCRIPTION

A 3

PD

16.01.2017

PE(IV)

PM(W)

PE(IV)

0101

1:50

CEB/MWPP/T/C-M/05

LAYOUT OF PUBLIC SANITARY FACILITY

CONSTRUCTION OF 100MW SEMI DISPATCHABLE WIND PARK

MANNAR WIND POWER PROJECT - PHASE 1

AutoCAD SHX Text
FOR BIDDING PURPOSE