SR-710 STUDY UPDATE SEPTEMBER 18, 2013
City of South Pasadena
![Page 2: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/2.jpg)
No Build• This option would have no effect on South Pasadena in
terms of the SR-710• The term no build refers to the SR-710 project, but other projects in
this scenario would still be built (e.g. Gold Line Foothill Extension).
![Page 3: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/3.jpg)
Bus Rapid Transit (BRT)
![Page 4: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/4.jpg)
Bus Rapid Transit (BRT)
There would be a significant effect on local businesses with the removal of on-street parking, elimination of bulbouts on Fair Oaks Ave
![Page 5: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/5.jpg)
Light Rail Transit (LRT)
![Page 6: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/6.jpg)
Light Rail Transit (LRT)
The City would have 2 stations one near Huntington Drive/Fremont Ave and the other Mission St/Fair Oaks Ave. The entire segment would be underground. Construction impacts and business interruption and/or relocation
![Page 7: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/7.jpg)
Light Rail Transit (LRT)
![Page 8: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/8.jpg)
TDM/TSMIn the City:
• There would be 5 intersection improvements
• 2 Local Street Improvements
• The Fair Oaks/SR-110 Improvement Project (Hook and off Ramp) is included
![Page 9: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/9.jpg)
TDM/TSM
“Consists of strategies and improvements to increase efficiency and capacity for all modes in the transportation system with lower capital cost investments and/or lower potential impacts.”
Transportation Demand Management/ Transportation System Management
Recent addition of “reversible lanes,” between Grevalia and Monterey, would have a significant impact to South Pasadena. The center median would be removed and converted into a travel lane whereby depending on traffic patters would function as a 3rd travel lane…
![Page 10: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/10.jpg)
Freeway Tunnel (F-7x)
- Vibrations (digging/boring)
- Emergency Response- Air Quality- Property Values- Historic Inventory- 3p –Public – Private
Partnership - Tolls - Trucks- Tunnel/Toll Avoiding
Traffic
![Page 11: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/11.jpg)
Freeway Tunnel (F-7x)
![Page 12: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/12.jpg)
Bundle/multi-mode
•Tunnel/BRT•Tunnel/LRT•Tunnel/TDM/TSM•BRT/LRT/TDM/TSM
All of these bundles will be further evaluated
![Page 13: Sr710 study update_power_point final final](https://reader036.fdocuments.net/reader036/viewer/2022081400/555d841ed8b42a6c3d8b4dde/html5/thumbnails/13.jpg)
Next Steps