Squeeze Studio D · SQUEEZE STUDIO 10, SEMESTER 2, 2016 SEONGHO BAE, 605311. PROJECT LOCATION...
Transcript of Squeeze Studio D · SQUEEZE STUDIO 10, SEMESTER 2, 2016 SEONGHO BAE, 605311. PROJECT LOCATION...
SQUEEZE STUDIO 10, SEMESTER 2, 2016SEONGHO BAE, 605311
DESIGN CRITERIAPROJECT LOCATION
CENTRAL
Human comfort living - all units with day light and break negative winter wind Human comfort living - all units with day light and break negative winter wind Human comfort living - all units with day light and break negative winter wind and break negative winter wind
Maximize public communal space inside of court-yard . Also introduce green space in Collingwood site because there has not enough opened green space for relaxing or having outside meal during lunch time.
Use sustainable building materials to reduce polu-tion and harmful chemical. Also introduce new tech-nology for timber structure that can be adapted for high rised building up to 20 - storey.
HUMAN COMFORT
COMMUNAL SPACE
SUSTAINABLEMATERIALGREEN
DEMOGRAPHIC ANALYSIS - COLINGWOOD
50% 50%Population Growth
7356 (in 2016) 11603 (in 2036)
+ 4250 Gender
35.1% 25.6% 11.2% 11.3% 14.1%
+
Household Size
Lone Couple One parent Couple with child Group Family
Age18 - 34 41%
24%50 - 59 8.8%60 + 8.9%
35 - 49
Household Weekly IncomeCollingwood City of Yarra
2.8% 1.6%
30.3% 22.3%Collingwood City of Yarra
$0
<$800
7.5%
17%
21%Total 45.5% of people use sustainable transportation
Squeeze Studio D Semester 2, 2016
Seongho Bae 605311
DESIGN DIAGRAM PROGRAM
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
Natural daylightVentilationMax. Open space
Winter windAccessibility
GENEALOGY DIAGRAM
1st floor
2nd floor
3rd floor
4th floor
5th floor
6th floor
7th floor
8th floor
9th floor
Roof
RETAIL & COMMERCIAL CAR DRIVEWAY THE SITE WALKWAY
WELLINGTON ST WALKWAY
RETAIL & COMMERCIAL
SITE PLAN
Car park
RestaurantGarden
Retail
Design hub / GalleryOffice
Circulation
ApartmentSwiming pool
Legends
0 105 20m
0 105 20m
ENVIRONMENTAL ANALYSIS
RADIATION
SHADOW STUDY
SUMMER EQUINOX WINTER
WIND STUDY
DAY LIGHT
A
A’
AMPHITHEATRE NIGHT TIME
SUMMER SEASON : STACKED MODULES WORK AS LOUVRE FOR SHADING UNDER UNITS.
WINTER SEASON : EVERY UNITS GAINED MAXI-MIZE SOLAR
WINTER WIND FROM NORTH SUMMER WIND FROM SOUTH EAST
0 5 10 20m
SECTION A-A’
COURTYARD VIEW CHILDREN PLAYGROUND
SWIMMING POOL
GROUND FLOOR PLAN 1 BEDROOM PLAN
2 BEDROOM PLAN
3 BEDROOM PLAN
Retail
Cafe/Convenience store
Retail
Retail
Retail
Drop Off Area
Lobby / Community Hall
LibraryOfficeOfficeOffice
Extended Drive Way
Design Hub
Design Hub
Amphitheatre
Fire place
Restaurant Restaurant Restaurant Restaurant
Stor
age
Stor
age
Stor
age
Stor
age
Gallery
0 5 10 20m
0 5 10 20m
0 1 2 4m 0 1 2 4m
0 1 2 4m0 1 2 4m
0 1 2 4m
4TH FLOOR PLAN
NORTH ELEVATION WEST ELEVATION
0 5 10 20m
ELEVATION
AERIAL VIEW