ATC-ABOC Days 24/01/07 SPS NORTH and PS EAST AREAS POWER CONVERTERS Situation of the power converters of the SPS and PS experimental areas Y.Gaillard AB/PO

description

SPS NORTH and PS EAST AREAS POWER CONVERTERS. Situation of the power converters of the SPS and PS experimental areas Y.Gaillard AB/PO. SPS NORTH and PS EAST AREAS POWER CONVERTERS. CONTENTS SPS NORTH AREA Equipments presentation New control system Start-up problems - PowerPoint PPT Presentation

Transcript of SPS NORTH and PS EAST AREAS POWER CONVERTERS

Page 1: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH and PS EAST AREAS POWER

CONVERTERS

Situation of the power converters of the SPS and PS experimental

areas

Y.Gaillard AB/PO

Page 2: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH and PS EAST AREAS POWER

CONVERTERS

CONTENTS SPS NORTH AREA

• Equipments presentation

• New control system

• Start-up problems

• Operation in the coming years

PS EAST AREA• Equipments presentation

• Main concerns

CONCLUSION

Page 3: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

330 PC (25kW 3.6MW)

3 buildings: BA80, BA81, BA82

8 power converter types:• C11 250A / 100V

• R11 500A / 150V

• R12 500A / 300V

• R13 500A / 225V

• R21 1000A / 300V

• R22 1500A / 250V

• R31 2500A / 255V

• R41 6000A / 600V

2 voltage booster types:• D21 1500A / 200V

• D31 2500A / 285V

Page 4: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

In operation since 1976 Original analog & digital electronics Wire wrap technology

Page 5: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

CONVERTER CRATE CONVERTER CRATE

POWER SUPPLY CRATE POWER SUPPLY CRATE

JUNCTION CRATE

DATA BUS

PCA

Com 1SK

8

JCPP

DELESTAGE

PUPITRE CRN

SK3/1-2

SK20

SK31

/1

SK31

/2

SK31

/3

IOR

142

0

IOR

142

0

IOR

142

0 CAMAC

CRATE

P0 SURVEY CRN

DUMP CONTROL

TAX 7

TAX 12

O R

VCC

Cables Plats

SK5 FTM

SK6 FTE

SK7 Start Pulse

SK2 Timing Cde

Ethernet

MODULES TG3PCA

GPS BA8xNASB8x

1553

LOGIC

SK200 SK200SK300 SK300

SK3 SK3

Ethernet

1x50

1x50

1x50

2x402x402x40

1x100

Coax.

Coax.

Coax.

I G

SK3 B8

To CAMAC

Patch Panel

SK4/5/6

SK3A

SK3B

SK10Access Norh Area

SK2

Compensateur BE

SK11

Heures Critiques BE

Old control system

Page 6: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

Junction Crate : Digital ElectronicuP 6809, Flex based system

CAMAC + PCA

Page 7: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

New control system

ICV

196

RIO

8062

+ C

TRP

SAC

CONVERTER CRATE CONVERTER CRATE

POWER SUPPLY CRATE POWER SUPPLY CRATE

DATA BUS

DUMP CONTROL

TAX 7

TAX 12

LOGIC

SK200 SK200SK300 SK300

SK3 SK3

1x100

VME CRATE DELESTAGESK20

SK3

BA80: V2NB80BA81: V2NB81BA82: V2NB82

BE

TIMING SPS

ETHERNET

CONSOLE

CONSOLE

P0 SURVEY

Page 8: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

SOFTWARE ARCHITECTURE

CESAR AB/CO/AP

LASER ALARMS AB/CO/AP

SPECIALISTSAPPLICATIONS AB/PO/CC

FESA AB/CO/FE

POWJCCMW CMW

AB/CO/IN

MAGNETS

VME CRATE

OPERATION POWSPECTRO

SPECTROMETERS MAGNETS

AB/PO/CC

Page 9: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

START UP PROBLEMS

DATABUS timing synchronization problem• Problem: The address trigger signal came too early

• Consequence: Several converters were commanded simultaneous

• Solution: The address signal was slowed down in POWJC

DATABUS current load• Problem: To many cards connected to ICV196

• Consequence: Some commands were unsuccessful

• Temporary solution: P42-K12 converters disconnected

• Final solution: Drivers will be installed to control the data busReady for next run.

Page 10: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

FAULTS STATISTICS

2004 2006

Exploitation period 26 weeks 20 weeks

Interventions 166 162

Duration of interventions 130 H 155 H

Mean intervention time 47’ 57’

Interventions / converters ratio 0.4 0.52

Power faults 21 12

Electronics faults 94 91

Operation faults 6 29

External faults 18 30

Page 11: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

MAIN CONCERNSElectronic card reliability

PCB connector contact

Cabling ageing

Wire wrap Obsolete

components

Split insulationDamaged gilded contacts

Page 12: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

100 electronic cards have to be repaired each year

The MTBF of the power converter is very low: ~7000H

Each fault is limited to a beam line (over 6 in north area)

Page 13: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

OBJECTIVES FOR THE COMING YEARS

Keep the same maintenance level with special actions Change obsolete IC of the address cards Clean connectors of the address cards

Keep the same operation expertise First Line training

Keep the intervention time of 1 hour

Improvements can only come with a consolidation program

Page 14: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

FUTURE CONSOLIDATION PROJECT

Replace 180 power converters (≤500A) by new switch-mode power converters.

Renovate 150 thyristor converters.

New electronic control.

Page 15: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH AREA POWER CONVERTERS

ESTIMATION

Budget estimation : 23 MCHF

Provisional schedule: 6 years

• 2 years studies and contracts

• 4 shutdowns for implementation

Manpower: 19 FTE

No budget allocated in AB consolidation! (below red line!)Nothing before 2010!

Page 16: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

PS EAST AREA POWER CONVERTERS

80 PC (8kW 2.5MW)

2 buildings: 251, 263

10 power converters types:• T1B 250A / 32V

• R10 250A / 50V

• R1 500A / 100V

• R3 800A / 300V

• R2 950A / 200V

• R2A/R2G1000A / 220V

• R2B 1000A / 250V

• R31 2500A / 355V

• R6 2500A / 500V5000A / 1000V

1 voltage booster type:• D0 1000A / 150V

Page 17: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

PS EAST AREA POWER CONVERTERS

In operation since 1970 Electronics replacement in 1991 PS standard control (1553)

Page 18: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

PS EAST AREA POWER CONVERTERS

2004 2006

Exploitation period 28 weeks 22 weeks

Interventions 40 41

Duration of interventions 33 H 53 H

Mean intervention time 37’ 76’

Interventions / converters ratio 0.61 0.63

Power faults 9 8

Electronics faults 14 8

Operation faults 2 8

External faults 15 17

FAULT STATISTICS

Page 19: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

PS EAST AREA POWER CONVERTERS

MAIN CONCERNS

Polarity switches :• Blocked with 0A reference

A software modification will be done for next run

• Some problems with old mechanical position sensorsStudies to install optical sensors are in progress

Auxiliary power supplies VERO :• Trivolts VERO are not reliable

Studies to install power modules + DC/DC converters are in progress

Page 20: SPS NORTH and PS EAST AREAS POWER CONVERTERS

ATC-ABOC Days 24/01/07

SPS NORTH and PS EAST AREAS POWER

CONVERTERS

CONCLUSIONSPS North area The new control system is operational since April 2006 It became stable in September after POWJC corrections Electronic reliability is the main concern Improvements can only come with a consolidation program Project could start in 2010 if a budget is allocated

PS Earth area Old power converters No consolidation program Can we improve diagnostic for magnet faults ? Call the right

service! What is the future of EAST areas with PS2?

Both Areas are using old power converters with not reliable electronics

=> High number of First Line interventions