Sprint 105 Review / Sprint 106 PlanningApril 22, 2013

Page 2: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint Resource Pages

• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+105+Progress+Summary

• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+106+Progress+Summary

• For information on the CONNECT 4.1 release visit: https://developer.connectopensource.org/x/q4CrBw

2

Page 3: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 Summary - Cumulative Flow

3

To Do

In Progress

QA

Done

Page 4: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 Summary - Burndown Chart

4

Page 5: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 Summary –Sprint Stats

• Points committed = 13– Initial points committed – 15.5

– Ticket added for 0.5 points of effort, totaling 16 points for sprint

– Ticket moved for 3 points , resulting in 13 points

• Tickets committed to sprint = 11

• Tickets completed = 7

• Points remaining (unclosed) at end of sprint = 5

• Points completed in sprint (velocity) = 8

5

Page 6: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 – Themes & Tasks

• 4.1 Release – Binaries and source available

– Complete and finalize supporting documentation

• 4.2 Release– CMS-OFM 4.0 install on WAS 7 JDK 1.6 testing

– Design for Document Query specification version identification

• CONN-46 & CONN-15

• Participation in the Healtheway Certification pilot

• Partner and Community Support

6

Page 7: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 - What We are Showing Today

• CONNECT 4.1 released on April 10 2013– Release overview page – CONNECT 4.1 Overview

JBoss Application Server Support

Continuous Integration and Code Base Improvements– Significantly increased automated test case coverage and build

process

Additional Improvements– For important issues resolution, see Release Notes for details

• CONN-355/357 – CONNECT not sending organization-id attribute statement in SAML header – necessary for certification testing

– Note - Support for CONNECT 4.0 is deprecated - all users are encouraged to target 4.1 for new adoption and upgrades.

7

Page 8: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 - What We are Showing Today

• CONNECT 4.2 Support adopters/federal partners that want to use

CONNECT with Java 6 (Feature request – CONN-350)

– CONN-363 – Update codebase to use Java 6

• Code changes and testing approach

– CONN-365 – Push CONNECT libraries built with Java 6 to maven central

Demo

8

Page 9: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 - What We are Showing Today

• CONNECT 4.2 Provide adopters that support both versions of the

specifications(QD and RD) the service version of the incoming message so that adapters can validate/further process the request and generate the version specific response (Feature request – CONN-46)

– CONN-293 – Research and analysis task related to design options (Responding)

– Link to design approach-

https://developer.connectopensource.org/x/kYDvBwDiscussion

9

Page 10: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 105 - What We are Showing Today

• Participation in HealtheWay pilot– CONN-317 – Pre-test setup for pilot testing (not

completed)

• Community and Federal Partner Support– Support CMS with their planned Direct Pilot

• Custodial Agent Duties– Unplanned infrastructure maintenance

• Significant impact to sprint 105

10

Page 11: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 106 - Proposed Themes

• Continued Testing for Java 6 & Java 7 Support

– Installation testing on WAS 7 /IBM SDK 1.6

– Installation testing on WL 11g / JDK 1.6

– Installation testing on WL 12c / JDK 1.7

– Installation testing on WAS 8.5 /IBM SDK 1.7

– Installation testing on JBoss 7.1.1 /JDK 1.7

– Installation testing on GlassFish 3.1.2 /JDK 1.7

– Smoke test on all installations

• Research and Write Design Approach for Multi-Specification Identification for QD/RD (Initiating)

– Review design approach with technical leads from Federal Partners (conference call)

11

Page 12: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Sprint 106 – Other tasks

• Run Healtheway certification pilot test cases for a vendor gateway– Pilot extended to May 31

• Other tasks– Partner and Community Support

– Ongoing Custodial Agent Duties

• Product Backloghttps://issues.connectopensource.org/secure/VersionBoard.jspa?

selectedProjectId=10140

12

Page 13: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

CONNECT 4.0Community Announcements

• CONNECT Awareness

– Open sprint review and planning meetings Next sprint meeting will be May 6th

– CONNECT 4.0 Blogs and Forum posts– http://www.connectopensource.org/developer-resources/forums

– CONNECT User Group meeting May 21st

– Call for participation and abstracts underway

13

Page 14: Sprint 105 Review / Sprint 106 Planning April 22, 2013.

Questions and Discussion

14