Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status

description

Spokane’s CSO Reduction Status. Spokane River Forum 26 May 2013. Spokane’s Primary Treatment Plant. Interceptor Sewers for Dry Weather Flows. CSO . RPWRF. CSO Regulator is an Overflow Threshold – e.g. “Leaping Weir”. How do combined sewers work?. wastewater. stormwater. CSO Regulator. - PowerPoint PPT Presentation

Transcript of Spokane River Forum 26 May 2013

Page 1: Spokane River Forum 26 May 2013

Spokane River Forum 26 May 2013

Spokane’s CSO Reduction Status

Page 2: Spokane River Forum 26 May 2013

Spokane’s Primary Treatment Plant

Page 3: Spokane River Forum 26 May 2013

Interceptor Sewers for Dry Weather Flows

RPWRF

CSO

Page 4: Spokane River Forum 26 May 2013

CSO Regulator is an Overflow Threshold – e.g. “Leaping Weir”

Page 5: Spokane River Forum 26 May 2013

How do combined sewers work?

Treatment Plant

wastewater

CSO Regulator

stormwater

Page 6: Spokane River Forum 26 May 2013

Annually, most combined sewage gets treated

Combined Sewage

Wastewater Flow

Time

Flow

Overflow Threshold

Overflows to River

Treated at RPWRF

Page 7: Spokane River Forum 26 May 2013

CSO Reduction HistoryBaselineas of 1980

33 outfalls

1000 average CSOs / year

550 avg million gallons / yr

Page 8: Spokane River Forum 26 May 2013

CSO Reduction HistoryPhase 11980s storm separation 86% volume reduction 24 outfalls

450 average CSOs / year

80 avg million gallons / yr

Page 9: Spokane River Forum 26 May 2013

CSO Regulations

Chapter 173-245 WAC:Frequency:

“… control of each CSO such that an average of one untreated discharge may occur per year.”

– Applied to each outfall

Water Quality:

“CSOs shall not violate water quality standards in receiving waters (numeric standards or the beneficial uses).”

Page 10: Spokane River Forum 26 May 2013

CSO Reduction HistoryPhase 2Storage Tanks by 2012 for overflow frequency

20 outfalls

280 average CSOs / year

70 avg million gallons / yr

Page 11: Spokane River Forum 26 May 2013

CSO 16

Page 12: Spokane River Forum 26 May 2013

Control Facility Construction

Page 13: Spokane River Forum 26 May 2013

Underground Storage Tank

Page 14: Spokane River Forum 26 May 2013

Fill Weir and Sump Drain

... Tank Drains to Sewer After Storm

Tank Fills During Storm...

Page 15: Spokane River Forum 26 May 2013

Self-Cleans After Tank Drains

Page 16: Spokane River Forum 26 May 2013

Self-Cleans After Tank Drains

Page 17: Spokane River Forum 26 May 2013

Self-Cleans After Tank Drains

Page 18: Spokane River Forum 26 May 2013

Site Restoration

Page 19: Spokane River Forum 26 May 2013

Monitoring & Cleaning Controls

Page 20: Spokane River Forum 26 May 2013

CSO Facilities Constructed

CSO 10

8

CSO 16/18

CSO 2/3

CSO 40CSO 19

CSO 39

CSO 42

CSO 38

Page 21: Spokane River Forum 26 May 2013

CSO Outfalls Eliminated

CSO 3

4

CSO 18CSO 40CSO 39

Page 22: Spokane River Forum 26 May 2013

Facilities In Final Design4

CSO 41

CSO 34-3CSO 33-2

Pending Integrated Plan

CSO 34-3

Up-basin Tanks

Pending Integrated Plan

Page 23: Spokane River Forum 26 May 2013

For better “dry weather” control:Weir Modification... “Before”

Page 24: Spokane River Forum 26 May 2013

Weir Modification... “After”

Page 25: Spokane River Forum 26 May 2013

Weir Modification... “After”

Page 26: Spokane River Forum 26 May 2013

Interim Weir Modifications

CSO 12

7

CSO 7

CSO 25

CSO 26CSO 14

CSO 6

CSO 15

Page 27: Spokane River Forum 26 May 2013

Weir Mods provide:

Less dry weather plugging

More response time

Improved monitoring

Page 28: Spokane River Forum 26 May 2013

CSO Reduction HistoryIntegrated PlanRevised approach

Prioritize CSO volume reduction

Compliance: 20-year vs. 5-year