Spinetic October 2016 (simple) v3 [Autosaved] · Chris Goodall, angel investor. Strictly Private...
Transcript of Spinetic October 2016 (simple) v3 [Autosaved] · Chris Goodall, angel investor. Strictly Private...
Business Plan September 2016
Chris Goodall, angel investor
Strictly Private and Confidential 20
In the latest prototype panel, each blade has dimensions 0.45x1.7m, and such a panel will have a total height of ~2m, with a width of 4-5m, depending on whether a 5 or 6 blade configuration is chosen. Final rated power outputs of 500-1000W per panel are envisaged. A key characteristic of Wind Panels is that they can be electrically and mechanically linked together to form larger energy generating arrays. Fig.8 below, shows two Wind Panels linked together, currently under evaluation at our Wiltshire test site
Figure 8: Photograph of linked Wind Panels
Two linked Spinetic wind panels
Business Plan September 2016
Extremely light and extremely strong
Business Plan September 2016
Extraordinary simplicity of construction
Business Plan September 2016
Cost efficiency
Enablers
• Plug & play simplicity = ultra easy installation (can use low skilled labour)
• Design for automotive style mass production = huge economies of scale
• Portability/plonkability = can reach the parts that other turbines cannot reach!
Result
LCoE comparison
• Conventional small wind: $0.35 to $0.80 per kWh
• Utility scale wind: $0.05 to $0.10 per kWh
• Spinetic Wind Panel at scale: $0.04 to $0.07 per kWh
Business Plan September 2016
Eventual LCoE is lower than that currently paid in our target market segments
Business Plan September 2016
Business Plan September 2016
Funding history and cash requirements
2013-2015 £1.2m, IP Group, Lark Energy (top 5 UK PV developer)
2016 (now) Raising £0.7m, of which c.£0.3m committed by existing investors
Mid 2017 Likely raise of £2-£4m, depending on choice of manufacturing route
Business Plan September 2016
Timeline to full commercialisation
Autumn ‘16 Winter ‘17 Spring ‘17 Summer ‘17
Panelsinstalled 4-6 10 10 20
Full scale contract manufacture
orDevelopment of own factory
Business Plan September 2016
Seeks corporate relationships with engineering and micro-grid businesses as well as investment
(Chris Goodall – [email protected])