Page 1 MIOSHA Safety Partnership | Spectrum Health Medical Group Beltline Integrated Care Campus | April 2014 MIOSHA Safety Partnership Spectrum Health Medical Group Beltline Integrated Care Center Monthly Report | April 2014 safety incidents Experience Summary Current Month Year to Date Project to Date Total OSHA Recordables 0 1 3 Project Man-Hours 26,762 96,702 174,880 DART Rate 0 2.07 3.43 Safety Meetings and Initiatives Elzinga & Volkers has started a project safety committee to get a first-hand safety perspective from the crews performing the work onsite on a daily basis. This group consists of field employees from each trade and has been meeting monthly for the last two months. At the conclusion of each meeting, the group walks the jobsite and discusses safety practices and current site conditions. Topics that we discussed at our weekly safety meetings included: » Housekeeping » Extension Cord Safety » Emergency Preparedness » Means of Egress 0 Goal: Kent Companies pouring the exterior stairs

description

April MIOSHA Newsletter

Transcript of Spectrum Health Integrated Care Center

Page 1: Spectrum Health Integrated Care Center

Page 1MIOSHA Safety Partnership | Spectrum Health Medical Group Beltline Integrated Care Campus | April 2014

MIOSHA Safety PartnershipSpectrum Health Medical GroupBeltline Integrated Care CenterMonthly Report | April 2014

safety incidents

Experience SummaryCurrent Month Year to Date Project to Date

Total OSHA Recordables 0 1 3Project Man-Hours 26,762 96,702 174,880DART Rate 0 2.07 3.43

Safety Meetings and InitiativesElzinga & Volkers has started a project safety committee to get a first-hand safety perspective from the crews performing the work onsite on a daily basis. This group consists of field employees from each trade and has been meeting monthly for the last two months. At the conclusion of each meeting, the group walks the jobsite and discusses safety practices and current site conditions. Topics that we discussed at our weekly safety meetings included:

» Housekeeping

» Extension Cord Safety

» Emergency Preparedness

» Means of Egress

0Goal:

Kent Companies pouring the exterior stairs

Page 2: Spectrum Health Integrated Care Center

MIOSHA Safety Partnership | Spectrum Health Medical Group Beltline Integrated Care Campus | April 2014 Page 2

Construction of the atrium lift continues

IncidentsZero incidents this month!

Project ProgressWe are wrapping up the interior construction in many areas of the building. The upper two floors have finish paint on the walls, casework installed and ceilings hung in the exam rooms. We are currently installing the carpeting in the back of house areas, where the doctors’ offices are located. As we finish up, each office will be closed one by one to prepare for the owner move in. In the hospitality areas on the upper two floors, we are working on the drywall and will be starting the finishes shortly.

On the lower two floors, drywall finishing is coming to an end. Finish paint is going on walls and casework is being installed throughout the floors. Flooring on these two floors will begin shortly.

Now that winter has decided to let go, we have resumed the exterior site work. Sidewalks are being poured on a daily basis and we are planting trees on the islands. We are also finishing up the composite panels on the building, and you are able to see the final product taking shape.

Metal panels being lifted to the roof

Final floor pour of the project