Spectra Energy in Peace River Regional...

5
4/14/2015 1 Peace River Regional District| April 23, 2015 Spectra Energy in Peace River Regional District Laverne Norris – Director, South Peace Area Evan Saugstad– Manager, Community & Aboriginal Relations Jay Morrison – Community & Aboriginal Relations Spectra Energy| Spectra Energy in BC A Vision & Culture of Safety Spectra Energy employees and contractors at every level demonstrate personal commitment to continuous safety improvement. The goal is a zero workrelated injury and illness culture. Safety Principles Safety begins at the top. Injuries and workrelated illnesses are preventable. Identifying and minimizing safety and health risks are priorities. Personal ownership for safety and looking out for others is essential. Openness, feedback and trust are keys to success. Safety is good business and a critical aspect of a high performance organization. 2

Transcript of Spectra Energy in Peace River Regional...

Page 1: Spectra Energy in Peace River Regional Districtprrd.bc.ca/board/agendas/2015/2015-10-483908012/pages/...NGL Transmission Pipe: 2,400 km SE Gas Processing Capacity: 3.7 Bcf/d 4Q14 DCP

4/14/2015

1

Peace  River  Regional  District|  Apri l  23,  2015

Spectra Energy in Peace River Regional District

Laverne Norris – Director, South Peace AreaEvan Saugstad– Manager, Community & Aboriginal RelationsJay Morrison – Community & Aboriginal Relations

Spectra Energy|Spectra Energy in BC

A Vision & Culture of Safety

Spectra Energy employees and contractors at every level demonstrate personal commitment to continuous safety improvement. The goal is a zero work‐related injury and illness culture.

Safety Principles• Safety begins at the top.• Injuries and work‐related illnesses are preventable.• Identifying and minimizing safety and health risks are priorities.

• Personal ownership for safety and looking out for others is essential.• Openness, feedback and trust are keys to success.• Safety is good business and a critical aspect of a high performance organization.

2

AD0018
Typewriter
3.2
AD0018
Apr23
AD0018
Typewriter
Received DC Office April 14, 2015
Page 2: Spectra Energy in Peace River Regional Districtprrd.bc.ca/board/agendas/2015/2015-10-483908012/pages/...NGL Transmission Pipe: 2,400 km SE Gas Processing Capacity: 3.7 Bcf/d 4Q14 DCP

4/14/2015

2

Spectra Energy|Spectra Energy in BC

A Leader in Pipeline, Processing & Gathering

3

Gas storage facilityGas processing plantPropane terminalNGL storageShale gas formationsCrude storageMajor oil pipeline terminal

Natural Gas Transmission Pipe:  31,000 km

Natural Gas Storage Capacity:  ~300 BcfNatural Gas Gathering Pipe:  113,000 km

Crude Transmission Pipe:  2,700 kmNGL Transmission Pipe:  2,400 km

SE Gas Processing Capacity:  3.7 Bcf/d 

4Q14 DCP Gathered and Processed: 6.7 Tbtu/d

4Q14 DCP NGLs Produced:  ~450 MBbl/d Distribution Pipe:  64,000 km

Union Gas Retail Customers:  1.4 million 

Spectra Energy|Spectra Energy in BC 4

• One of the largest natural gas midstream businesses in Canada 

• Unsurpassed footprint connecting natural gas plays to premium markets – and perfectly poised to serve growing demands

• 58‐year track record in safely, reliably and responsibly constructing and operating natural gas gathering, processing and transportation facilities

• Comprised of four complementary, but very distinct, commercial business divisions:

– BC Pipeline

– BC Field Services

– Midstream 

– Natural Gas Liquids (NGL)

Our Western Canadian Operations

AD0018
Typewriter
3.2
AD0018
Apr23
Page 3: Spectra Energy in Peace River Regional Districtprrd.bc.ca/board/agendas/2015/2015-10-483908012/pages/...NGL Transmission Pipe: 2,400 km SE Gas Processing Capacity: 3.7 Bcf/d 4Q14 DCP

4/14/2015

3

Spectra Energy|Spectra Energy in BC

• Expansions• South Peace III• North Montney Projects• Fort St. John Mainline Loops

• Ongoing  Maintenance• Pipeline Upgrades Program 

(Wonowon Replacement)

• McMahon Turnaround 2015

• Grandhaven & Gathering System Digs

• Westcoast Connector Gas Transmission (WCGT)

Growing the Business: Recent Developments

5

Spectra Energy|Spectra Energy in BC

Plant Turnarounds – McMahon 2015• Gas plants undergo total facility shutdown on 4‐year cycles to conduct comprehensive regulatory inspections, improvements and upgrades to maintain business viability, system integrity, reliability and safety. 

• CIMS Services engaged as lead contractor to manage related turnaround activities (i.e. traffic, accommodation, ensuring local opportunities).

• Project anticipated to provide significant boost to local economy

• Customers also perform their own maintenance concurrently during these turnarounds.

6

AD0018
Typewriter
3.2
AD0018
Apr23
Page 4: Spectra Energy in Peace River Regional Districtprrd.bc.ca/board/agendas/2015/2015-10-483908012/pages/...NGL Transmission Pipe: 2,400 km SE Gas Processing Capacity: 3.7 Bcf/d 4Q14 DCP

4/14/2015

4

Spectra Energy|Spectra Energy in BC

Project Scope:•$6‐8B investment•~ 850 km, 48‐inch pipeline

•Transports northeast B.C. gas production to Prince Rupert, B.C.

•Two pipelines within a single right‐of‐way

•First pipeline: Up to 4.2 Bcf/d of natural gas

•Long‐term agreement with BG Group

•Continuing work with potential partners to secure additional customers within corridor

•EA Certificate received

7

Advancing Westcoast Connector Gas TransmissionBritish Columbia‐Based Solutions for Global LNG 

Spectra Energy|Spectra Energy in BC

Peace River Regional District ‐ Local Benefits

8

• 336 full‐time Spectra Energy employees in the PRRD Regional District; ~ 150 in FSJ

• $163MM Taxes Paid in BC, 2013

• Contributions to local charities and organizations

Map of Operations in area.

AD0018
Typewriter
3.2
AD0018
Apr23
Page 5: Spectra Energy in Peace River Regional Districtprrd.bc.ca/board/agendas/2015/2015-10-483908012/pages/...NGL Transmission Pipe: 2,400 km SE Gas Processing Capacity: 3.7 Bcf/d 4Q14 DCP

4/14/2015

5

Spectra Energy|Spectra Energy in BC

Partner of Choice

Strategic Giving Programs

We continue our legacy of giving back to the communities where we live and work by supporting employee volunteerism and philanthropy:

• In 2014, the Spectra Energy Foundation donated over $153,000 to community organizations in Peace River Regional District.

• Our United Way campaign raised over $370,000 throughout B.C.

• 2015 marks our 13th Anniversary of the Northern Opportunities program.

Helping Hands in Action Highway Clean‐up Project

9

AD0018
Typewriter
3.2
AD0018
Apr23