CONTRACTOR SHALL CHECK AND MEASURE THE LOAD ON ALL THE EXISTING AND NEW BRANCH CIRCUITS IN ALL THE ELECTRICAL PANELS AND CONFIRM THEY ALL COMPLY WITH NEC 210.19(A)(1) AND 210.20(A) AND (B).
AutoCAD SHX Text
ALL NEW CONDUITS BETWEEN GENERATORS, SWITCHGEARS, AN NEW ATS SHALL BE GRS OR IMC AND BELOW/HIDDEN/ INSIDE/ UNDER THE EXISTING STRUCTURE WALL IN GENERATOR/SWITCHGEAR AREA.
AutoCAD SHX Text
THE ELECTRICAL PLANS ARE DIAGRAMMATIC ONLY. REFER TO ARCHITECTURAL PLANS FOR EXACT DIMENSIONS OF THE BUILDING AND APPURTENANCES. REFER TO MECHANICAL AND PLUMBING PLANS FOR EXACT LOCATIONS OF MECHANICAL EQUIPMENT.
AutoCAD SHX Text
TEMPERATURE RATING OF CIRCUIT BREAKERS SHALL BE COMPATIBLE WITH TEMPERATURE RATING OF CONDUCTOR INSULATION. THE OVERCURRENT PROTECTION SHALL BE IN ACCORDANCE WITH THE TERMINAL RATING LIMITATIONS OF SECTION 110.14 (C) (1) FOR CIRCUITS RATED 100 AMPS OR LESS OR MARKED FOR #14 THROUGH #1 CONDUCTORS.
AutoCAD SHX Text
ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL CONFORM WITH APPLICABLE STANDARDS OF UL, NEC, NEMA, ASTM AND ANSI. ALL NEW EQUIPMENT AND DEVICES SUCH AS BREAKERS, SWITCHES, PANEL BOARDS, ETC SHALL BE COMMERCIAL GRADE.
AutoCAD SHX Text
ALL ELECTRICAL EQUIPMENT AND INSTALLATION AND CONDUITS SHALL BE GROUNDED IN ACCORDANCE TO NEC ARTICLE 250. CONDUITS SHALL NOT BE USED AS THE SOLE EQUIPMENT GROUNDING CONDUCTOR.
AutoCAD SHX Text
PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR COMPLETING AND OPERATING SYSTEM SHOWN ON THE DRAWINGS. INSTALLATION OF EQUIPMENT, WIRING, ETC., SHALL BE DONE AT THE EXPENSE OF THE CONTRACTOR.
AutoCAD SHX Text
THE CONTRACTOR SHALL PAY ALL REQUIRED FEES AND SHALL OBTAIN ALL NECESSARY PERMIT AND LICENSES FOR INSTALLATION OF WORK, COMPLETED.
AutoCAD SHX Text
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE LOCAL CODES, MANUFACTURER INSTRUCTIONS AND THE FOLLOWING CODES AND REGULATIONS:
AutoCAD SHX Text
CONTRACTOR SHALL VERIFY ALL DOORS SWINGS WITH THE ARCHITECTURAL PLANS PRIOR TO INSTALLING LIGHT SWITCH BOXES. LIGHT SWITCHES SHALL BE LOCATED ON LOCK SIDE OF DOOR UNLESS PHYSICALLY IMPOSSIBLE TO INSTALL IN THIS LOCATION.
AutoCAD SHX Text
ALL ELECTRICAL WORK AND MATERIALS SHALL BE GUARANTEED FOR A PERIOD OF MINIMUM ONE YEAR FROM THE DATE OF ACCEPTANCE OF THE FINAL INSTALLATION BY THE OWNER.
AutoCAD SHX Text
ALL ITEMS, MATERIAL AND EQUIPMENT INSTALLED AS PART OF THIS WORK SHALL BE NEW AND U.L. TESTED, UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
ALL CUTTING OF WALLS, FLOORS, ETC., FOR CONDUIT AND EQUIPMENT AND ALL CLOSING OF UNUSED OPENINGS SHALL BE DONE AT THE EXPENSE OF THE CONTRACTOR. OPENINGS IN THE FIRE WALLS SHALL BE SEALED WITH FIRE SEALANT.
AutoCAD SHX Text
ALL MATERIAL NOT TO BE USED SHALL BE REMOVED FROM SITE AND ALL DEBRIS SHALL BE CLEANED AND THE AREA OF WORK SHALL BE LEFT IN CLEAN CONDITION.
AutoCAD SHX Text
ALL CONDUCTORS SHALL BE COPPER OF TYPE THWN OR THHN, 75 DEGREE, U.N.O.. #12 A.W.G. MINIMUM SIZE. (U.N.O.).
AutoCAD SHX Text
ALL CONDUCTORS #8 AWG AND LARGER MAY BE ALUMINUM STRANDED. ALL WIRING SHALL BE COLOR CODED. ALL CONDUCTOR SIZES SHOWN IN DWG IS BASED ON COPPER. CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENT FOR WIRE SIZES ACCORDING TO TYPE.
AutoCAD SHX Text
THE NUMBER OF WIRES ARE NOT NORMALLY INDICATED FOR ALL CIRCUITS. ONLY THOSE WHERE CLARIFICATION IS NECESSARY ARE SHOWN. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL WIRE NECESSARY FOR THE PROPER FUNCTION OF THE SYSTEM WHETHER INDICATED OR NOT.
AutoCAD SHX Text
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER PHASING THE CIRCUITS IN THE PANEL IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE FOR MULTI-WIRE AND INDIVIDUAL CIRCUITS. CONTRACTOR SHALL BALANCE THE PANELBOARD LOAD ON ALL PHASE, UNDER NORMAL OPERATING CONDITIONS, AFTER COMPLETION OF THE WIRING.
AutoCAD SHX Text
BRANCH CIRCUITS OVER 100 FEET FROM PANEL TO LAST DEVICE SHALL HAVE CONDUCTORS INCREASED ONE SIZE LARGER THAN INDICATED TO COMPENSATE FOR VOLTAGE DROP.
AutoCAD SHX Text
ELECTRICAL METALLIC TUBING (EMT) SHALL BE ALLOWED FOR INTERIOR BRANCH CIRCUITS NOT OTHERWISE SPECIFIED TO BE GRS OR IMC. ARMORED CABLE (AC) AND METAL CLAD CABLE (MC) MAY BE USED WHERE PERMITTED BY NEC AND INSPECTING AUTHORITY IN LIEU OF EMT FOR CONCEALED CIRCUITS SERVING LIGHTING, RECEPTACLES AND SMALL MOTORS.
AutoCAD SHX Text
WIRING DEVICES SHALL BE FLUSH MOUNTED. EACH HOMERUN SHALL HAVE A (SEPARATE) WHITE NEUTRAL AND GREEN GROUND WIRE. GENERALLY RUN EXPOSED CONDUIT PARALLEL TO OR AT RIGHT ANGLES TO WALLS AND STRUCTURAL MEMBERS.
AutoCAD SHX Text
ALL DEVICES SHALL BE OF COMMERCIAL GRADE.
AutoCAD SHX Text
THE ELECTRICAL PLANS ARE DIAGRAMMATIC ONLY. FIELD VERIFY OR REFER TO ORIGINAL ARCHITECTURAL PLANS FOR THE EXACT DIMENSIONS OF THE BUILDING AND APPURTENANCES.
AutoCAD SHX Text
SCOPE:
AutoCAD SHX Text
PERMITS, LICENSES AND FEES:
AutoCAD SHX Text
APPLICABLE CODES AND REGULATIONS:
AutoCAD SHX Text
NATIONAL ELECTRICAL CODE
AutoCAD SHX Text
NATIONAL FIRE PROTECTION ASSOCIATION
AutoCAD SHX Text
A.
AutoCAD SHX Text
B.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
DRAWINGS:
AutoCAD SHX Text
STANDARDS:
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
8.
AutoCAD SHX Text
9.
AutoCAD SHX Text
10.
AutoCAD SHX Text
11.
AutoCAD SHX Text
12.
AutoCAD SHX Text
13.
AutoCAD SHX Text
CONDUCTORS:
AutoCAD SHX Text
CONDUITS:
AutoCAD SHX Text
WIRING:
AutoCAD SHX Text
GROUNDING:
AutoCAD SHX Text
DEVICES:
AutoCAD SHX Text
GUARANTEE:
AutoCAD SHX Text
CUTTING AND PATCHING:
AutoCAD SHX Text
CLEANING:
AutoCAD SHX Text
14.
AutoCAD SHX Text
15.
AutoCAD SHX Text
16.
AutoCAD SHX Text
1.
AutoCAD SHX Text
TELEPHONE AND DATA OUTLET. MOUNT AT 18" AFF OR AS NOTED.
AutoCAD SHX Text
PROVIDE NEW ELECTRICAL EQUIPMENT. MATCH EXISTING BUILDING STANDARD.
AutoCAD SHX Text
EXISTING EQUIPMENT TO REMAIN
AutoCAD SHX Text
RELOCATE EXISTING EQUIPMENT
AutoCAD SHX Text
DOUBLE DUPLEX RECEPTACLE WITH COMMON FACE PLATE, MOUNT 18" AFF OR AS NOTED
AutoCAD SHX Text
DUPLEX RECEPTACLE: 2P,3W, 20A, 125V, MOUNT 18" AFF OR AS NOTED
AutoCAD SHX Text
PANELBOARD
AutoCAD SHX Text
HOMERUN TO PANEL. ARROWS INDICATE NUMBER OF CIRCUITS
AutoCAD SHX Text
CONDUIT CONCEALED IN CEILING OR WALL
AutoCAD SHX Text
SINGLE POLE TOGGLE SWITCH, FLUSH MOUNTED AT 3'-10" AFF OR AS NOTED, A LETTER INDICATES WHICH FIXTURE(S) ARE TO BE SWITCHED
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
GENERAL DRAWING: CONTRACTOR IS RESPONSIBLE TO VERIFY ALL THE INFORMATION SHOWN IN THESE DRAWINGS, SUCH AS THE PANEL SCHEDULES, LOADS AND RISER DIAGRAM. CONTRACTOR IS ALSO RESPONSIBLE TO COORDINATE THE ELECTRICAL SPECIFICATIONS, VOLTAGE, CURRENT, NEMA CONFIGURATION, BREAKER SIZE, ETC SHOWN IN THESE DRAWINGS WITH OTHER DISCIPLINES. IN CASE OF ANY DISCREPANCIES WITH WHAT IS SHOWN, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A WRITTEN NOTIFICATION OF DISCREPANCIES AND INFORM D2 ENGINEERING , AND REQUEST FOR VERIFICATION OF INFORMATION (RFI). CONTRACTOR IS RESPONSIBLE TO VERIFY ALL THE LOADS PER EACH CIRCUIT AND PER EACH PANEL THAT WORK HAS BEEN DONE AND CONFIRM NONE OF THE CIRCUITS OR THE PANELS ARE OVERLOADED, OR DOES NOT COMPLY WITH NEC CODES AND REGULATIONS. IF SUBMITTALS ARE REQUESTED, THEY SHALL BE PROVIDED WITHIN THE FIRST TWO WEEKS AFTER THE CONSTRUCTION NOTICE TO PROCEED DAY. RELOCATING EQUIPMENT: EXTEND EXISTING WIRING AND CONDUIT FOR ANY EQUIPMENT BEING RELOCATED.
AutoCAD SHX Text
LABELING: ALL ELECTRICAL EQUIPMENT, SUCH AS ATS-1, STARTERS, RELAYS, CONTACTORS, SWITCHES, AND OTHER ELECTRICAL EQUIPMENT, SHALL HAVE IDENTIFICATION PLATES OF BLACK LAMINATED PLASTIC WITH 1" INCH WHITE LETTERS IDENTIFYING EQUIPMENT. EQUIPMENT IN FINISHED AREAS SHALL HAVE PLATES MOUNTED ON INSIDE OF DOOR; OTHERWISE PLATES SHALL BE MOUNTED ON FRONT OF EQUIPMENT. SECURE PLATES FOUR SCREWS. CONTRACTOR SHALL PROVIDE REVISED TYPEWRITTEN PANEL DIRECTORIES INDICATING ALL THE NEW CIRCUITS, WITH THE SUITE NUMBER, ROOM NO. AND THE SPECIFIC EQUIPMENT IT IS SERVING INTHE PANEL DIRECTORY. COMPLY WITH NEC 408.4.
AutoCAD SHX Text
SCAN THE FLOORS BEFORE ANY PENETRATION, USING GROUND PENETRATING RADAR (GPR) TECHNOLOGY. AVOID ANY DAMAGES TO THE FLOOR STRUCTURE.
AutoCAD SHX Text
2.
AutoCAD SHX Text
SCOPE OF WORK 1. COORDINATE WITH LOUDON COUNTY REPRESENTATIVE FOR INSTALLING THE NEW 2000 AMP ATS-1 AND CONNECTION TO EXISTING SWITCHBOARD AND TWO 1250 KW GENERATORS AND ASSOCIATED CONTROLS. COORDINATE WITH THE MANUFACTURERS AND PROVIDE THE CONCRETE PAD BEFORE THE ATS INSTALLATION. 2. PROVIDE AND INSTALL ALL NECESSARY CABLES, CONDUITS, INCLUDING CONTROL CABLES AND CONDUITS AND JUNCTION BOXES FOR THE NEW ATS. 3. PROVIDE NEW CABLES AND CONDUITS TO THE NEW AUTOMATIC TRANSFER SWITCH AND THE EXISTING GENERATORS AND SWITCHBOARD AS SHOWN IN THE DRAWINGS. 4. SEE RISER DIAGRAM FOR ADDITIONAL INFORMATION AND SCOPE OF WORK. 5. PROVIDE ALL NECESSARY CONTROL COMMUNICATIONS BETWEEN THE NEW 2000 AMP AUTOMATIC TRANSFER SWITCH ASCO 7000 SERIES AND THE EXISTING GENERATORS AND SWITCHBOARD. IT IS ALLOWED TO REUSE EXISTING CONDUITS, IF CODE APPROVED. ALL EXISTING FUNCTIONS SUCH AS ISOLATION BY PASS TRANSFER, TWO UTILITY TRANSFER FUNCTION, AND CLOSED TRANSITION SWITCHING IN THE EXISTING "EGPD" SWITCHGEAR, SHALL REMAIN AND THE NEW GEN1/GEN2 TRANSFER SHALL BE ADDED. 6. THE CONTRACTOR SHALL CONTACT "EATON" AND "GENERAC" REPRESENTATIVES AND REQUEST TO REVISE THE EXISTING SYSTEM PER THE DRAWINGS. 7. AUTOMATIC TRANSFER SWITCH ATS-1 SHALL HAVE A 10 MINUTE TRANSITION DELAY WHEN UTILITY POWER IS BACK, IT WILL NOT TRANSFER THE POWER FROM THE GENERATOR TO THE UTILITY TRANSFORMER. IN THE EVENT WHEN POWER IS BACK INTO THE UTILITY TRANSFORMER, THE AUTOMATIC TRANSFER SWITCH NUMBER 1 WILL TRANSFER THE POWER TO THE UTILITY TRANSFORMER AFTER 10 MINUTES AND AT THE SAME TIME WILL RUN THE GENERATOR FOR MINIMUM OF 10 MINUTES TO COOL DOWN.
AutoCAD SHX Text
THE FOLLOWING COMMISSIONING SHALL BE DONE BY CONTRACTOR: 1. DEMONSTRATE THAT WHEN THE UTILITY POWER IS OFF THAT GENERATOR 1 WILL START AND GENERATOR 2 WILL REMAIN OFF WHEN GENERATOR 1 IS RUNNING, THEN, TURN THE MAIN BREAKER AT GENERATOR 1 OFF AND DEMONSTRATE THAT GENERATOR 2 WILL AUTOMATICALLY START. 2. DEMONSTRATE THAT WHEN TURNING THE UTILITY POWER OFF WHILE GENERATOR 1 IS IN THE OFF POSITION THAT GENERATOR 2 WILL AUTOMATICALLY START. 2A. WHEN THE GENERATOR 2 IS ON, TURN THE UTILITY POWER "ON" THE ATS-1 SHALL TRANSFER TO THE UTILITY POWER AND RUN GENERATOR #2 FOR 10 MINUTES. 3. THE CONTRACTOR SHALL PROVIDE A TEMPORARY ROLL-UP GENERATOR-ATS AND CONNECTING CABLES TO SWITCHBOARD 1 (SWB-1) DURING CONSTRUCTION. 4. THE MAIN DISCONNECT/CONNECT OF ATS-1 AND COMMISSIONING SHALL BE DONE DURING A WEEKEND PERIOD - SATURDAY AND/OR SUNDAY.
AutoCAD SHX Text
ELECTRICALLY OPERATED CIRCUIT BREAKER
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1

SITE

E-2

PLAN

EXISTING SITE PLAN-ELECTRICAL

N.T.S.

NEW SITE PLAN-ELECTRICAL

N.T.S.

TEMPORARY GENERATOR FEED PLAN

N.T.S.

AutoCAD SHX Text
EXISTING 2000 GALLON TANK TO REMAIN
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING UTILITY TRANSFORMER
AutoCAD SHX Text
EXISTING EXTERIOR SWITCHBOARD EGDP
AutoCAD SHX Text
GENERATOR FEED TO EGDP ATS. 2 SETS: 6-4" PVC WITH 4 #500 MCM & 1 #250 GND IN EA. (1 SET PER GENERATOR)
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
TO SWITCHBOARD SWB-1
AutoCAD SHX Text
EXISTING 2000 GALLON TANK TO REMAIN
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING UTILITY TRANSFORMER
AutoCAD SHX Text
EXISTING EXTERIOR SWITCHBOARD EGDP
AutoCAD SHX Text
GENERATOR FEED TO EGDP ATS. 2 SETS: 6-4" PVC WITH 4 #500 MCM & 1 #250 GND IN EA. (1 SET PER GENERATOR)
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
NEW ABOVE GROUND CONDUITS OR TROUGH. SEE DETAIL-1
AutoCAD SHX Text
CABLE ENTRY/EXIT CABINET. MATCH EXISTING EATON SWITCHBOARD STEEL CABINET
AutoCAD SHX Text
PROVIDE NEW SWITCHBOARD SECTION 10 FOR CABLE PULL. INSTALL CONCRETE PAD UNDERNEATH. MATCH EXISTING EATON SWITCHBOARD CABINET.
AutoCAD SHX Text
SEE DRAWING E-6 FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
TO SWITCHBOARD SWB-1
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
70"
AutoCAD SHX Text
36"
AutoCAD SHX Text
74"
AutoCAD SHX Text
THE NEW ATS
AutoCAD SHX Text
INSTALL NEW CONCRETE PAD TO SUPPORT NEW CABLE AND CONDUIT
AutoCAD SHX Text
EX. SERVICE ENTRANCE
AutoCAD SHX Text
THE CONTRACTOR SHALL PROVIDE THE NEW ATS-1 AND THE EXTENSION FOR CABINET FOR CABLE ENTRY/EXIT TO ATS-1. THE AUTOMATIC TRANSFER SWITCH SHALL BE MANUFACTURED BY ASCO MODELG7ACTBA32000N5XM, 1G, 18B, 18G, 30BA3, 40, 44G, 72E, 85SB, 111A G7ACTBA32000N5XM, 1G, 18B, 18G, 30BA3, 40, 44G, 72E, 85SB, 111A . THE NEW ATS SHALL HAVE : 7000 SERIES, CLOSED TRANSITION BYPASS-ISOLATION TRANSFER SWITCH, 3 POLE - SOLID NEUTRAL, 2000A, 480V, NEMA 3R 7000 SERIES, CLOSED TRANSITION BYPASS-ISOLATION TRANSFER SWITCH, 3 POLE - SOLID NEUTRAL, 2000A, 480V, NEMA 3R -ENCLOSURE FRONT CONNECTED. THE TRANSFER SWITCH SHALL HAVE A SOURCE SELECTOR SWITCH WITH THE FOLLOWING OPTIONS. THE TRANSFER SWITCH SHALL HAVE A SOURCE SELECTOR SWITCH WITH THE FOLLOWING OPTIONS. 1: GENERATOR 1 PREFERRED MODE. 2: GENERATOR 2 PREFERRED MODE. 3: AUTOMATIC MODE. 4: ALTERNATE MODE. GENERATOR 1 PREFERRED MODE : WITH THE SOURCE SELECTOR SWITCH IN GENERATOR 1 POSITION ON LOSS OF UTILITY POWER, GENERATOR 1 SHALL BE SIGNALED TO START, ONCE GENERATOR 1 COMES TO PROPER VOLTAGE AND FREQUENCY THEN THE GENERATOR TRANSFER SWITCH SHALL TRANSFER TO GENERATOR 1 POWER. IN THE EVENT THAT GENERATOR 1 FAILS WHILE SUPPLYING POWER TO THE FACILITY LOAD AND THE UTILITY POWER HAS NOT BEEN RESTORED, GENERATOR 2 SHALL BE SIGNALED TO START AND THE LOAD SHALL BE TRANSFERRED TO GENERATOR 2. GENERATOR 1 FAILURE TIME DELAY SHALL BE ADJUSTABLE FROM 0 TO 60 MINUTES, 59 SECONDS. THE CONTRACTOR SHALL SET THE FAILURE TIMER TO 30 SECONDS ONLY. GENERATOR 2 PREFERRED MODE. WITH THE SELECTOR SWITCH IN THE GENERATOR 2 POSITION, THE TRANSFER SWITCH SHALL DO THE SAME OPERATION AS SHOWN ABOVE FOR GENERATOR 1, EXCEPT WITH GENERATOR 2 STARTING. AUTOMATIC MODE: WHEN THE SELECTOR SWITCH IS ON AUTOMATIC MODE, DURING THE LOSS OF UTILITY POWER, BOTH GENERATORS SHALL BE SIGNALED TO START. WHICHEVER GENERATOR WHICH CAME TO THE PROPER VOLTAGE AND FREQUENCY SHALL BE SELECTED AND SEND A SIGNAL TO THE ELECTRONIC BREAKER AND TRANSFER THE POWER. THE OTHER GENERATOR SHALL START A COOL DOWN PERIOD OF A 5 MINUTES. THE AUTOMATIC TRANSFER SWITCH SHALL HAVE A COOL DOWN TIMER TIME DELAY ADJUSTABLE FROM 0 TO 60 MINUTES AND 59 SECONDS. IF DURING THE AUTOMATIC MODE, ONE OF THE GENERATORS FAILS WHILE CONNECTED TO THE FACILITY LOAD, THEN AUTOMATICALLY THE SECOND GENERATOR SHALL BE SIGNALED TO START IN THE SAME MANNER AS DESCRIBED FOR THE PREVIOUS GENERATOR. ALTERNATE MODE: THE AUTOMATIC TRANSFER SWITCH SHALL HAVE AN ALTERNATE MODE WHICH PROVIDES BALANCED RUNNING TIME OF THE TWO GENERATORS BY AUTOMATICALLY DETERMINING THE PREFERRED GENERATOR FOR STARTING. ON LOSS OF UTILITY POWER, THE MAIN TRANSFER SWITCH SHALL SEND A SIGNAL TO THE GENERATOR WHICH IS NEXT IN ORDER TO START. ONCE THE AUTOMATICALLY SELECTED PREFERRED GENERATOR STARTS, THE ELECTRONIC BREAKER SHALL BE CLOSED AND START THE EMERGENCY POWER TO THE LOAD. IF THIS GENERATOR FAILS TO START OR FAILS WHILE CONNECTED TO THE FACILITY LOAD, THEN THE SECOND GENERATOR SHALL BE SIGNALED TO START IN THE SAME MANNER AS THE PREVIOUS GENERATOR STARTED. RESTORATION OF UTILITY. THE NEW AUTOMATIC TRANSFER SWITCH SHALL SENSE WHEN THE UTILITY POWER IS RESTORED. UPON RESTORATION OF THE UTILITY SERVICE, RETRANSFER OF THE GENERATOR POWER TO THE UTILITY POWER SHALL START. WITHIN A PRESELECTED TIME, THE LOAD SHALL BE TRANSFERRED FROM GENERATOR POWER TO THE UTILITY POWER WITHOUT ANY INTERRUPTION OF THE POWER. IT IS IMPORTANT THAT AUTOMATIC TRANSFER SWITCH SHALL BE A 3 POLE AND CLOSE TRANSITION SWITCH. AFTER THE TRANSFER, THE GENERATOR SHALL BEGIN A COOL DOWN TIMING SEQUENCE BEFORE SHUTTING DOWN. N A COOL DOWN TIMING SEQUENCE BEFORE SHUTTING DOWN. THE FOLLOWING CONTACTS ARE PROVIDED FOR FROM EACH MANUFACTURER REPRESENTATIVE: 1. EATON MANUFACTURER REPRESENTATIVES: MR. SOLLY VENTURA REGARDING ANY CHANGES TO THE SWITCHGEAR AND THE CONTROLS. MR. SOLLY VENTURA, TEL: 301 621-6726, EMAIL ADDRESS IS : [email protected] [email protected] 2. GENERAC MANUFACTURER REPRESENTATIVE: MR. DARREN QUEEN AT 770-530-8091, EMAIL ADDRESS [email protected] . SENTATIVE: MR. DARREN QUEEN AT 770-530-8091, EMAIL ADDRESS [email protected] . 3. ASCO ATS REPRESENTATIVE: MR. ROBERT BENAVIDEZ IN RESTON, VA, TELEPHONE 571-313-8041, EMAIL ADDRESS: '[email protected]'
AutoCAD SHX Text
1000
AutoCAD SHX Text
EXISTING 2000 GALLON TANK TO REMAIN
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING EXTERIOR SWITCHBOARD EGDP
AutoCAD SHX Text
GENERATOR FEED TO EGDP ATS. 2 SETS: 6-4" PVC WITH 4 #500 MCM & 1 #250 GND IN EA. (1 SET PER GENERATOR)
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
NEW ATS-1 AND SIDE CABINET FOR CABLE ENTRY.
AutoCAD SHX Text
NEW CABLE/CONDUIT THROUGH 3 SETS OF 30" x 10" x LENGTH
AutoCAD SHX Text
THE SWITCHBOARD SHALL BE FULLY CHARGED, AT THE TIME OF CONSTRUCTION.
AutoCAD SHX Text
TEMP. 750 KW GENERATOR.
AutoCAD SHX Text
1000 AMP LOCAL DISCONNECT
AutoCAD SHX Text
1000 AMP TEMP. ATS
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
DISCONNECT UTILITY POWER TO THE SWITCHBOARD AND CONNECT TO TEMPORARY GEN/ATS/FEED
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
DISCONNECT EX. SERVICE THE SWITCHES MAIN DISCONNECT TO TEMPORARY POWER
AutoCAD SHX Text
TEMPORARY FEED TO THE BUILDING MAIN SWITCHBOARD SWB1.
AutoCAD SHX Text
RISER DIAGRAM NOTES
AutoCAD SHX Text
EXISTING UTILITY TRANSFORMER
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
GENERATORS AND UTILITY POWER SHALL TEMPORARY DISCONNECT TO SWITCHBOARD "EGDP" DURING THE TEMPORARY GENERATOR SUPPLY.
AutoCAD SHX Text
6 SETS OF (3#500, 1#250G, 4"C.)
AutoCAD SHX Text
4 SETS OF (4#350, 1#3G, 4"C.)
AutoCAD SHX Text
1200
AutoCAD SHX Text
2000S
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
EXISTING CABLE AND CONDUIT TO REMAIN AS IS
AutoCAD SHX Text
DISCONNECT EXISTING UTILITY AND GENERATOR SERVICE TO THE SWITCHBOARD DURING THE TEMPORARY GENERATOR SUPPLY.
AutoCAD SHX Text
3 SETS OF (3#500, 1#250G)
AutoCAD SHX Text
1000
AutoCAD SHX Text
TEMP.
AutoCAD SHX Text
12
AutoCAD SHX Text
THE SECTION 9 DIMENSION ARE 30"WX42"DX90"H. THE NEW SECTION 10 SHALL BE THE SAME SIZE AS SECTION 9 TO ALLOW FOR CABLE PULLING.
AutoCAD SHX Text
11
AutoCAD SHX Text
INSTALL NEW CONCRETE PAD TO SUPPORT NEW CABLE AND CONDUIT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1

UTILITY -1

SERVICE

UTILITY -2

SERVICE

GENERATOR-2

SERVICE

LOAD BANK

TEST

BREAKER

GENERATOR-1

SERVICE

SWITCHBOARD

OUTPUT TO THE

LOAD

TO SWITCHBOARD

SWB-1

TO EX. 4000A SWITCHBOARD

SWB-1 INSIDE THE MAIN

ELECTRICAL ROOM

EX. EGDP (WEATHERPROOF), 2000A,

480Y/277V, 4W, 30 SWITCHGEAR

UTILITY -1

SERVICE

UTILITY -2

SERVICE

GENERATOR-2

SERVICE

LOAD BANK

TEST

BREAKER

GENERATOR-1

SERVICE

SWITCHBOARD

OUTPUT TO THE

LOAD

TO SWITCHBOARD

SWB-1

E-3

DIAGRAMRISER

EXISTING PARTIAL-ONE-LINE DIAGRAM

N.T.S.

NEW WORK-PARTIAL ONE-LINE DIAGRAM

N.T.S.

TEMPORARY RISER DIAGRAM

N.T.S.

AutoCAD SHX Text
NORMAL SOURCE
AutoCAD SHX Text
EMERG. SOURCE
AutoCAD SHX Text
SOURCE 1
AutoCAD SHX Text
SOURCE 2
AutoCAD SHX Text
GEN-1
AutoCAD SHX Text
GEN-2
AutoCAD SHX Text
EXISTING SWITCHGEAR EGDP
AutoCAD SHX Text
2000
AutoCAD SHX Text
EX.
AutoCAD SHX Text
2000
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EX. UTLITY XFMR
AutoCAD SHX Text
6 SETS OF (3#500, 1#250G, 4"C.)
AutoCAD SHX Text
4 SETS OF (4#350, 1#3G, 4"C.)
AutoCAD SHX Text
1200
AutoCAD SHX Text
2000S
AutoCAD SHX Text
RISER DIAGRAM NOTES
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
EXISTING CABLE AND CONDUIT TO REMAIN AS IS
AutoCAD SHX Text
NORMAL SOURCE
AutoCAD SHX Text
EMERG. SOURCE
AutoCAD SHX Text
SOURCE 1
AutoCAD SHX Text
SOURCE 2
AutoCAD SHX Text
NEW 2000 AMP ATS-1
AutoCAD SHX Text
GEN-1
AutoCAD SHX Text
GEN-2
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING SWITCHBOARD EGDP
AutoCAD SHX Text
6 SETS OF (3#500, 1#250G, 4"C.)
AutoCAD SHX Text
4 SETS OF (4#350, 1#3G, 4"C.)
AutoCAD SHX Text
1200
AutoCAD SHX Text
2000S
AutoCAD SHX Text
RISER DIAGRAM NOTES
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
EXISTING CABLE AND CONDUIT TO REMAIN AS IS
AutoCAD SHX Text
1000
AutoCAD SHX Text
EXISTING 2000 GALLON TANK TO REMAIN
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING 1250KW DIESEL GENERATOR (OFCI)
AutoCAD SHX Text
EXISTING EXTERIOR SWITCHBOARD EGDP
AutoCAD SHX Text
GENERATOR FEED TO EGDP ATS. 2 SETS: 6-4" PVC WITH 4 #500 MCM & 1 #250 GND IN EA. (1 SET PER GENERATOR)
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
NEW ATS-1 AND SIDE CABINET FOR CABLE ENTRY.
AutoCAD SHX Text
NEW CABLE/CONDUIT THROUGH 3 SETS OF 30" x 10" x LENGTH
AutoCAD SHX Text
THE SWITCHBOARD SHALL BE FULLY CHARGED, AT THE TIME OF CONSTRUCTION.
AutoCAD SHX Text
TEMP. 750 KW GENERATOR.
AutoCAD SHX Text
1000 AMP LOCAL DISCONNECT
AutoCAD SHX Text
1000 AMP TEMP. ATS
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
DISCONNECT UTILITY POWER TO THE SWITCHBOARD AND CONNECT TO TEMPORARY GEN/ATS/FEED
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
DISCONNECT EX. SERVICE THE SWITCHES MAIN DISCONNECT TO TEMPORARY POWER
AutoCAD SHX Text
TEMPORARY FEED TO THE BUILDING MAIN SWITCHBOARD SWB1.
AutoCAD SHX Text
RISER DIAGRAM NOTES
AutoCAD SHX Text
EXISTING UTILITY TRANSFORMER
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
GENERATORS AND UTILITY POWER SHALL TEMPORARY DISCONNECT TO SWITCHBOARD "EGDP" DURING THE TEMPORARY GENERATOR SUPPLY.
AutoCAD SHX Text
6 SETS OF (3#500, 1#250G, 4"C.)
AutoCAD SHX Text
4 SETS OF (4#350, 1#3G, 4"C.)
AutoCAD SHX Text
1200
AutoCAD SHX Text
2000S
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
EXISTING CABLE AND CONDUIT TO REMAIN AS IS
AutoCAD SHX Text
DISCONNECT EXISTING UTILITY AND GENERATOR SERVICE TO THE SWITCHBOARD DURING THE TEMPORARY GENERATOR SUPPLY.
AutoCAD SHX Text
3 SETS OF (3#500, 1#250G)
AutoCAD SHX Text
1000
AutoCAD SHX Text
TEMP.
AutoCAD SHX Text
12
AutoCAD SHX Text
THE SECTION 9 DIMENSION ARE 30"WX42"DX90"H. THE NEW SECTION 10 SHALL BE THE SAME SIZE AS SECTION 9 TO ALLOW FOR CABLE PULLING.
AutoCAD SHX Text
11
AutoCAD SHX Text
INSTALL NEW CONCRETE PAD TO SUPPORT NEW CABLE AND CONDUIT
AutoCAD SHX Text
NOTE TO ELECTRICAL REVIEWER. REQUEST FOR EXCEPTION TO THE CODE: WE LIKE TO INSTALL THE NEW CABLES FROM THE TWO GENERATORS TO THE NEW ATS VIA EXISINTG EGDP SWITCHBAORD. THE CODE MAY NOT ALLOWED TO RUN THE CABLES INSIDE THE SWITCH BOARD; HOWEVER, IN THIS CASE, THERE IS NO OTHER SOLUTION AND THE MAJORITY OF THE ROUTE OF CABLES ARE RUN IN THE CABLE ENTRY/EXIT PART OF THE SWITCHBOARD EGDP. THE ATS AND SWITCHBOARD SHALL BE CONSIDERED AS PART OF SAME UNIT, SINCE THE ATS IS DOING THE FUNCTION OF THE TRANSFERRING POWER BETWEEN THE GENERATORS. FOR ANY QUESTIONS PLEASE CALL SAM DAVATI AT 202-439-0785, AT D2 ENGINEERING.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1
AutoCAD SHX Text
CONTRACTOR SHALL REMOVE THE 2000 AMP LOAD BANK TEST BREAKER AND ONE OF THE GENERATOR 2000 AMP BREAKERS TO ALLOW FOR CABLE/CONDUIT ENTRY FROM AND TO THE NEW ATS AND GENERATORS. ADJUST THE LOCATION/MOUNTING OF THE 2000 AMP BREAKER TO ALLOWED THE CABLE CONNECTION WITH PROPER BENDING.
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1

TO EX. 4000A SWITCHBOARD

SWB-1 INSIDE THE MAIN

ELECTRICAL ROOM

1. COORDINATE ALL WORK WITH NOVEC, WITH ON-GOING

CONSTRUCTION WITHIN THE BUILDING AND WITH THE OWNER.

UTILITY -1

SERVICE

UTILITY -2

SERVICE

GENERATOR-2

SERVICE

LOAD BANK

TEST

BREAKER

GENERATOR-1

SERVICE

SWITCHBOARD

OUTPUT TO THE

LOAD

TO SWITCHBOARD

SWB-1

TO EX. 4000A SWITCHBOARD

SWB-1 INSIDE THE MAIN

ELECTRICAL ROOM

EX. EGDP (WEATHERPROOF), 2000A,

480Y/277V, 4W, 30 SWITCHGEAR

M

EX.

UTILITY

METER

EXISTING UTILITY TRANSFORMER

E-4

SWITCHBOARD

REVISION

EXISTING SWITCHGEAR "EGDP" PLAN-1

N.T.S.

NEW SWITCHGEAR "EGDP" PLAN-2

N.T.S.

TEMPORARY GENERATOR FEED PLAN-2

N.T.S.

AutoCAD SHX Text
NORMAL SOURCE
AutoCAD SHX Text
EMERG. SOURCE
AutoCAD SHX Text
SOURCE 1
AutoCAD SHX Text
SOURCE 2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
NORMAL SOURCE
AutoCAD SHX Text
EMERG. SOURCE
AutoCAD SHX Text
SOURCE 1
AutoCAD SHX Text
SOURCE 2
AutoCAD SHX Text
NEW 2000 AMP ATS-1
AutoCAD SHX Text
GEN-1
AutoCAD SHX Text
GEN-2
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
1000
AutoCAD SHX Text
TEMP. 750 KW GENERATOR.
AutoCAD SHX Text
1000 AMP LOCAL DISCONNECT
AutoCAD SHX Text
1000 AMP TEMP. ATS
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
DISCONNECT EX. SERVICE THE SWITCHES MAIN DISCONNECT TO TEMPORARY POWER
AutoCAD SHX Text
TEMPORARY FEED TO THE BUILDING MAIN SWITCHBOARD SWB1.
AutoCAD SHX Text
1000A
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
NORMAL SOURCE
AutoCAD SHX Text
EMERG. SOURCE
AutoCAD SHX Text
SOURCE 1
AutoCAD SHX Text
SOURCE 2
AutoCAD SHX Text
GEN-1
AutoCAD SHX Text
GEN-2
AutoCAD SHX Text
EXISTING SWITCHGEAR EGDP
AutoCAD SHX Text
2000
AutoCAD SHX Text
EX.
AutoCAD SHX Text
2000
AutoCAD SHX Text
EX.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1

E-5

SWITCHBOARD

REVISION

EXISTING SWITCHGEAR "EGDP" PLAN-1

N.T.S.

NEW SWITCHGEAR "EGDP" PLAN-2

N.T.S.

AutoCAD SHX Text
2000A MAGNUM ATS
AutoCAD SHX Text
2000A MAGNUM ATS
AutoCAD SHX Text
2000A MAGNUM BYPASS ISOLATION ATS
AutoCAD SHX Text
2000A MAGNUM BYPASS ISOLATION ATS
AutoCAD SHX Text
MAGNUM 2000 A FIXED
AutoCAD SHX Text
SBS-620 RMS520 LSI
AutoCAD SHX Text
LSI 65 KAIC
AutoCAD SHX Text
MAGNUM 2000 A FIXED
AutoCAD SHX Text
SBS-620 RMS520 LSI
AutoCAD SHX Text
LSI 65 KAIC
AutoCAD SHX Text
RGH 2000 A TRIP: 2000 A 310+
AutoCAD SHX Text
65 KAIC
AutoCAD SHX Text
ATS LOAD OUTGOING
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
2000A MAGNUM ATS
AutoCAD SHX Text
2000A MAGNUM ATS
AutoCAD SHX Text
2000A MAGNUM BYPASS ISOLATION ATS
AutoCAD SHX Text
2000A MAGNUM BYPASS ISOLATION ATS
AutoCAD SHX Text
MAGNUM 2000 A FIXED
AutoCAD SHX Text
SBS-620 RMS520 LSI
AutoCAD SHX Text
LSI 65 KAIC
AutoCAD SHX Text
MAGNUM 2000 A FIXED
AutoCAD SHX Text
SBS-620 RMS520 LSI
AutoCAD SHX Text
LSI 65 KAIC
AutoCAD SHX Text
RGH 2000 A TRIP: 2000 A 310+
AutoCAD SHX Text
65 KAIC
AutoCAD SHX Text
ATS LOAD OUTGOING
AutoCAD SHX Text
NEW 2000 AMP ATS-1
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
GEN-1
AutoCAD SHX Text
GEN-2
AutoCAD SHX Text
2000
AutoCAD SHX Text
NEW
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1

E-6

SWITCHBOARD

REVISION

THIS PLAN SHOWS OUTSIDE WALL BEHIND SWITCHBOARD EGDP

N.T.S.

AutoCAD SHX Text
2000A MAGNUM ATS
AutoCAD SHX Text
2000A MAGNUM ATS
AutoCAD SHX Text
2000A MAGNUM BYPASS ISOLATION ATS
AutoCAD SHX Text
2000A MAGNUM BYPASS ISOLATION ATS
AutoCAD SHX Text
MAGNUM 2000 A FIXED
AutoCAD SHX Text
SBS-620 RMS520 LSI
AutoCAD SHX Text
LSI 65 KAIC
AutoCAD SHX Text
MAGNUM 2000 A FIXED
AutoCAD SHX Text
SBS-620 RMS520 LSI
AutoCAD SHX Text
LSI 65 KAIC
AutoCAD SHX Text
RGH 2000 A TRIP: 2000 A 310+
AutoCAD SHX Text
65 KAIC
AutoCAD SHX Text
ATS LOAD OUTGOING
AutoCAD SHX Text
NEW 2000 AMP ATS-1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
CONCRETE PAD
AutoCAD SHX Text
OPENING TO WALL
AutoCAD SHX Text
OPENING TO WALL
AutoCAD SHX Text
PATCH AND SEAL THE WALL
AutoCAD SHX Text
INSTALL NEW TROUGH IN THE OUTER PORTION OF EXISTING WALL, TO BE MIN. 12 INCHES ABOVE FLOOR.
AutoCAD SHX Text
EX. WALL
AutoCAD SHX Text
SPECIAL NOTES ADDED AFTER THE PREBID WALK THROUGH. PLEASE INCLUDE ALL THE FOLLOWING INFORMATION IN YOUR ORIGINAL BID. SP1.THE CONTRACTOR SHALL PROVIDE 3 SECTIONS OF 30" X 10" TROUGH, FOR A TOTAL OF (30"X30" TROUGH)WITH REMOVABLE COVER TO SUPPORT AND HOLD THE NEW CABLES. PROVIDE PROPER SUPPORT AND FASTEN TO THE GROUND. PROVIDE 36"XLENGTH OF CONCRETE FLOOR IN THE BACK OF EXISTING SWITCHBOARD TO HOLD THE CABLES. THE CONTRACTOR IS NOT ALLOWED TO PROVIDE 2000-AMP BUSS BACK AND FORTH TO THE ATS, AS AN ALTERNATE REPLACEMENT. THE BUSS REQUIRES INTERNAL SPACE HEATING AND IF IT FAILS, IT CAN CAUSE CONDENSATION INSIDE THE BUSS AND SHORT CIRCUIT THE LINE. THIS WOULD NOT BE ALLOWED FOR SUCH FACILITY. SP2. NOTE TO ELECTRICAL REVIEWER: WE LIKE TO INSTALL THE NEW CABLES FROM THE TWO GENERATORS TO THE NEW ATS VIA REROUTE AND UNDERSTAND THAT CODE MAY NOT ALLOWED TO RUN THE CABLES INSIDE THE SWITCH BOARD; HOWEVER, IN THIS CASE, THERE IS NO OTHER SOLUTION AND THE MAJORITY OF THE ROUTE OF CABLES ARE RUN IN THE CABLE ENTRY/EXIT PART OF THE SWITCHBOARD EGDP. THE ATS AND SWITCHBOARD SHALL BE CONSIDERED AS PART OF SAME UNIT, SINCE THE ATS IS DOING THE FUNCTION OF THE TRANSFERRING POWER BETWEEN THE GENERATORS. WE HAVE REQUESTED FOR THE EXCEPTIONS FROM THE COUNTY REVIEWER TO ALLOW SUCH INSTALLATION IN DRAWING E3. SP3.THE CONTRACTOR SHALL REMOVE THE SWITCHBOARD SECTION 9 BREAKER THAT PROVIDES LOAD BANK TESTING. THE COMPARTMENT SHALL REMAIN AS IS, TO ALLOW CABLE ENTRY TO THE SWITCHBOARD. ONE ONE ONE OF THE TWO GENERATOR BREAKERS AT SECTION 8 SHALL BE REMOVED TO ALLOW CABLE CONNECTION FROM THE NEW ATS TO THE EXISTING GENERATOR SWITCHBOARD. THE CONTRACTOR IS ALLOWED TO REVISE AND EXTEND EXISTING BUSS TO ALLOW ALL CABLES TO FIT IN THE SECTIONS 8, 9 AND 10 PER MANUFACTURER DIRECTION AND PERMISSION. NEW BUSS SHALL BE THE SAME SIZE, MATERIAL AND FROM THE SAME MANUFACTURE AS THE EXISTING BUSS. MANUFACTURER SHALL VISIT THE SITE AND APPROVE THE EXTENSION TO THE SWITCHBOARD. PROVIDE A COPY OF THE APPROVAL FOR OUR REVIEW AND APPROVAL. SP4. GENERATOR TEMPORARY POWER TO THE BUILDING : THE CONTRACTOR IS ALLOWED TO PROVIDE NEW TEMPORARY CABLES TO SUPPLY TO THE EXISTING SERVICE ENTRANCE CABLES , OR PROVIDE TEMPORARY SERVICE DIRECTLY ROUTED ACROSS THE ROADWAY AND PROVIDE PROTECTION TO BE DRIVEN OVER AND CONNECT TO THE LOAD SIDE OF THE SWITCHBAORD-1 INSIDE THE BUILDING. SP5. REMOVAL OF THE ENTIRE GENERATOR DISTRIBUTION PANEL AND REPLACING IT WITH NEW AUTOMATIC SWITCH WILL BE MORE COSTLY AND PROVIDE LESS OPTION IN THE FUTURE FOR SECOND UTILITY FEED IN TO THE BUILDING. IT IS NOT ALLOWED AT THIS STAGE. SP6.OUTAGES: MAXIMUM OUTAGE TO THE BUILDING SHALL BE LIMITED TO NO MORE THAN 100 MINUTE AT EACH STAGE. IT IS EXPECTED TO HAVE 3 OUTAGES, DURING THE FIRST INITIAL DISCONNECTION, RECONNECTION AND DURING THE COMMISSIONING. THE CONTRACTOR SHALL INFORM THE PROJECT MANAGER TWO WEEKS IN ADVANCE. THE CONTRACTOR BE AWARE THAT 801 SYCOLIN BUILDING IS RUNNING IMPORTANT FUNCTIONS SUCH AS 911 CENTER AND THE POLICE STATION. LONGER OUTAGES THAN 100 MINUTES CANNOT BE TOLERATED. SP7. SUBMITTAL: THE CONTRACTOR SHALL PROVIDE SUBMITTAL OF THE FOLLOWING ITEMS FOR REVIEW AND APPROVAL BEFORE PURCHASING THE EQUIPMENTS. 1)ATS-MADE BY ASCO ATS-MADE BY ASCO 2)CABLES AND CONDUITS CABLES AND CONDUITS 3)TEMPORARY GENERATOR AND SCHEDULE OF DISCONNECT AND RECONNECTED TO THE EXISTING SYSTEM TEMPORARY GENERATOR AND SCHEDULE OF DISCONNECT AND RECONNECTED TO THE EXISTING SYSTEM 4)TEMPORARY ATS TEMPORARY ATS 5)POWER OUTAGE SCHEDULE AND TIME INTERVALS FOR EACH OUTAGE. POWER OUTAGE SCHEDULE AND TIME INTERVALS FOR EACH OUTAGE. 6)ANY BUSS EXTENSION TO THE EXISTING SWITCH BOARD SHALL BE SUBMITTED FOR APPROVAL. ANY BUSS EXTENSION TO THE EXISTING SWITCH BOARD SHALL BE SUBMITTED FOR APPROVAL. 7)THE NEW AUTOMATIC SWITCH SHALL BE MANUFACTURED BY ASCO. IF THE CONTRACTOR HAS OTHER MANUFACTURES AUTOMATIC TRANSFER SWITCHES SUCH AS ZENITH, GENERAL ELECTRIC, ETC., WITH EQUAL THE NEW AUTOMATIC SWITCH SHALL BE MANUFACTURED BY ASCO. IF THE CONTRACTOR HAS OTHER MANUFACTURES AUTOMATIC TRANSFER SWITCHES SUCH AS ZENITH, GENERAL ELECTRIC, ETC., WITH EQUAL FUNCTIONS SHALL PROVIDED ALTERNATE PRICE FOR SELECTION OF OTHER SWITCHES.
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1
AutoCAD SHX Text
1

E-7

SWITCHBOARD

REVISION

AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1

E-8

SWITCHBOARD

REVISION

AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1

E-9

SWITCHBOARD

REVISION

AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE: 06-18-2015
AutoCAD SHX Text
CHECKED BY: SD
AutoCAD SHX Text
Consultants:
AutoCAD SHX Text
DRAWN BY: CADD
AutoCAD SHX Text
801 SYCOLIN BUILDING
AutoCAD SHX Text
GENERATORS SWITCHBOARD REVISION
AutoCAD SHX Text
%%uD2 ENGINEERING, LLC
AutoCAD SHX Text
%%UMECHANICAL PLUMBING ELECTRICAL
AutoCAD SHX Text
MONTGOMERY VILLAGE, MARYLAND 20886
AutoCAD SHX Text
19526 CLUB HOUSE ROAD
AutoCAD SHX Text
FAX. - 301-208-9405
AutoCAD SHX Text
TEL. - 301-208-9576
AutoCAD SHX Text
BIDSET
AutoCAD SHX Text
6-18-15
AutoCAD SHX Text
PREBID WALK THRU COMMENTS
AutoCAD SHX Text
08-01-16
AutoCAD SHX Text
1