  • SPECIFICATIONS

    City of Beverly Hills – Roxbury Park Restroom Facility 471 S. ROXBURY DRIVE BEVERLY HILLS, CALIFORNIA DECEMBER 20, 2013 RTK PROJECT NO. 12-07103 Prepared by: RTK ARCHITECTS INC. 3975 Landmark Street, Suite 400, Culver City, California 90232

  • City of Beverly Hills – Roxbury Park Restroom Facility Project Directory 00002 - p1

    SECTION 00002

    PROJECT DIRECTORY

    Owner: CITY OF BEVERLY HILLS Alan Schneider, AIA – Director, Project Administration Donielle Kahikina, AIA – Project Manager, Project Administration 345 North Foothill Road Beverly Hills, CA 90210 Tel: 310.285.1150 Fax: Architects: RTK ARCHITECTS, INC. Contact: Mandana Motahari, AIA 3975 Landmark Street, Suite 400 Culver City, CA 90232-2354 Tel: 310.837.3606 Fax: 310.837.6341 Email: mmotahari@rtkarchitects.com Structural Engineer: BRANDOW & JOHNSTON, INC. Kim Caravalho, S.E. 700 South Flower Street, Suite 1800 Los Angeles, CA 90071 Tel: 213.596.4500 Fax: 213.596.4599 Mechanical / Plumbing Engineer: SPEC ENGINEERING Sia Garestani, P.E. 16830 Ventura Blvd., Suite 266 Encino, CA 99143 Tel: 818.783.6965 Fax: 818.783.6996 Electrical Engineer: TEK ENGINEERING Masoud Narimanzadeh, P.E. 16830 Ventura Blvd., Suite 266 Encino, CA 99143 Tel: 818.783.6965 Fax: 818.783.6996

  • City of Beverly Hills – Roxbury Park Restroom Facility

    Table of Contents 00010 - p1

    SECTION 00010

    TABLE OF CONTENTS

    INTRODUCTORY PAGES 00002 Project Directory

    00010 Table of Contents SPECIFICATIONS Division 1 – General Requirements 01050 Field Engineering 01090 Reference Standards 01100 Summary 01170 Requests for Information 01200 Project Meetings 01230 Alternatives 01310 Progress Schedules 01340 Submittal and Substitutions 01400 Quality Requirements 01410 Testing Laboratory Services 01500 Temporary Facilities and Controls 01620 Storage and Protection 01700 Execution Requirements 01740 Warranties and Bonds 01780 Closeout Submittals 01900 Seismic Bracing and Anchoring Division 2 – Site Construction 02010 Subsurface Investigation 02110 Site Clearing 02210 Finish Grading 02225 Demolition 02372 Storm Water Pollution Prevention Control 02505 Decomposed Granite Paving 02510 Water Distribution 02520 Concrete Paving 02710 Sanitary Sewer 02720 Storm Drainage 02810 Irrigation System Division 3 – Concrete 03100 Concrete Forms and Accessories 03200 Concrete Reinforcement 03300 Cast-In-Place Concrete Division 4 – Masonry 04200 Masonry 04270 Glass Masonry Unit Division 5 – Metals

    05300 Metal Decking 05400 Cold-Formed Metal Framing

  • City of Beverly Hills – Roxbury Park Restroom Facility

    Table of Contents 00010 - p2

    Division 6 - Wood and Plastics

    06152 Fiber-Reinforced Hybrid Rainscreen Siding Division 7 - Thermal, Moisture and Acoustical 07100 Fluid-Applied Waterproofing 07190 Water Repellents 07265 Concrete Slab Vapor Emissions Treatment 07540 PVC Thermoplastic Membrane Roofing (Sika Sarnafil) 07600 Flashing and Sheet Metal 07920 Sealant & Caulking

    Division 8 - Doors and Windows 08110 Steel Doors and Frames 08310 Access Doors and Panels 08710 Door Hardware Division 9 – Finishes 09900 Painting and Coatings Division 10 – Specialties

    10170 Toilet Partitions 10800 Toilet Room Accessories

    Division 15 – Mechanical and Plumbing 15300 Fire Protection (Design/Build - Deferred Approval Item) 15400 Plumbing 15800 HVAC Systems Division 16 – Electrical 16000 Electrical General Requirements 16010 Basic Electrical Requirements 16050 Basic Electrical Materials & Methods 16110 Raceways 16111 Conduit 16120 Conductors 16123 Building Wire and Cable 16130 Boxes 16140 Wiring Devices 16170 Grounding and Bonding 16190 Supporting Devices 16195 Electrical Identification 16440 Disconnect Switches 16470 Panelboard 16500 Lighting

  • City of Beverly Hills – Roxbury Park Restroom Facility

    Field Engineering 01050 – p1

    SECTION 01050

    FIELD ENGINEERING

    PART 1 - GENERAL 1.01 SUMMARY

    A. Provide such field engineering services as are required for proper completion of the Work

    including, but not necessarily limited to: 1. Establishing and maintaining lines and levels; 2. Structural design of shores, forms, and similar items provided by the Contractor as part of

    his means and methods of construction. 1.02 SUBMITTALS

    A. Comply with pertinent provisions of Section 01340.

    B. Upon request of the Architect, submit: 1. Data demonstrating qualifications of persons proposed to be engaged for field engineering

    services. 2. Documentation verifying accuracy of field engineering work. 3. Certification, signed by the Contractor's retained field engineer, certifying that elevations

    and locations of improvements are in conformance or nonconformance with requirements of the Contract Documents.

    1.03 QUALITY ASSURANCE

    A. Use adequate numbers of skilled workmen thoroughly trained and experienced in the necessary crafts and completely familiar with the specified requirements and methods needed for proper performance of the work of this Section.

    1.04 PROCEDURES

    A. In addition to procedures directed by the Contractor for proper performance of the Contractor's responsibilities:

    1. Locate and protect control points before starting work on the site. 2. Preserve permanent reference points during progress of the Work. 3. Do not change or relocate reference points or items of the Work without specific approval

    from the Architect. 4. Promptly advise the Architect when a reference point is lost or destroyed, or requires

    relocation because of other changes in the Work. a. Upon direction of the Architect, require the field engineer to replace reference stakes

    or markers. b. Locate such replacements according to the original survey control.

    END OF SECTION

  • City of Beverly Hills – Roxbury Park Restroom Facility Reference Standards 01090 - p1

    SECTION 01090 REFERENCE STANDARDS PART 1 - GENERAL 1.01 SUMMARY A. Work included: 1. Throughout the Contract Documents, reference is made to codes and standards which

    establish qualities and types of workmanship and materials, and which establish methods for testing and reporting on the pertinent characteristics.

    2. Where materials or workmanship are required by these Contract Documents to meet or exceed the specifically named code or standard, it is the Contractor's responsibility to provide materials and workmanship which meet or exceed the specifically named code or standard.

    3. Proof: a. It is also the Contractor's responsibility, when so required by the Contract Documents

    or by written request from the Architect, to deliver to the Architect all required proof that the materials or workmanship, or both, meet or exceed the requirements of the specifically named code or standard.

    b. Such proof shall be in the form requested by the Architect, and generally will be required to be copies of a certified report of tests conducted by a testing agency approved for that purpose by the Architect.

    B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General

    Conditions, Supplementary Conditions, and other Sections of Division One of these Specifications.

    2. Specific naming of codes or standards occurs on the Drawings and/or in these Specifications.

    1.02 QUALITY ASSURANCE A. In procuring all items used in this Work, it is the Contractor's responsibility to verify the detailed

    requirements of the specifically named codes and standards and to verify that the items procured for use in this Work meet or exceed the specified requirements.

    B. Rejection of non-complying items:

    1. The Architect reserves the right to reject items incorporated into the Work which fail to meet the specified minimum requirements.

    2. The Architect further reserves the right, and without prejudice to other recourse the Architect may take, to accept non-complying items subject to an adjustment in the Contract Amount as approved by the Architect and the Owner.

    C. Applicable reference standards include, but are not necessarily limited to, standards of agencies

    and associations who may be referred to in the Specifications by the following abbreviations. 1. "AA" = Aluminum Association 2. "AABC" = Associated Air Balance Council 3. "AAMA" = American Architectural Manufacturers' Association 4. "AASHTO" = American Assoc. of State Highway and Transportation Officials 5. "ACI" = American Concrete Institute

  • City of Beverly Hills – Roxbury Park Restroom Facility Reference Standards 01090 - p2

    6. "ADC" = Air Diffusion Council 7. "AGC" = Associated General Contractors of America 8. "AI" = Asphalt Institute 9. "AIA" = American Institute of Architects 10. "AISC" = American Institute of Steel Co