Specification for Pressure Vessles
Transcript of Specification for Pressure Vessles
-
8/11/2019 Specification for Pressure Vessles
1/66
Specification for
Pressure Vessels
-
8/11/2019 Specification for Pressure Vessles
2/66
This page was intentionally left blank
-
8/11/2019 Specification for Pressure Vessles
3/66
-
8/11/2019 Specification for Pressure Vessles
4/66
ii Revision History
The following is a brief summary of the 4 most recent revisions to this document. Details ofall revisions prior to these are held on file by the issuing department.
Version No. Date Author Scope / Remarks
Verison !ep " #.!. $ahadevan%P'12$
!pecification for Pressure Vessels ()nitial issue.
iii
Related Business Processes
ode Business Process !"PB# $.%&
#P.*4 Design% +onstruct% $odify and De(+ommission ,acilities
iv Related orporate #ana'ement (rame )ork !#(&Documents
The related +$, Documents can be retrieved from the +orporate -usiness +ontrolDocumentation egister T/0).
http://sww9.pdo.shell.om/dept/tsd/tcc/tcp/apps/taxi/index_sub.htmhttp://sww9.pdo.shell.om/dept/tsd/tcc/tcp/apps/taxi/index_sub.htm -
8/11/2019 Specification for Pressure Vessles
5/66
*AB+" ,( ,N*"N*S
1 )6T7D&+T)76.............................................................................................................8
1.1 P&P7!# /6D 7-9#+T)V#!..................................................................................8
1.2 +:/6;#! T7 T:# !P#+),)+/T)76.......................................................................8
1.3 D#,)6)T)76!............................................................................................................"
1.4 &!/;#....................................................................................................................... !T/6D/D!.........................................................................................12.2 !:#== ;7&P !T/6D/D!.................................................................................1
2.3 !:#== !T/6D/D D/)6;!.............................................................................11
2.4 )6T#6/T)76/= !T/6D/D!..............................................................................13
2.? +7$P/6> /6D !:#== ;7&P !T/6D/D D/T/ ' #@&)!)T)76 !:##T!.....13
2.* =)!T 7, +7$P/6> /PP7V#D !&-(V#6D7!.................................................13
2.8 +7$P=)/6+# )T: !T/6D/D!........................................................................142." =/6;&/;# /6D &6)T! 7, $#/!$#6T......................................................14
2.< +76,=)+T)6; #@&)#$#6T!...........................................................................14
3 !+7P# 7, !&PP=>......................................................................................................1?
3.1 $#+:/6)+/= #@&)P$#6T....................................................................................1?
3.2 !#V)+#!...............................................................................................................1?
3 3 !P/# P/T! 1?
-
8/11/2019 Specification for Pressure Vessles
6/66
8.2.3 Test +ertificates......................................................................................2*
8.3 $#T:7D 7, D7+&$#6T/T)76 T/6!$)!!)76...............................................2*8.4 )D#6T),)+/T)76.....................................................................................................2*
8.? D/T/........................................................................................................................2*
8.* T/6!$)TT/=.........................................................................................................2*
8.8 $/6&/=!................................................................................................................28
8." #+7D +/D!....................................................................................................28
". P/+B/;)6; A P#!#V/T)76 ,7 !:)P$#6T................................................2"
".1 P/+B)6; #@&)#$#6T!...................................................................................2"
".2 +/T)6; )D#6T),)+/T)76....................................................................................2"
-
8/11/2019 Specification for Pressure Vessles
7/66
-N*R,D*-,N
. PRP,S" AND ,B0"*-V"S
!pecifications !P5 contain information'reFuirements on PD7 facilities that are either usedrepeatedly% or that are retained for future reference. These documents are intended for useby the +ompany and its nominated +onsultants and +ontractors.
The !P system is intended toC
Publish guidelines or codes of practice.!et the +ompany standards.,orm a basis of technical specifications for the procurement of eFuipment or technicalservices.Disseminate and record engineering information% eGperience and procedures.
This Document is fully restricted for PD7. The accessibility for this document shall bemaintained by PD7 $echanical +orporate ,unctional Discipline :ead +,D:5 and histechnical focal point.
!PHs shall be prepared and revised in accordance with #D((1 HProposal% Production%)ssue and $aintenance of #ngineering eference DocumentsH.
This specification together with standard drawings% !Ps% #Ds% D#Ps as mentioned insection 2 sets out the minimum reFuirements for the design% engineering% supply ofmaterials% fabrication% assembly% inspection% testing% transportation% installation%commissioning supervision% functionality and supply of Pressure Vessel pacage. )t hasbeen written in a format that enables the ProIect engineer and the +onsultant to easily and
uniformly prepare a reFuisition and purchase Pressure Vessels storage atmospheric5
-
8/11/2019 Specification for Pressure Vessles
8/66
8. eviews% modifications and adIustments to the document will normally be made by the+orporate ,unctional Discipline :ead +,D:5 for $echanical #ngineering every four years
or earlier when Iustified.
.3 D"(-N-*-,NS
The following Definitions% terms and abbreviations used in this document% are definedbelowC
2"N"RA+ *"R#-N,+,24
!hall ( The word HshallH is to be understood as mandatory.!hould ( The word HshouldH is to be understood as strongly recommended.$ay ( The word HmayH is to be understood as indicating a possible course of
action.)nclude% )ncludes%)ncluding(
)f the word JincludeK or JincludesK or JincludingK is used in any document andthis specification% it shall be taen as having the meaning Jincluding but notlimited toK and shall not be considered as creating or inferring any limitationon the description that follows if other components'eFuipments reFuired
+ompany 'Principal ( Petroleum Development 7man =.=.+. $uscat% !ultanate of 7man.+onsultant ( / contracted party by the +ompany who is responsible for providing
design engineering and other related consultancy service under acontract.
#P+ +ontractor ( / contracted party by the +ompany who is responsible for providingdesign engineering% procurement and construction service under acontract.
Purchaser ( / party% who places the order on% or reFuests tender from% the Vendor'!upplier. This can be the +ompany' #P+ contractor.
!cope ( /ll wors eGecuted and all services carried out by the Vendor'!upplier inaccordance with this !pecification and its referenced standards and
data sheets
-
8/11/2019 Specification for Pressure Vessles
9/66
)TP )nspection and Test Plan
=T =iFuid Penetrant Testing
$#!+ $aterials and #Fuipment !tandards and +ode
$T $agnetic Particle Testing
6DT ' 6D# 6on(Destructive Testing ' 6on(Destructive #Gamination
PD7 Petroleum Development 7man ==+
P#,! Process #ngineering ,low !cheme
P Procedure
P:T Post eld :eat Treatment
#D eFuisition for #ngineering Documentation
T adiographic Testing
!P !pecification 6ew +ompany standard5
TP) ' TP)/ Third Party )nspector ' Third Party )nspection /gency or /uthority
&T <rasonic Testing
N,*"C +ontractors% +onsultants% !uppliers% Vendors and users !:/== ensure the+ompany is consulted for any deviations from M!:/==M and M!:7&=DMreFuirements.
.$ SA2"
Thi ! ifi ti t th ith th f d t d d d d t h t h ll f th
-
8/11/2019 Specification for Pressure Vessles
10/66
-
8/11/2019 Specification for Pressure Vessles
11/66
D#P 2...1(;en Preparation and microfilming of technical drawings
D#P 3.1.2.11(;en $etallic $aterials(!elected !tandards
D#P 3.1.2.31(;en $etallic $aterials(Prevention of -rittle ,racture
D#P 3.1.*.1"(;en elding of $etals
D#P 3.4*..31(;en Thermal )nsulation
D#P 31.1..1(;en $aterial Traceability and Positive $aterial )dentification P$)5
D#P 31.1.3.1(;en !ymbols A )dentification !ystem $echanical
D#P 31.2.2.31(;en )nternals for +olumns
D#P 31.22.?.11(;en ;as'=iFuid !eparators Type selection and design rules
D#P 31.22.?.12(;en=iFuid'=iFuid and ;as'=iFuid'=iFuid three(phase5 !eparators The selection and design rules
D#P 31.22.1.3?(;en. $anufacturing eports for Pressure Vessels
D#P 31.22.2.31(;enPressure Vessels /mendments'!upplements to /!$# !ectionV)))% Div 1 and Div 25
D#P 34..1.3(;en !tructural design and engineering
D#P 34.1
-
8/11/2019 Specification for Pressure Vessles
12/66
! 2.1* Typical details of !choepentoeter vane feed inlet5 type )))5
! 2.18 Typical details of !choepentoeter vane feed inlet5 type )V5
! 2.1 *"S*-N2 R"7-R"#"N*S
8. -NSP"*-,N R"7-R"#"N*S
)nspection and testing reFuirements shall be in accordance with the applicable +ompany%
!hell ;roup and )nternational standards% with the relevant sections of this specification and
the data sheets.
The Vendor shall specify all of the inspection and testing reFuirements in the )TP which shall
identify the activities reFuiring the PurchaserHs approval% review% witnessing etc. / typical)TP is attached in /ppendiG(".
Purchaser reserves the right to inspect every component or item% which will form part of the
pressure vessel. The responsibility for the inspection% certification% etc. of all materials%
parts% etc. lies with the Vendor.
6ot withstanding the above% the Purchaser or his authoriLed representative shall have free
access to all parts of the VendorHs and his !ub(VendorEs wors at all times during the
manufacturing period.
The Vendor shall be responsible for coordinating the inspection and testing of !ub(Vendor
supplied eFuipment% and for ensuring that the PurchaserHs representatives are given the
necessary access for inspection% and adeFuate warning of inspection and witness tests.
The Vendor and all !ub(Vendors5 shall give the +ompany% as reFuired% without charge% all
reasonable facilities for the purpose of inspecting the eFuipment to ensure that it is
f d i d i h h i i i d i d h i l ifi i d
-
8/11/2019 Specification for Pressure Vessles
23/66
/ll welding and welding consumables shall be in accordance with D#P 3.1.*.1"(;en%unless indicated otherwise in this specification. 7nly =ow :ydrogen welding consumables
shall be used. Diffusible :ydrogen level shall be less that 1ml'1g weld metal% unlessagreed and approved by the Purchaser. /ll welding consumables shall have specifiedmechanical properties eFual to or greater than the material being welded% unless agreed andapproved by the Purchaser.
The Vendor shall supply all necessary eFuipment and record welding variables during theProcedure @ualification ecord P@5 Test% production welding and weld Fualification tests.Prior to the start of production welding all P! with supporting P@ shall be submitted forapproval to the Purchaser.
here it is demonstrated that on noLLle ' branch weld neither radiography nor ultrasonic
eGamination can be performed% the root pass after deposition and the weld shall be
eGamined visually and subIect to $T ' =T.
/ll components including plates% forgings% fitt ings% welding consumables etc. shall becheced for impact test reFuirements to the specified lower design temperature =DT5 asthe minimum design metal temperature $D$T5 to meet the applicable codes andstandards. Vendor shall confirm with the material supplier the reFuired impact test value at
specified =DT conform to the specified impact value as per D#P 3.1.2.31(;en andapplicable codes and standards. +ertified $aterial Test eport shall clearly specify the testresults.
P:T shall be performed as per the code reFuirements and as specified in the eFuipment
datasheet.
Positive $aterial )dentification P$)5 shall be carried out on all wetted parts material.Vendorshall submit P$) procedure with the bid for +ompany'Purchaser review. Vendor shall refer
31 1 1 ; f
-
8/11/2019 Specification for Pressure Vessles
24/66
/ny defects found by the TP)/ shall be rectified in his presence. here this is not possible
or practical% checlists shall be prepared and signed by the TP)/ stating all Hpending itemsH.+opies of these lists shall be sent to the Purchaser to enable their subseFuent checing.
The eFuipment shall not be tested or leave the factory before all discovered defects have
been rectified.
8.1 *"S*-N2 R"7-R"#"N*S
This section describes the minimum reFuirements for the testing of the eFuipment. Thistesting shall be performed in the VendorEs wors.
The Purchaser reserves the right to observe any of the testing% dismantling% inspection and
reassembly of eFuipment as specified.
&nless otherwise specified% all testing eFuipment reFuired shall be provided by the Vendor.
PurchaserEs witnessing of shop test results shall not constitute a waiver of the VendorEs
obligation to provide eFuipment which meets all specified operating conditions.
8.1. Hydrostatic *est
:ydro testing shall be as per the code% specification% data sheets and )nspection A Testing
Plan. )nspector shall witness all hydrostatic tests. Drainage ' flushing ' drying of the
eFuipment shall strictly follow immediately after the hydrostatic testing as specified in !P(
2?1. The water to be used for the hydrostatic test apart from the reFuirements as to
-
8/11/2019 Specification for Pressure Vessles
25/66
:. D,#"N*A*-,N R"7-R"#"N*S
eFuirements for Vendor documentation are listed in the eFuisition for #ngineering
Documents #D5 form included in /ppendiG(3 and sections below. The Vendor shall prepare
a Vendor Document egister VD5 or !uppliers Document !chedule !D!5 in the +ompany
standard format using the above information as a guide. The Vendor shall submit the
Document egister to Purchaser for review and approval together with document delivery
schedule after award and prior to submission of any other documentation. The Document
egister will thereafter form the basis of submission and control of all documents. The
+ompany title bloc'drawing number can be included on the front sheet. /ll documentation
shall be submitted for review'approval to the Purchaser within the committed schedule. )tshall be the responsibility of the Vendor to ensure that the production schedule taes into
account documentation submission% including a two wees review period by the Purchaser%
which includes document delivery time.
:. -N(,R#A*-,N *, B" SB#-**"D A+,N2)-*H *H" B-D
Vendor shall submit all the reFuired documents as specified'identified in the #D form
attached in /ppendiG(3. )n addition to this Vendor shall submit the followingC1. Table of +ompliance% /ppendiG(4 duly completed% signed and stamped.
2. &nit rates for noLLles with flange rating as mentioned in datasheets for siLes 6P!2to 6P! 24 and any higher siLes if specified in the datasheets.
3. &nit rate for cleats A ladders on per g basis and platform on per m2basis.
:.1 -N(,R#A*-,N *, B" SB#-**"D A(*"R ,RD"R
-
8/11/2019 Specification for Pressure Vessles
26/66
:.1.3 *est ertificates
+ertificates for each mechanical% performance or calibration test% as applicable shall befurnished% including hydrostatic test certificates and as identified in #D form% /ppendiG(3.
:.3 #"*H,D ,( D,#"N*A*-,N *RANS#-SS-,N
/ll documentation for review'approval shall be transmitted via internet soft copy5 or hard
copy by use of courier services and shall be sent to the Purchaser% the details of which shall
be discussed during the bid clarification meeting. ,inal documentation shall be in the form
of hard copy as well as electronic form as specified in #D form% /ppendiG(3.
:.$ -D"N*-(-A*-,N
#ach drawing and document shall be identified with the following information for drawings atitle bloc shall be used5C
a5 )dentify and signature of originator% checer and approver.
b5 Title
c5 Purchase order number
d5 The item'tag number or eFuipment number
e5 7fficial name of VendorEs company
f5 VendorEs drawing number.
g5 =atest revision by means of a number or letter in triangle with that number or letteradIacent to the alterations.
h5 +ompany drawing number.
-
8/11/2019 Specification for Pressure Vessles
27/66
+orrections will be mared on the drawings. $ared(up copies of the drawings will be
returned to the Vendor under cover of the appropriate transmittal form.
The Vendor shall at all times be responsible for review and correction of !ub(VendorEs
drawings and documents prior to submittal to Purchaser for approval.
The Purchaser will clearly indicate on the documents which parts% if any% are QholdE. The
Purchaser will inform the parties concerned% of the reasons for placing JholdK% and the
dates5 on which release of these JholdsK can be eGpected. The Vendor shall not delay
manufacturing of released parts because of JholdK placed on other parts.
&pon approval of the VendorEs drawings by the Purchaser% the Vendor shall forward to thePurchaser the reFuired number of approved documents% prints and disettes as stated on
the #D form under cover of a transmittal form% ,inal Document Transmittal ,DT5.
$anuals shall also be submitted to Purchaser under cover of a ,DT.
:.: #ANA+S
The manual with all the relevant details to install% commission and operate'maintain the
eFuipment shall be provided% with all the applicable drawings and details. The manual shall
include all instructions on specific safety procedures for the installation and start(up of the
eFuipment.
)nstallation% operation and maintenance instructions including !ub(Vendor manuals.
Technical design data and test results $anufacturer databoo5.
+ertification data.
-
8/11/2019 Specification for Pressure Vessles
28/66
;. PAA2-N2 > PR"S"RVA*-,N (,R SH-P#"N*
The preparation for shipment of eFuipment and materials shall be in accordance with #D(
*(1% D#P 8.1.8.11(;en and additional reFuirements as defined in this section. !pecial
care should be taen for the pacaging of delicate eFuipments ' parts.
;. PA-N2 R"7-R"#"N*S
/ll noLLles and open ends of the eFuipment shall be treated with !hell #nsis ,luid !D+ and
closed off by wooden or plastic blans and taped. !mall bore connections shall be tapedover.
Preservation of the pacages shall be suitable for a storage period of at least * months.
/ll eFuipment under sea shipment and those with +r($o or higher alloy steel material shall
be cleaned% dried and then purged with nitrogen and sealed with nitrogen with a small
positive pressure not less than .8 barg5. 6itrogen bottles shall be provided and secured to
the shipping saddles for refilling. /ll associated valves and gauges shall be provided to
monitor the nitrogen pressure inside the vessel.
The eFuipment shall be paced in a seaworthy close boarded case with a waterproof lining.
The case shall be sufficiently strong to withstand handling and storage.
,or transportation of any eFuipment in !ultanate of 7man% the maGimum height including
the trailer standard height of low bed trailer 1.3 metres% special low bed trailer height 1
metre5 shall be ?.? metres. The Vendor shall critically review this reFuirement and obtain
necessary approvals from local authorities ' Purchaser prior to transportation. The
-
8/11/2019 Specification for Pressure Vessles
29/66
+rate dimensions and gross weight
!pecific l ifting and'or storage instructions
+rate identification
!upplier and Purchaser details
-rief material specification
Purchase order number
,inal destination
/ complete pacing list in a waterproof sleeve shall be firmly attached to the outside of eachcrate. /n identical list shall be attached to the inside of the crate.
-
8/11/2019 Specification for Pressure Vessles
30/66
SH"D+-N2
-
8/11/2019 Specification for Pressure Vessles
31/66
#nsure VendorEs epresentatives engineers')6!P#+T7!5 have free access to all
fabrication areas at any reasonable time% including all times that fabrication wor is being
performed.
eview the production program% including input from sub(contractors.
eview material substitutions5% if any.
eview scope of the overall inspection plan and define responsible parties regarding
interpretation% witnessing and reviewing.
eview any conflicts in codes'specifications and record which prevails.
eview any reFuirements to witness any particular inspection by PurchaserEsepresentative.
eview test program and procedures.
eview purchase order variation procedures and agree that any variation in design or
fabrication not approved by the Purchaser in writing shall be considered by the
)6!P#+T7 as non(acceptable.
+ertified minutes of meeting shall be prepared by the Vendor and issued to the
Purchaser for his approval'signature within two 25 woring days from the date of themeeting.
-
8/11/2019 Specification for Pressure Vessles
32/66
APP"ND-"S
-
8/11/2019 Specification for Pressure Vessles
33/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=9 "NV-R,N#"N*A+ > S-*" ,ND-*-,NS
The proIect specific environmental and site conditions shall be confirmed'provided by thePurchaser based on the site location. The facilities shall be suitable for operation in the specifiedenvironmental conditions in addition to the operating conditions.
The local environmental conditions are severe. There are freFuent sandstorms% and theatmosphere is heavily laden with airborne dust particles% some as small as 2 microns. )t rainsrarely. The rain is often combined with hail and sandstorms.
/verage #nvironmental conditions for the production stations areC
Relevant Am@ient Data
-arometric pressure $aGimum
-
8/11/2019 Specification for Pressure Vessles
34/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=91 "7-P#"N* DA*ASH""*S > DRA)-N2S
1. Pressure Vessel Datasheet
2. Demister Datasheet
3. $ass'+entre of $ass of #Fuipment Datasheet
-
8/11/2019 Specification for Pressure Vessles
35/66
-
8/11/2019 Specification for Pressure Vessles
36/66
-
8/11/2019 Specification for Pressure Vessles
37/66
-
8/11/2019 Specification for Pressure Vessles
38/66
-
8/11/2019 Specification for Pressure Vessles
39/66
-
8/11/2019 Specification for Pressure Vessles
40/66
-
8/11/2019 Specification for Pressure Vessles
41/66
-
8/11/2019 Specification for Pressure Vessles
42/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=93 R"7-S-*-,N (,R "N2-N""R-N2 D,#"N*S!R"D (,R#S&
-
8/11/2019 Specification for Pressure Vessles
43/66
-
8/11/2019 Specification for Pressure Vessles
44/66
-
8/11/2019 Specification for Pressure Vessles
45/66
-
8/11/2019 Specification for Pressure Vessles
46/66
-
8/11/2019 Specification for Pressure Vessles
47/66
-
8/11/2019 Specification for Pressure Vessles
48/66
-
8/11/2019 Specification for Pressure Vessles
49/66
-
8/11/2019 Specification for Pressure Vessles
50/66
-
8/11/2019 Specification for Pressure Vessles
51/66
-
8/11/2019 Specification for Pressure Vessles
52/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=9$ *AB+" ,( ,#P+-AN"
The Vendor shall confirm below that the offer complies with all the clauses contained in thisspecification or otherwise highlight deviation ' eGceptions under the clarification column. Vendorcan use separate sheets if space provided in the clarification column is insufficient. ords suchas J6otedK shall not be used.
+lient C Petroleum Development 7man PD75 Vendor C
+lient ef. 6o. C P 6o. Vendor ef. 6o C
Specification
Reference
onforms Alternative larification
Section 4es / No 4es / No
1
1.1
1.2
1.3
1.4
2
2.1
2.2
-
8/11/2019 Specification for Pressure Vessles
53/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
+lient C Petroleum Development 7man PD75 Vendor C
+lient ef. 6o. C P 6o. Vendor ef. 6o C
SpecificationReference
onforms Alternative larification
Section 4es / No 4es / No
4.3
?
?.1
?.2
*
*.1
*.2
*.2.1
*.2.2
8
8.1
8.2
-
8/11/2019 Specification for Pressure Vessles
54/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
+lient C Petroleum Development 7man PD75 Vendor C
+lient ef. 6o. C P 6o. Vendor ef. 6o C
SpecificationReference
onforms Alternative larification
Section 4es / No 4es / No
-
8/11/2019 Specification for Pressure Vessles
55/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=96 A++,)AB+" N,CC+" +,ADS
This appendiG defines the allowable piping loads acting on noLLles of process vessels such ascolumns% drums and shell and tube heat eGchangers interconnected with piping designed by thePurchaser.
-
8/11/2019 Specification for Pressure Vessles
56/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=98 SP-R (,R#A*
-
8/11/2019 Specification for Pressure Vessles
57/66
-
8/11/2019 Specification for Pressure Vessles
58/66
-
8/11/2019 Specification for Pressure Vessles
59/66
-
8/11/2019 Specification for Pressure Vessles
60/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=9: S"R (""DBA PA2"
SP9 1%8< SP"-(-A*-,N (,R PR"SSR" V"SS"+SS"R (""DBA (,R#
/ny user who identifies an inaccuracy% error or ambiguity is reFuested tonotify the custodian so that appropriate action can be taen. The user isreFuested to return this page fully completed% indicating precisely theamendments5 recommended.
Name
Ref -D Date
Pa'e Ref Brief Description of han'e ReEuired and Reasons
-
8/11/2019 Specification for Pressure Vessles
61/66
Petroleum Development ,man ++evisionC
#ffectiveC !ep("
APP"ND-=9; -NSP"*-,N AND *"S* P+AN !-*P& (,R#A*
*4P-A+ -NSP"*-N *"S* P+AN
-
8/11/2019 Specification for Pressure Vessles
62/66
ontractorFs Name evision 6o Page 1
7uality ontrol PlanRef.
ProGect ontract / P., No.
Discipline"lement Pressure Vessel#anufacture
Vessel *a'
Sl.No
Activityontrollin'Document
Acceptance riteria.(reEuency of *est.
SupplierFsVerificationPersonnel
VerificationDocument
#anufacturer"P
ontractor/ *P-
Authorised-nspector
PD,
1. Design +alculations
and Drawings
+ontract
!pecifications
+onformance to
manuf. code andcontractspecificationreFuirements /pproval ( /ll
Design
$anager
/pproved
calculationsand Drawings
: : : or
eviewas per
contract
2. elding Procedures /pplicable +odeA relevant !hellD#P
/pproval /llP! related topressure retainingparts
elding ' @/#ngineer
/pproved forconstructionprocedure
: : :
3. /pproval of 6DTProcedures
/pplicable +odeA !P 118*
+onformance torelevant code Aspec
elding ' @/#ngineer
/pproved 6DTprocedures
: :
4. eview of 6DT
operatorsEFualification andvalidity
)!7
-
8/11/2019 Specification for Pressure Vessles
63/66
ontractorFs Name evision 6o Page 2
7uality ontrol PlanRef.
ProGect ontract / P., No.
Discipline"lement Pressure Vessel#anufacture
Vessel *a'
Sl.No
Activityontrollin'Document
Acceptance riteria.(reEuency of *est.
SupplierFsVerificationPersonnel
VerificationDocument
#anufacturer"P
ontractor/ *P-
Authorised-nspector
PD,
etc drawings% Data
!heets% etc". Verification of
transfer of materialmaring on cutsegments
$anufacturerEsprocedures
/ll cut materialshall bear thematerial detailsincluding heatnumbers
@+ )nspector Traceabilityrecord
:
-
8/11/2019 Specification for Pressure Vessles
64/66
ontractorFs Name evision 6o Page 3
7uality ontrol PlanRef.
ProGect ontract / P., No.
Discipline"lement Pressure Vessel#anufacture
Vessel *a'
Sl.No
Activityontrollin'Document
Acceptance riteria.(reEuency of *est.
SupplierFsVerificationPersonnel
VerificationDocument
#anufacturer"P
ontractor/ *P-
Authorised-nspector
PD,
D#P
1?. ,errite chec asreFuired5
/P) P ?"2 A/! /4.2
/P) P ?"2 @+ )nspector ,errite +heceport
1*. Dimensional)nspection
/pproveddrawings% codeand relevantD#P
+onformancewithin thetolerance limitsspecified in thecontrolling docs
@+ )nspector Dimensionalinspectionreport
18. +learance for P:T of the vessel
/pprovedDrawings AData sheets
/ll elding :otwor5 worscompleted andvisually accepted
@+ )nspector +learanceeport
: :
1". P:T /pprovedP:T
procedure
+onformance tocode A spec
reFuirements
@+ )nspector P:T chart
1
-
8/11/2019 Specification for Pressure Vessles
65/66
ontractorFs Name evision 6o Page 4
7uality ontrol PlanRef.
ProGect ontract / P., No.
Discipline"lement Pressure Vessel#anufacture
Vessel *a'
Sl.No
Activityontrollin'Document
Acceptance riteria.(reEuency of *est.
SupplierFsVerificationPersonnel
VerificationDocument
#anufacturer"P
ontractor/ *P-
Authorised-nspector
PD,
D#P repairs
24. +learance for ,lushing ' cleaningA Pressure Test
/pproveddrawings ;/ AP#,!5 A Datasheets
/ll fabrication A6DT in the vesselcompleted andaccepted
@+ )nspector +learanceeport
: :
2?. ,lushing ' +leaning $anufacturerEsProcedure Acontract !pec
/ll internalsurface shall bedirt free
,abrication!upervisor A@+ inspector
,lushing '+leaningeport
:
2*. Pressure Testing $anufacturerEsProcedure%+ode% approveddrawings A datasheets
Test pressuremaintained as percontrolling docsand no leaages
@+ )nspector Pressure Testeport
: :
28. )nspection of
internals )nstallation
$anufacturerEs
Procedure%+ode% approveddrawings A datasheets andinternalsmanufacturerEsinstructions
/ll internal
installat ion inaccordance withapproveddrawings
,abrication
!upervisor A@+ inspector
)nstallation
)nspectioneport
:
2". Painting system PD7 !pec !P124* Part 1% 2 A?
+onformance to!P 124* Part 2 A?
Painting!upervisor A@+ inspector
PD7 /pprovedpainting system
:
2
-
8/11/2019 Specification for Pressure Vessles
66/66
ontractorFs Name evision 6o Page ?
7uality ontrol PlanRef.
ProGect ontract / P., No.
Discipline"lement Pressure Vessel#anufacture
Vessel *a'
Sl.No
Activityontrollin'Document
Acceptance riteria.(reEuency of *est.
SupplierFsVerificationPersonnel
VerificationDocument
#anufacturer"P
ontractor/ *P-
Authorised-nspector
PD,
/ll inspections listed
in Table 1 of !P(124* Part 4 shall becarried out
124* Part 4 accordance with
the respectivepainting systemreFuirements ATable 1 of !P124* Part(4
!upervisor A
@+ inspector
)nspection
eport%:oliday Testeport A/dhesion Testeport
31. +ode !tamping '6ame Plate details
$anufacturing+ode
)n accordancewithmanufacturingcodereFuirements
@+ )nspector +ode stamp '6ame plate
:
32. eview of $D- Afinal elease
+ontract A+odereFuirements
+omplete inaccordance withcontract and code
reFuirements
@/@+$anager
$D- : :