SPESIFIKASI TEKNIK
No. Uraian Unit1. KAPASITAS MW2. BOILER
- Type
- Manufacture- Boiler Capacity T/h- Boiler Fuel Comsumtion (Coal) T/h- Plant Heat Rate- Boiler Thermal Efficiency %
3. STEAM TURBINE AND AUXiLIARY EQUIPMENT- Type- Manufacture- Speed rpm- Number of Extraction- Output MW- Gross turbine-generator heat rate kcal/KWH- Make Up Water %- Generator Power Faktor
3 GENERATOR- Type- Manufacture- Cooling System- Capacity kWWATER TREATMENT SYSTEM- Sea Water Tank- Reverse Osmosis Plant m3/hour- Demin Water Tank m3- Raw Water Tank m3
- Water Treatment System ton/days
- Waste Water Treatment Plant m3/hourCOOLING TOWER- Type'- Flowrate- Number FIRE PROTECTION SYSTEMLIMESTONE HANDLING SYSTEM- Size- Limestone Stockpile m3- Limestone Handling m3- Limestone SpesificationBED HANDLING SYSTEM- Capacity
COAL HANDLING SYSTEM- Ship Unloader ton/hour- Trestle m- Belt Conveyor Capacity ton/hour- Coal Stockyard ton/hour- Dry Coal sheed ton- Coal Spesification/HHV kKal- Draught Jetty m- Barge Capacity dwtASH HANDLING SYSTEM- Fly Ash Silo Capacity- Type- NumberChimney- High m- TypeIntake & Discharge- Lenght m- TypeBuilding- Mosque- Sport Facility- LandscapeCommissioning Consumption- Coal ton- Limestone ton- HSD KL- Sand m3 or tonGENERATOR TRANSFORMER- Type- Manufacture- Capacity- Type of CoolingFUEL OIL SYSTEM- CapacityLocation / Coordinate
SPESIFIKASI TEKNIK
PLTU 3 BABEL PLTU 4 BABEL2 x 30 MW 2 x 16,5 MW
UG-130/9.8-M YG-75/5.29-M21
Sichuan Chuanguo Boiler JINAN BOILER130 t/h 75 t/h
47.98 t/h (2 boiler) 27.62 t/h (2 boiler)3430 kCal/kWH
82.20%
Condensing Steam TurbineChina Chang Jiang Energy CO. Later
30003
16.52673
00.85
QF-15-2 10500VShan Dong Ji Nan / Nan Jing
Air Cooling16500
2 x 20 t/h 552 x 350 m3 2 x 150
350 m3 2 x 250
320 t/day 7 Ton/h
100 m3/h 15
4000 ton 180 2 x 6 t/h 150
≥ 87 %
150
2 x 12033400 ton
9m3 x 27 mx 7 m3700 - 4300 kcal/kg
6,24 m5000 ton
500 m2
2 x 80 mncrete & Steel Liner
Intak = 40; Discharge = 360 mGeotextile & Stone
1 Unit1 Unit1 Unit
30,055 ton2,882 ton185 KLiter
131 ton
PT. Trafoindo Prima Perkasa20 MVAONAN
2 x 100 kL
SPESIFIKASI TEKNIK
PLTU 1 Kalbar PLTU 2 Kalbar PLTP Ulubelu(2 x 50 MW) (2 x 27,5 MW) (2 x 55 MW)
UG-130/5.3-M (CFB)
JINAN BOILER Wuxi Huaguang Boiler Co. Ltd220 t/h 2 x 143 t/h70 t/h
85%
N27.5-4.90-1Nanjing I Jieneng { Hangzhou
3000(2 Hp + 2 LP)
2752495.5
0.2720.8
Synchronous GeneratorNanjingl Oingdao IJinanAir Cooled27.5 MW
LATER - Later2 x 500 - Later
2 x 1000 - Later
4 x 7,2 t/h 7
LATER 10
BT-P-lOORT50 m3/h1 Set
400 tons/day (20 hrs operation time and 4 hrs
regeneration time)
400N/A
2 x 400 8 t/h800/40011760
3700-4500N/A5000
325 tCylindrical steel silo with conical bottom
2
< 1 mm MeshN/A
purity > 90 %
------
SPESIFIKASI TEKNIK
PLTU Sintang PLTU Sangau3 x 7 MW 2 x 7 MW
ALBOK BOILER or equal PT. ZUG IND. INDONESIA or Equal44 t/h 40 t/h
262 t/h 60 t/h3450 kCal/kWH
85% 85%
CCJEC or Equal
7280
150
7
10
Later LATERLater LATER70 t/h 50Later LATERLater LATER
3800 kCal 38005.0 m MRL LATER3500 DWT 5000
Approximately 40 minimum 40Later LATER
LaterLater
LaterLaterLater
LaterLaterLaterLater
SPESIFIKASI TEKNIK No. Uraian Unit PLTU Lampung
1. Kapasitas (2 x 100 MW)2. BOILER & AUX EQUIPMENT
- Type- Manufacture
- Steam generating capacity at boiler (Main Steam Flow) T/h- Design pressure (Drum) Kg/cm2 g- Design temperature at Superheater Outlet C
- Boiler heat release rate at MCR: Main steam flow T/h
3. STEAM TURBINE AND AUXiLIARY EQUIPMENT- Type- Manufacture- Speed rpm- Number of Extraction- Output MW- Gross turbine-generatoj heat rate kcal/KWH- Main Steam Pressure C- Main Steam Temperature Kg/cm2 g- Main Steam Flow Kg/h- Exhaust Steam Pressure mmHG abs- Exhaust Steam Flow Kg/h- Feedwater Temperature at HP Final Heater Outlet C- Make Up Water %- Generator Power Faktor
4 CONDENSER AND FEED WATER HEATING PLANTVacuum Pump- Type- Manufacture- Number of Unit
CIRCULATING WATER PUMP( Sea water cooling pump)- Type- Manufacture- Number - Capacity m3/H
CONDENSATE PUMP
SPESIFIKASI TEKNIK PLTU Sumatera Barat PLTU 3 BABEL PLTU 4 BABEL PLTU 1 Kalbar PLTU 2 Kalbar
(2 x 112 MW) (2 x 30 MW) (2 x 16,5 MW) (2 x 50 MW) (2 x 27,5 MW)
Wuxi Huaguang Boiler Co. Ltd
14361
485
130
N27.5 - 4,90-1Nanjing/Jieneng/Hangzhou
30002 PH + 2 LP
27.52495.5
49470
110000
0.2720.8
32 SAP - 10 JALater
36300
CFB (Circulating Fluidized Bed Boiler) / UG-130/5,3-M
SPESIFIKASI TEKNIK PLTP Ulubelu PLTU Sintang PLTU Sangau
(2 x 55 MW) 3 x 7 MW) (2 x 7 MW)