Spec Teknik Pembangkit-Ira

14
No. Uraian Unit 1. KAPASITAS MW 2. BOILER - Type - Manufacture - Boiler Capacity T/h - Boiler Fuel Comsumtion (Coal) T/h - Plant Heat Rate - Boiler Thermal Efficiency % 3. STEAM TURBINE AND AUXiLIARY EQUIPMENT - Type - Manufacture - Speed rpm - Number of Extraction - Output MW - Gross turbine-generator heat rate kcal/KWH - Make Up Water % - Generator Power Faktor 3 GENERATOR - Type - Manufacture - Cooling System - Capacity kW WATER TREATMENT SYSTEM - Sea Water Tank - Reverse Osmosis Plant m3/hour - Demin Water Tank m3 - Raw Water Tank m3 - Water Treatment System ton/days - Waste Water Treatment Plant m3/hour COOLING TOWER - Type '- Flowrate - Number FIRE PROTECTION SYSTEM LIMESTONE HANDLING SYSTEM - Size - Limestone Stockpile m3 - Limestone Handling m3 - Limestone Spesification BED HANDLING SYSTEM - Capacity

Transcript of Spec Teknik Pembangkit-Ira

Page 1: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK

No. Uraian Unit1. KAPASITAS MW2. BOILER

- Type

- Manufacture- Boiler Capacity T/h- Boiler Fuel Comsumtion (Coal) T/h- Plant Heat Rate- Boiler Thermal Efficiency %

3. STEAM TURBINE AND AUXiLIARY EQUIPMENT- Type- Manufacture- Speed rpm- Number of Extraction- Output MW- Gross turbine-generator heat rate kcal/KWH- Make Up Water %- Generator Power Faktor

3 GENERATOR- Type- Manufacture- Cooling System- Capacity kWWATER TREATMENT SYSTEM- Sea Water Tank- Reverse Osmosis Plant m3/hour- Demin Water Tank m3- Raw Water Tank m3

- Water Treatment System ton/days

- Waste Water Treatment Plant m3/hourCOOLING TOWER- Type'- Flowrate- Number FIRE PROTECTION SYSTEMLIMESTONE HANDLING SYSTEM- Size- Limestone Stockpile m3- Limestone Handling m3- Limestone SpesificationBED HANDLING SYSTEM- Capacity

Page 2: Spec Teknik Pembangkit-Ira

COAL HANDLING SYSTEM- Ship Unloader ton/hour- Trestle m- Belt Conveyor Capacity ton/hour- Coal Stockyard ton/hour- Dry Coal sheed ton- Coal Spesification/HHV kKal- Draught Jetty m- Barge Capacity dwtASH HANDLING SYSTEM- Fly Ash Silo Capacity- Type- NumberChimney- High m- TypeIntake & Discharge- Lenght m- TypeBuilding- Mosque- Sport Facility- LandscapeCommissioning Consumption- Coal ton- Limestone ton- HSD KL- Sand m3 or tonGENERATOR TRANSFORMER- Type- Manufacture- Capacity- Type of CoolingFUEL OIL SYSTEM- CapacityLocation / Coordinate

Page 3: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK

PLTU 3 BABEL PLTU 4 BABEL2 x 30 MW 2 x 16,5 MW

UG-130/9.8-M YG-75/5.29-M21

Sichuan Chuanguo Boiler JINAN BOILER130 t/h 75 t/h

47.98 t/h (2 boiler) 27.62 t/h (2 boiler)3430 kCal/kWH

82.20%

Condensing Steam TurbineChina Chang Jiang Energy CO. Later

30003

16.52673

00.85

QF-15-2 10500VShan Dong Ji Nan / Nan Jing

Air Cooling16500

2 x 20 t/h 552 x 350 m3 2 x 150

350 m3 2 x 250

320 t/day 7 Ton/h

100 m3/h 15

4000 ton 180 2 x 6 t/h 150

≥ 87 %

Page 4: Spec Teknik Pembangkit-Ira

150

2 x 12033400 ton

9m3 x 27 mx 7 m3700 - 4300 kcal/kg

6,24 m5000 ton

500 m2

2 x 80 mncrete & Steel Liner

Intak = 40; Discharge = 360 mGeotextile & Stone

1 Unit1 Unit1 Unit

30,055 ton2,882 ton185 KLiter

131 ton

PT. Trafoindo Prima Perkasa20 MVAONAN

2 x 100 kL

Page 5: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK

PLTU 1 Kalbar PLTU 2 Kalbar PLTP Ulubelu(2 x 50 MW) (2 x 27,5 MW) (2 x 55 MW)

UG-130/5.3-M (CFB)

JINAN BOILER Wuxi Huaguang Boiler Co. Ltd220 t/h 2 x 143 t/h70 t/h

85%

N27.5-4.90-1Nanjing I Jieneng { Hangzhou

3000(2 Hp + 2 LP)

2752495.5

0.2720.8

Synchronous GeneratorNanjingl Oingdao IJinanAir Cooled27.5 MW

LATER - Later2 x 500 - Later

2 x 1000 - Later

4 x 7,2 t/h 7

LATER 10

BT-P-lOORT50 m3/h1 Set

400 tons/day (20 hrs operation time and 4 hrs

regeneration time)

Page 6: Spec Teknik Pembangkit-Ira

400N/A

2 x 400 8 t/h800/40011760

3700-4500N/A5000

325 tCylindrical steel silo with conical bottom

2

< 1 mm MeshN/A

purity > 90 %

------

Page 7: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK

PLTU Sintang PLTU Sangau3 x 7 MW 2 x 7 MW

ALBOK BOILER or equal PT. ZUG IND. INDONESIA or Equal44 t/h 40 t/h

262 t/h 60 t/h3450 kCal/kWH

85% 85%

CCJEC or Equal

7280

150

7

10

Page 8: Spec Teknik Pembangkit-Ira

Later LATERLater LATER70 t/h 50Later LATERLater LATER

3800 kCal 38005.0 m MRL LATER3500 DWT 5000

Approximately 40 minimum 40Later LATER

LaterLater

LaterLaterLater

LaterLaterLaterLater

Page 9: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK No. Uraian Unit PLTU Lampung

1. Kapasitas (2 x 100 MW)2. BOILER & AUX EQUIPMENT

- Type- Manufacture

- Steam generating capacity at boiler (Main Steam Flow) T/h- Design pressure (Drum) Kg/cm2 g- Design temperature at Superheater Outlet C

- Boiler heat release rate at MCR: Main steam flow T/h

3. STEAM TURBINE AND AUXiLIARY EQUIPMENT- Type- Manufacture- Speed rpm- Number of Extraction- Output MW- Gross turbine-generatoj heat rate kcal/KWH- Main Steam Pressure C- Main Steam Temperature Kg/cm2 g- Main Steam Flow Kg/h- Exhaust Steam Pressure mmHG abs- Exhaust Steam Flow Kg/h- Feedwater Temperature at HP Final Heater Outlet C- Make Up Water %- Generator Power Faktor

4 CONDENSER AND FEED WATER HEATING PLANTVacuum Pump- Type- Manufacture- Number of Unit

CIRCULATING WATER PUMP( Sea water cooling pump)- Type- Manufacture- Number - Capacity m3/H

CONDENSATE PUMP

Page 10: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK PLTU Sumatera Barat PLTU 3 BABEL PLTU 4 BABEL PLTU 1 Kalbar PLTU 2 Kalbar

(2 x 112 MW) (2 x 30 MW) (2 x 16,5 MW) (2 x 50 MW) (2 x 27,5 MW)

Wuxi Huaguang Boiler Co. Ltd

14361

485

130

N27.5 - 4,90-1Nanjing/Jieneng/Hangzhou

30002 PH + 2 LP

27.52495.5

49470

110000

0.2720.8

32 SAP - 10 JALater

36300

CFB (Circulating Fluidized Bed Boiler) / UG-130/5,3-M

Page 11: Spec Teknik Pembangkit-Ira

SPESIFIKASI TEKNIK PLTP Ulubelu PLTU Sintang PLTU Sangau

(2 x 55 MW) 3 x 7 MW) (2 x 7 MW)