SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... ·...

30
SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and C. Lynn, Shell, B. Layton – STEP Energy Services, E. Fraser – ThruTubing Solutions Presented at the ICoTA Roundtable – Oct. 29, 2014 by L. Edillon, STEP Energy Services

Transcript of SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... ·...

Page 1: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long - Overcoming Challenges in

Completing 3600 m Laterals

R. Liston and C. Lynn, Shell, B. Layton – STEP Energy Services,

E. Fraser – ThruTubing Solutions

Presented at the ICoTA Roundtable – Oct. 29, 2014 by

L. Edillon, STEP Energy Services

Page 2: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

PRESENTATION OUTLINE

� Overview of the Asset

� The Benefit of Longer Wells

� Introduce the Challenge

� Completion Objectives

� Equipment Design (Coiled Tubing / BHA Design)

� Operational Summary

� Conclusions and Recommendations

Slide 2

Page 3: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

GROUNDBIRCH ASSET OVERVIEW

� Location: Northeast BC, Canada

� Montney Formation (shaly siltstone)

� Horizontal Wells

� 2,100 to 2,600 m TVD

� 4,500 to 6,300 m MD

� 114.3 mm or 139.7 mm casing

� Unconventional Gas Play (thousands

of wells planned)

� All planned completions activities

must be highly reliable and repeatable!

Slide 3

Gundy

Page 4: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

THE BENEFIT TO LONGER WELLS

Dominance of Longer Wells in Unconventionals

1) Access more reserves with one wellbore [improved economics]

2) Reduced environmental footprint [HSE]

3) Reduced dead space in development

Groundbirch Conducted 5 Well Trial to Prove Technical Do-Ability

Slide 4

1

2

3

AO13

Page 5: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 4

AO13 if this gets blurry when its blown up on the projector, you will not be able to read it. and the two squares in the left corner should either be photo shopped out or not cut off, looks messy. Anna Ostrom, 10/7/2014

Page 6: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

Well PBTD

(m)

TVD (m) Lateral Length

(m)

MD/TVD

B 6,250 2,353 3,550 2.66

C 6,310 2,423 3,589 2.60

D 6,320 2,479 3,611 2.55

E 6,180 2,354 3,638 2.63

F 6,283 2,427 3,676 2.59

Page 7: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

THE CHALLENGE – “GOING LONG”

Slide 6

� Increase lateral length 60% to 3600 m

� Key Design Considerations:

� Drilling (SPE-170888-MS) – 177.8mm x 139.7mm ← Modified design

� Effective stimulation of complete lateral ← Plug & Perf

� Effective cleanout of wellbore post-stimulation ← Limiting factor

Address the limitations:

Completion Objectives

Design Optimization

Execution

AO15

Page 8: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 6

AO15 the arrow in the first line needs to be fixed. this is also a fairly boring slide.Anna Ostrom, 10/7/2014

Page 9: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

SERVICE EQUIPMENT OPTIONS CONSIDERED

Slide 7

� Specific Requirements:

1. Depth: Achieve 6250 m w/ 250 daN to mill out deepest plug.

2. Annular Velocity: >40 m/min in vertical 177.8 mm Casing

3. Cost: Avoid increasing completion cost / meter of well in

development scenario

� Options considered:

Coiled Tubing Snubbing Unit Service Rig

BL2

Page 10: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 7

BL2 again this slide needs something to keep the audience. Creat boxes for options considered - possibly bought up with animationBen Layton, 10/8/2014

Page 11: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

Project Overview

Slide 8

0

1000

2000

3000

4000

5000

6000

-8000 -6000 -4000 -2000 0 2000 4000

De

pth

(m

)Injector Weight (daN)

Force Limitation Utilizing 50.8 mm / 60.3 mm Coiled Tubing

60.3 mm 50.8 mm

Target Depth : 6250 m

AO12

Page 12: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 8

AO12 youve cut off the "slide 10" in the right corner. either make them all smaller or takethem out. Anna Ostrom, 10/7/2014

Page 13: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

Project Overview

Slide 9

0

1000

2000

3000

4000

5000

6000

-8000 -6000 -4000 -2000 0 2000 4000

De

pth

(m

)Injector Weight (daN)

Force Limitation Utilizing 50.8 mm / 60.3 mm Coiled Tubing

60.3 mm 50.8 mm

Target Depth : 6250

Vertical portion of well

Heel portion of well

Horizontal portion of well

AO9

Page 14: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 9

AO9 change the referance lines to black. having the red may cause confusion.Anna Ostrom, 10/7/2014

Page 15: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

Slide 10

0

1000

2000

3000

4000

5000

6000

7000

-8000 -6000 -4000 -2000 0 2000 4000 6000

De

pth

(m

)Injector Weight (daN)

Force Limitation Utilizing 66.7 mm Coiled Tubing

66.7 mm 60.3 mm 50.8 mm

Target Depth : 6250 m

Target Depth Not Reached

AO11

Page 16: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 10

AO11 same with this change the large arrow to black. Anna Ostrom, 10/7/2014

Page 17: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

CT SELECTION CRITERIA SUMMARY

Slide 11

CT Size

Specific Requirements

Meets Objectives

Depth:6250 m

required

Annular Velocity: >40 m/min

required

Cost:Complete all

wells with 1

string (CT

Fatigue)

60.3 mm 5400 m 33.6 m/min No Concern No

66.7 mm 6000 m 38.6 m/min Concern No

BL4

Page 18: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 11

BL4 Watch that the green is still legible when used with the projector.Change Slide to black - make meet objectives Dark bolded redBen Layton, 10/8/2014

Page 19: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

EXTENDED REACH TECHNIQUES CONSIDERED

Options Considered:

Coiled Tubing Tractor

Pipe Straightener

Slide 12

Hydraulically activated downhole pulling effect – up to 7000 lbs of additional force

� Risk of becoming stuck in hole from debris-

laden column.

� Cost of losing the tool downhole. Availability at

time of operation.

Page 20: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

ALTERNATIVE EXTENDED REACH TECHNIQUES

Options Considered:

Coiled Tubing Tractor

Pipe Straightener

Slide 13

Straightens pipe to reduce residual bend and friction

� Additional mechanical bend increases fatigue

� Time constraints to design and develop for large OD CT

Page 21: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

UNDERSTANDING CT LIMITATIONS – LITERATURE REVIEW

� Greater reaches obtained with tractors non viable for application

� Project exceeded conventional limitations w/o tractors (2.57 MD/TVD)

Slide 14

Reference (SPE#) Region CategoryCT Total Depth

CT Lateral Reach

MD/TVD

(md-m) (m)

94208 (Moore et al., 2005) Sakhalin, Russiawith Tractor

9,373 6,760 3.59

164237 (Arukhe et al., 2013) Saudi Arabia 9,113 6,217 3.15

170831 (Liston et al., 2014) W. Canada

without Tractor

6,198 3,612 2.57

159574 (Griffin and Nichols, 2012) Bakken Shale, US 5,520 2,939 2.14

127399 (Al-Buali et al., 2009) Saudi Arabia 3,694 2,390 1.99

168250 (Burke et al., 2014) Alaska

CT Drilling

4,077 1,309 1.47

106874 (Tongs et al., 2007) W. Canada 6,370 1,908 1.43

84162 (Patrick et al., 2003) W. Canada 6,605 1,025 1.21

AO8

Page 22: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 14

AO8 This chart may be too busy, some may have an issue reading this from the back of the room.Anna Ostrom, 10/7/2014

Page 23: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

The Answer: Benefits of an Engineered 73.0 mm Tapered String

Slide 15

0

1000

2000

3000

4000

5000

6000

7000

-10000 -8000 -6000 -4000 -2000 0 2000 4000 6000D

ep

th (

m)

Injector Weight (daN)

73.0 mm 66.7 mm 60.3 mm 50.8 mm

Target Depth : 6250 m

0.250”Wall

0.250”Wall

0.175”Wall

0.175”Wall

0.156”Wall

0.156”Wall

SimplifiedCT XC

SimplifiedCT XC

CT Size

Specific Requirements

Meets Objectives

Depth:6250 m

required

Annular Velocity: >40 m/min

required

Cost:Complete all

wells with 1

string (CT

Fatigue )

Tapered

73.0 mm6250 m 40.5 m/min Concern YES

BL5

Page 24: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 15

BL5 again watch this greenRemove 7 inch casing, enlarge font, make green text either more green or black with green shading in background. - make colors more pronoucned and legible.Ben Layton, 10/8/2014

Page 25: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

TOOL DESIGN – MAXIMIZE RATE AND MINIMIZE FATIGUE

Objectives:

Requirement: Improved BHA design

Slide 16

Maximize Velocity Increase TorqueMinimize Stalls / Circ. Pressure

Control Fatigue

Motor

Performance

Standard 2-7/8”

Design

New 3-1/8”

Design

% Improvement

Flow Range

(L/Min)190-650 380-800 25 %

Operating Pressure (kPa)

7,310 5,450 26 %

Stall Torque (Nm)

1,790 2,200 23 %

BL6

Page 26: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 16

BL6 may want to make this chart a little biggerCreate boxes for objectivesPercent improvement over previous designBen Layton, 10/8/2014

Page 27: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

COILED TUBING EQUIPMENT DESIGN

New trailer construction enabled:1) Additional pipe capacity2) Overcome transport limitations

from Houston to Site (4,400 kms)

Slide 17

73.0 mm ODReel

Capacity (m)

Weight (lbs)

Previous Design

5330 150,000

New Design 6800 180,000

BL7

Page 28: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 17

BL7 eliminate 60.3 and 66.7mmalude to transportation issues that forced the construction of new equipmentBen Layton, 10/8/2014

Page 29: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

SPE-170831

Going Long – Overcoming Challenges in Completing 3600m Laterals

OPERATIONAL SUMMARY

Slide 18AO3

Page 30: SPE-170831 Going Long - Overcoming Challenges in Completing 3600 … 2014 Roundtable... · SPE-170831 Going Long - Overcoming Challenges in Completing 3600 m Laterals R. Liston and

Slide 18

AO3 Same comment as slide 7Anna Ostrom, 10/7/2014