Spacelift Range and Network Systems Division
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Presentation to AFCEA
17 Jan 13 Col Janet Grondin SMC/RN
![Page 2: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/2.jpg)
Agenda
• RN Overview • 2012 Accomplishments • RN Strategy • 2013 Focus Areas • LISC Update • Small Business Opportunities • Summary
2
![Page 3: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/3.jpg)
3
Spacelift Range
Eastern Range and Western Range each comprised of 12 subsystems:
– Command Destruct – Communications – Data Handling – Range Safety – Optics – Planning & Scheduling – Radar – Surveillance – Timing & Sequencing – Telemetry – Weather – Modeling & Simulation
2000+ Configuration Items
Over $2B in assets
Ballistic Missiles
Spacelift Launches
Pt. Mugu
Equatorial Orbits Santa Ynez PK
Kwajalein
Vandenberg AFB Anderson Peak
Highly Inclined Orbits
Ballistic Missiles
Ascension
CCAS/KSC/PAFB
Pillar Point Argentia
Eastern Range
Antigua
Wallops Island
Western Range
W C O O A
Spacelift Ranges Critical to Launch Success
![Page 4: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/4.jpg)
Mission: • Sustain and Modernize the Air Force
Satellite Control Network to ensure responsive, effective support to the warfighter.
• Provide highly reliable command and control, communication, telemetry and tracking for over 170 DoD, NRO, civil, and allied satellites in support of launch, surveillance, navigation, communication, and weather missions.
• Lead development of compatible C2 and standard training systems for the space enterprise.
Satellite Control Network
Assured Access to Space
4
![Page 5: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/5.jpg)
Space Training Acquisition Office
5
Program Photo
Standard Space Trainer Distributed Mission Operations – Space
Joint Space Training Federation
![Page 6: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/6.jpg)
RN’s 2012 Major Accomplishments
As of: 6
PEO Commitments Complete C-Band Radar move plan Fielded Guam Tracking Station (GTS) Remote Block
Change (RBC) Significant Accomplishments
Fielded Mission Flight Control Center (WR) IOC declared for GPS Metric Tracking (ER & WR) Fielded Pillar Point Telemetry Antenna (WR) Fielded Cape 1B Transmitter upgrade (ER) Delivered WGS Standardized Space Trainer (SST)
![Page 7: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/7.jpg)
RN Strategy
Deliver upgrades completing development now
Prioritize investment based on reliability & mission criticality
Fund highest priority modifications Leverage all funding sources Prepare to spend fallout funds
Transition management to sustainment organization
7
![Page 8: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/8.jpg)
2013 Focus Areas
As of: 8
PEO Commitments Award LISC Contract with at least 5% savings (3Q) Award LTRS Network Modernization IP Contracts (1Q) Deliver the Hawaii RTS Block Change Upgrade (2Q)
Other RN Priorities Award Hybrid Remote Block Change (1Q) LISC RFP release (1Q) Western Modernized Network RFP release (3Q) SE&I Re-compete RFP release (4QCY13/1QCY14) Test/Acceptance of Range/Network developments Move AFSCN PM duties to SMC/SL in Colorado Springs
![Page 9: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/9.jpg)
LISC
LISC combines requirements from three contracts – Eastern Range O&M – Western Range O&M – Level 2 Maintenance & Sustainment
Benefits – Lower costs – Single contractor accountable for “green range” – Consistent Reliability & Maintainability Data for better investment decisions
Acquisition Strategy – LISC Operations, Maintenance & Sustainment (OM&S) Contract
• Core mission requirements • 23% Small Business subcontracting requirement
– Range Operations Support (ROS)
• Formerly called LISC Ops Support (OS) • Small Business Set-Aside for mission support • Approximately 7% of LISC budget
9
![Page 10: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/10.jpg)
LISC Status
As of: 10
Status Acquisition Strategy Approved SMC “Murder Board” Complete Assignment of ROS to 45 CONS Business Clearance Conducted Final draft RFP posted OSD Peer Review (Jan 13)
Way Ahead Release RFP (Jan/Feb 13) Proposals due 45 days after RFP release
![Page 11: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/11.jpg)
RN Opportunities
As of: 11
RN Unified SE&I contract RN Certification and Accreditation
AFSCN Commercial Provisioning Follow-on AFSCN sustainment
Spacelift Range Communications Upgrades Range Command/Destruct Upgrade
![Page 12: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/12.jpg)
Communications Upgrade
• Two Initiatives • Modernized Eastern Range (MEN) • Western Modernized Network (WMN)
– Content • Replace ATM with IP • 2012 - 2018
• Schedule • MEN:
• In source selection now • 2 awards: NETCENTs and IP Companion
• WMN: • Acquisition Strategy in Final Coordination • Similar to MEN acquisition • May or may not use Alliant GSA contract
12
![Page 13: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/13.jpg)
Space Training Current Activities
• Standardized Space Trainers • MILSATCOM • GPS • Space Fence
• Supporting Joint Space Training Federation • Sustaining space simulation capability (DMO-S) • Conducting analyses for SMC SPOs
13
![Page 14: Spacelift Range and Network Systems Division · 2013-06-05 · Spacelift Range and Network Systems Division I n t e g r i t y - S e r v i c e - E x c e l l e n c e Presentation to](https://reader033.fdocuments.net/reader033/viewer/2022041918/5e6ae2388b7c956c2e64e7cc/html5/thumbnails/14.jpg)
Summary
• LISC on final approach for RFP release • WMN next big opportunity • SE&I contract RFP most likely CY14
14