SPACE SURVEY ROBERTA MCMANUS What are Facilities & Administrative (F&A) Costs? “those that are...
-
Upload
shanna-manning -
Category
Documents
-
view
214 -
download
1
Transcript of SPACE SURVEY ROBERTA MCMANUS What are Facilities & Administrative (F&A) Costs? “those that are...
SPACE SURVEY
ROBERTA MCMANUS
2
What are Facilities & Administrative (F&A) Costs?
“those that are incurred for common or joint objectives [of the University] and, therefore,
cannot be identified readily and specifically with a particular
sponsored project, an instructional activity or another
institutional activity”
Space Survey
Space Survey 3
OMB Circular A-21 and F&A
Provides guidance on F&A cost treatment and definitions
Provides definitions and examples of each of the components for each major category
Requires educational institutions with more than $10 million in total direct costs to prepare Long Form F&A Proposal
Provides guidance on development/format of F&A Proposal submittal
F&A a.k.a. Overhead a.k.a. Indirect Cost Proposal
Space Survey 4
OMB Circular A-21 and F&AF&A Cost Components Facilities
Building and Equipment Depreciation Interest Operations and Maintenance Library
Administration General Administration Departmental Administration Sponsored Projects Administration Student Services Administration
Space Survey 5
F&A Allocation ProposalObjective of the F&A allocation
study is to aggregate and distribute F&A costs to the major functions of the institution in proportions reasonably consistent with the nature and extent of their use
Generally new rates are established every four years
FSU’s current rates expire June 30, 2010
Space Survey 6
F&A Rate Development ProcessProcess must be designed to ensure that
Federal sponsors do not in any way subsidize the F&A costs of other sponsors,
Activities of the rate development process◦ Analysis of administrative expenses across the
university 26% Limitation
◦ Space survey conducted to determine how FSU facilities are being used (e.g. instruction vs. sponsored research) No limitation
SRAS currently preparing for 2010 proposal
Space Survey 7
Space SurveyPurpose
◦Document building room usage◦Allocate Facilities costs◦Provide productivity analysis
Space survey tool WebSpace◦On-line◦ Integrates with F&A proposal analysis
software◦Enables management of survey process
and results
Space Survey 8
Space SurveyMethodology
◦Identify buildings to survey (SRAS) Based on predominance of research
usage
◦Survey buildings/rooms (SRAS/Facilities Managers/Faculty) SRAS staff - support during process Facilities managers - facilitate/data entry Faculty involvement - identify how rooms
used and associated %
Space Survey 9
Space Survey
Task Anticipated Time Frame
Notification to campus (e.g. Council of Deans)
April/May 2010
Identify/Notify facility managers May 2010
Education/Training June 2010
Conduct survey June - July 2010
Confirm results August – September 2010
Analyze/Update results October – December 2010
Submit F&A Proposal March 2011
Onsite Visit (estimate) March 2012
10
SRAS Contacts
Roberta McManus – Associate Director◦[email protected]◦645-2485
Helen McCann – Business Analyst◦[email protected] ◦644-8947
Space Survey