SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 1
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
1 CONTACT INFORMATION Mike Leegard (OCIC)
2 CONTACT INFORMATION AND CLARIFICATION PROCESS Mike Leegard (OCIC)
3 PRE-LETTING CONFERENCE Mike Leegard (OCIC)
4 SPECIAL PROVISIONS RELATING TO INDIAN EMPLOYMENT Maria Sarabia/Adrienne Bond (Civil Rights)
5 EQUAL PAY Mike Leegard (OCIC)
6 RESPONSIBLE CONTRACTOR Mike Leegard (OCIC)
7 COMPLIANCE WITH TAX LAW REQUIREMENTS Mike Leegard (OCIC)
8 REFERENCE INFORMATION DOCUMENTS Mike Leegard (OCIC)
9 EMERALD ASH BORER COMPLIANCE Tina Markeson (Environmental Stewardship)
10 PARTNERING Mike Leegard (OCIC)
11 USE OF ADHESIVE ANCHORS Mike Leegard (OCIC)
12 TARGETED GROUP BUSINESS (TGB) AND VETERAN-OWNED SMALL BUSINESS
Mike Leegard (OCIC)
13 MINNESOTA REPORT ON JOBS REQUIREMENTS Mike Leegard (OCIC)
14 03/20/1805/18/18
ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR FEDERALLY FUNDED PROJECTS
RevisedRevised
Mike Leegard (OCIC) Charlie GroshensCharlie Groshens
15 03/20/1805/18/18
ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR STATE FUNDED PROJECTS
RevisedRevised
Mike Leegard (OCIC) Charlie GroshensCharlie Groshens
16 (1103) DEFINITIONS Mike Leegard (OCIC)
IDIQ (1301) CONSIDERATION OF PROPOSALS (INDEFINITE DELIVERY/INDEFINITE QUANTITY)
Kevin Kosobud (Innovative Construction Unit)
17 (1301) CONSIDERATION OF PROPOSALS (LANE RENTAL METHOD)
Kevin Kosobud (Innovative Construction Unit)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 2
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
18 (1301) CONSIDERATION OF PROPOSALS (A+B METHOD) Kevin Kosobud (Innovative Construction Unit)
19 (1302) AWARD OF CONTRACT Mike Leegard (OCIC)
20 (1306) EXECUTION AND APPROVAL OF CONTRACT Mike Leegard (OCIC)
21 03/09/18 (1404) MAINTENANCE OF TRAFFIC & (2563) TRAFFIC CONTROL
Revised Mike Leegard (OCIC) Ted Ulven
IDIQ 03/09/18 (1404) MAINTENANCE OF TRAFFIC & (2012) TRAFFIC CONTROL
Revised Mike Leegard (OCIC) Ted Ulven
22 (1505) COOPERATION BY CONTRACTORS Mike Leegard (OCIC)
23 (1505) COOPERATION BY CONTRACTORS (BRIDGE) Mike Leegard (OCIC)
24 (1507) UTILITY PROPERTY & SERVICE Mike Leegard (OCIC)
25 (1508) CONSTRUCTION STAKES, LINES & GRADES Mike Leegard (OCIC)
26 (1508) CONSTRUCTION STAKES, LINES & GRADES Mike Leegard (OCIC)
27 (1508) CONSTRUCTION STAKES, LINES & GRADES Mike Leegard (OCIC)
28 (1508) CONSTRUCTION STAKES, LINES & GRADES Mike Leegard (OCIC)
29 (1508) CONSTRUCTION STAKES, LINES & GRADES Mike Leegard (OCIC)
30 (1514) MAINTENANCE DURING CONSTRUCTION Mike Leegard (OCIC)
31 (1601) SOURCE OF SUPPLY & QUALITY Mike Leegard (OCIC)
32 (1602) NATURAL MATERIAL SOURCES Terry Beaudry (Grading and Base)
Mike Leegard (OCIC)
33 (1606) STORAGE OF MATERIALS Jim Kochsiek ( Materials)
33.1 04/20/18 (1701) LAWS TO BE OBSERVED (PROMPT PAY AND RETAINAGE)
New Mike Leegard (OCIC) Jim Cownie
34 (1701) LAWS TO BE OBSERVED (WETLANDS) Mike Leegard (OCIC)
35 (1701) LAWS TO BE OBSERVED (BUILDINGS REMOVALS OR Mark Vogel (Environmental
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 3
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
MOVES) Stewardship)Mike Leegard (OCIC)
36 (1701) LAWS TO BE OBSERVED (BRIDGE) Mark Vogel (Environmental Stewardship)
Mike Leegard (OCIC)
37 (1701) LAWS TO BE OBSERVED (CULTURAL RESOURCES – FEDERALLY FUNDED)
Mike Leegard (OCIC)
38 (1701) LAWS TO BE OBSERVED (CULTURAL RESOURCES – STATE FUNDED)
Mike Leegard (OCIC)
39 (1701) LAWS TO BE OBSERVED – CARGO PREFERENCE ACT, USE OF UNITED STATES - FLAGGED VESSELS
Mike Leegard (OCIC)
40 (1701) LAWS TO BE OBSERVED – CERTIFICATION OF NONDISCRIMINATION AGAINST ISRAEL
Mike Leegard (OCIC)
41 (1706) EMPLOYEE HEALTH & WELFARE Mike Leegard (OCIC)
42 (1707) PUBLIC CONVENIENCE AND SAFETY Mike Leegard (OCIC)
43 (1712) PROTECTION AND REST. OF PROPERTY Mike Leegard (OCIC)
44 (1717) AIR, LAND, AND WATER POLLUTION (CONCRETE GRINDING)
Ken Graeve (Erosion and Stormwater Management)
45 (1717) MPCA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION STORM WATER (CSW) PERMIT
Ken Graeve (Erosion and Stormwater Management)
46 (1717) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR TRIBAL LANDS
Ken Graeve (Erosion and Stormwater Management)
47 (1718) FURNISHING RIGHT OF WAY Mike Leegard (OCIC)
48 IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT
Mike Leegard (OCIC)
49 (1801) SUBLETTING OF CONTRACT Mike Leegard (OCIC)
50 (1802) TRAINING FOR CONSTRUCTION TRUCK OPERATORS Mike Leegard (OCIC)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 4
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
51 (1803) PROGRESS SCHEDULES Mike Leegard (OCIC)
52 03/09/18 (1804) PROSECUTION OF WORK (ADA) Revised Todd Grugel (ADA) Joe Zilka
53 03/09/18 (1804) LIMITATION OF OPERATIONS - NIGHT CONSTRUCTION Revised Mike Leegard (OCIC) Jody Stuck
54 04/20/18 (1806) DETERMINATION & EXT. OF CONTRACT TIME Revised Mike Leegard (OCIC) Seth Yliniemi
55 05/18/18 (1806) DETERMINATION AND EXTENSION OF CONTRACT TIME (LANDSCAPING)
Revised Paul MerchlewiczMike Leegard (OCIC)
Paul Merchlewicz
56 04/20/18 (1807) FAILURE TO COMPLETE THE WORK ON TIME Revised Mike Leegard (OCIC) Seth Yliniemi
IDIQ (1903) COMPENSATION FOR ALTERED QUANTITIES Kevin Kosobud (Innovative Construction Unit)
57 (1910) COST ESCALATION Mike Leegard (OCIC)
58 (2011) CONSTRUCTION SURVEYING
59 (2011) CONSTRUCTION SURVEYING (METRO) Brad Canady (Metro Surveys)
60 (2011) CONSTRUCTION SURVEYING (DIGITAL SURFACE MODEL METHOD USING THE AMG-EXCAVATION SYSTEM)
Rebecca Embacher (Advanced Materials Technology)
61 (2011) CONSTRUCTION SURVEYING FOR ASPHALT BOND BREAKER LAYER UNDER CONCRETE OVERLAYS
Maria Masten (Concrete)
62 11/17/1703/20/18
(2011) AS-BUILTS RevisedRevised
Trisha Stefanski (Asset Management)
Anthony WotzkaPaul Merchlewicz
63 (2013) ROAD/WEATHER SENSOR AND CABLE Curt Pape (Maintenance)
64 (2013) ROAD WEATHER INFORMATION SYSTEM (R/WIS) Curt Pape (Maintenance)
65 12/01/17 (2016) QUALITY MANAGEMENT - PAVER MOUNTED THERMAL PROFILE (PMTP) METHOD
Revised Rebecca Embacher (Advanced Materials Technology)
Rebecca Embacher
66 12/01/17 (2016) QUALITY MANAGEMENT SPECIAL – INTELLIGENT COMPACTION (IC) METHOD
Revised Rebecca Embacher (Advanced Materials Technology)
Rebecca Embacher
IDIQ (2021) MOBILIZATION Kevin Kosobud (Innovative Construction Unit)
67 (2031) FIELD OFFICE AND LABORATORY Mike Leegard (OCIC)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 5
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
68 (2031) FIELD OFFICE AND LABORATORY – BROADBAND SERVICES
Mike Leegard (OCIC)
69 (2031) COMBINATION FIELD-LAB OFFICE Mike Leegard (OCIC)
70 03/09/18 (2041) ON-THE-JOB TRAINING PROGRAM Revised Maria Sarabia/Adrienne Bond (Civil Rights)
Lee Zutz
71 (2051) MAINTENANCE & RESTORATION OF HAUL ROADS Mike Leegard (OCIC)
72 03/09/1804/20/18
(2101) CLEARING AND GRUBBING RevisedRevised
Tina Markeson (Environmental Stewardship)
Paul MerchlewiczChristina Markeson
73 (2102) PAVEMENT MARKING REMOVAL Ken Johnson & Ethan Peterson(Pavement Marking)
Revised per Ethan Peterson.
74 (2103) BUILDING REMOVAL Mark Vogel (Environmental Stewardship)
75 (2103) CONSTRUCTION WASTE MANAGEMENT AND DEBRIS RECYCLING REQUIREMENTS
Mark Vogel (Environmental Stewardship)
76 (2104) REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES
Mike Leegard (OCIC)
77 (2104) REMOVE AND HAUL TREATED WOOD Mark Vogel (Environmental Stewardship)
78 (2104) REMOVE TANK (HISTORICAL/POSSIBLE TANKS POSSIBLE)
Brian Kamnikar (Environmental Stewardship)
79 (2104) REMOVE TANK (KNOWN TANK OR FACILITY) Brian Kamnikar (Environmental Stewardship)
80 (2104) ABATE ASBESTOS-CONTAINING PIPES OR CULVERTS Mark Vogel (Environmental Stewardship)
81 (2104) ABESTOS CONTAINING WASTE MATERIAL ABATEMENT
Mark Vogel (Environmental Stewardship)
82 (2104) ASBESTOS AND REGULATED WASTE ASSESSMENT Mark Vogel (Environmental Stewardship)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 6
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
83 (2104) REGULATED WASTE ASSESSMENT (BRIDGE) Mark Vogel (Environmental Stewardship)
84 (2104) REMOVAL OF ASBESTOS AND REGULATED WASTE (BRIDGE)
Mark Vogel (Environmental Stewardship)
85 (2104) REMOVE ASBESTOS AND REGULATED WASTE MATERIAL
Mark Vogel (Environmental Stewardship)
86 (2104) HAUL SALVAGED MATERIALS Mike Leegard (OCIC)
87 (2104) ABANDON PIPE SEWER Mike Leegard (OCIC)
88 (2104) REMOVE SEALANT MATERIALS Mike Leegard (OCIC)
89 (2104) REMOVE SEALANT MATERIALS Mike Leegard (OCIC)
90 03/09/18 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA)
Revised Todd Grugel (ADA) Joe Zilka
91 (2105/2106) EXCAVATION AND EMBANKMENT (DIGITAL SURFACE MODEL METHOD USING THE AMG-EXCAVATION SYSTEM)
Rebecca Embacher (Advanced Materials Technology)
92 (2105) EXCAVATION AND EMBANKMENT Terry Beaudry (Grading and Base)
93 (2105) ROCK BLASTING SPECIFICATIONS Jason Richter (Materials and Road Research - Geotechnical)
94 (2105) ROCK EXCAVATION (PRODUCTION BLASTING) Jason Richter (Materials and Road Research - Geotechnical)
95 (2105) SETTLEMENT PLATES Jason Richter (Materials and Road Research - Geotechnical)
96 (2105) CONSTRUCT TURN LANE Terry Beaudry (Grading and Base)
97 (2105) WEEP TRENCH Jason Richter (Materials and Road Research - Geotechnical)
98 (2105) SHOULDER TRENCHING Jason Richter (Materials and Road Research - Geotechnical)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 7
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
99 (2105) SOIL STABILIZATION GEOGRID Jason Richter (Materials and Road Research - Geotechnical)
100 (2105) GEOTEXTILE FABRIC BOND BREAKER INTERLAYER FOR CONCRETE OVERLAY
Maria Masten (Concrete)
101 (2105) CONTROLLED EXCAVATION Jason Richter (Materials and Road Research - Geotechnical)
102 (2105) SUBGRADE SOIL MODIFICATION Terry Beaudry (Grading and Base)
103 (2106) EXCAVATION AND EMBANKMENT Terry Beaudry (Grading and Base)
104 04/20/18 (2112) SHOULDER PREPARATION Revised Unknown Paul Merchlewicz
105 (2118) AGGREGATE SURFACING Terry Beaudry (Grading and Base)
106 (2123) TRACTOR MOUNTED BACKHOE Mike Leegard (OCIC)
107 (2123) CRAWLER MOUNTED BACKHOE Mike Leegard (OCIC)
108 03/09/18 (2215) RECLAMATION Revised Terry Beaudry (Grading and Base)
Terry Beaudry
109 (2231) BITUMINOUS PATCHING MIXTURE Greg Johnson (Bituminous)
110 (2231) PAVEMENT SEATING John Garrity (Bituminous)
111 (2231) PAVEMENT CLEANING John Garrity (Bituminous)
112 (2231) PAVEMENT CRACKING John Garrity (Bituminous)
113 (2231) BIT. SURFACE (CRACK AND JOINT REPAIR)
114 (2231) PAVEMENT BREAKING (RUBBLIZING) John Garrity (Bituminous)
115 (2232) MILLED RUMBLE STRIPS Ken Johnson & Ethan Peterson(Pavement Marking)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 8
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
116 (2232) MILLED RUMBLE STRIPS Ken Johnson & Ethan Peterson(Pavement Marking)
117 (2232) MILLED RUMBLE STRIPS - INTERMITTENT Ken Johnson & Ethan Peterson(Pavement Marking)
118 (2232) MILLED SINUSOIDAL RUMBLE STRIPS Ken Johnson & Ethan Peterson(Pavement Marking)
119 (2232) MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE) Ken Johnson & Ethan Peterson(Pavement Marking)
120 (2232) MILLED SINUSOIDAL RUMBLE STRIPS - INTERMITTENT
Ken Johnson & Ethan Peterson(Pavement Marking)
121 (2232) MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE) - INTERMITTENT
Ken Johnson & Ethan Peterson(Pavement Marking)
122 03/09/18 (2232) MILL AND PATCH BITUMINOUS PAVEMENT (ADA) Revised Todd Grugel (ADA) Joe Zilka
123 (2232) MICRO MILL BITUMINOUS PAVEMENT SURFACE John Garrity (Bituminous)
124 12/08/17 (2301) CONCRETE PAVEMENT Revised Maria Masten (Concrete) Maria Masten
125 (2301) DOWEL BAR Maria Masten (Concrete)
126 (2301) DRILL AND GROUT REINFORCEMENT BAR (EPOXY COATED)
Maria Masten (Concrete)
127 (2301) HIGH PERFORMANCE DOWEL BAR – 1.25 inch Maria Masten (Concrete)
128 (2301) HIGH PERFORMANCE DOWEL BAR – 1.5 inch Maria Masten (Concrete)
129 (2301) CONCRETE PAVEMENT LUGS Maria Masten (Concrete)
130 (2301) SLAB JACKING Maria Masten (Concrete)
131 (2302) CONCRETE PAVEMENT REHABILITATION (CPR) Maria Masten (Concrete)
132 (2302) CONCRETE GRINDING Maria Masten (Concrete)
133 (2302) CONCRETE GRINDING WITH NO INCENTIVES Maria Masten (Concrete)
134 (2331) BITUMINOUS JOINT SAWING AND SEALING John Garrity (Bituminous)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 9
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
135 (2331) PAVEMENT JOINT ADHESIVE John Garrity (Bituminous)
136 (2331) BITUMINOUS EMULSION FOR OTTA SEAL John Garrity (Bituminous)
137 (2331) MASTIC FOR VOID FILLING John Garrity (Bituminous)
138 (2331) BITUMINOUS PAVEMENT CRACK TREATMENT John Garrity (Bituminous)
139 (2353) ULTRATHIN BONDED WEARING COURSE (UTBWC) (MSCR)
John Garrity (Bituminous)
140 (2356) BITUMINOUS SEAL COAT AND BITUMINOUS UNDERSEAL
John Garrity (Bituminous)
141 (2356) OTTA SEAL John Garrity (Bituminous)
142 (2357) BITUMINOUS MATERIAL FOR SHOULDER TACK John Garrity (Bituminous)
143 03/09/1804/20/18
(2360) PLANT MIXED ASPHALT PAVEMENT (MSCR) RevisedRevised
John Garrity (Bituminous) John GarrityGreg Johnson
144 03/09/1804/20/18
(2360) PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (MSCR)
RevisedRevised
John Garrity (Bituminous) John GarrityGreg Johnson
145 (2360) POROUS ASPHALT PAVEMENT John Garrity (Bituminous)
146 04/20/18 (2360) FINE-GRADED (4.75 mm) ASPHALT MIXTURE Revised John Garrity (Bituminous) Greg Johnson
147 (2360) PLANT MIXED ASPHALT PAVEMENT - THICKNESS PAYMENT SCHEDULE
John Garrity (Bituminous)
148 (2363) PERMEABLE ASPHALT STABILIZED STRESS RELIEF COURSE (PASSRC) AND PERMEABLE ASPHALT STABILIZED BASE (PASB) (MSCR)
John Garrity (Bituminous)
149 04/20/18 (2365) STONE MATRIX ASPHALT - SMA (MSCR) Revised John Garrity (Bituminous) Greg Johnson
150 03/09/18 (2390) COLD-IN-PLACE RECYCLED (CIR) BITUMINOUS AND COLD CENTRAL PLANT RECYCLING (CCPR) BITUMINOUS
Revised Terry Beaudry (Grading and Base)
Terry Beaudry
150.1 11/17/17 (2399) PAVEMENT SURFACE SMOOTHNESS New Tom Nordstrom (Pavement Management)
Tom Nordstrom
151 (2411) CONSTRUCT CONCRETE OR MASONRY PLUG
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 10
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
152 (2411) MECHANICALLY STABILIZED EARTH WALLS WITH PRECAST CONCRETE PANELS
Joe Black (Bridge)
153 (2411) PREFABRICATED MODULAR BLOCK WALL (PMBW) WITH AND WITHOUT SOIL REINFORCEMENT
Joe Black (Bridge)
154 (2442) REMOVAL OF EXISTING BRIDGES Chris Smith (Environmental Stewardship) and Mark Spafford
(Bridge)
155 (2452) STEEL SHEET PILING - TEMPORARY Unknown
156 12/08/17 (2461) STRUCTURAL CONCRETE Revised Maria Masten (Concrete) Maria Masten
157 12/08/17 (2462) PRECAST CONCRETE Revised Maria Masten (Concrete) Maria Masten
158 11/17/17 (2471) STRUCTURAL METALS Mark Spafford (Bridge) Jihshya Lin
158.1 03/09/18 (2472) METAL REINFORCEMENT New Mark Spafford (Bridge) Mark Spafford
159 (2501) PIPE TIES
160 (2501) BULKHEAD CULVERT
161 (2501) PLUG FILL AND ABANDON PIPE CULVERT
162 (2501) TRASH GRATE FOR BOX CULVERT
163 (2501) SAFETY APRON
164 (2501) SAFETY GRATE
165 (2501) CLEAN PIPE CULVERT
166 11/17/17 (2501) PIPE CULVERTS Revised Andrea Hendrickson (Bridge Hydraulics)
Tim Swanson
167 11/17/1701/12/18
(2501) POLYPROPYLENE PIPE CULVERTS RevisedRevised
Andrea Hendrickson (Bridge Hydraulics)
Tim SwansonAndrea Hendrickson
168 03/09/18 (2502) SUBSURFACE DRAINS Revised Terry Beaudry (Grading and Base)
Jody Stuck
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 11
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
169 11/17/17 (2503) PIPE SEWERS Revised Andrea Hendrickson (Bridge Hydraulics)
Tim Swanson
170 11/17/1701/12/18
(2503) POLYPROPYLENE PIPE SEWERS RevisedRevised
Andrea Hendrickson (Bridge Hydraulics)
Tim SwansonAndrea Hendrickson
171 (2503) CONNECT TO EXISTING STORM SEWER Andrea Hendrickson (Bridge Hydraulics)
172 (2503) CONSTRUCT BULKHEAD Andrea Hendrickson (Bridge Hydraulics)
173 (2503) SLOTTED DRAIN Andrea Hendrickson (Bridge Hydraulics)
174 (2503) PLUG FILL AND ABANDON PIPE SEWER Andrea Hendrickson (Bridge Hydraulics)
175 (2503) 18" STEEL CASING PIPE Andrea Hendrickson (Bridge Hydraulics)
176 (2504) CHANGES IN CITY UTILITY SYSTEM
177 (2504) RELOCATE HYDRANT AND VALVE
178 (2504) INSTALL HYDRANT
179 (2504) INSTALL VALVE AND BOX
180 (2504) ADJUST VALVE BOX - WATER
181 (2504) ADJUST CURB BOX
182 (2504) 18" STEEL CASING PIPE
183 (2504) POLYSTYRENE INSULATION
184 (2506) MANHOLES AND CATCH BASINS
185 (2506) INFILTRATION AND FILTRATION SYSTEMS Beth Neuendorf (Water Resources)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 12
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
186 (2506) CLEAN OUT CATCH BASIN
187 (2506) CONNECT INTO EXISTING DRAINAGE STRUCTURE
188 (2506) CONSTRUCT CONTROL STRUCTURE
189 (2521) CONCRETE WALK (ADA) Todd Grugel (ADA)
190 (2531) CONCRETE CURB AND GUTTER (ADA) Todd Grugel (ADA)
191 (2531) CONCRETE CURB DESIGN V (ADA) Todd Grugel (ADA)
192 (2531) TRUNCATED DOMES Todd Grugel (ADA)
193 (2533) CONCRETE MEDIAN BARRIERS Mike Elle (Design Standards)
194 (2533) PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337
Mike Elle (Design Standards)
195 (2533) PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 - ANCHORED
Mike Elle (Design Standards)
196 (2533) CONCRETE MEDIAN BARRIER DESIGN 8308 AND 8309 Mike Elle (Design Standards)
197 (2533) RELOCATE PORT. PRECAST CONC. BARRIER DESIGN 8337
Mike Elle (Design Standards)
198 (2533) RELOCATE PORT. PRECAST CONC. BARRIER DESIGN 8337 - ANCHORED
Mike Elle (Design Standards)
199 (2533) INSTALL CONCRETE MEDIAN BARRIER Mike Elle (Design Standards)
200 (2540) MAIL BOX SUPPORT Mike Elle (Design Standards)
201 (2540) RELOCATE MAIL BOX SUPPORT Mike Elle (Design Standards)
202 (2554) TRAFFIC BARRIERS Mike Elle (Design Standards)
203 (2554) TRAFFIC BARRIER DESIGN SPECIAL A Mike Elle (Design Standards)
204 (2554) END TREATMENT - ENERGY ABSORBING TERMINAL Mike Elle (Design Standards)
205 (2554) END TREATMENT - TANGENT TERMINAL Mike Elle (Design Standards)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 13
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
206 (2554) END TREATMENT – TYPE 31 TANGENT TERMINAL Mike Elle (Design Standards)
207 (2554) END TREATMENT – FLARED TERMINAL Mike Elle (Design Standards)
208 (2554) CONNECTING PIN Mike Elle (Design Standards)
209 (2554) GUARDRAIL POST SEAT Mike Elle (Design Standards)
210 (2554) T-BARRIER BRIDGE CONN. DES. 8318 Mike Elle (Design Standards)
211 (2554) GUIDE POST - TYPE SPECIAL Mike Elle (Design Standards)
212 (2554) INSTALL ANCHOR ASSEMBLY - 3 CABLE Mike Elle (Design Standards)
213 (2554) INSTALL ANCHOR ASSEMBLY-PLATE BEAM Mike Elle (Design Standards)
214 (2554) WATER FILLED BARRIER Mike Elle (Design Standards)
215 (2554) RELOCATE WATER FILLED BARRIER Mike Elle (Design Standards)
216 (2554) TENSION CABLE GUARDRAIL Mike Elle (Design Standards)
217 (2554) TENSION CABLE GUARDRAIL WARRANTY Mike Elle (Design Standards)
218 (2554) IMPACT ATTENUATOR BARRELS Mike Elle (Design Standards)
219 (2554) RELOCATE IMPACT ATTENUATOR BARRELS Mike Elle (Design Standards)
220 (2554) IMPACT ATTENUATOR Mike Elle (Design Standards)
221 (2554) IMPACT ATTENUATOR (C-A-T) Mike Elle (Design Standards)
222 (2554) IMPACT ATTENUATOR (QUAD GUARD) Mike Elle (Design Standards)
223 (2554) IMPACT ATTENUATOR (SMART CUSHION) Mike Elle (Design Standards)
224 (2554) RELOCATE IMPACT ATTENUATOR Mike Elle (Design Standards)
225 (2557) FLEXIBLE PLASTIC GLARE SCREEN Mike Elle (Design Standards)
226 (2557) TEMPORARY GLARE SCREEN Mike Elle (Design Standards)
227 (2557) INSTALL CHAIN LINK FENCE Mike Elle (Design Standards)
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 14
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
228 03/09/18 (2563) TRAFFIC CONTROL SUPERVISOR Revised Mike Leegard (OCIC) Ted Ulven
229 03/09/18 (2563) INTELLIGENT WORK ZONE SYSTEM Revised Mike Leegard (OCIC) Ted Ulven
230 03/09/18 (2563) ALTERNATE PEDESTRIAN ROUTE Revised Mike Leegard (OCIC) Ted Ulven
231 03/09/18 (2563) RAISED PAVEMENT MARKERS TEMPORARY Revised Mike Leegard (OCIC) Ted Ulven
232 03/09/18 (2563) PORTABLE CONCRETE BARRIER DELINEATOR Revised Mike Leegard (OCIC) Ted Ulven
233 03/09/18 (2563) MEDIAN BARRIER DELINEATOR Revised Mike Leegard (OCIC) Ted Ulven
234 03/09/18 (2563) TUBE DELINEATORS Revised Mike Leegard (OCIC) Ted Ulven
235 03/09/18 (2563) FLAGGER Revised Mike Leegard (OCIC) Ted Ulven
IDIQ 03/09/18 (2563) FLAGGER Revised Mike Leegard (OCIC) Ted Ulven
236 03/09/18 (2563) POLICE OFFICER Revised Mike Leegard (OCIC) Ted Ulven
237 03/09/18 (2563) WORKERS PRESENT SPEED LIMIT Revised Mike Leegard (OCIC) Ted Ulven
238 03/09/18 (2563) TRUCK/TRAILER MOUNTED IMPACT ATTENUATOR (TMA)
Revised Mike Leegard (OCIC) Ted Ulven
239 03/09/18 (2563) PORTABLE CHANGEABLE MESSAGE SIGN Revised Mike Leegard (OCIC) Ted Ulven
239.1 03/09/18 (2563) AUDIBLE MESSAGE DEVICE New Mike Leegard (OCIC) Ted Ulven
240 03/09/18 (2563) CONSTRUCTION SIGN - SPECIAL Revised Mike Leegard (OCIC) Ted Ulven
241 (2571) GEOTEXTILE WEED BARRIER FABRIC Todd Carroll (Environmental Planning and Design)
242 05/18/18 (2573) STORM WATER MANAGEMENT Revised Ken Graeve (Erosion and Stormwater Management)
Val Svensson
243 (2574) SOIL PREPARATION Ken Graeve (Erosion and Stormwater Management)
244 04/20/18 (2575) ESTABLISHING TURF AND CONTROLLING EROSION Revised Ken Graeve (Erosion and Stormwater Management)
Paul Merchlewicz
245 03/09/18 (2575) SITE RESTORATION (ADA) Revised Todd Grugel (ADA) Joe Zilka
246 (2580) INTERIM PAVEMENT MARKING Ken Johnson & Ethan Peterson
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 15
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
(Pavement Marking)
247 (2580) PAVEMENT MARKINGS – LATE SEASON Ken Johnson & Ethan Peterson(Pavement Marking)
248 (2581) REMOVABLE PREFORMED PLASTIC MASK (BLACK) Ken Johnson & Ethan Peterson(Pavement Marking)
249 (2581) REMOVABLE PREFORMED PAVEMENT MESSAGE TAPE Ken Johnson & Ethan Peterson(Pavement Marking)
250 (2582) PAVEMENT MARKINGS Ken Johnson & Ethan Peterson(Pavement Marking)
251 (3105) BAGGED PORTLAND CEMENT CONCRETE PATCHING MIX GRADE 3U18 AND 3U18M
Maria Masten (Concrete)
252 (3135) MODIFIED AGGREGATE BASES Terry Beaudry (Grading and Base)
252.1 03/20/18 (3138) AGGREGATE FOR SURFACE AND BASE COURSES New Terry Beaudry (Grading and Base)
Terry Beaudry
253 (3139) GRADED AGGREGATE FOR FINE GRADED (4.75 mm) ASPHALT MIXTURE
John Garrity (Bituminous)
254 (3151) BITUMINOUS MATERIAL (MSCR) John Garrity (Bituminous)
255 (3236) REINFORCED CONCRETE PIPE Steve Grover (Materials)
255.1 04/20/18 (3245) THERMOPLASTIC PIPE New Terry Beaudry (Grading and Base)
Terry Beaudry
256 (3247) CORRUGATED POLYETHYLENE PIPE Andrea Hendrickson (Bridge Hydraulics)
257 (3248) POLYVINYL CHLORIDE PIPE Andrea Hendrickson (Bridge Hydraulics)
257.1 04/20/1805/18/18
(3278) CORRUGATED POLYETHYLENE DRAINAGE TUBING NewRevised
Terry Beaudry (Grading and Base)
Terry BeaudryTerry Beaudry
258 (3301) REINFORCEMENT BARS Steve Grover (Materials and Road
SP2018Modify.doc Created October 20, 2017Revised by CO Special Provisions on 05/18/18 Page 16
MODIFICATIONS TO SP2018 BOOK
SP2018NUNBE
RDATE OFACTION TITLE OF SECTION
ACTION (REVISED, NEW OR
DELETED)OWNER/AUTHOR OF
SECTION.
PERSON WHO REQUESTED
ACTION
Research)
259 (3302) DOWEL BAR Maria Masten (Concrete)