Southwest Florida Freight Summit
October 8, 2015
Ellen LindbladDirector, Planning & Environmental Compliance
Lee County Port Authority
Lee County Port Authority
The Lee County Port Authority (LCPA) operates both Southwest Florida International Airport and Page Field in Fort Myers, Florida
The LCPA operates as an enterprise fund with revenue generated from airport operations
No ad valorem (property) tax dollars support the airport operations or construction
Sources of revenue include the rents and fees from our tenants, passenger facility charges (PFC), and Federal Aviation Administration (FAA), Florida Department of Transportation (FDOT) and Transportation Security Administration (TSA) grants
Southwest Florida International Airport
The terminal opened on September 9, 2005. The complex is 798,000 sq. ft and includes 28 gates with expansion to 65 gates This facility cost $438 million and was paid for by revenues from our tenants and grants from
federal and state resources. It was the largest public works project in Lee County history.
Southwest Florida International Airport (RSW)
RSW is responsible for ensuring the infrastructure and air service to meet the air transportation needs of the local five county area:
Charlotte, Collier, Glades, Hendry and Lee
Air Trade Area
RSW Provides Nonstop Service to 47 DestinationsMarket Additions 2015/2016• Atlanta
(additional carrier)
• Cancun, Mexico(starting October 2015)
• Chicago-O’Hare(additional carrier)
• Cincinnati(additional carrier)
• Cleveland(additional carriers)
• Dallas-Love(starting January 2016)
• Latrobe• Houston-Hobby• Philadelphia
(additional carrier)
• San Juan, Puerto Rico• Havana, Cuba
(Choiice Aire November2)
Foreign Trade Zone (FTZ)
RSW’s entire property is a designated FTZ
In 2014 RSW Had it’s Second Best Year in the 31-Year History of the Airport
Source: LCPA Finance Department
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
5,2
07,2
12
5,2
77,7
08
5,1
85,6
48 5,8
91,6
68
6,7
36,6
30 7
,518
,169
7
,643
,217
8
,049
,676
7
,603
,845
7
,415
,958
7
,514
,316
7
,537
,745
7
,350
,825
7
,637
,801
7
,970
,493
Pa
ss
en
ge
rs
Years
Passenger Totals 2000 - 2014
RSW Freight Totals
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 20140
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
31,676,009
32,430,896
32,259,743
31,313,537
33,026,324
38,473,708
40,768,711
39,562,378
33,787,844
33,660,987
34,168,191
32,539,320
33,830,747
32,156,880
33,469,950
Freight Totals 2000 - 2014
Po
un
ds
Years
2014 Top 10 Carriers at RSW
Freight (lbs)
FedexUPSAir BerlinSouthwest Airlines Delta Air LinesUnitedUS AirwaysAmerican AirlinesRepublicShuttle America
Fedex15,550,866
UPS10,398,923
Air Berlin6,311,870
Terminal Access Road Expansion Rehabilitation of Roads Parallel Runway Program
ARFF/Apron Project Completed Air Traffic Control Tower Parallel Runway
RSW Future Projects
300 acres zoned for non-aviation development 240 acres zoned for future aviation development
RSW Future Skyplex Development
Rail Feasibility Study for RSW Study the feasibility of a rail
connection between RSW to the proposed Florida Fuel Connection Facility in Clewiston for the shipping of aviation fuel
Study the feasibility of a rail connection between RSW to Seminole Gulf Rail in Lee County
Evaluate cost for ROW, environmental etc.
MPO Coordination
Thank You