Southsite Green - Team 5

18
April 10 through 12, 2014 Study Area C - Team 5 Study Area A Study Area B Study Area C - Team 5 http://www.southsidegreen.com Contributors Dina Klavon David Himes Carla Lukehart Jon Stilan Brad Palmisiano Robert Arnold Jim Segedy Janice Serra Brandon Vatter Carolyn Dimmick

Transcript of Southsite Green - Team 5

  • 1. April 10 through 12, 2014 Study Area C - Team 5 Study Area A Study Area B Study Area C - Team 5 http://www.southsidegreen.com Contributors Dina Klavon David Himes Carla Lukehart Jon Stilan Brad Palmisiano Robert Arnold Jim Segedy Janice Serra Brandon Vatter Carolyn Dimmick

2. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Spring Flows Existing Conditions 3. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Spring Flows Existing Conditions 4. April 10 through 12, 2014 Study Area C - Team 5 Dry Weather Flows Lower South Side Park to Mission Street Drainage Area (24 hour Post Rain Event) Measured Flow 1. Mid-Quarry Field Flow 20 gpm 2. End Quarry Field Flow 10 gpm 3. Upper Steps Flow 10 gpm 4. Upper Rink Flow 20 gpm 5. Mid Rink Flow 15 gpm Minimum: 80% - 90% into combined sewer Potential: $30 $40 million gal/year [@ $0.37/gallon = $11.1million - $14.8 million in savings http://www.southsidegreen.com 5. April 10 through 12, 2014 Study Area C - Team 5 Site Community Amenities http://www.southsidegreen.com Pond / interactive water features Trails Wayfinding Lighting Trail / walkway delineation Education / interaction Benches Permeable paving Bike access Public art / partnerships Boardwalk Railroad trestle entryway Grove of honor 6. April 10 through 12, 2014 Study Area C - Team 5 Site Plan http://www.southsidegreen.com 7. April 10 through 12, 2014 Study Area C - Team 5 Site Plan http://www.southsidegreen.com 8. April 10 through 12, 2014 Study Area C - Team 5 Site Plan http://www.southsidegreen.com 9. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Cascading Pools Along Renziehausen Run 10. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Waterfall Between Ponds 11. April 10 through 12, 2014 Study Area C - Team 5 Site Plan http://www.southsidegreen.com 12. April 10 through 12, 2014 Study Area C - Team 5 Site Plan http://www.southsidegreen.com 13. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Gateway 14. April 10 through 12, 2014 Study Area C - Team 5 Site Plan http://www.southsidegreen.com 15. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Stream Bed with Path 16. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Renziehausen Run 17. April 10 through 12, 2014 Study Area C - Team 5 Retention Areas Upper Primary 36,000 cu ft Upper Secondary 11,000 cu ft Middle Primary 34,000 cu ft Middle Secondary 9,000 cu ft Lower Primary 19,800 cu ft Lower - Secondary 9,000 cu ft Total Retention 118,800 cu ft http://www.southsidegreen.com 18. April 10 through 12, 2014 http://www.southsidegreen.com Study Area C - Team 5 Potential Management Area Future Expansion