SOUTH YARRA (EASTERN PORTAL) PRECINCT
Transcript of SOUTH YARRA (EASTERN PORTAL) PRECINCT
![Page 1: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/1.jpg)
SOUTH YARRA (EASTERN PORTAL) PRECINCT
COMMUNITY REFERENCE GROUP
1 DECEMBER 2020
![Page 2: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/2.jpg)
PROGRAM
![Page 3: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/3.jpg)
CONSTRUCTION PROGRESS
RIA
![Page 4: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/4.jpg)
PROGRESS UPDATE
CYP
![Page 5: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/5.jpg)
CONSTRUCTION LOOKAHEAD FOR 2020
Around the clock Monday to
Friday and from 7am to3pm on Saturday
24/7
![Page 6: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/6.jpg)
CONSTRUCTION UPDATE - CYP
![Page 7: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/7.jpg)
TUNNELLING UPDATE
– All oversized pieces of the TBMs have now been returned to site on St Kilda Road
– 24/7 works continue in the retrieval shaft to facilitate the retrieval of each of the TBM gantry pieces, which will be pulled back through the completed eastbound tunnel.
– All of TBM Millie’s gantry pieces have been returned to the station box, with XX of TBM Alice’s gantry pieces still to be retrieved
– The gantry crane will be used to pick up and turn the pieces around before they are pulled back through Millie’s completed tunnel.
– CYP team will breakthrough shaft wall into RIA site in December
[caption]
Picture to go here
![Page 8: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/8.jpg)
CROSS PASSAGE UPDATE
– Preparatory works for cross passage construction are underway from the Eastern Portal and will continue into next year
– This includes mobilising working platforms, grouting to improve ground conditions, and installing supporting structures for the excavation
– There are six cross passages located between Anzac Station and the Eastern Portal, with excavation on these set to commence in early 2021
– Works to facilitate the cross passage construction will operate out of Eastern Portal
[caption]
Picture to go here
![Page 9: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/9.jpg)
9
CYP EASTERN PORTAL LOOKAHEAD
*Subject to confirmation
• Cross passage construction ongoing until
mid 2021
• Tunnel fit out works will continue between
2021 and 2023
• William Street will be reopened late 2022
• Shaft build-out and Mechanical and
Electrical building construction from late
2021 until mid-2023
• Final fit-out, landscaping and roadworks
early-mid 2023
• Handover/completion mid-late 2023
![Page 10: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/10.jpg)
INTERIM DESIGN UPDATE- CYP
![Page 11: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/11.jpg)
OVERVIEW
11
• Draft development plans were available for public display and comment
from Friday 6 April to Friday 27 April 2018.
• Across the two portals (Eastern and Western) there were 22 submissions
received. Seven of these provided comments on the Eastern Portal
Development Plan
• Feedback was also received from the Design Review Panel, including the
Office of the Victorian Government Architect
![Page 12: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/12.jpg)
DEVELOPMENT PLAN REFRESHER
12
![Page 13: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/13.jpg)
LANDSCAPE AND PUBLIC REALM
13
![Page 14: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/14.jpg)
LANDSCAPE AND PUBLIC REALM
14
![Page 15: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/15.jpg)
ACCESS BUILDING DESIGN
15
****
![Page 16: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/16.jpg)
INTERIM DESIGN - CYP
16
![Page 17: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/17.jpg)
FOOTPRINT REDUCTION EVOLUTION
17
![Page 18: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/18.jpg)
FOOTPRINT REDUCTION EVOLUTION
18
![Page 19: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/19.jpg)
BUILDING AT DEVELOPMENT PLAN
19
![Page 20: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/20.jpg)
NEW LAYOUT
20
![Page 21: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/21.jpg)
COMPARISON
21
![Page 22: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/22.jpg)
22
![Page 23: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/23.jpg)
VIEW TOWARDS TOORAK ROAD
23
![Page 24: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/24.jpg)
VIEW FROM TOORAK ROAD
24
![Page 25: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/25.jpg)
25
![Page 26: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/26.jpg)
OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN
PLAN SHOWING COMBINDED CYP & RIA PUBLIC REALM DESIGNS
LEGEND
TBM
RETRIEVAL
SHAFT
OSBORNE
STREET
BRIDGE
OSBORNE STREET
SANDRINGHAM LINE
AREA SUBJECT TO CHANGES
AS PART OF POSSIBLE FUTURE
SUBSTATION AMENDMENT
CYP/ RIA
BOUNDARY
![Page 27: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/27.jpg)
OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN
LEGEND
AREA SUBJECT TO CHANGES
AS PART OF POSSIBLE FUTURE
SUBSTATION AMENDMENT
TBM
RETRIEVAL
SHAFT
OSBORNE STREET
SANDRINGHAM LINE
LAG - Lagerstroemia indica
x L. Fauriei, Crepe Myrtel
(4m x 4m)
BAS – Banksia Serrata,
Old Man Banksia
(5m x 4m)
CFFF – Corymbia Ficifolia
‘FairyFloss’
(6m x 4m)
EUM – Eucalyptus Melliodora,
Eucalyptus ‘Beardsell Pink’
(8m x 7m)
ACI – Acacia implexa,
Lightw ood
(8m x 7m)
EMLS – Eucalyptus Mannifera
‘Little Spotty’
(8m x 7m)
SELECTED TREE PLANTING IMAGES
![Page 28: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/28.jpg)
OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN
AREA SUBJECT TO CHANGES
AS PART OF POSSIBLE FUTURE
SUBSTATION AMENDMENT
OSBORNE STREET
SANDRINGHAM LINE
SELECTED TREE PLANTING IMAGESLEGEND
CFFF – Corymbia Ficifolia
‘Fairy Floss’
(6m x 4m)
EMLS – Eucalyptus
Mannifera ‘Little Spotty’
(8m x 7m)
PCC – Pyrus calleryana
‘Cleveland Select’
(11m x 6m)
![Page 29: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/29.jpg)
OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN
OSBORNE STREET
SANDRINGHAM LINE
SELECTED TREE PLANTING IMAGES
LEGEND
CFFF – Corymbia Ficifolia
‘Fairy Floss’
(6m x 4m)
EMLS – Eucalyptus
Mannifera ‘Little Spotty’
(8m x 7m)
PCC – Pyrus calleryana
‘Cleveland Select’
(11m x 6m)
![Page 30: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/30.jpg)
COMMUNITY & COMMUNICATIONS UPDATE
![Page 31: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/31.jpg)
COMMUNICATIONS
– The December construction update has been delivered to residents and businesses and is also available online
– Update also includes information about a short 24/7 rail occupation involving works around South Yarra station and along the corridor to Chapel Street
Recent and upcoming communications
![Page 32: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/32.jpg)
ENVIRONMENTAL MANAGEMENT
![Page 33: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/33.jpg)
AIR QUALITY MONITORING
William Street
October 2020
PM10
![Page 34: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/34.jpg)
AIR QUALITY MONITORING
William Street
October 2020
PM2.5
![Page 35: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/35.jpg)
NOISE MONITORING
William Street
October 2020
![Page 36: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/36.jpg)
VIBRATION MONITORING
Eastern Portal
October 2020
![Page 37: SOUTH YARRA (EASTERN PORTAL) PRECINCT](https://reader031.fdocuments.net/reader031/viewer/2022013009/61ce3c34f174b120247c02ff/html5/thumbnails/37.jpg)
Questions?