SOUTH SUDAN - Upper Nile State, Maban County For ... · Vi lage Air strip Camp infrastructure Other...

1
Jamhur primary school Kukuli Darfur 1 & 2 Samari 3 Chali 2 Mayak 1 Samari 2 Chali 1 Mugum Dindiro Balila Dawala Samari 1 Soda Benamayu 1 Wego Anyile Yabus Dereng Jindi Kilgo Borfa Jabel Morufa Kernkan Mayak 3 Benamayu 2 Jeigo Wadaga Belatuma Baldugu Agadi Tongo Kolnugura Bee Samari 4 Surkum Mayak 2 Zariba Balila Gabanite SOUTH SUDAN - Upper Nile State, Maban County Note: Data, designations and boundaries contained on this map are not warranted to be error-free and do not imply acceptance by the REACH partners, associates, donors or any other stakeholder mentioned on this map. Satellite Acquisition Date: 24/06/2016 by Digitalglobe. Provided by: UNOSAT Data sources: REACH (2017) Coordinate System: GCS WGS 1984 File: REACH_SSD_Map_UNHCR_Doro_LatrineFill_18Apr17 Contact: [email protected] ² Doro Refugee Camp - Latrine fill level - April 2017 For Humanitarian Purposes Only Production date: 18 April 2017 Camp infrastructure Other camp features ! \ Juba Maban Latrine fill level

Transcript of SOUTH SUDAN - Upper Nile State, Maban County For ... · Vi lage Air strip Camp infrastructure Other...

Jamhurprimaryschool

Kukuli

Darfur1 & 2

Samari 3

Chali 2

Mayak 1

Samari 2

Chali 1Mugum

DindiroBalila Dawala

Samari 1

Soda

Benamayu 1

Wego

Anyile

Yabus

Dereng

Jindi

Kilgo

Borfa

Jabel MorufaKernkan

Mayak 3

Benamayu 2

Jeigo

Wadaga

Belatuma

Baldugu

Agadi

Tongo

Kolnugura

Bee

Samari 4

Surkum

Mayak 2 Zariba

Balila

Gabanite

SOUTH SUDAN - Upper Nile State, Maban County

Note: Data, designations and boundaries contained onthis map are not warranted to be error-free and do notimply acceptance by the REACH partners, associates,donors or any other stakeholder mentioned on thismap.

Satellite Acquisition Date: 24/06/2016 by Digitalglobe.Provided by: UNOSATData sources: REACH (2017)Coordinate System: GCS WGS 1984File: REACH_SSD_Map_UNHCR_Doro_LatrineFill_18Apr17Contact: [email protected]

²Doro Refugee Camp - Latrine fill level - April 2017

0 0,5 1km

For Humanitarian Purposes Only Production date: 18 April 2017

1/4 Full or les sFull (w ithin 0.5m of the top)Half full (More than ¼ full – nearly full)

ClinicMarketDis tribution s iteSchool

Road w ith murramAs ses sed villageVillageAir s trip

Camp infrastructure Other camp features

!\Juba

C.A.R.

Ethiopia

Kenya

Sudan

UgandaD.R.C.

Maban

Bee

Latrine fill level