South King & Pierce Cooperation
description
Transcript of South King & Pierce Cooperation
![Page 1: South King & Pierce Cooperation](https://reader036.fdocuments.net/reader036/viewer/2022062520/568161b2550346895dd17842/html5/thumbnails/1.jpg)
South King & Pierce Cooperation
![Page 2: South King & Pierce Cooperation](https://reader036.fdocuments.net/reader036/viewer/2022062520/568161b2550346895dd17842/html5/thumbnails/2.jpg)
Cooperative Objectives
Comply with standards1. WAC 296-800-16005, 10 & 152. WAC 296-305-02001
a. NFPA 1851
Optimize PPE performance withinbudget constraints
Establish an evidence-based standard
Drive reform in turnout manufacturing
![Page 3: South King & Pierce Cooperation](https://reader036.fdocuments.net/reader036/viewer/2022062520/568161b2550346895dd17842/html5/thumbnails/3.jpg)
Historical
![Page 4: South King & Pierce Cooperation](https://reader036.fdocuments.net/reader036/viewer/2022062520/568161b2550346895dd17842/html5/thumbnails/4.jpg)
• Phase One “User Satisfaction”– Break In– Primary Set
• Real incidents/drills• One “month” operations
– Secondary Set• Ten specified workouts
• Evaluations– 20 Dimensions each for
coat and pants• Summarized as a
percentage of satisfaction
74%
![Page 5: South King & Pierce Cooperation](https://reader036.fdocuments.net/reader036/viewer/2022062520/568161b2550346895dd17842/html5/thumbnails/5.jpg)
Phase Two “Head to Head”– Six CPAT-based stations
executed in all turnouts sequentially• Tailboard step• Stairclimb• Ceiling pull• Crawl• Lift and drag• Ladder manipulation
Choose the highest performing ensemble.