South King & Pierce Cooperation

5
South King & Pierce Cooperation

description

South King & Pierce Cooperation . Cooperative Objectives. Comply with standards WAC 296-800-16005, 10 & 15 WAC 296-305-02001 NFPA 1851 Optimize PPE performance within budget constraints Establish an evidence-based standard Drive reform in turnout manufacturing. Historical. - PowerPoint PPT Presentation

Transcript of South King & Pierce Cooperation

Page 2: South King & Pierce Cooperation

Cooperative Objectives

Comply with standards1. WAC 296-800-16005, 10 & 152. WAC 296-305-02001

a. NFPA 1851

Optimize PPE performance withinbudget constraints

Establish an evidence-based standard

Drive reform in turnout manufacturing

Page 3: South King & Pierce Cooperation

Historical

Page 4: South King & Pierce Cooperation

• Phase One “User Satisfaction”– Break In– Primary Set

• Real incidents/drills• One “month” operations

– Secondary Set• Ten specified workouts

• Evaluations– 20 Dimensions each for

coat and pants• Summarized as a

percentage of satisfaction

74%

Page 5: South King & Pierce Cooperation

Phase Two “Head to Head”– Six CPAT-based stations

executed in all turnouts sequentially• Tailboard step• Stairclimb• Ceiling pull• Crawl• Lift and drag• Ladder manipulation

Choose the highest performing ensemble.