SOP TITLE NO. REb’. EMERGENCY EOUIPMENT INVENTORY A · The inventory of Emergency Equipment is...

111
a. ,. / \ TRAINING RECORD SOP TITLE SOP NO. REb’. NO. EMERGENCY EOUIPMENT INVENTORY 620 005 A 0 The trainees must sign below to show agreement with the following statement THE SOP DESCRIBEDABOVE HASBEEN EXPLAINEDTOME,AND~ FULLYUNDERSTANDALLTHATIS REQUIREDOFMETOCOMPLYWITHITSREQUIREMENTS. NAME SIGNATURE POSITION / DEPARTMENT DATE Name of Trainer: (Block Capitals) Signature of Trainer: Date: For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:15:32:27

Transcript of SOP TITLE NO. REb’. EMERGENCY EOUIPMENT INVENTORY A · The inventory of Emergency Equipment is...

a.

,. / \

TRAINING RECORD

SOP TITLE SOP NO. REb’. NO.

EMERGENCY EOUIPMENT INVENTORY 620 005 A 0

The trainees must sign below to show agreement with the following statement

THE SOP DESCRIBEDABOVE HASBEEN EXPLAINEDTOME,AND~ FULLYUNDERSTANDALLTHATIS REQUIREDOFMETOCOMPLYWITHITSREQUIREMENTS.

NAME SIGNATURE POSITION / DEPARTMENT DATE

Name of Trainer: (Block Capitals)

Signature of Trainer: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: Emergency Equipment

SOP Page 1 of 3

620.00 1 Effective Date: Revision No: J, Date: 08 o’, 00 . _. Prev Rev No: 0 Dated: 2S.ll.YX

1.0 PURPOSE

To describe the component parts of SIFA emergenby response equipment and define the maintenance / testing regime necessary to ensure operational readiness.

2.0 PROCEDURE

2.1 EMERGENCY RESPONSE EQUIPMENT

The overall structure of emergency response equipment is shown below. The list of emergency equipment, together with the test/maintenance frequency is summarised in Attachment I.

EMERGENCY RESPONSE EOUIPMENT

I DETECTION

Fire AlarmSystem Gas Detection System

AUTOMATIC RESPONSE (Sprinklers)

MANUAL RESPONSE

MOBILE SYSTEMS

r I I I I Safety Shower Foam Canon Fire Response Spill Response First Aid

Eye Wash Foam Tank First Aid Boxes Water Tank Stretchers

High Pressure Hydrant Blankets

I Mobile pump Spill kits

‘Ozde” Monitor Gas tight suits B.A. Sets

24Vayradio DSX Units TO&ES

HOSES

pEik?q

.

Written & Reviewed By:

Cieran Hill safety Systems Engineer

late:

*

Approved By: Read By: Read By:

John O’Donoghue Ger Kennedy Mike Raddan S&E Manager Maintenance Engineer ERT Leader

‘Date: Date: Date: --

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY & ENVIRONMENTAL PROCEDURE

DTLE: Emergency Equipment

SOP Page 2 of 3

620.001 Effective Date: Revision No: 1 Date: 08 07 00 -. . Prev Rev No: 0 Dated: 2511.98

2.2 Detection Systems

Fire Alarm Fire alarm system is installed and maintained by external contractor (Champion Preussag,

as of Feb 2000). The audibility and functionality is checked on a monthly basis, 1s outlined . in SOP 620.006. The results are recorded in Attachment I1 to SOP 620.006.

2.3 Gas Detection

Gas/vapour detection systems are installed in SPU (hydrogen), chiller plant (ammonia). These units are calibrated every six months, by external agent (Respro as at 19 Jan2000).

Records are kept by Maintenance Dept.

2.4 Automatic Response: The following areas are protected by sprinklers:

BPC Warehouse Pharma Pharma warehouse.

The sprinkler system is maintained annually by external agent (Provincial sprinklers as at 19 Jan 2000). The records are kept by Maintenance Dept. Upon activation of a

;prinkler head, the flow is detected by a flow alarm. This triggers the site fire alarm ;ystem. Weekly checks are performed to ensure the functionality of the flow alarms in Pharma, BPC and Bay 130 and warehouse respectively. Records of these :hecks are kept by Maintenance Dept.

2.5 h4anual Response

Manual response systems are divided into two categories, fixed systems and mobile systems which may be deployed anywhere throughout the sites. The structure of the response to an emergency situation is set out in the Emergency Plan (ref. SOP 620.004). The duties of the Emergency Response Team (fire crew) are set out in Emergency Response Team Duties (SOP 620.003).

2.6 Fixed systems: The foam canon system is comprised of the following: Foam canon #l Foam canon #2 Foam concentrate tank Water tank High pressure hydrant

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY & ENVIRONMENTAL PROCEDURE SOP Page 3 of 3

TITLE: Emergency Equipment 620.00 I Effective Date: Revision No: j Date: OS 02 00 - Prev Rev No: 0 Dated: XII.98

2.7 Mobile Systems

Mobile response equipment may be divided into three categories: Fire response, Spill response, First aid. The main components are summarised below. The maintenance frequency is outlined in Attachment I. The specific C~CCI~S by the ERT Leader are recorded in Attachment II.

Fire Response: Spill Response First Aid Mobile pump Spill kits First aid kits Ozzie monitor Drainblockers Eye wash units B.A. sets Gas tight suits Safety showers Mobile foam canon Splash suits Stretchers 2-way radios Blankets DSX units Torches Hoses Hose reels Fire extinguishers

The inventory of Emergency Equipment is contained in SOP 620.005 ‘Emergency Equipment Inventory’.

2.8 The contents of first aid kits are checked on a monthly basis against the list of recommended coIltents. Any necessary items are replaced. The results are recorded on

Attachment III to this SOP. It is the responsibility of each Department Manager to ensure that the check is performed monthly. A list of locations of first aid kits and Department responsibility for their maintenance is given below.

First Aid Kit Location Department Responsible Reception EHS NPD Lab BPC Wet Chemistry Lab QC BPC Office BPC Bay 130 Office BPC Warehouse Materials & Logistics Jeep Materials & Logistics Pharma Pharma SIFA W6rkshop Maintenance .I

C&K Workshop C&K Canteen Corporate Catering Services.

2.9 Safety showers and eye wash units are checked on a weekly basis. The results are recorded in Attachment IV. In BPC and Bay 130, the checks are performed daily

as outlined in SOP 209.104.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

REWISION LOG

SOP TI?ZE: Emergency Equipment SOP NLTMBER: 620.00 I

REVISION NO. REQUESTED REASON FOR REVISION EFFECTIVE BY: DATE

0 KH New SOP 2x.0 I .w

1 KH Update emergency response eqt~ipmcn~ chart.

Expand section 2.8 first aid kit location. Updates 10 artacl~nents.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SOP RECEItil’ CONFIR2MATION

SOP TITLE: Emergency Equipment

I acknowledge receipt of the above SOP.

For All Co.vies Excevt 0.A Master Co.vy:

I have destroyed (returned in the case of BMI’s and CPsd) the superseded revision of the SOP.

Signed: Department:

, . ‘: :

: . ,

I i

.

.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY PROCEDURE Page I of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

1.0 PURPOSE The purpose of the Emergency Plan is to describe the procedures to be followed and the roles and responsibilities of key personnel in the event of a Major or Catastrophic incident on the main SCHWARZ PHARMA Limited site, or in Bay 130.

DEFINITIONS l Localised Incident - Localised effect Zone, limited to single plant area which can

be dealt with by local personnel a Major Incident - Medium effect Zone limited to site boundaries. e Catastrophic Incident - Large effect zone, off site effects on surrounding community.

The Emergency Plan provides for a coordinated response to Emergencies arising from: l Fires l Explosions l Spillage of dangerous substances l Toxic Gas releases l Transportation Accidents l Any other incident which warrants the activation of the Emergency Plan.

2.0 PROCEDURE 2.1 Despite the best efforts of SCHWARZ PHARMA Limited to safely manage hazardous

chemicals and processes incidents may occur that require an Emergency Response in order to prevent escalation and to mitigate the consequences of an Emergency should one occur.

2.2 SCHWARZ PHARMA Limited’s Emergency Plan provides a blueprint for the actions to be taken during an emergency.

2.3 The plan itself is broken down into two sections namely:

II Written By : Approved By: Approved By:

Donal Mullins, Safety & Health Officer.

Fiona Walsh, HRLSafety Mgr.

Bernie Harten, General Mgr.

Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY PROCEDURE Page 2 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: I Date: 01.04.03

2.4 l Phase I -This section describes the roles and responsibilities of personnel involved in

the immediate on site response to the Emergency e.g. Site evacuation, Search and Rescue, Fire Fighting and Spill Response.

l Phase II - This section describes the roles and responsibilities of personnel in the event that the emergency escalates to a point where it has off site implications. It describes the roles of those involved in the factual and timely communication of emergency information to emergency services, statutory bodies, neighbours, employees and their relatives, the public and the media E.g. Media Control, Phone Groups. It also includes Environmental Monitoring beyond the site boundary.

2.5 The Emergency Plan is issued as a controlled document under the normal site documentation procedures. The Attachments outlined below will be updated as necessary in the Emergency Manual by the Safety Specialist in order to reflect up to date on site conditions: l Attachment I = Maps and Drawings

l Attachment II = Emergency Telephone Numbers l Attachment III = Consequence Models

2:6

l Attachment IV = Incident Specific Responses

The Emergency Plan will be reviewed annually and updated as necessary to reflect changes in Emergency Personnel and site changes which impact on the Emergency Plan as identified by the site Change Control Procedure i.e.

l New processes l New Chemicals l New ‘Equipment or Facilities

2.7 The Emergency Plan will be tested on a three yearly fi-equency using desk top exercises in order to: . l Assess the functionality of the Plan l Identify deficiencies where apparent l Assess the Emergency Organisations response to a given scenario.

2.8 A copy of the Emergency Plan will be issued to all those directly involved in the Plan including the local emergency services.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY PROCEDURE Page 3 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

2.9 Copies of the Emergency Manual will be held in the following Locations:

2.10

2.11

A copy of this SOP will be sent to the Ennis Fire Station.

Information relating to Inventories of Chemicals held on site will be printed off automatically on a weekly basis from the SAP System and held in the QA & Support Services Admin Asst. offrce review as required in the event of an Emergency.

Following the occurrence of a Major on site Emergency, debriefing, medical support and counseling will be provided as necessary in order to provide the necessary support in the aftermath of an incident.

t

“ .

.’

“ . ; .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

Page 4 of 24 SAFETY PROCEDURE SOP

Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

The contents of the emergency plan are outlined as follows: SECTION SECTION TITLE PAGE

3.0 Emergency Response Phase I 5 3.1 Instructions for Incident Controllers G

3.1.1 Incident Controller 6 3.1.2 Deputy Incident Controller 7 3.1.3 Incident Recorder 7

3.2 Instruction for Evacuation Control Personnel Controllers 7 3.2.1 Evacuation Controller 7 3.2.2 Assembly Point Co-Ordinator 8

3.3 Emergency Response Team 9 3.3.1 ERT Leader 9 3.3.2 ERT Personnel 10

3.4 Security Officer Instructions 11 3.5 Site Co-ordinator 12 3.6 Personnel without specific duties 12 3.7 Visitors 13

4.0 Emergency Response Phase II 14 4.1 Phase II Response 14

4.1.1 Incident Management Team 15 4.1.2 Communications Group 16 4.1.3 Incident Control Group 17

a 4.1.4 Phone Group 18 4.1.5 Medical Treatment & First Aid 18 4.1.6 Morgue Facilities 18

4.2 Environmental Monitoring 18 4.2.1 Monitoring Instructions for Environmental Personnel 18

4.2.1.1 Air Monitoring 19 4.2.1.2 Monitoring and Control of Contaminated Water 20 4.2.1.3 Surface Water Monitoring 20 4.2.1.4 Ground Water Monitoring 20 4.2.1.5 Monitoring Equipment 20 *

5.0 Training Requirements for Emergency Personnel 21 6.0 Emergency Drills 21 7.0 Revision 22 Appendix 1 Prepared Media Response 22 Appendix II Standard Telephone Answers for Phone Group 22

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:27

SAFETY PROCEDURE

TITLE: EMERGENCY PLAN

3.0 EMERGENCY RESPONSE PHASE I The purpose of the Phase 1 Response is to:

Page 5 of 24

SOP Effective Date:

620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

l Describe the roles and responsibilities of personnel involved in the immediate on site response to the Emergency e.g. Site evacuation, Search and Rescue, Fire Fighting and Spill Response. The function of the Phase 1 response is to bring the Emergency under control as quickly as possible thereby preventing any escalation of the situation.

Site personnel are notified of an Emergency situation by the activation of the evacuation alarm, which is recognised as a loud continuous siren. The alarm can be raised automatically by Fire Detection Systems or manually through the activation of a break glass unit. Once an alarm is activated, all personnel must make there work areas safe and move directly to their nominated Assembly Points. Those personnel with specific duties in the Phase I response must move directly to their nominated positions as defined within the Emergency Plan. The details of specific personnel actions are outlined below:

Note 1: In the event of a Major Emergency situation in Bay 130 the Emergency Services

should be immediately called out as the ERT does not have capabilities to respond to an

Emergency situation in Bay 130. The on duty Incident Controller should Liase with the

Emergency Services and initiate a Phase II response if required.

.- . - _ _ __. . Deputy Incident

Controller and Recorder _... ..--__--_.

r -- -I- -._ IL ERT Team Leader I- ---. incident

.I

-T

Controller t--------,

,- -- III--- .- -.-.... ERT Team Security Officer Members :- ..----_ _____.--

: i

‘.

Assembly Point Co-ordi nator

t Evacuation Traffic Marshals

Co-Ordinator 4-F

7 - + _..

Muster List Co-ordinator

I

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

Page 6 of 24 SAFETY PROCEDURE SOP

Effective Date: TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04

Prev Rev No: 1 Date: 01.04.03

3.1 INSTRUCTIONS FOR INCIDENT CONTROLLERS 3.1.1 INCIDENT CONTROLLER

Incident, Controller Ranking Jon O’Halloran 1

Pat Quirke 2 Ger Kennedy 3 Peter Holly 4 Mary Shire 5

Following the activation of the Site Evacuation Alarm during normal working hours (08OOhrs - 1700Hrs, Mon - Fri) ail on site Incident Controllers must: (See Note 2 for Incident Controller outside Normal Working hours) 1. Move directly to the ERT Hut. 2. Assume responsibilities according to the agreed Ranking System. (See Note 3)

Note 2: The ERT Leader will assume the dual role of Incident Controller and ERT Leader if an emergency

situation arises outside of normal working hours. As such, he has full authority to use his judgement to make

decisions to bring an incident under control.

Note 3: The lowest number present will assume the position of Incident Controller and the next Ranked

person will assume the position of Deputy Incident Controller and the person ranked in the third position

should’assume the position of recorder

The nominated Incident Controller must:

1. Don the Incident Controllers High visibility vest.

2. Assume overall responsibility for the Emergency.

3. Identify the location of the EmergenCy.

4. Assume Radio-Communications with the ERT Leader and the Evacuation Controller.

5. Instruct the ERT Leader on the Actions to be taken while ensuring the following.

A) Safety of personnel.

B) Protection of the Environment.

C) Minimisation of damage to plant, buildings and stock.

D) Summoning of external emergency services as necessary

E) Communication with emergency services where necessary.

F) Maintenance of records relating to the incident.

G) The initiation of a Phase II Response. if deemed necessary. .’

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

SAFETY PROCEDURE

: i <’

Page 7 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Prev Rev No: I

Date: 01.03.04 Date: 01.04.03

3.1.2 DEPUTY INCIDENT CONTROLLER The Deputy Incident Controller will provide advice and technical back-up to the Incident Controller and to the Emergency Services when they arrive.

3.1.3 RECORDER The Incident Controller in the #3 position will assume the role of recorder in the event ot’ an evacuation. As recorder he/she must record all of Incident details including: l Times of events l Instructions given by the Incident Controller and Actions taken. All details must be recorded in the “Evacuation Efficiency Testing Log” which is located in the ERT Hut. The recorded details will provide a detailed history of the incident and the response.

3.2 INSTRUCTIONS FOR EVACUATION CONTROL PERSONNEL 3.2.1 EVACUATION CONTROLLER

Bvacuation Contaoller

Brian O’Connell

Deputy Evacuation Controller

Sandra Griffin

Following the activation of the Site Evacuation Alarm during normal working hours (0800hrs - 1700Hrs, Mon - Fri) the Evacuation Controller must:

r -_-_-._ _._-_. __ _._- .._._-_ No%4: The Security qfficer on duty will act as Evacuation Controller outside of normal working hours.

1. Proceed directly to Security, swiping out on the way and collect a radio.

2. Designate Traffic Marshals to block off the road into SCHWARZ PHARMA Limited at the main junction using traffic cones and instruct them to divert traffic as necessary in order to maintain clear access for emergency vehicles to the facility.

7.

3. Designate back up Assembly Point Counters if no counters are available.

4. Ascertain the status of the Assembly Point Counts with the Assembly Point Counters.

5. Once the counts are complete, inform the Incident Controller of any personnel that are unaccounted for.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

rlr

i’ c

SAFETY PROCEDURE Page 8 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

6. Note the names of any personnel requested to leave the assembly point to assist in the Emergency e.g. First Aiders, Emergency Fitter/Electrician etc and ensure that no other personnel leave their nominated assembly point.

7. Order the evacuation of the site if requeited by the Incident Controller. The groups should reassemble on the left hand side of the road, half the way up towards Tyco

8. Order stand down when incident is under control. This should be announced over the PA system. The silencing of almms must not be regkwded as the si,wwI to .s~~u~d down.

T CO-ORDINATORS

herdnns Admin Asst. I

Following the activation of the Site Evacuation Alarm, Assembly Point Co-Ordinators must: _e_.-_- _.-. -__--..-__- Note 5: The Site Co-ordinator or Security Officer will act as Counter outside of normal working hours ..-_--.. . ..-__.- .- . _-- . . -_-____-_-

1. Proceed immediately to the Security Hut, swiping out on the way and collect the Muster listings

2. Perform a roll call at their Assembly Point if necessary to do so.

3. Inform the Evacuation Controller of the count completion and inform him / her verbally of any

u,naccounted personnel.

4. Ensure all personnel stay at their respective Assembly Point, until the order is given to stand down +

by the Evacuation Controller. __ _.~ ___._,., -_ . .._ _ _ / If any persons critical to the Emergency Plan are planning to leave site they should check to

/ ensure their back up is on site. If no back up is available they should contact the Safety Specialist or in I I his absence the i-R/Safety Manager to ensure that alternative arrangements are put in place. I. ,.- .._ - -_-_-_- _. -. - _ . ._--. - ..

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

. .

Page 9 of 24 SAFETY PROCEDURE SOP

Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Prev Rev No: 1

Date: 01.03.04 Date: 01.04.03

3.2.3 MUSTER LIST CO-ORDINATOR

Muster List Co-Ordinator

Roisin Lievre

Deputy Co-Ordinator

Ger Kennedy

Following the activation of the Site Evacuation Alarm, the Muster List Co-Ordinator must: 1. Proceed immediately to the Security Hut.

2. Collect the Manual Site Count from the Security Officer.

3. Wait until ail personnel have clocked out and initiate a Printout of the muster list.

4. Distribute the Muster sheets to the necessary Assembly Point counters. ( The Muster List prints

by exception and hence only lists those who have clocked in but not clocked out)

5. The Muster List Co-Ordinator must take note of employees who have failed to clock-out.

6. The Muster List Co-Ordinator must complete a tally between the manual and electronic lists in

order to account for personnel who are not recorded on the electronic system and liase with the

Evacuation Controller as necessary in order to assist the timely completion of the count.

3.3 EMERGENCY RESPONSE TEAM INSTRUCTIONS 3.3.1 ERT LEADER

ERT Leader Deputy Leader Ciaran Reidy (Team 2) Mike Carmody Seamie O’Connell (Team 1) Gerry Gleeson Mike Reddan (Team 3) None

--. . ---. __.-- .-... ! Note 7: Due to the absence of a Deputy Leader on Team 3 it is necessary for Security to inform

I the Safety Specialist or in his absence the Site Co-ordinator if the an ERT Team Leader is not

L oresent on site so that an ERT Member mav be nominated as leader in his absence _._- _ ._-.. _.. _ _ ._

Following the activation of the Site Evacuation Alarm ERT Leaders must 1. Move directly to the ERT Hut

*

2. Don Fire Gear. 3. Obtain Radio (INormal communications on Channel I. Channel 2 may be usedfor ERT

Operatioris) 4. Assess the situation. 5. Agree appropriate action with the incident Controller. 6. Give the necessary instruction to ERT. 7. ‘Maintain communication with the Incident Controller. 8. Maintain control of ERT

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

,

SAFETY PROCEDURE Page 10 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

Note 8:

If it is assessed that the ERT membership available cannot deal with the situation and its gravity is such that

it requires an Emergency Response outside Emergency services must be called by the Incident Controller at

the request of the ERT Leader. If such an incident occurs outside normal working hours the ERT Leader

may contact outside Emergency services directly.

e I I Note 9:

l Information regarding the quantities of chemicals and their location as generated by the SAP System is

available at all times in the Security Hut for review by the Incident Controller or External Emergency

Services.

l Site Maps and Consequence Models may be found in the Attachments to the Emergency Manual

I Note 10:

If a Fire Fighting situation arises on site in which appreciable volumes of water are used, the ERT Leader

must direct ERT Members to:

l Commence operation of the Firewater Transfer Pump.

9 Confirm that main sprinkler valve supplying the effected building is fully open.

l Confirm operation of the Diesel Pump.

I . . Confirm the fuel level in the pump and refill if necessary.

3.3.2 ERT PERSONNEL

Following the activation of the Site Evacuation Alarm ERT Personnel must

I. Make safe their job and proceed directly ERT Hut.

2. Don their Fire Fighting Gear

3. Move Portable Pump and the Fire Trolley onto the roadway.

4. Await Instructions from ERT Leader.

5. Follow the Instructions given by the ERT Leader

6. Provide assistance to the Fire Brigade if required and take instructions from the Officer in Charge.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

SAFETY PROCEDURE Page 11 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Prev Rev No: I

Date: 01.03.04 Date: 01.04.03

3.4 SECURITY OFFICER INSTRUCTIONS Following the activation of the Site Evacuation Alarm the Security Officer must 1. Ensure the barrier is down and nobody enters or leaves the site except outside Emergency

Services.

2. Print off the site Evacuation Count after 4 minutes (in the absence of the Muster Co-Ordinator)

a 3. Distribute Evacuation counts to Assembly Point Co-Ordinators. (in the absence of the Muster Co-Ordinator)

4. Ensure that clear passage is available for Emergency services into the facility. Order the movement of trucks or cars as necessary and liaise with Traffic Marshals.

If the evacuation occurs outside normal working hours the Site Co-ordinator or Security Officer must. 1. Proceed to assembly point with a radio and the Muster List and perform the roll call.

2. Perform roll call of ERT in ERT Hut

3. If any persons are missing inform the ERT Leader by radio.

4. Return to Security.

Note 11:

Following stand down the Security Officer on duty must l Confirm that all doors have been Re-Magnetised. l Print off a second Muster List and check it against the manual list to ensure that all

employees have swiped back in. Employees who have failed to swipe must be notified and requested to swipe in.

Note 12:

Bav 130 Provision,

If an alarm activates in Bay 130 outside of normal working hours the Security Officer on duty must contact the Group 4 Mobile Unit and request them to carry out an inspection of the Bay. The Site Co-ordinator must be informed of the alarm situation and depending on the findings of the Group 4 Inspection a response must be initiated as necessary.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

SAFETY PROCEDURE Page 12 of24

SOP Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

3.5 Site Co-ordinator

Following the activation of the Site Evacuation Alarm the Site Co-ordinator must: 1. Proceed in an orderly fashion to his Assembly Points swiping out on the way.

2. Outside of normal working hours he must assume the role of Evacuation Controller if required.

Note 13:

The Site Co-ordinator is the senior site representative outside normal working hours and as such has the Authority to assume responsibility for the site in the event that an incident occurs, until the arrival of senior management on site

3.6 PERSONNEL WITHOUT SPECIFIC EMERGENCY DUTIES

Following the activation of tlie Site Evacuation Alarm all personnel without specific Emergency Response duties including SCHWARZ PHARMA Limited Employees, Contractors and Truck Drivers must.

1. Make their job safe

2. Proceed in an orderly fashion to the Assembly Points (located in the main Car Park). SCHWARZ

PHARMA Limited Employees and contractors with Swipe cards should swipe out on the way.

The Assembly Points are clearly marked by placards on the fence wall.

3. Persons should remain quiet to facilitate effective roll call by Assembly Point Co-Ordinators

4. Persons must remain there until they are given the order to stand down.

3.7 VISITORS

1. Following activation of the alarm Visitors should be directed to their appropriate assembly point

by their SCHWARZ PHARMA Limited contact.

2. Visit&-s must remain there until they are given the order to stand down

’ :

:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

SAFETY PROCEDURE Page 13 of 24

SOP Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Prev Rev No: I

Date: 01.03.04 Date: 01.04.03

4.0 EMERGENCY RESPONSE PHASE II The purpose of the Phase II Response is to:

Describe the roles and responsibilities of personnel in the event that the emergency escalates to a point

where it has off site implications. It describes the roles of those involved in the factual and timely

communication of emergency information to emergency services, statutory bodies, employees. the public

and the media. e.g. Media Control, Phone Groups, Environmental Monitoring

PHASE II INCIDENT MANAGEMENT ORGANISATION STRUCTURE

.._-_----. -._-. _. .., Medical Centre

& Morgue Environmental

Monitoring Media / Neighbours

Incident Control : 4-j’ Communications

Group

H.S.A I EPA I County Council ISchwarz I Phone Group

/- Services j Team : Insurance Coinpanies

_ ,___ _.-._.--- __--.- -- -- *

‘a

External Phone Calls

%&dent Communications Phone Group Incident Control Support Services l&kagement Group Group

Group B. Harten K. McCauley A. Loughnane ERT Leader L. Maloney (Env. Monitoring)

M. Shire M. Dohmann S. McCarthy ERT Team S. McAleer (Env. Monitoring)

S. Burke M. Kenny G. Alfred Safety Specialist M. O’Brien (WWTP Operation)

F. Martin Fiona Walsh M. Casey P. Quirke G. Kennedy ( Engineering)

R. Lewis S. McAleer R. Lievre Incident controllers B. Shine (Engineering) ~

D. Mullins K. Lynch (Pharma Engineering)

I. Wills U. McCarthy (Medical)

Interchange ofpersonnel may be necessary depending on resource availability in the event qf an emergency.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

SAFETY PROCEDURE

TITLE: EMERGENCY PLAN

SOP Effective Date:

620.004 Revision No: 2 Prev Rev No: 1

Date: 01.03.04 Date: 01.04.03

1.1 PHASE II RESPONSE 1. A Phase IT response may only be initiated by the Incident Controller.

2. Once the Phase II response has been initiated all Phase II Incident Response Personnel must report to their designated locations.

ei 3. Given the overlap between the Incident Management Group and the Incident Control Group all controllers not directly involved in the Incident must report to the General Managers Office.

-___ _____,__ -- ____ --._

NOTE 14: If an Emergency Incident occurs outside normal working hours members of the Emergency Management Team will be called by the Site Co-ordinator to provide for the Phase II Response. If there is imminent danger to neighbouring companies they must be notified by the Site Co-ordinator of that danger. The Communications Group will make other calls to the media and government agencies once they arrive on site

_---__-..--. -. ._ _ _ _ .

The function of each grouping within the Phase II Management Team may be summarised as follows:

4.1.1 INCIDENT MANAGEMENT GROUP

In&@&t Management / Technical Group (Primary Location:- General Mgrs office - ~~~,istPatio~Biliiding),

I) _ B. Harten M. Shire S. Burke F. Martin P. Quirke R. Lewis D. Mullins I. Wills Note 15: The Incident Management Organisation will locate itself in the Administration Building 1 however if the incident escalates to a point where it is unsafe to use the Administration Building the / + Phase II Organisation will transfer to Bay 130 The function of the Incident Management Group is: 1) To keep in contact with the Incident Control to determine how the incident is progressing.

,

2) To provide the Incident Controller with Technical Assistance relating to the incident.

3) To provide necessary technical information relating to the incident to Communications Group, as it becomes available.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

I. Page IS of 24

SAFETY PROCEDURE SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

4) To initiate Environmental Monitoring and response where necessary (See Section 4.2)

5) To communicate with external Agencies and Schwarz Pharma where necessary.

6) To deal with external calls transferred to them by the Phone Group.

e Emergency Room Requirements for the Incident Management Team

1) Copy of Emergency plan

2) Internal telephones

3) Map of Shannon

4) List of personnel addresses and contact numbers.

5) Two way radio

4.1.2 COMMUNICATIONS GROUP Cor#,i@cations Group (Primary Location:- Video Conference Room - Administration Building) K. McCauley F. Walsh S. McAleer M. Dohmann M. Kenny

The function of the Communications Group is:

1) To inform neighbours of the incident, the nature of the hazards involved and the emergency actions need to be taken as outlined by the Incident Management Group (See Attachment II of Emergency Ma.nual for Emergency Telephone Numbers).

2) To modify initial prepared statements and fax them to the relevant Media Organisations followitig approval by the General Manager. External Media Consultants may be contacted as necessary to assist in dealing with the Media. (See Appendix II of Emergency Plan for Prepared Media Statement)

3) To deal with external calls transferred to them by the Phone Group.

4) To provide updated and more detailed statements to the Media as the Incident progresses. include general company information where necessary.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

Media Organisation Phone Fax - RTE Limerick 061-410222 06 1-3 10223

Limerick Live 95 FM 061-461900 061-419595 fkre FM 065-6829392 ----- - _.- 065-6828888 Irish Examiner 021-4802346 02 l-4275477 Limerick Leader 06 1-2 I 4503 06 I-40 1424 Glare Champion 065-6828105 065-6.820374 Irish Times 0 I-6758224 01-6772130 Irish Independent 01-7055333 0 l-7055784

6) Prepare for TV interviews where necessary.

6) To inform relatives of emergency situation where necessary

7) To listen to radio to determine how the incident is being reported.

8) To keep SCHWARZ PHARMA Limited people informed of the developing situation

4.13 INCIDENT CONTROL

1) The function of the Incident Control Group is:

1) Keep in contact with the Incident Management Group in the Emergency Room and the ERT Leader by means of radio.

2) Establish danger zone, holding zone, and safe zone.

3) Liase with outside Emergency Services.

4) Shut down operations i.e. organise nearby operations to be scaled down e.g. electric’s shut off. I

5) Anticipate incident escalation, e.g. spread, cooling water. truck removal

6) Ensure adequate provision is made for casualties

7) Take Photographs of Emergency scene.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

I Page 17 of24 SAFETY PROCEDURE

TITLE: EMERGENCY PLAN

SOP Effective Date:

620.004 Revision No: 2 Date: 0 I .03.04 Prev Rev No: 1 Date: 0 I .04.03

4.1.4 PHONE GROUP

Phd&e Group (Primary Locatiou:- Finance Dept - Administration Building) A. Loughnane S.McCarthy G.Alfied R.Lievre M. Casey

The function of the Phone Group is:

1) To set up the switch to divert all calls to Finance Department, knock off the ‘Call Fwd’ button and depress the ‘Emergency Phone Group’ button.

2) To man the phones and communicate prepared statements as directed by the Communications Group to the appropriate parties. (See Appendix III for Prepared Telephone Replies).

3) To screen all calls (as per the lists below) and to ensure that only important calls are traniferred to the Communications and Incident Management Groups

Calls to Pass on:

Shannon Development Environmental Protection Agency (E.P.A) Health and Safety Authority (H2.A) Glare County Council, Media Neighbouring Companies Gardai / Chief fire Officer SCHWARZ PHARMA (Monheim) Hospitals looking for Information Relatives of injured employees

Calls to be stopped:

l Relatives of unaffected employees l Personal Calls l Far away companies and residents (unaffected) l Routine business calls

Discretion should be applied on calls offering help. If in doubt, check with Incident Management Group.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:28

pzr- 4.1.5 MEDICAL TREATMENT /FIRST AID

Page 18 of2-i

SOP Effective Date:

620.004 Revision No: 2 Date: 0 I .03.04 Prev Rev No: I Date: 0 1.04.03

The Occupational Health Nurse will set up the Medical Centre for First Aid / Medical Treatment. First Aiders may be called upon as necessary to assist in the treatment of casualties.

4.1.6 MORGUE FACILITIES

* If necessary offices in the Main Administration may be used as temporary morgue facilities. If a fatality occurs in Bay 130 the Pharma Preparation room may be used.

4.2 Environmental Monitoring

Safeguarding the Environment is second only to Safety of Personnel in the event of an emergency situation. Environmental monitoring during an emergency situation will be necessary, both on- and off site, to determine the extent and possible consequences of emissions to Health & Safety and the Environment. Environmental monitoring which will be required for emergency situations include:

o Contaminated firewater from fire fighting and vessel cooling to prevent surface ground and soil contamination.

l Surface water if necessary to prevent contamination of surface water drains and culvert. l Ground water if necessary. l Air Monitoring of vessel releases (gases & vapours), reactor contents from fire or explosion, or side products’fi-om combustion of construction materials

4.2.1 MONITORING INSTRUCTIONS FOR ENVIRONMENTAL PERSONNEL

Ehirironmeirtal Support Area Lourda Moloney Air Analysis Sinead McAleer WWTP Operations Mark O’Brien Water Analysis i WWTP Operations

*QC Assistance to be provided where necessary under direction from EHS Personnel.

If requested by the Incident Controllers or Incident Management Team Environmental + personnel must undertake Environmental Mcmitoring activities as follows: 1. Assemble information regarding the type and quantity of release/emission from the Incident

Controller, Incident Management Group and/or other relevant personnel. This should give 311 indication as to the type of monitoring requirements necessary.

2. Taking account of the nature of the release, select and ‘wear the appropriate personal protection to enable the safe monitoring of the emission.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY PROCEDURE Page 19 of 24

SOP Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Date: 0 I .03.04 Prev Rev No: 1 Date: 0 1.0-1.03

I’ , I

3. Seek advice where necessary on the selection of the PPE and extreme caution at all times when monitoring hazardous emissions under emergency conditions.

4. Depending on the nature of the release and the receiving media be it Air, Water or Soil. set up the necessary monitoring to assess the quantities and extent of the emissions as outlined below:

4.2.1.1 AIR MONITORING

1. Establish the Wind Speed and Direction and any other relevant weather conditions.

2. Obtain such weather data from weather station, wind sock or Me? Eireann website or by telephone.

3.

4.

5.

e 6.

7.

8.

9.

Immediately set up sampling points downwind of the release source in order to accurately assess the situation.

Continuously monitor the Wind speed and direction in case of change and adjust the number and location of sampling points as necessary.

For odour monitoring the sense of smell is the best available indicator, while for air monitoring a list of the specific equipment exists. (See 4.2.1.5)

Consult available Consequence Models as necessary to assess the potential effects of specific incidents. (See Attachment III of the Emergency Manual)

Carry out Air Monitoring in accordance with the standard methods in use. Specific information relating to the nature of the release should be obtained from either the Plant Incident Controller, BPC Personnel, or other relevant personnel.

Monitor air in suitable locations, around the release and at the perimeter of the facility. Exercise due caution when monitoring any releases or spills.

Monitor air off-site if necessary. The off-site monitoring locations will vary to take into account the direction and speed of the prevailing wind at the time of the release.

10. Air monitoring shall be completed to ensure the area has been made safe to work in before personnel can re-enter the building or the area around the release.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY PROCEDURE

,k

Page 20 of 24

SOP Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Date: 0 1.03.04 Prev Rev No: 1 Date: 0 I J4.03

4.2.1.2 MONITORING AND CONTROL OF CONTAMINATED WATER.

. In the event of a large scale fire event firewater will be directed into the WWTP. The Equalisation Tanks and Digestion Tank have a certain retention volume available for this purpose.

2. If the WWTP cannot cope with the volumes of Firewater being generated Shannon Development should be contacted regarding the release of excess volume to sewer.

3. If a volume of Chemicals have been lost to drain the lift pumps in the Old WWTP should be switched off to retain the material in the tank. The effluent should be sampled to assess its components and subsequent action regarding its transfer should be agreed.

4.2.1.3 SURFACE WATER MONITORING.

1. Carry out surface water monitoring to check for contamination at the relevant surface water drains in the event of a liquid spill/release. Use spill control equipment where appropriate if it is available.

4.2.1.4 GROUND WATER MONITORING

. jrf there is potential for Groundwater contamination it will be necessary to sample ground water points to assess the level contamination. This is not an immediate priority in an emergency situation.

4.2.1.5 MONITORING EQUIPMENT.

1. An emergency stock of air sampling equipment will be kept in the ERT Station, and the relevant tubes for the specific release should be used. Regular checks are carried out to ensure that all monitoring equipment is calibrated and recharged if necessary. These stocks will be maintained as necessary by the Environmental Technologist Responsible for Air Monitoring. 4

2. An emergency stock of containers suitable for the sampling of Aqueous emissions will also be held in the ERT Hut. These stocks will be maintained as necessary by the Environmental Technologist Responsible for Water Monitoring.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

f- Page 21 of24

SAFETY PROCEDURE SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 0 I .03.04 Prev Rev No: 1 Date: 0 I .05.03

5.0 TRAINING REQUIREMENTS FOR EMERGENCY PERSONNEL

The Training requirements of key Emergency personnel may be summarised as follows:

Emergency Function Training Requirements Frequency of Duration of Training Training

ERT Team Leader ERT Specific Training Annually 40 Hours Command and Control Course 3 yearly frequency 16-24 Hours

ERT Team Member ERT Specific Training Annually 40 Hours

Incident Controllers Command and Control Course 3 yearly frequency 16-24 Hours Emergency Plan Refresher Annually I hours

Assembly Point Co-Ordinator Emergency Plan Refresher Annually 1 hour

Assembly Point Counters Emergency Plan Refresher Annually 1 hour

Muster List Co-Ordinator Emergency Plan Refresher Annually 1 l10u1

Security Officers Emergency Plan Refresher Annually 1 hour

Site Co-ordinator Emergency Plan Refresher Annually 1 hour

Communications Group Emergency Plan Refresher Annually 1 hour

Phone Group Emergency Plan Refresher Annually 1 hour

Incident Mgt / Technical Team Emergency Plan Refresher Annually 1 h01ll

Support Services Emergency Plan Refresher Annually I hour

Site Personnel Trial Evacuation Min of twice per year N/A

In addition to the training listed above a Desk Top Test of the Emergency Plan will be completed on a 3 yearIy basis using external Incident Management Consultants.

Drawings Chemical Storage Drawing No: 1 OOG00023 Emergency Equipment Locations Drawing No: 1 OOH0007 1 Foul Sewer & Treated Effluent Drawing No: 1 OOG094 12 Site Mains Water Drawing No: 1 OOG085 12 Site Map Drawing No: 1 OOGOOO 14 Site Surface Water Drawing No: 1006091/2-l-2 Process Effluent into WWTP Drawing No: 10009 112

SOP’S Emergency Contact Telephone Numbers SOP 601.002.

6.0 EMERGENCY DRJLLS

Every year, two drills will be conducted - one in either half of the year to evaluate the effectiveness of Phase I of the Emergency Response. Details of the drills’will be recorded in the ‘Test of Evacuation Effectiveness Logbook’.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY PROCEDURE

j Page 22 of 24

SOP Effective Date:

TITLE: EMERGENCYPLAN 620.004 Revision No: 2 Date: 01.03.04 Prev Rev No: 1 Date: 01.04.03

7.0 REVISION This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new revision of this SOP.

Appendix I Prepared Media Statement

At . . . . . . . . . . . . AM/PM a (Fire / Explosion / Spill / Release/) occurred at SCHWARZ PHARMA Limited in the (BPC production building / Tank Farm / Warehouse etc) fDeIete below as necessary) l All people have been accounted for.

l There are - people still unaccounted for.

l There are no reports of casualties as yet.

l people were injured

l There were fatalities

SCHWARZ PHARMA Limited Emergency Crews and External Emergency Services are responding to the incident. A more detailed statement will be issued later.

Appendix II Standard Telephone Answers

Ql. Information on the Incident/what happened ? The Incident Management Team will provide statements and regular updates once they are made available. Q2. An incident has occurred but Information (or update) is not available yet: “An Incident has occurred, I am not aware of the up to date position as we are still awaiting further information from the scene. *

Q3. Information on injuries? Clearance from Incident Management Team required 0 Cc X employees have been injured ” “No names are being released until relatives have been

notified” “ Extent of injuries have not been confirmed” l There are no reports of injuries at this point

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY PROCEDURE Page 23 of 24

SOP Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Prev Rev No: I

Date: 01.03.04 Date: 01.04.03

Q4. Media -where the call can’t be put through to theincident Management Team

l I’m sorry but I can’t get hold of relevant people l Give prepared statement (if provide) l Give commitment that Incident Management Team will ring/fax back as a priority l Please bear with LIS, the system is inundated with calls” etc.

a Q5. Callers (‘ Can I speak to.....” Find out exactly who they are and what they want and categorise as pass on or deal with.

Q6. Personal callers for non-essential staff ( e.g. relations) “ The site has been evacuated. We are trying to keep the phone‘lines clear for emergency use. Personnel will have access to a phone on a rota basis”

Q7 Personal calls for essential staff “I’m sorry but that person is dealing with the incident”

QS Abusive callers Remain pleasant.

.

“I Understand your situation” etc. “Trying to keep the phone lines free” etc.

Q9 Technical questions from general public “ what chemicals are involved . . are they toxic?” Get information from Incident Management Team in a relevant form. If not available yet ask caller to ring back, meanwhile relay to Incident Management Group.

QlO. Exact cause of the Incident ? “The exact cause of the incident is not known at present. A full investigation will take place. Its too early to speculate”

Qll. Previous Incidents “ 1 can’t comment on that incident I wasn’t here at the time”

Q12. Far away residents/callers asking: is there any danger? 0

Find out how fay away the caller is+om the facility. 0 “Companies or residents who may be exposed are being given advice on what emergency

action to take” l Very far away - no danger l Mile or two e.g. town centre - “ unlikely to be a hazard but stay inside and close ail l doors and windows as a precautidn”

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SA.F’ETY PROCEDURE Page 24 of24

SOP Effective Date:

TITLE: EMERGENCY PLAN 620.004 Revision No: 2 Prev Rev No: 1

Date: 01.03.04 Date: 01.04.03

Q13. Staff ringing up

Clearance from Incident Management Team required” X employees have been injured” “No names are being released until relatives have been notified” ” Extent of injuries have not been confirmed”

l There are no reports of injuries at this point l Ask caller to free the line ASAP.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

REVISION LOG j

SOP TITLE : EMERGENCYPLAN SOP NUMBER/CODE: 620.004

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

0 Kieran Hill To create new SOP 28.10.99

1 Dermot Hanrahan Update SOP to formalize the Emergency Plan with the ?’ 04.03 __. documentation system and to expand the detail of the plan.

2 Donal Mullins m Updated to show company name change. n Remove ‘Environmental’ from procedure heading = Change signatories from D.Hanrahan. J. O’Donoghue

& M. Cregan. 9 Remove ‘BPC Facilitator’. = Rename Incident Controllers. n Rename assembly point co-ordinators. n Rename ERT Leaders. m New names added to sect 4.0 Emergency response. a Update 4.1.2 -5 tel & fax numbers. = Update phone group names. n Add section 6.0

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

RECEIPT OF SOP CONFIRMATION

SOP TITLE:

EMERGENCY PLAN

I acknowledge receipt of the above SOP.

For All CJpies Exceut Q.A Master.C&y:

I have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

‘I

.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY 62. ENVIRONMENTAL ATTACHMENT

TITLE: EMERGENCY RESPONSE TEAM

Page 1 of 5

SOP Effective Date:

620.003 Revision No: 2 Date: 10.06.03 Prev Rev No: 1 Dated: 09.06.00

1.0 PURPOSE

To describe the SCHWARZ PHARMA Limited Emergency Response Team (ERT) function, roles and responsibilities, training, membership requirements and payment arrangements.

2.0 PROCEDURE

2.1 Introduction

8 2.1 .I The SCHWARZ PHARMA Limited Emergency Response Team is a voluntary group of SCHWARZ PHARMA Limited personnel with Fire-fighting, Spillage Response, Search and Rescue, Confined Space and First Aid expertise capable of providing a rapid on site response to mitigate the consequences of an Emergency condition should one arise.

2.1.2 The primary duties of the ERT are to:

l Rescue trapped or disabled personnel l Provide First Aid Treatment-to injured personnel l Fight outbreaks of Fire where possible thereby preventing escalation. l Control and Clean-up Accidental Releases as necessary in order to minimise loss and

ensure the protection personnel and the environment. l Mitigate where practicable the effects of Fire-fighting operations on the environment. l Test ERT equipment where necessary and ensure its readiness.

2.1.3 In order of priority the ERT goals are to:

1. Preserve life 2. Protect the Environment 3. Safeguard Equipment and Facilities

II Written By : Approved By: Approved By: Approved By:

II Dermot Hanrahan, Safety & Env. Officer (Systems)

Date:

John O’Donoghue, Safety & Env. Manager.

,ERT Leader. John Keane, HR Manager.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY & ENVIRONMENTAL ATTACHMENT Page 2 of 5

SOP ( Effective Date:

TITLE: EMERGENCY RESPONSE TEAM 620.003 Revision No: 2 Prev Rev No: 1

Date: 10.06.03 Dated: 09.06.00

2.2 Structure and Responsibility

22.1 ERT has cross-departmental membership comprising both Shift and Day workers.

2.2.2 There are four ERT Leaders each of which has overall responsibility for the team’s co-ordination and liaison with the Incident Co-Ordinator in the event of an Emergency Situation. In their absence a nominated Deputy ERT Leader will assume overall responsibility for the team.

2.2.3 Details of ERT Membership and leadership may be found on the N Drive under Safety System / ERT/ Membership and Leadership.

2.2.4 Given the cross-departmental nature of the ERT there are no specific teams and in the event of an emergency teams are composed of the members on site at that time.

2.3 ERT Membership Duties

It is the duty each ERT members to 0 Ensure his/her attendance of scheduled training. . Ensure that the Safety & Environment Officer (Systems) is notified if they are

unable to attend training due to unforeseen circumstances. . Ensure completion of all ERT Training requirements as required. . Ensure the completion of training forms where necessary. 0 Ensure that his/her gear is maintained in a state of preparedness. . Ensure immediate response to all emergency calls.

. l Follow instructions as given to him/her by the ERT Leader. . Submit overtime forms where necessary. . Submit expense forms where necessary. . Ensure the collection and wearing of the available pagers on arrival on site

and the immediate response to their activation should the need arise. The duties and competencies of all ERT Members are outlined in Attachment I.

2.4 ERT Leader Duties

Excluding the normal ERT member duties it is the ERT Leaders duty, and in his absence the Deputy ERT Leaders duty to ensure that:

I l The ERT are effectively co-ordinated during an Emergency Response. l Emergency situations are carefully evaluated before actions are taken and

personnel are not put into situations of unnecessary risk. l The emergency services are called outside normal working hours if it is considered that

scale of the incident and the number of ERT personnel available is insufficient to allow a safe and appropriate response.

-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

Page 3 of 5 SAFETY & ENVIRONMENTAL ATTACHMENT

TITLE: EMERGENCY RESPONSE TEAM

SOP Effective Date:

620.003 Revision No: 2 Date: IO.06.03 Prev Rev No: I Dated: 09.06.00

m

l That additional training needs are identified where necessary and brought to the attention of the Safety and Environment Officer (Systems).

l That deficiencies in the competency of members are brought to the attention of the Safety and Environment Officer (Systems)

l The ERT Hut is kept in tidy and in a state of preparedness at all times. l Monthly checks (See Attachment II) are completed as per agreed schedules and that

the malfunction or absence of any equipment is immediately brought to the attention of the Safety and Environment Officer (Systems).

l Expense sheets are submitted to the Accounts Department where necessary. l Training Records and Overtime Sheets are completed following all training sessions

and submitted to the Safety and Environment Officer (Systems) l ERT Leader meetings are attended where necessary.

2.5 Training

2.51 Each ERT Member is as a minimum required to complete the following training in any given calendar year.

l 8 Hours First Aid - Provided by the Occupational Health Nurse l 8 Hours On-Site ERT Drills - Provided by FIST Limited l 8 Hours BA Refresher and Fire Training.- Provided by FIST Limited l 16 Hours On site carried during normal working hours - Self Training. (Training

modules will be prepared by the Safety & Environmental Officer (Systems) and will be made available in the ERT Hut for training purposes.

2.5.2

2.5.3

Note: An ERT Training Assessment Sheet must be completed by the Occupational Health Nurse and FIST Trainer following each training session in order to

l Document the Training content l Assess the performance of ERT Members l Identify any deficiencies l Identify Equipment / items requiring attention.

ERT Leaders and their Deputies will also be required to complete a “Command and Control” Training course at a frequency of 2-3 years.

The Safety and Environmental Officer (Systems) is responsible for scheduling the ERT Training which in general will be organised during a members non-rosteied work day, although on occasions due to scheduling difficulties or due to a member being unable to attend a scheduled session it may be necessary to complete the training during normal working .hours.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

r Page 4 of 5 SAFETY & ENVIRONMENTAL ATTACHMENT SOP

Effective Date:

TITLE: EMERGENCY RESPONSE TEAM 620.003 Revision No: 2 Prev Rev No: 1

Date: 10.06.03 Dated: 09.06.00

2.5.4 The ERT Training Schedule will be posted on the Safety Notice Boards in the ERT Hut, Administration and the Canteen at the beginning of each calendar year. The schedule will also be posted on the N Drive under Safety System / ERT.

2.55 Each ERT Member has individual responsibility for noting his training schedule and ensuring attendance on the scheduled dates.

2.6 Certification and Competencies

2.6.1 Each ERT Member must have the following certification: l Certification as a BA Wearer l Certification as a First Aider

2.6.2 Given that the success of the ERT is based on a team structure it is imperative that each member is able to perform his or her duties in a satisfactory manner. The proficiency of each member will be performed on an ongoing basis and correct competencies of ERT Membership must be achieved and maintained.

2.6.3 Competencies will be checked and confirmed by the Occupational Health Nurse and the external ERT Trainers. (Attachment I). Details of training performance will also be recorded in ERT Training Assessment Sheet (Attachment Ill).

2.6.4 ERT Leaders must also demonstrate competency in l Emergency Situation Management l Team Leadership

0 2.7 Conditions of Membership

2.7.1 It is necessary for ERT members to have both the physical and mental abilities to Carry out their duties without endangering themselves or others.

2.7.2 All members must undergo a medical prior to joining the ERT. The Medical will include an ECG, Lung Function Test and detailed Physical Questionnaire. Failure to meet the requirements of the medical will prevent membership.

2.7.3 The ECG, Lung Function Test and detailed Physical Questionnaire will be included in each ERT Members Annual Medical in order to confirm continued suitability for ERT Membership.

2.7.4 All members must complete the necessary 40 Hrs training.

2.7.5 If a member wishes to step down from service- they must give 3 months notification in order to facilitate the replacement of that member.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

*

3.0

4.0 REVlSlON

SAFETY & ENVIRONMENTAL ATTACHMENT

TITLE: EMERGENCY RESPONSE TEAM

Effective Date: Revision No: 2

rev Rev No: 1 Date: 10.06.03 Dated: 09.06.00

2.8 Re-numeration and Expenses ERT members will receive the following payments in recognition of their ERT Service.

2.8.1 Annual Allowance:- Summer Payment = E 159 Cash payment (Net of Tax) 8 E 190 Vouchers Christmas Payment = E 159 Cash payment (Net of Tax) & E 190 Vouchers

l Payment for training that has been completed on overtime is paid at the Basic Shift Rate + Shift Premium + 1.75.

. Payment for such overtime will be paid at (Christmas. l Overtime sheets for training must be submitted to the Safety and Environment Officer

(Systems) for approval.

2.8.2 Annual ERT Night out In recognition of services given the members of the ERT Team are entitled to a night out. The night out shall be organised by‘the ERT Leaders and the Leaders are also responsible for the submission of the necessary expense reports. The Company will allocate ‘878-00 for each member attending the night out. The names of those members attending the nights out must be submitted with the expense report.

2.8.3 Expenses Expenses for costs incurred during training will be reimbursed as per SOP 703.016 “Training / Business Travel Allowances & Expenses”. Expense forms may be obtained on the Q drive under Finance / Forms / Expense form 703.016. Each ERT Member is responsible for his / her own expenses, An external training requisition form (TR5) which

- maybe found on the Q drive under HR/SOP/Forms must also be submitted with the expense form.

DOCUMENTATION

Attachment I Example : The duties and competencies of all ERT Members Q:\S&E\SOP\Forms\duties and competencies of all ERT .doc

Attachment II

Attachment II I

Monthly checks (Logbook)

Example : ERT Training Assessment sheet Q:\S&E\SOP\Forms\ ERT Assessment .doc

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new revision of this SOP.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY & ENVIRONMENTAL ATTACHMENT I

TITLE: ERT MEMBER COMPETENCY RECORD

rage I 01 I

SOP’ Effective Date:

620.003 Revision No: 2 ‘Date: 10.06.03 Prev Rev No: I Dated: 09.06.00

Name: Department:

DUTIES

RESCUE OF TRAPPED OR INJURED PERSONNEL

TREATMENT OF INJURED PERSONNEL FIRE FIGHTING

SPILLAGE RESPONSE AND CLEAN UP

LEADERSHIP SKILLS

COMPETENCIES

l Breathing Apparatus Certification l Rescue Techniques from Height and Confined Space. l Use of Ropes, Pulley systems. l Use of stretchers l Familiarity with SCHWARZ PHARMA LIMITED site

and buildings l Medical suitability l 2-way radio use l Certification in First Aid

.

.

.

.

a

.

.

.

.

.

.

Breathing Apparatus Certification Site Knowledge of Electrical Isolation pdints Site Knowledge of Hydrants and locations Extinguisher use Hose craft Stand-pipes & hydrants & Dry Risers use Operation of Mobile pump Operation of the Foam inductor Operation of the Ozzie monitor Operation of Fixed and mobile foam canons Knowledge of Fixed systems inc. Sprinklers and FM200 System

D Spill Response Techniques B Zoning and Decontamination procedures B Breathing Apparatus Certification D Use of Gas-tight/ splash suits D Use of watercurtains to prevent a gas cloud from

moving off-site. ; Isolation procedures in the Ammonia Plant m ‘Use of Material Safety Data Sheets D Emergency Situation Management D Team Leadership

ACHIEVED SIGNED

DATE

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY & ENVIRONMENTAL ATTACHMENT I1 Page 1 of I

SOP Effective Date:

TITLE: ERT MONTHLY INSPECTION OF EMERGENCY 620.003 Revision No: 2 Date: 10.06.03

EQUIPMENT Prev Rev No: I Dated: 09.06.00

Month: Year: ITEM TEST DESCRIPTION PASS / READING I SIGNED DATE

FAIL QUANTITY BY

I Fnam Cannon Mobile I Test run the svstem I

Firewater Transfer 1 Review stock level and replenish as necessary I

Check and confirm operation of pump.

ePump# 1 Check operation and refuel as necessary (ERT Base) Portable Pump # 2 (Bav Check operation and refuel as necessarv

Cleanliness of ERT 1 Sweep out room and empty bins as necessary ‘Room Preparedness of Organise where necessary

Comments: All checks have been completed as necessary signed :

(ERT Leader)- Date: - -

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

SAFETY & ENVIRONMENTAL ATTACHMENT III

TITLE: ERT ASSESSMENT FORM

Page 1 of 1

SOi Effective Date:

620.003 Revision No: 2 Date: 10.06.03 Prev Rev No: I Dated: 09.06.00

REFERENCE NO: / /

DETAILS OF EXERCISE

DATE:

NAME OF INSTRUCTOR EXERCISE DESCRIPTION:

LOCATION:

COMPANY

OBJECTIVES OF EXERCISE

EQUIPMENT USED

I - -__.. --I

POST EXERCISE REVIEW

FIRE CREW LEADERS COMMENTS 1 I

INSTRUCTORS COMMENTS

CREW PERFORMANCE I

ITEMS REQUIRING ATTENTION

RECOMMENDATIONS

Signed by : ERT Leader Date:

Signed by: Instructor Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

REVISION LOG

SOP TITLE: EMERGENCY RESPONSE TEAM SOP NUMBER/CODE: 620.003

REVISION NO. REQUESTED REASON FOR REVISION EFFECTIVE BY: DATE

0 Kieran Hill To create new SOP 28.10.99

1 Kieran Hill To incorporate ERT members training requirement / 09.06.00 competencies.

To identify scenario-specific training modules, debrief records.

To record any necessary changes to emergency plan, emergency equipment or add training requirements.

2 D. Hanrahan Expand on detail relating to duties, training, competencies, membership and renumeration.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:29

RECEIPT OF SOP CONFIRMATION

SOP TITLE: EMERGENCY RESPONSE TEAM

I acknowledge receipt of the above SOP.

&r All Copies Except Q.A Master Copy:

I have destroyed (returned in the case of Master BMl’s and CPs) the superceded revision of the SOP.

Signed: Department:

:

,/ ”

.’

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: EFFICIENCYTESTINGOFTHEEMERGENCY EVACUATIONPROCEDURE.

Page 1 of 1

SOP 620.006 Effective Date:

Revision No: 2 Date: 03.10.01 Prev Rev No: 1 Dated: 0402.00

1.0 PURPOSE To describe the manner in which the efficiency of the Emergency Evacuation Procedure is routinely tested and necessary corrective actions identified are recorded and co&pleted.

2.0 PROCEDURE It is the responsibility of Safety & Environment Manager to ensure that all relevant personnel are informed of the contents of this procedure.

0 2.1

2.2

2.3

2.4

2.5

2.6

Emergency evacuations must be simulated at least twice a year unless the number of evacuations during the normal course of business exceeds this number. In such case the lessons learned during these evacuations can be used in place of the simulated evacuations.

During the course of any evacuation be it simulated or real, the detail of the response and recording of critical times must be recorded by the Environmental Health & Safety Officer Systems or in his absence the deputy incident controller at the time of the incident.

Following the evacuation any problems arising are noted following discussion with the Fire Crew leader, the Incident Controller, Assembly Point Counters, the Evacuation Controller, the Security officer on duty or any other interested parties.

This discussion may take place in the form of individual discussion or through a formalised meeting as deemed necessary to evaluate the effectiveness of the evacuation.

Any problems identified and the subsequent corrective actions required must be recorded in an Evacuation Effectiveness Log Bodk (see Attachment I). Corrective Actions identified will be raised and tracked as per SOP 610.018. This log is held’in the ERT Hut.

The effectiveness of the Evacuation should be communicated to all those directly involved in the Evacuation.

DOCTJMENTATION Attachment I : Example of ‘Evacuation Effectiveness Log Book’.

4.0 REVISION

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new revisidn of this SOP.

Written By : Approved By: Approved By: Approved By:

Dermot Hanrahan, John O’Donoghue, Safety & Env Officer Systems. Safety & Environment Manager.

Pat Gallagher. Facilities Manager.

Bernie Hal-ten. N itrnres Man. Man:~pur.

Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL PROCEDURE Attachment I

Page 1 of 1

SOP ’ 620.006 Effective Date:

Revision No: 2 Date: 03.10.01 TITLE: EXAMPLE OF’EVACUATION EFFECTIVENESS

LOG BOOK’.

Prev Rev No: 1 Dated: 04.02.00

Evacuation Effectiveness Log Sheet

Date of Evacuation:

Evacuation Type:

Reason for Activatiom-

Simulated b

Alarm Activation b

Alarm activated at : hrs ERT Team ready for deployment: hrs Assembly Point Counts completed: hrs

Post Evacuation meeting held Meeting Attended by:

Yes b No b

Evacuation reviewed with:

Problems identified:-

Corrective Actions Required Description CAR No Responsible

Person Completion

Date

Signed:- Date:-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

f REVISION LOG

SOP TITLE: EFFICIENCYTEST~NGOFTHEEMERGENCY SOP NUMBER/CODE: 620.006 EVACUATIONPROCEDURE.

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

Kieran Hill To create new SOP 28.10.99

Kieran Hill Replaced original attachment I with new version. 28.02.00

Dermot Hanrahan l Change in title of sop from emergency system test procedure.

. Modify log sheet and move testing of fire system to a new sop.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

/I:

RECEIPT OF SOP CONFIltiMATION

SOP TITLE:

EFFICIENCY TESTING OF THE E~VIERGEN~Y EVACUATION PROCEDURE.

I acknowledge receipt of the above SOP.

&7&ll CoDies .E~~O.A~rLop~ -___

I have destroyed (returned in the case of Master BMI’s and CPS) the superceded revision of the SOP.

Signed: Department: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

Page 1 of2 SAFETY PROCEDURE

TITLE: EMERGENCY CONTACT TELEPHONE NUMBERS

SOP 601.002 Effective Date:

Revision No: 19 Date: 07.04.04 Prev Rev No: 18 Dated: 18.02.04

1.0 PURPOSE To define the method by which Emergency Contact Telephone Numbers are updated and made available within SCHWAFZ PHARMA Limited.

2.0 PROCEDURE 2.1 It is the responsibility of each Department Manager to provide a list of personnel in their

Department who need to be contacted in case of an Emergency. A list containing the appropriate personnel will be made available at all specified locations within SCHWARZ PHARMA Limited (See Attachment I). It is the responsibility of the HRBafety Manager to ensure that the list contains all necessary contact numbers.

2.2 It is the responsibility of the Admin Assistant to maintain the listing of Contact Telephone Numbers in accordance with this SOP.

2.3

2.4

If the Key Contact Number of an outside Authority, Agency or Company changes, the Admin Assistant must immediately be notified of that change provided it has been made known to SCHWARZ PHARMA Limited. Alternatively changes will be picked up in accordance with 2.8.

If a SCHWARZ PHARMA Limited Employee changes number he/she should immediately noti ty their Department Administrator of the change and he/she in turn should notify the Admin Assistant of the change by Email.

2.5 Once the Admin Assistant has been notified of the change he/she must update the listing and speed dials immediately and forward a controlled copy (marked COPY by the copy punch) of the revised ‘“Emergency Contact Telephone numbers” to all personnel responsible for posting the “Emergency Contact Numbers ” ( See Attachment II). This Attachment is controlled separately to the SOP.

2.6 The identified responsible persons must post the levised “Emergency Telephone Numbers” promptly and in a prominent position and be responsible for its availability (See Attachment II).

Written By : Approved By:

Anne Loughnane. Admin Assistant.

Date:

Fiona Walsh, HR/Safety Manager.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

I SAFETY & ENVIRONMENTAL PROCEDURE SOP :

601.002 TITLE: EMERGENCY CONTACT TELEPHONE

NUMBERS

Page 2 of 2

2.7 The Emergency Contact Telephone Numbers are located under Q/S&E/SOPS/FORMS/601.002~Att.I emergency contact telephone numbers.doc

2.8 While the Admin Assistant will maintain the system in an up to date manner using the procedure described, she will also check the names, teleplmne numbers and details regarding neighbouring Companies and Authorities on an annual basis in order to ensure their accuracy.

* 3.0 DOCUMENTATION

Attachment I : Distribution List and locations of Emergency Contact Telephone numbers.

Attachment II : Example of - Emergency Contact Telephone Numbers Q/S&E/SOPS/FORMS/6O1.OO2~Att.I emergency contact telephone numbersdoc.

REVISION

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new version of this SOP

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL ATTACHMENT I

TITLE: DISTRLBUTION LIST AND LOCATIONS OF EMERGENCY CONTACT TELEPHONE NUMBERS.

SOP 601.002

Page I of 1

Effective Date: Revision No: 19 Prev Rev No: IS

Date: 07.04.04 Dated: 18.02.04

Distribution List I I

Location of Listing

Patricia Kennedy BPC - Production Office Notice Board

Marian Houlihan Security Hut

Gabrielle Alfred Facilitators Office Pharma

John FitzgeraId Control Room Nitrates

Trish Kennedy Bay I30 Notice Board

Anne Loughnane Reception

Brendan Lynch

Ger Teefy

Lourda Moloney

Fiona Walsh

Maintenance Workshop

. Warehouse Notice Board

Waste Water Treatment Plant - Lab ’

HR/Safety Managers Office

Lucy Marsh QC - API Lab

Donal Mullins , 1 Emergency Manual x 11 copies and 1 copy to Ennis

Margaret Kenny

Fire Station.

PA to Asst. Manager office.

Ken McCauley Assistant General Manager’s Office.

.

:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL ATTACHMENT II

TITLE: EXQMPLE OF :-

EMERGENCY CONTACT TELEPHONE NUMBERS.

Page I of 2

SOP 601.002 Effective Date:

Revision No: 19 Date: 07.04.04 Prev Rev No: 18 Dated: 18.02.04

_ Emergency Contact Telephone Numbers

SCHWARZ PHARMA LIMITED 061- 714100 MAIN PLANT: 061 -472779 BAY 130

Detlef Thielgen Work: 0049 2173 481706 6223 00497715571210 6224 Home: 0049 217389 6225

6666

Issued by :

Note : Controlled as per SOP 601.002

Revision Nr. : Date :

:

*

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL ATTACHMENT II

TITLE: EX4MPLE OF :-

EMERGENCY CONTACT TELEPHONE NUMBERS.

Page 2 of 2 s o p ’

601.002 Effective Date: Revision No: 19 Prev Rev No: 18

Date: 07.04.04 Dated: 18.02.04

Bmergerky Contact Telephone Numbers I’ Name Location Telephone Number

Fire Brigade/Ambulance Limerick 999 Garda Station Shannon 061-361272/361640 Hospital Ennis/Limerick 065-6824464!061-301111

STATE AGENCIES EPA Wexford 05360600 (Tel) 053 - 60699 (Fax) EPA Cork 021 -4875540 (Tel) 021-4875545 (Fax) HSA Dublin 01 6620400 (Tel) 01 -6620417 (Fax) HSA Cork 021 - 4964900 (Tel) 01 - 9641663 HSA Limerick 061-418956/419900 (Tel) 061 - 419599

SITE OFFICES Nitration Plant Construction Site Office 061-360313 Nitration Plant Construction Site 086-2537084 -oreman (Michael Forde)

Issued by : Revision Nr. : Date :

Note : Controlled ss per SOP 601.002

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

REVISION LOG

SOP TITLE: EMERGENCY CONTACT TELEPHONE SOP NUMBER/CODE: 60 I .002 NUMBERS

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

0 MOB To create a new SOP. 04.05.94

1 JOD Additional telephone number added and changes in 12.05.94 circulating procedure for the attachment.

2 MOB Additional telephone numbers added and changes 16.07.95 made to existing numbers.

3 JOD/MOB Changes made to existing telephone numbers. 28.03.96

4 JOD Additional telephone numbers added. 15.08.96

5 JOD Additional telephone numbers added. 09.10.96

6 BH Additional telephone numbers added 03.02.97 I 7 PG Additional telephone numbers added 09.05.97

8 JOD Changes made to existing numbers and to reflect 06.10.97 organisational changes on Safety & Security.

9 TWIKH Additional numbers added. 10.11.97

10 JOD Additional numbers added and some changes made. 06.03.98

11 - JOD Additional numbers added. 1 1.03.98

12 K. Hill Addition of telephone numbers of neighbouring 18.02.99 companies

13 K.Hill Additional no’s added I 24.08.99

14 JOD Update to new format SOP , Include additional speed 11.12.00 dial numbers for all home numbers. Revise method of revision control and change title’to ” Emergency Contact Telephone Numbers”.

15 A. Loughnane n Update SOP to new format / layout. 14.03.02 a Change title from Receptionist/S&E Secretary. m Swopped Attachments I and II around.

16 A. Loughnane l Remove Pat Gallagher from signatures. 19.05.03 l Remove SIFA Limited. l Add Dermot Hanrahan x 6 copies for emergency

manual (Attachme& I).

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

REVISION LOG

SOP TITLE: EMERGENCY CONTACT TELEPHONE SOP NUMBER/CODE: 601.002 NUMBERS

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

17 A. Loughnane l Attachment 1 : add PA to Asst. Manager to IO. I 1.03 location listing, responsibility Kathleen O-‘Leary & Ken McCauley, Asst General Manager.

l Remove Dermot Hanrahan from list. l Remove PJ Halpin from list. l Trish Kennedy responsible for B I30 copy.

18 A. Loughnane +3 Replace John O’Donoghue with Fiona Walsh. 20.02.04 4* Change title from S&E Mgr to HR/Safety Mgr. l 3 Remove Environment from SOP title. l Z* Change title from S&E Administrator.

19 A. Loughnane l Update Att II : remove Kathleen O’Leary & replace with Mgt Kenny, add Lourda Maloney for wwtp office, update Donal Mullins to receive 1 I copies instead of 6.

l Section 2.5 : add comment on ‘COPY ‘punch and speed dials.

l Attachment II is controlled separately to sop itself.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

RECEIPT OF SOP CONFIRMATION

SOP TITLE:

EMERGENCY CONTACT TELEPHONE NUMBERS.

I acknowledge receipt of the above SOP.

For All Copies Excevt Q.A Mvster Copv: ___-

I have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL PROCEDURE SOP Page 1 of 4

Title: Environmental Health & Safety Training 601.007 T’ Effective Date: for Contractors and Transport Companies. Revision No: 3 Date: 10.01 .oo

Prev Rev No: 2 Dated: 18.10.99

1.0 PURPOSE

To define the basic Environmental Health & Safety training which all contractors and transport companies as defmed in SOP 3 10.00 1 must receive prior to commencing work on site and the method by which training is recorded.

2.0 PROCEDURE

2.1 Introduction:

SIFA Ltd. is a Fine Chemical / Pharmaceutical manufacturing facility. The nature of the business results in the presence of chemicals and conditions which have the potential to cause serious safety and environmental issues. Contractors are therefore required to be vigilant at all times, to abide by site rules and to ensure that their actions do not result in injury to themselves or others, damage to equipment or property or damage to the Environment.

NOTE : It is the sole responsibility of the person responsible for the training of the contractor’s to ensure that he / she passes this training record to the Engineering Adrninistrator for filing.

2.1.1 Contractors must as a minimum requirement, be made understand the regulations outlined in this document .before commencing work. If fiu-ther training is required, it should be completed as necessary and recorded by the person responsible for the contractors while on site. Refer to SOP301 .OOl for a list of training personnel for each department.

2.1.2 Attachment I should be completed by the person responsible for the introduction of the contractor on site and forwarded to the Engineering Administrator who will update the “Register of Contractor Training” as necessary (See Attachment II). Each contractor on site will receive a copy of the site Environmental Health & Safety regulations as outlined in Attachment III detailed instructions may be found in SIFA’s Environmental Health & Safety Manual for Contractors and Supplies.

*

Written & Reviewed By: Approved By: Approved By: Approved By:

1. Hanrahan, P. Gallagher, ..-_._- _ - .._.. -_.

.I. Driver, .I. O’Donoghur kkronment Officer. Facilities Manager. HR Manager. Sati% 22 l3vir. Mgr.

late: Date: Date: Date: ---_-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL PROCEDURE

Title: Environment Health & Safety Training for Contractors and Transport Companies.

SOP Page 2 of 4

601.007 ’ Effective Date: Revision No: 2 Date: 10.01.00 Prev Rev No: 2 Dated: 18.10.99

2.2 SAFETY REGULATIONS

2.2.1 Eating and Drinking. This is pennitted only in the canteen.

2.2.2 Smoking Smoking is permitted only in the canteen. Smoking is strictly forbidden in all outdoor areas. Smoking material must be extinguished before coming on site.

2.2.3 Hot Work Permits Work is any work that may produce heat or a source of ignition (sparks) e.g. drilling, grinding, welding, soldering etc.

Hot Work Permit is required for any hot work to be done outside the engineering building, canteen and office building.

A Hot Work Permit is a form which is completed by the Facilitator of an area in order to lay down the conditions necessary for safe working in an area of fire risk. It consists of a series of checks which must be signed by the Supervisor. Such checks include for example ensuring movable containers of flammable materials are 1 Om away, fixed storage tanks are under vacuum or sealed, checking the area with a solvent meter and having a fire extinguisher present.

Confined Entry Permits:

A confined space is any vessel, reactor, drier, container, tank, manhole etc., where there is partial natural ventilation. Again, this permit is issued by the facilitator. Checks include: ensuring moving parts are locked off, ensuring pipelines are disconnected so that no material can be pumped into the confined space. ensuring oxygen levels are adequate, ensuring there are no flammables present. a harness is being used and ensuring another person is present at all times.

Fire Alarm:

If the fire alarm is activated (siren), people must make their jobs safe and report to the assembly point for visitors/contractors in the main car park for roll call. .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

I I

SAFETY & ENVIRONMENTAL PROCEDURE

Title: Environment Health & Safety Training for Contractors and Transport Companies.

SOP Page 3 of 4

601.007 I Effective Date: Revision No: 3 Date: 10.01.00 Prev Rev No: 2 Dated: 18.10.99

Evacuation:

Upon discovering a fire:

l Raise the alarm l Make yak job area safe e.g. turn off gas bottles if welding l Attack the fire if safe to do so, with fire extinguishers l If the fire cannot be extinguished. report immediately to the emergency co-

ordination point (outside the fire store) and inform the emergency controller as to the nature of the fire.

l Report to the Visitors/Contractors assembly point for roll call.

2.3 SAFETY EQUIPMENT The following Safety Equipmint must be worn :-

* Safety glasses must be worn at all times on site beyond the ‘red lines’. The only exception to this are offke areas.

l Steel toe capped shoes or boots l GIoves when working with hazardous materials (e.g.) corrosive, hot or sharp. l Additional eye protection must be worn when performing hazardous jobs (e.g.) shield

when welding, goggles when grinding, operating lathe.

2.4 ENVIl3ONMENTAL REGULATIONS

2.4.1 Drains & sumps Liquids other than clean water may not be discharged of to surface water drain points. Liquids contaminated with traces of oils, solvents, product. concrete etc. must only be’discharged at suitable points including sinks or directly to sewer. If there is any doubt about regarding the disposal of liquids contact the S&E Dept. or on site contact for instruction regarding the disposal of the waste.

2.4.2 Hazardous Wastes Hazardous Wastes such as chemical residues, solvent based paints. asbestos. cleaning agents, oils / oil filters, batteries, fluorescent tubes and other chemically contaminated materials must not be disposed of into the site compactor. Hqardous wastes must be suitably packaged and taken off site for disposal or else following prior agreement may be given to SIFA for disposal.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

I I

SAFETY & ENVIRONMENTAL PROCEDURE SOP Page 4of4

Title: Environment Health & Safety Training for 601.007 ; Effective Date: Contractors and Transport Companies. Revision No: 3 Date: 10.01.00

Prev Rev No: 2 Dated: 18.10.99

2.4.2 Non-Hazardous Wastes Non-Hazardous Wastes such as paper, cardboard, water based paint tins, cardboard, uncontaminated materials and engineering debris excluding metals, may be disposed of to the site compactor. For projects generating large amounts of Non-Hazardous wastes separate arrangements for disposal should be made.

2.5 GENERAL GUIDELINES

1.

2.

3. 4.

2: 7. 8. 9.

10.

If you smell smoke or any strong odour, while working DO NOT IGNORE IT. Bring it to the Area Facilitator or site contact’s attention. DO’NOT interfere with equipment unless cleared to do so by the Area Facilitator of the area. DO NOT open valves or break lines without approval. Clean up all spillage’s immediately if it is safe to do so. If the spill is large or the nature of the material is unknown or toxic contact the Area Facilitator immediately and inform him / her of the situation. Dispose of all clean up materials in a proper manner. Leave work areas clean and tidy following completion of work and dispose of all materials in a proper manner. DO NOT discharge any liquids or materials to soil. DO NOT dispose containers containing liquid to the skip. Inform the Area Facilitator, Site Contact or S&E Dept. of any Environment incidents such as spillage’s, leaks, etc. Inform the Area Facilitator, Site Contact or S&E Dept of any Safety incidents, accidents or unsafe conditions.

3.0 REVISION The SOP is reviewed annually according to SOP 1 documented in a new revision of the SOP.

00.007. Any necessary changes will be

.

II

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL ATTACHMENT I SOP Page 1 of 1

Title: Safety Training Record For Contractors & 601.007 -I Effective Date: Transport Companies. Revision No: 3 Date: 10.01.00

Prev Rev No: 2 Dated: 18. IO.99

CONTRACTOR AND TRANSPORT COMPANIES “ENVIRONMENTAL HEALTH AND SAFETY TRAINING RECORD.

I have been informed and understand of the Environmental Health & Safety rules and regulations at SIFA Limited by the SIFA contact person named below and agree to be bound by these. I have also received a copy of the SIFA Limited Environmental Health & Safety Regulations (See Attachment 111 SOP601.007).

Other training received

Contractor Name (Blocks) Date

Company Date

Signed Contractor

Date

Signed SIFA Representative

Date

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:30

SAFETY & ENVIRONMENTAL ATTACHMENT II SOP

Title: Register of Trained Contractors - (Example only). 601.007

Page 1 of 1

Effective Date: Revision No: 3 Prev Rev No: 2

Date: 10.01.00 Dated: 18.10.99

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL ATTACHMENT III SOP Page 1 of 2

Title: Environmental Health & Safety Regulations at SIFA 901.007 Effective Date: Limited. Revision No: z Date: 10.01 .oo

Prev Rev No: 2 Dated: 18.10.99

SAFETY REGULATIONS

Eating and Drinking. rhis is permitted only in the canteen.

Smoking smoking is permitted only in the canteen. Smoking is strictly forbidden in all outdoor areas. Smo]<ing material nust be extinguished before coming on site.

‘Iot Work Permits Nork is any work that may produce heat or a source of ignition (sparks) e.g. drilling, grinding, welding, soldering etc.

lot Work Permit is required for any hot work to be done outside the engineering building, canteen and office juilding.

1 Hot Work Permit is a form which is completed by the Supervisor of an area to ensure it is safe to work. It :onsists of a series of checks which must be signed by the Supervisor. Such checks include for example ;nsuring movable containers of flammable materials are 1 Om away, fixed storage tanks are under VacLlum or ealed, checking the area with a solvent meter and having a fire extinguisher present.

Ionfined Entry Permits:

I confined space is any vessel, reactor, drier, container, tank, manhole etc., where there is partial natural ,entilation. Again, this permit is issued by the facilitator. Checks include: ensuring moving parts are locked ff, ensuring pipelines are disconnected so that no material can be pumped into the confined space, ensuring xygen levels are adequate, ensuring there are no flammables present, a harness is being used and ensuring nother person is present at all times.

ire Alarm: ‘the fire alarm is activated (siren), people must make their jobs safe and report to the assembly point for isitors/cofitractors in the main car park for roll call. #vacuation:

rpon discovering a fue:

Raise the alarm Make your job area safe e.g. turn off gas bottles if welding

‘Attack the fire if safe to do so, with fire extinguishers If the fire cannot be extinguished, report immediately to the emergency co-ordination point (outside the fire store) and inform the emergency controller as to the nature of the fire. Report to the Visitors/Contractors assembly point for roll call.

AFETY EQUIPMENT he following Safety Equipment must be worn ::-

4

Safety glasses must be worn at all times on site beyond the ‘red lines’. The only exception to this are office areas. Protective clothin& Steel toe capped shoes oi boots (minimum requirements for laboratory contractors or a closed shoe) Gloves when wor&.ing with hazardous materials (e.g.) corrosive, hot or sharp. Additional eye protection must be worn when performing hazardous jobs (e.g.) shield when welding, goggles when grinding, operating lathe.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL ATTACHMENT III

Title: Environmental Health & Safety Regulations at SlFA Limited.

SOP Page 2 of 2

60 1.007 Effective Date: Revision No: 2 Date: 10.01 .oo Prev Rev No: 2 Dated: 18. IO.99

I I

ENVIRONMENTAL REGULATIONS

Drains & sumps Liquids other than clean water may not be discharged of to surface water drain points. Liquids contaminated with oils, solvents, product, concrete etc. should only be discharged at suitable points including sinks or dircctl) to sewer. If there is any doubt about regarding the disposal of liquids contact the S&E Depl. or on sire contact for instruction regarding the disposal of the waste.

Hazardous Wastes Hazardous Wastes such as chemical residues, solvent based paints, asbestos, cleaning agents. oils / oil filters, batteries, fluorescent tubes and other chemically contaminated materials must not be disposed of into the site zompactor. Hazardous wastes must be suitably packaged and taken off site for disposal or else following prior agreement may be given to SIFA for disposal.

Yen-Hazardous Wastes ?Jon-Hazardous Wastes such as paper, water bases paint tins, uncontaminated materials and engineering debris nay be disposed of to the site compactor. For projects generating large amounts of Non-Hazardous w&es separate arrangements for disposal should be made. Cardboard boxes and other cardboard based items must be disposed of to the ‘cardboard only’ skip provided.

SENERAL GUIDELINES

b If you smell smoke or any strong odour, while working DO NOT IGNORE IT. Bring it to the area Facilitator or site contact’s attention.

) DO NOT interfere with equipment unless cleared to do so by the Supervisor of the area. ) DO NOT open valves or break lines without approval. 1 Clean LIP all spillage’s immediately if it is safe to do so. If the spill is large or the nature of the material is

unknown or toxic contact the local supervisor immediately and inform him / her of the situation. 1 Dispose of all clean up materials in a proper manner. 1 Leave work areas clean and tidy following completion of work and dispose of all materials in a proper

manner. 1 DO NOT discharge any liquids or materials to soil. m DO NOT dispose containers containing liquid to the skip. D Inform the area Facilitator, Site Contact or S&E Dept. of any Environment incidents such as spillage’s,

leaks, .etc. D Infbrm the area Facilitator, Site Contact or S&E Dept of any Safety incidents, accidents or unsafe

conditions.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

/

REVISION iLOG

SOP TITLE: Environment Health & Safety Training for SOP NUMBER/CODE: 60 I .007 Contractors and Transport Companies.

REVISION NO. REQUESTED REASON FOR REVISION EFFECTIVE BY: DATE

0 RC N/A 17.07.95

1 RC To change the SOP numbering from 602.055 to 60 I.007 and 18.04.96 incorporate approvals of Maintenance Engineer & H.R. Cu- Ordinator.

2 DH Change SOP and update attachments, to include environmental X10.99 training content and procedures.

3 DH Expand attachment I to include Company Name. Modify to new input note re shoes in lab areas and modify training record and register. Updated Attachment III (page 2 section on non-hazardous wastes) to include ref. to ‘cardboard only skip’.

‘w

*

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SOP R.?iCEIPT CONFkMATIOiV

SOP TITLE: Environment Health & Safety Training for Contractors and Transport Companies.

I acknowledge receipt of the above SOP.

For AU Copies Exceot 0.A Master Cop:

I have destroyed (returned in the case of BMI’s returned and CPs) the superseded revision of the SOP.

Signed: Department:

ti

:

*

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY PROCEDURE Page 1 of 3

SOP Effective Date:

TITLE: External Accident /Incident Reporting 601.016 Revision No: 1 Date: 23.03.04 Prev Rev No: 0 Dated: 1501.99

1.0 PURPOSE

This procedure defines the circumstances and the process in operation for reporting Safety and Environment Accidents and Incidents to Corporate, Regulatory Bodies and Insurance Company.

2.0 PROCEDURE

m 2.1 CORPORATE REPORTING

2.1.1

2.2

2.2.1

2.2.2

2.23

Accidents and Incidents are reported to Corporate body as per SOP BA PU 0 1.203. (Attachment I)

HEALTH & SAFETY AUTHORITY NOTlFICATION OF ACCIDENTS/INCIDENTS.

Where a serious injury has occurred e.g. spinal injuries , loss of limb and third degree burns, the Authority should be notified as soon as is practical by phone or fax by the HR / Safefy Manager or his/her deputy. The Authority will advise whether they wish the scene to be preserved for their own investigation or whether to use the SCH WARZ PHARMA Limited investigation report.

Where an absence occurs of more than 3 days arising from an accident at work, the 1Rl Form ofNotice of Accidents (Attachment II) is filled out by the Safety Specialist and in his absence by the HR / Safety Manager as soon as is practical after the Accident and when all the facts have been ascertained. Follow the instruction on the back of the form and fi II out all questions as precisely as possible. A copy of this form is held on file and details are transcribed onto the General Register.

When a serious Incident has occurred or an Incident as defined in the Notice of Dangerous Occurrences General Application Regulations 1993, the Authority should be notified by phone or fax by the HR / Safety Manager or his deputy as soon as practical. The Authority wilI advise whether they wish the scene to be preserved for their own investigation or use the SCHWARZ PJXARMA Limited investigation report.

Written By : Approved By: Approved By: Approved By:

Donal Mullins, Safety & Health Officer.

Fiona W&h, HRISafety Manager.

Ivor Wills, Head of QA & ‘Support Services

Bernie Harten, General Manager.

Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

Page 1 of4 SAFETY&ENVIRONMENTALPROCEDU RE SOP

Effective Date: I TITLE:NON-PROCESSWASTECOLLECTION 605.062 Revision Prev Rev No: No: 2 1 Date: Dated: 30.01.01 28.03.03

1.0

2.0

(II)

PURPOSE

To provide guidelines to ensure that Hazardous and Non-hazardous wastes which do not arise directly from on-site manufacturing processes are disposed of in accordance with Company requirements, IPC Licence requirements and the Transport Regulations.

PROCEDURE

2.1 Waste originating from chemical processes is already addressed under SOPS 602.044, 602.050, and 602.05 1.

2.2 IPODEC

2.2.1 IPODEC supply a Roro Packer, 1100 and 660 L Wheely bins and Builders Skip for the removal of waste from the main site.

2.2.2 The wastes for disposal in the Roro Packer / Wheely bin and the open bin are uncontaminated fibre kegs, plastic liners, gloves, mop heads, cardboard boxes, canteen waste, uncontaminated packaging and other general site refilse.

2.23 The waste for disposal in the skip includes builders rubble and any non- recyclable metal.

2.2.4 IPODEC will provide SIFA LIMITED with a monthly collection and Disposal Record each month. The records are filed in the Environmental Offlice.

2.3 HEGARTY HAMMOND

2.3.1 Warehouse will contact Hegarty Hammond by fax when there is a load of crushed drums/scrap metal on site. The fax to be filed in Warehouse for collection by the Environmental Officer at the end of December each year.

2.3.2 The crushed drums include; 200L tight head, 200 L open top drum or any other drum or container which has been crushed. Normally a crushed drum load consists of 80 drums. Drums must be crushed and washed befa-e being removed off site, as per SOP400.022 (crushing steel drums)

Written By : Approved By: Approved By: Approved By:

Mark O’Brien, Environmental Officer Waste.

Date:

Ger Kennedy, Marcus Dohmann, John O’Donoghue. Maintenance Eng. Supply Chain Mgr. S & E Manager.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY&EWIRONMENTALPROCEDURE Page 2 of 4

SOP Effective Date:

TITLE: NON-PROCESS WASTE COLLECTION 605.062 i Revision No: 2 Date: 28.03.03 Prev Rev No: I Dated: 30.01.01

2.33 Hegarty Hammond will supply a disposal certificate for both drums and scrap metal which should then be filed with the removal record

2.4 ATLAS OIL:

2.4. I Atlas Oil collect waste oil approximately 3 times per year.

2.4.2 Atlas Oil will collect any waste oil generated on site.

c 2.5

2.6

2.7

2.7.1

2.7.2

2.73

2.4.3 Waste oil must be recorded in the Waste Register in the Environmental Office and included in the Annual Report to the EPA. Atlas Oil will provide a Certificate of Disposal for oil collected annually.

SAFETY KLEEN:

2.5.1 Safety Kleen come on site approximately 4 times a year to recycle the degreaser solvent in the Maintenance Workshop. 280 L is recovered each year.

REHAFS:

2.6.1 Rehab will empty the colour code bin when required.

2.6.2 Types of waste collected by Rehab, (1) Brown Glass (2) Green Glass (3) Clear Glass (4) Aluminium Cans.

2.6.3 The Security Officer should fill in the Rehab Waste Collection Record (see Attachment I>, (a) Date of collection (b) Description of waste i.e. brown/green/clear glass or aluminium cans (c) Quantity of bins (d) Disposal/ plant e.g. the driver will have this information (e) Collection docket number (f-) Any comments to be made regarding the load.

2.6.4 The Environmental Officer will collect the Rehab Records annually for filing.

FLUORESCENT TUBES

All used and broken fluorescent tubes are stored in the maintenance workshop in the container provided by Contec. These are collected and sent off-site recovery.

When the container is nearly full, the maintenance dept. contact the Environmental Officer Waste and he / she will arrange for the collection of the tubes. +

The Environmental Officer Waste or other designated person must sign the Cl form provided by the Contec and the pink page and any other paper work must be forwarded to the Erivironmental Officer Waste for filing and completing the waste register.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETYcSrENVIRONMENTALPROCEDURE

TITLE: NON-PROCESS WASTE COLLECTION

Page 3 of 4

SOP Effective Date:

605.062 Revision No: 2 Date: 28.03.03 Prev Rev No: I Dated: 30.01.01

2.8 WASTE COOKING OIL

2.8.1 Waste cooking oil is collected by the supplier of the cooking oil. MT Oils and recycled.

2.8.2 The canteen manager is responsible for organising the collection of the oil.

2.8.3 Receipts issued for the collection outlining the volumes collected, must be forwarded to the Environmental Officer Waste.

2.9 CONNAUGHT TIMBER

2.9.1 Connaught Timber will collect all waste timber from site for recycling. The Warehouse will contact Connaught Timber when there is a build up of timber on-site.

2.9.2 Connaught Timber will supply a Timber Waste Recover / Recycling monthly and annual report which will be filed in the Environmental Officer.

2.10 CAR4

2.10.1 CARA will collect batteries, biros, tipex and other hazardous offlce waste when required. The waste is stored in the blue recycling bins located by the outgoing fax in the admin building.

2.11 IT IMAGE IRELAND

All printer /photocopier cartridges will be collected / recycled by IT Images Ireland on request.

2.12 INFORBLATION SECURITY MANAGEMENT

Information Security Management will collect all paper for recycling every 2nd Tuesday. The paper is stored in 6 confidential bins which are located in admin x 2, nitration, Pharma, BPC and Bay 130. Security will sign the collection docket which will be collected by the Environmental Office and filed in the Environmental Officer.

2.13 CLEAN lRELAND REFUSE All cardboard should be baiIed in the bailer which is located outside the Environmental Office. Warehouse will empty the bailer and contact Clean Ireland Refuse regarding the collection of bails. Clean Ireland Refuse will supply a Certificate for all cardboard removed / recycled from site. The Certificates will be filed in the Environmental OffIce.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY&ENVIRONMENTALPROCEDURE Page 4 of 4

SOP Effective Date:

TITLE: NON-PROCESS WASTE COLLECTION 605.062 Revision No: 2 Date: 28.03.03 ~ Prev Rev No: 1 Dated: 30.01.01

3.0

4.0 REVISION

DOCUMENTATION Attachment I Example of Non-Chemical Process Waste Collection - REHAB

Q:\S&E\SOP’s\Forms\Waste Collection Rehab.doc

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new revision of this SOP.

:

.I~ ‘.

.: .

.’ ‘. I

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL ATTACHMENT I

TITLE: EXAMPLE OF

NON-PROCESS WASTE COLLECTION -

REHAB

Page 1 of I

SOP Effective Date:

605.062 i Revision No: 2 Date: 28.03.03 Prev Rev No: 1 Dated: 30.01.01

Date of Collection Description of Waste Quantity Disposal Site Collection Dot. Comments Green Bin, Received. White Bin, Blue Bin, Brown Bin.

‘I

‘,- ” ‘“., :

. , “ , , ‘, x

, ‘̂ , : .

‘..

,‘ . . ; ” a,,

i ‘:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

REVISIONL@G

SOP TITLE: TITLE: NON-PROCESSWASTECOLLECTION SOP NUMBERKODEAOS.067

REVISIONNO. REQUESTED REASONFORREVISION EFFECTIVE BY: DATE

0 TW Previously called “602.062”. Reason for this revision is because of a new code numbering system.

25.08.97

1

2

MOB

MOB

Review and update cooking oil and fluorescent tubes.

!+ Update to include Connaught Timber, Cara, IT Images, Information security Management, Clean Ireland RefLrse

): Change name of SOP.

I

. .,/‘

..i ; :

‘.

: ; , ‘.,

>1 , .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

. I

RECEIPT OF SOP COliFIRMATION

SOPTITLE: TITLE: NON-PROCESS WASTE COLLECTION

I acknowledge receipt of the above SOP.

m Ail Copies Except Q.A Mnster Copy:.

I have destroyed (returned in the case of Master EMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

‘Dali;

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: RESPONSE TO TOC ALARM ACTIVATION

SOP . 602.077

’ Effective Date: Revision No: 1 Prev Rev No: 0

Date: 14.01.02 Dated: 14.07.99

1.0 PURPOSE To define the method by which a response is made to the activation of the T.0.C alarm.

2.0 PROCEDURE NOTE : The T.O.C. unit measures the Total Organic Carbon content of nonprocess water before going off site to the culvert. The instrument in located at the Surface Water drain SW-07 (see Attachment I drawing). The purpose of the instrument is to monitor the T.O.C. levels and activate an alarm system if agreed levels are exceeded

i.1 Alarm settings.

2.1.1 The alarm will only activate when the T.O.C. rises to a level of I30 ppm or greater (Warning Level) and will switch off once readings return below this value.

2.1.2 If the T.O.C. levels rise to 160 ppm (Action Level) the audible alarm continues to ring and a second non audible alarm activates a diversion valve which diverts the Surface Water to a process line which enters the effluent at ES0 1 (see Attachment II drawing M 10-004- 061/2). This will continue to happen until T.O.C. readings drop below 160 ppm whereby the Surface Water will be re-diverted to the culvert.

2.2 Alarm Activation. 2.2.1 Work Hours Response

2.2.1.1 Upon T.O.C. alarm activation, the Team Leader, Technical Operator or designate should contact an Environmental Technologist or member of the environmental department if on-site to investigate the cause or if not should investigate the cause of the alann themselves. The alarm can be silenced temporarily while the incident is being investigated by depressing the alarm reset button inside the T.0.c’. hut. It this hut is locked a key may be obtained from Security.

2.2.1.2 The investigation should consist of checks on areas where containers are stored and being filled and emptied in the first instance.

Written By : Approved By: Approved By:

I Sinead McAleer, John O’Donoghue, Jon O’Halloran, Environmental Technologist. Safety & Environment Manager. BPC Co-ordinator.

II Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: RESPONSE TO TOC ALARM ACTIVATION

Page 2 of 3

SOP 602.077 c Effective Date:

Revision No: 1 Date: 1401.02 Prev Rev No: 0 Dated: 1407.99

2.2.1.3 Sampling and inspection of Surface Water monitoring points should take place according to monitoring points listed in Attachment I or any updated subsequent version.

2.2.1.4 If a source for the alarm activation is found then this source must be immediately confined and a clean up commenced.

2.2.1.5 Details of the incident must be recorded on an Accident / Incident record sheet and sent to the Safety & Environment Manager for fixther investigation.

2.2.2 After Work Hours Response.

2.2.2.1 Following alarm’activation, a BPC Operator should source the cause of the Surface Water contamination. The alarm can be siIenced temporarily while the incident is being investigated by pressing the alann reset button inside the T.O.C. hut. If this hut is locked a key may be obtained from Security.

2.2.2.2 Areas where contaminants could enter the surface water drains should be inspected e.g. the hard stand area at BPC, leaks fi-om containers beside drains, cleaning of used production equipment. The drains should be inspected for odours or visible contamination. Should contamination be found, the drain should be sampled and held for assessment by the Environmental Technologist.

2.2.2.3 On finding the source of the alarm, the leak, if any, should be stopped and the ground washed thoroughly. The contaminants should be flushed through the drains as quickly as possible using water. The alarm should deactivate once the contaminant levels in the surface water drop below 130ppm. This reading can be obtained fi-om the LCD panel inside the TOC hut.

2.2.2.4 Should the alarm remain activated continuously fqr longer than 30 minutes after flushing is complete, an Environmental Technologist or member of the S & E Department should be contacted. It may be necessary to inspect the TOC system for possible system problems and to continue assessment of contaminant entry into the drain systems. The numbers can be obtained from the Emergency Contact Telephone Numbers list (Q/S&E/SOPS/FORMS/60 1.002-AK1 emergency contact telephone numbers.doc).

4

-

.’

‘, . ’ 2,:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: RESPONSE TO TOC ALARM ACTIVATION

SOP 602.077 :’ Effective Date:

Revision No: 1 Date: 14.01.02 Prev Rev No: 0 Da ted: 1407.99

2.2.1.5 Details of the incident must be recorded on an Accident / Incident record sheet and sent to the Safety & Environment Manager for further investigation.

2.3 Valve Controls.

In response to a T.O.C. value of 160 ppm or greater being reached, the surface water will be diverted from the culvert drain to the effluent drain. This is achieved through a series of valves which respond to a signal from the C.P.U. In order to ensure that the valves are working correctly the valve system should be checked twice a year. This should be conducted by holding down the alarm reset/ spike test button on the main control unit in the T.O.C. hut which will trigger the valve system into a non-audible alarm. This will close the valve to the culvert drain and open the valve on a process line diverting the surface water to the effluent. After the valve on the culvert drain has fLllly closed, the button should be released to ensure that the valves revert to normal. Details of this check should be kept with the Laboratory Equipment record.

3.0 DOCUMENTATION

Attachment I : Surface Water Drain’age Drawing Attachment II : Drawing MlO-004-061/2. - Process Water Drawing

4.0 REVISION

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new revision of this SOP.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL ATTACHMENT I SOP 602.077

TITLE: SURFACE WATER DRAINAGE DRAII~ING

Page 1 of 1

Effective Date: Revision No: 1 Date: 14.01.02 Prev Rev No: 0 Dated: 14.07.99

CAR PAW

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

SAFETY & ENVIRONMENTAL ATTACHMENT II

TITLE: Drawing MlO-004-061/2

PROCESS WATER DRAWING

SOP 602.077 Effective Date:

Revision No: 1 Prev Rev No: 0

Page 1 of 1

Date: 14.01.02 Dated: 14.07.99

Thls Survwy In Capyright.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

REVISION LOG

SOP TITLE: RESPONSE TOTOCALARMACTIVATION. SOP NUMBER/CODE: 602.077

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

0 Donal Mullins To create new SOP 29.10.99

1 Sinead McAleer > Include section 2.2.2 ‘Alarm Activation -after work hours”.

J+ Alteration of section 2.3 ‘Valve controls’ to include twice yearly valve test.

> Revision of attachment 1.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:31

RECEIPT OF SOP CONFIRMATION

SOP TITLE:

RESPONSE TO TOCK ALARM ACTIVATION

I acknowledge receipt of the above SOP.

I have destroyed (returned in the case of Master BMl’s and CPs) the superceded revision of the SOP.

Signed: Department:

:

,

*

: .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENT PROCEDURE SOP Page 1 of 2

Title: Response to Emergency Conditions in the 606.026 Effective Date: Waste Water Treatment Plant .: Revision No: 3 Date: 3 I .08.99

Prev Rev No: Dated:

1.0 PURPOSE

To describe the procedures to be followed following the occurrence of an emergency condition within the Waste Water Treatment Plant (WWTP).

2.0 PROCEDURE

2.1 Foaming

2.1.1 On discovering foam on the top of SBR1/2 some anti-foam agent may be added directly to one or both SBRs. If the level of foam in the SBRs does not drop, the blower for the SBR(s) may be switched off at its emergency stop located on the blower in the blower house. Ear protection must be worn while in the Blower House.

2.1.2 Any foam on the top of the tanks can be returned into the SBRs, then the top of the SBRs hosed with water and this water can be scooped back into the SBRs.

2.13 The foam must be prevented from entering the culvert, any foam which has flowed off the top of the tanks onto the ground can be broken up using water.

2.1.4 Contact the Environmental Dept. as soon as possible to report the incident. Follow any instructions given regarding restarting the Blower(s).

2.1.5 Complete an Incident Report and record the foaming incident as necessary.

written & Approved By: Approved By: Approved By: Approved By: Approved By:

M.O’Brien, J. O’Donoghue, D.Muliins, F. Martin. P. Gallagher. Safety & Environment S&E Manager. Environmental Officer. BPC Manager. Facilities Mgr. bsistant. late: Date Date Date Date -..-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENT PROCEDURE SOP Page 2 of 2

Ti tie: Response to Emergency Conditions in the 606.026 Effective Date: Waste Water Treatment Plant ,: Revision No: 0 Date: 31.08.99

Prev Rev No: _ Dated:

3.0 Plant Equipment Tripping

3.1 If any piece of plant equipment electrically trips it will flash red on the SCADA screen. The piece of plant can be restarted by pressing the reset button for that piece of equipment on its control panel in the control room. If it does not restart contact Maintenance.

4.0 Power Cut

4.1 Contact Environmental Dept. who will restart the SBRs or advise over the phone the steps to restart.

5.0 Company Shutdown

5.1 The Safety and Environmental Assistant ltiay make changes to the SBR cycles to allow,the WWTP to run during shutdown.

5.2 These changes may involve extending ‘Aerobic React Times’ decreasing or eliminating ‘Batch Amount’, ‘Fill Times’, ‘Settle Times’, ‘Decant Times’ and ‘Waste Times’.

5.3 After shutdown the cycles and batch amounts must be returned to the normal operation parameter slowly. The Safety and Environmental Assistant will decide the speed at which this will be done after carrying out analysis on the SBRs and the feed.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

REVISION tiOG

I

SOP TITLE: Response to Emergency Conditions in the Waste Water SOP NUMBER/CODE: 606.026 Treatment Plant

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

0 M.O’Brien To establish a new procedure

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

RECEIPT OF SOP C~NFIFWATION

SOP TITLE: Response to Emergericy Conditions in the Waste Water Treatment Plant

..

I acknowledge receipt of the above SOP.

For All Copies Excexlt 0.A Master Cow:

I have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SOP TITLE SOP NO. REV. NO. Response to Emergency Conditions in the Waste Water Treatment Plant 606.026 0

The trainees must sign below to show agreement with the following statement

THE SOP DESCRIBED ABOVE HAS BEEN EXPLAINED TO ME, AND 1 FULLY UNDERSTAND ALL THAT IS REQUIRED

OF ME TO COMPLY WITH ITS REQUIREMENTS.

NAME SIGNATURE POSITION / DEPARTMENT DATE

Name of Trainer: (Block Capitals)

Signature of Trainer: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENTAL PROCEDURE

Title: Preparation of Safety and Environmental SOPS

SOP Page 1 of 2

607.002 Effective Date: : Revision No: 1 Date: 20.04.00

Prev Rev No: g Dated: 02.10.98

1.0

2.0

PURPOSE

To provide guidelines for the preparation of Standard Operating Procedures (SOPS) in the Safety and Environment Department.

PROCEDURE

2.1 Procedures generated in the S&E Dept. will use the format outlined in Attachment I.

2.1.1 Each page must be headed SAFETY AND ENVIRONMENT PROCEDURE and must include the SOP title, the SOP number, the page number in the form “page x of y”, the effective date, the revision number and date and the previous revision number and date.

2.1.2

2.13

In addition to the above the first page of the SOP must include the approval signatures.

The SOP shall include the headings PURPOSE - wherein the purpose of the procedure is stated and PROCEDURE - which describes the actual procedure to be followed. A section on REVISION must also be included.

2.1.4 Samples of forms, where needed will be attached at the end of the procedure as Attachments. Attachment must be refelTed to and numbered using roman numerals.

2.1.5

2.2

2.2.1

Existing SOPS shall remain in force until revised under this fonnat.

PREPARING THE SOP

As the need arises, Standard Operating Procedures may be prepared according to these guidelines.

2.2.2

2.2.3

The title of the SOP should be brief but descriptive and should clearly identify the content of the SOP.

The SOP should be written in a clear direct style. The instructions should be as unambiguous and as brief as possible. Use checklists and bullet points where possible. .,

Written & Reviewed By: Approved By: Approved By:

D-H&an Environmental Officer Systems

-_-. J. O’Donoghue Bernadette Fallon Safety & Environmeni Manager Quality Assurance Manager

Date: Date: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENTAL PROCEDURE SOP Page 2 of 2

Title: Preparation of Safety and Environmental 607.002 Effective Date: SOPS i Revision No: 1 Date: 20.04.00

Prev Rev No: 0 Dated: 02.10.98

2.2.4 The SOP must be numbered in accordance with SOP 100.002 and SOP 607.001 which defines the sections under which the new SOP may be categorised. The numbering system and revision system will not change with the implementation of this SOP.

2.2.6 Other documents and SOPS may be referenced as part of a procedure

2.2.7 Safety and Environment SOPS shall be approved of as appropriate by the relevant SIFA Personnel whose area of responsibility is directly effected by the generation ot‘ the SOP. The content of the approvals list shall be at the discretion of the S&E Manager. Approval signatures will be only signed on the first page of the procedure.

3.0 REVISION

This SOP and all Safety & Environment SOPS are reviewed annuaIly in accordance with SOP 100.007. Any necessary changes will be documented in a new version of this SOP.

*

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENTAL ATTACHMENT I

Title: Example of SOP Format

,

SOP Page 1 of 1

607.002 Effective Date: .: Revision No: 1 Date: 20.04.00

Prev Rev No: 0 Dated: 02.10.98

1.0 PURPOSE

2.0 PROCEDURE

3.0 REVISION

Written & Approved By: Approved By:

D. Ham&an, Environmental Officer Systems.

Date:

J. O’Donoghue, Safety & Environment Manager.

Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

REVISION LOG <!

SOP TITLE: Preparation of Safety & Environmental SOPS SOP NUMBER: 607.002

II REVISION NO. I

REQUESTED REASON FOR REVISION EFFECTIVE BY: I DATE

Ire 0 I TW I NEW SOP 2X.10.98

I D.H Revision of SOP to new format and the inclusion of section 3 on

revision.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SOP TITLE: Preparation of Safety & Environmental SOPS

I acknowledge receipt of the above SOP.

For All Couies Except 0.A Master COPY:

I have destroyed (returned in the, case of BMI’s & CPs) the superceded revision of the SOP.

Signed: Department:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENTAL PROCEDURE Page 1 of 2

SOP Effective Date:

TITLE: Numbering of Safety & Environmental Standard Operating Procedures (SOPS).

607.001 " Revision No: 2 Date: 06.09.02 Prev Rev No: 1 Dated: 20.04.00

1.0 PURPOSE

To define the method by which Safety & Environmental Standard Operating Procedures (SOPS) must be numbered.

lyli 2.0 PROCEDURE

It is the responsibility of the S&E Manager to ensure that all concerned individuals are familiarised with this SOP.

2.1

2.2

2.3

2.4 The second three digits are issued sequentially.

2.5

The Safety & Environmental Administrator shall control the issue of SOP numbers.

The SOP number shall consist of a six digit code in the format.:- XXX.XXX

The first three digits shall be in the range 600-699 depending on which section of the Safety & Environmental Department it refers to.

The following codes have been assigned to the various sections under which Safety & Environmental procedures may be classified.

600 =’

601 =

602 =

603 =

Health & Sanitation

Safety & Industrial Hygiene

Environmental

Security

Written By : Approved By: . .

Sinead McAleer, Environmental Technologist.

Date:

John O’Donoghue, Safety & Environment Manager.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: Numbering of Safety & Environmental Standard Operating Procedures (SOPS).

Page 2 of 2

SOP : Effective Date:

607.001 Revision No: 2 Date: 06.09.02 Prev Rev No: 1 Dated: 20.04.00

GO4 = Training

GO5 =

GO6 =

Waste Disposal

General Environmental

607 =

610 =

620 =

GO =

General Documentation

Environmental Management System

Emergency Response.

Occupational Hygiene s

3.0 REVISION

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be

documented in a new revision of this SOP.

s

;

*

‘i

. , . , ‘, :

,s’ , ; ‘ , . ,

0 . .

. .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

REVISION LO9

SOP TITLE: Numbering of Safety & Environmental SOP NUMBER/CODE: 607.001 Standard Operating Procedures (SOPS).

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

Donal Mullins To create new SOP 03.04.9s

Dermot Hanrahan Revision of SOP to new format along with inclusion of 27.04.00 grouping 620 emergency response to section 2.5

Dermot Hanrahan 2.5 Inclusion of section 630 Occupational Hygiene.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

RECEIPT OF SOP CONFIRMATION

SOP TITLE: Numbering of Safety & Environmental Standard Operating Procedures (SOPS).

I acknowledge receipt of the above SOP.

For Ali Copies E wed 0. A Mastercopy! __.---

I have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

TITLE: EQUIPMENT ISOLATION SOP

620.002 Effective Date: i Revision No: 0 Date: 24.08.99

Prev Rev No: Da ted: -

PURPOSE:

To outline the procedures necessary for effective isolation of equipment.

PROCEDURE

2.1

2.2

2.3

2.4

2.5

2.6

Isolation is achieved by switching off / disconnecting the motive force (electricity compressed air, hydraulic fluid, etc.)

Each craftsperson has his own lock, to which there is only one key.

At the point of isolation, a padlock is to be fitted by each craftsperson performing work.

Most isolators have facility ‘for locking by 3 padlocks. Otherwise, a %ulticlasp” must be used to enable multiple padlocks to be fitted.

A tag indicating the name of craftsperson working on the equipment must also be attached. Where more than one trade is involved additional tags must be attached.

Removal of tags / padlocks may only be authorised by the person who originally attached them. Any other person removing safety isolation devices without authorisation, will be subject to disciplinary action, up to and including dismissal.

Written & Approved By: Approved By: Approved By : Read By :

Kieran Hill Safety Systems Enginee;

John O’Donoghue Safety & Environment Mgr.

Pat Gallagher Engineering Mgr.

Brendan Lynch. Maintenance Supervisor.

Date: Date: Date: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

REVISIONLOG

SOP TITLE: EQUIPMENT ISOLATION SOP NUMBER/CODE: 620.002

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

0 Kieran Hill To create new SOP

a.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

RECEIPT OF SOP CONFIRMATION

SOP TITLE:

EQUIPMENT ISOLATION

I acknowledge receipt of the above SOP.

For All Copies Except @A Mnster Copy:

I have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

TRAINING RECORD

SOP TITLE SOP NO.

EOUIPMENT ISOLATION 620.002

REV. NO.

0

The trainees must sign below to show agreement with the following statement

THE SOP DESCFUBEDABOVEHASBEEN EXPLAINEDTOME~AND~FULLYUNDERSTANDALLTHATIS REQUIREDOFMETOCOMPLYWITHITSREQUIREMENTS.

NAME SIGNATURE POSITION / DEPARTMENT DATE

. .

Name of Trainer: (Block Capitals)

Signature of Trainer: Date:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:32

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENTOF~CCUPATIONAL INJURY/ILLNESS.

Page 1 of 3

SOP 601.033 Effective Date:

Revision No: 0 Date: 22.11.02 i/ Prev Rev No: Dated:

1.0 PURPOSE : To ensure that any employee who has an occupational injury/illness is medically evaluated and managed in an effective manner to enable that employee resume (either full or restricted) duties at the earliest opportunity.

2.0 PROCEDURE

Description :

The implementation of this SOP relies on a clear understanding of its purpose as outlined above and full co-operation from all involved. All injuries/illness shall be reported as they occur to appropriate Supervisor and an Accident / incident Record completed (Ref. SOP 601.014 Internal Accident / Incident /Near Miss Reporting). The Facilitator should phone or send email to the Occupational Health Nurse, Safety & Environment Manager and their own Area Manager informing them of Accident / Incident as soon as it is feasible to do so. In this procedure, Accident / Incident covers Injury or Illness.

Once an employee is injured or becomes ill, he/she receives immediate attention ii-om a First Aider or the Occupational Health Nurse if required (OHN), and typically one of the following scenarios will apply :-

2.1 Incidents where First Aid treatment is only required are as follows :-

a) Initial treatment provided by First Aider/OHN at location or Medical Centre. b) Employee returns to work

2.2 Incidents where the employee returns to work after receiving medical attention without restrictions to continue working :-

a) Initial treatment provided by First Aider/OHN b) Referral to Company Doctor for treatment/evaluation c) Employee returns to work immediately or next day d) OHN monitors progress of employee

Written By :

Una McCarthy, Occupational Health Nurse.

Date:

Approved By:

John O’Donoghue, Safety & Environment Manager.

Approved By:

Dr. Michael Flynn, Company Dwtor.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENT OF OCCUPATIONAL [NJURY/ILLNESS.

Page 2 of 3

SOP 601.033 Effective Date:

Revision No: 0 Date: 22.11.02 ,: Prev Rev No: Dated:

2.3 Incidents where the employee returns to work after receiving medical attention where work restrictions are required :-

a) Initial treatment provided by First Aider /OHN b) Referral to Company Doctor or Hospital for treatment/evaluation c) Company Doctor advises employee to return to work with restrictions d) Department Manager advises OI-IN of alternative work which may be available

and the OHN decides on whether it is suitable or not. e) Employee returns to work prescribed Q OHN mo&tors progress of employee or restricted duties g) Restriction removed when reviewed by Company Doctor/OHN

0 2.4 Incidents where a Lost Time Accident (LTA) occurs are as follows :-

a) InitiaI treatment provided by First Aider/OHN b) Referral to Company Doctor for treatment/ evaluation c) Company Doctor advises employee if he/she shall not be able to return to next

scheduled work shift and will issue a Certificate of Absence. d) Employee returns to plant with Certificate providing details to Facilitator of Injuries

and diagnosis. e) Facilitator informs OHN and S&E Manager of Injuries and impending absence

being LTA. f) OHN monitors progress of employee prior to and on return to work g) Employee is reviewed intermittently by the Company Doctor and restrictions may

be issued as a condition for the employee to return to work, or employee may be cleared to return to work without restrictions

h) Employee will be interviewed by Facilitator and Area Manager or Safety Manager

0 to establish how accident happened.

2.5 A Medical Certificate is required for any absence from work greater than one day. This will be issued by the Company Doctor in the case of work related injury/illness and fhis certificate is given by the employee to his/her Facilitator and forwarded to the Human Resources Department.

All employees on work related absence must report to the OHN on return to work at the earliest opportunity.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENT OF OCCUPATIONAL INJURY/ILLNESS.

Page 3 of 3

SOP 601.033 Effective Date:

Revision No: 0 Date: 22.11.02 ,i Prev Rev No: Dated:

2.6 Non Work Related Injury/IlIness

All employees requiring immediate attention at work for non work related illness/injury will be attended to by the OHN / First Aider as appropriate. Depending on their condition they will be referred to their own General Practitioner or the nearest hospital.

3.0 REVISION

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented in a new revision of this SOP.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

REVISION LOG

SOP TITLE: MANAGEMENT OF OCCUPATIONAL IN.KJRY/ILLNESS

SOP NUMBER/CODE:

601.033

REVISION REQUESTED REASON FOR REVISION EFFECTIVE NO. BY: DATE

0 Una McCarthy To create new SOP

‘::: ‘;.!, I ,>, I’, a ,:,

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

RECEIPT OF SOP CONkIRMATION

I acknowledge receipt of the above SOP.

For All Covies Excevt Q.A Master Copv:

1 have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENT OF PROCESS SAFETY

Page 1 of 5

SOP / hma1s -._

601.032 i Effee ywu .-. _._. __ w Revision No: 0 Date: 14/06/02 Prev Rev No: Dated:

1.0 PURPOSE

The purpose of this procedure is to describe the methodology in use at SOFA Limited to ensure that

> The safety of all processes is assessed prior to their introduction or modification

9 The necessary controls eliminate or minimise any associated risk.

> The necessary Emergency measures are put in place to mitigate the consequences of an associated

emergency situation should it arise.

Note I:-. Other Operational SOP’s which form part of this suite of SOPS in&de: Chemical Reaction Hazards - 940.001, Equipment Proposal Report - 211.01 I Preliminary Hazard Assessment - 60 1.03 I, Equipment Evaluation & Selection - 301.003 HAZOP Procedure - 311.001, Basis qf Process Safety Rep&t - 3 I I: 002 Basis qf Safety & Environmental Protection - 601.030.

2.0 PROCEDURE

a, 2.1 Hazard Identification and Risk Assessment

To secure the Safety and Health of all personnel within SIFA and the protection of the Environment it is necessary to identify the hazards that exist on site, to analyse the consequences of these hazards if realised, to make assessments of the risks involved and to put in place the controls necessary to eliminate or reduce the chances of the identified hazards being realised.

Written By : Approved By: Approved By: Approved By:

Dermot Hanrahan,, Safety & Env Officer.

Date:

John O’Donoghue, Safety & Env Mgr.

Frances Martin, BPC Manf. Mgr.

Pat Gallagher, ,, Facilities Mgr.

Approved By:

Mary Shire, NPD Mgr.

Approved By:

Bernie Harten, Nitrates Manf. Mgr.

Approved By:

.Werner Kunz, Pharma Manf. Mgr.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

Page 2 of 5 SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENT OF PROCESS SAFETY

SOP 6O1 .O32 .’ Effective Date:

Revision No: 0 Prev Rev No:

Date: 14/06/02 Dated:

The method of Hazard identification in SIFA can essentially be divided into two areas namely :-

Process Hazard Studies

Occupational and Environmental Hazard Studies.

Figure, 1: Hazard Ident~ficntion

2.2 Process Hazard Evaluation

2.2.1 The evaluation of Process Hazards is concerned with identifying the Process Safety hazards associated with the storage, manufacture and handling of raw materials, intermediates and waste streams on site. The components elements of a Process Hazard Evaluation are outlined in Figure 2 and the detail of each element is outlined in the associated SOPs.(See Note 1 above)

2.2.1 The evaluation of any process is initiated through the Change Control Process and it is the responsibility of the Safety and Environment Manager to ensure that the necessary studies are completed in order to fully assess the implications of a change from a Process Safety viewpoint, thereby ensuring that in as much as is practicable that the introduction or modification of a process does not compromise the safety of the facility.

2.2.2 The methodology as outlined in Figure 2 is systematic in nature however some iteration does exist between stages.

. . : : :_ , ..,

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENT OF PROCESS SAFETY

Page 3 of 5

’ ’ ’ 601.032 j Effective Date: Revision No: 0 Date: 14/06/02 Prev Rev No: Dated:

Occupational and Environmental Hazard Evaluation

2.3. I The evaluation of Occupational and Environmental hazards is concerned with identifying the Occupational hazards associated with the introduction or modification of a process and the Environmental hazards associated with storage, manufacture and handling of raw materials, intermediates, waste streams on site, emissions to atmosphere and emissions to the WWTP .

(I)

2.4

2.5 . . .

a

2.6

2.3.2 The components elements of an Occupational and Environmental Evaluation are outlined in Figure 2 and the detail of each element is outlined in the associated SOPS. (See Note 1).

2.3.3 The Safety and Health Offker’ is responsible for evaluating the Occupational and Environmental Risks associated with a process introduction or modification and it is through the assessment of associated reports (See Fig 2) and discussions with NPD, Tech Services and the Production departments that hazards are identified and the necessary controls are put in place.

2.3.4 The methodology as outlined in Figure 2 is systematic in nature however some iteration does exist between stages.

Reports arising from each stage of the methodology must be fully signed off before the process can be run on plant.

It is the responsibility of the originating department to ensure that the original copy of each fully approved report is forwarded to the Safety and Environment Officer for filing in the relevant Environment Protection/Health and Safeti File. ( See Attachment I File Record Sheet )

All Environment Protection / Health and Safety Files will be retained in the WWTP offke.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENVIRONMENTAL PROCEDURE

TITLE: MANAGEMENT OF PROCESS SAFETY

Page 4 of 5

SOP : 601.032 Effective Date:

Revision No: 0 Date: 14/06/02 Prev Rev No: Dated:

2.7 The Files will be reviewed on a three yearly cycle in order to ensure that they accurately reflect the processes as they exist on the plant. (See Attachment I File Record Sheet)

2.8 Any modification of an existing process will necessitate a review of the Environment Protection / Health and Safety File and it must be updated to reflect any changes made.

Figure 2: Protocol for Conducting Hazard Studies t

f Occupational and EnvironmGt~I

Hazard Studies I

Assessment’ (NPD SOP 940.001)

I

(S&E SOP 301.003)

(S&E SOP 301.001)

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENVIRONMENTAL PROCEDURE SOP :’

Page 5 of 5

TITLE: MANAGEMENT OF PROCESS SAFETY 601.032 Effective Date:

Revision No: 0 Prev Rev No:

Date: 14/06/02 Dated:

3.0 DOCUMENTATION Attachment I Example of :- File Record Sheet.

Q/S&E/S0P’~/Forms/601.032~Att. I File Record Sheet.doc

4.0 REVISION

This SOP is reviewed annually according to SOP 100.007. Any necessary changes will be documented

a in a new revision of this SOP.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

SAFETY & ENWRONMENTAL ATTACHMENT J

TITLE: FILERECORDSHEET.

Page 1 of 1

SOP:; 601.032 Effective Date:

Revision No: 0 Date: 14/06/02 Prev Rev No: Dated:

Environment Protection/Health & Safety File

Record Sheet.

Report Title Date

Beceived

Prepared by Checked and Complete

1

Chemical Reaction Hazard Report

Equipment Proposal Report

Preli,minary Hazard Analysis-Report

Equipment Design and EvaNation

. fi&&lp Report

Basis,of I%cess Safety Reck

Basis of Occupational and-~&kironmentaI

Protection Report

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

REVISION LOG

SOP TITLE: MANAGEMENT OF PROCESS SAFETY SOP NUMBER/CODE : 60 1 a032

REVISION NO. REQUESTED BY: REASON FOR REVISION EFFECTIVE DATE

0 DH To create new SOP

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33

:’

RECEIPT OF SOP CONFIRMATION

SOP TITLE:

MANAGEMENT OF PROCESS SAFETY

I acknowledge receipt of the above SOP.

1 have destroyed (returned in the case of Master BMI’s and CPs) the superceded revision of the SOP.

Signed: Department:

. .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 25-07-2013:15:32:33