Sonoma Ecology CenterTMDL Implementation Project Update
November 4, 2011
Funded by EPA, Managed by SFEP, Administered by MMWD, and north bay partnership organized and overseen by NBWA
QAPP Development
Sediment/turbidity monitoring QAPP is complete
BMI monitoring QAPP is in its final review by EPA
Implementation documentation QAPP - draft to be completed this year
Monitoring QAPP input on monitoring variables and
protocols Begun water quality data collection BMI monitoring sites selected Monitoring team trained
Permitting
Vegetation Management permits/CEQA extended.
Stormwater Management feature permits to be secured as needed.
Sonoma Creek Sediment TMDL
Main focus: steelhead troutState ListingSECTION 303(d):
SEDIMENT (NUTRIENTS & PATHOGENS)
FundingFUND STUDY TO
ASSESS POLLUTANT (SEDIMENT)
Limiting Factors
Analysis WHAT FACTORS LIMIT STREAM
HEALTH?Source
Analysis WHAT ARE THE MAIN SEDIMENT
SOURCES?Measures for Action HOW AND WHERE DO WE FOCUS IMPLEMENTATION?
(leads to site prioritization studies)
The SF Bay Fund pilot project – Site selection analysis focused on the upper watershed.
SEC’s current 319H funded work continues this analysis watershed wide.
Stream channel contribution
•67,700 tons/year
•64% human caused
TMDL Implementation Site Prioritization
We combined reach-scale sediment-supply data with habitat value data in a GIS analysis to identify priority sites for TMDL implementation.
Site selection began with the sub-watersheds defined as high sediment producers by the Sonoma Creek Sediment Source Analysis.
Prioritization process Step 1. Aquatic habitat value ranking Step 2. Sediment source ranking Step 3. Restoration amenability assessment
Assessing and Prioritizing Sites for
Restoration
•Creek assessments completed along 9 properties
• Identified 25 areas as potential restoration project sites
•Conducting additional outreach
Site assessments along
Sonoma Creek
Bottom. Photo from A-2; erosion and undercutting of upland area on left bank with undercutting of mature Bay laurel.
Above. Photo from A-1; undercut Bay laurel and erosion on right bank
Top. Photo from A-4; large sediment source from 30+ ft. incision along right bank.
Current Restoration Projects
Bottom. Retention basin 6 months after installation with germinated grass seed; project funded by CA Resources Agency.
Below. Willow revetment installation along the left bank of Sonoma Creek in Kenwood, CA, funded by CDFG, Fisheries Restoration Grant Program.
Top. Installation of a storm water detention basin seeded with native grasses at the Nathanson Creek Preserve Demonstration Garden.
Capacity Building
• Presentation to SV groundwater Technical Advisory Committee on history of sediment TMDL in Sonoma Valley
• Input on SCWA scoping study: providing landowner connections to potential sites, promoting distributed smaller-scale approaches with multiple long-term benefits
Capacity Building
Presented talks on watershed health scorecards and indicators, at California Sustainability Indicators Symposium in Feb 2011 and at Bay Area Watershed Network in May 2011.
Consultations with City of Sonoma: Agreement to move toward a watershed approach to the city's flood and stormwater challenges: see graphic showing Nat watershed draped over city
Sonoma Creek SubwatershedsNathanson Creek and the City of Sonoma