SOLARIS ENERGY ALBINA SOLAR PARK · Solaris Energy 49MW Pv Park Teaser ina 1 INVESTMENT PROPOSAL...
Transcript of SOLARIS ENERGY ALBINA SOLAR PARK · Solaris Energy 49MW Pv Park Teaser ina 1 INVESTMENT PROPOSAL...
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected]
• C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
Pag
ina1
INVESTMENT PROPOSAL EXT01 - 05.07.2012
SOLARIS ENERGY 49 MW PHOTOVOLTAIC SOLAR PARK
STUDY DEVELOPER : SC ARMAND CONSULTING SRL
ADDRESS : STR. PIATA A.MOCIONI, NR.6, TIMISOARA
TEL : 0356 414 175
FAX : 0356 414 173
MAIL : [email protected] ; [email protected]
WEB : www.armandconsulting.eu ; energy.armandconsulting.eu
SOLARIS ENERGY ALBINA SOLAR PARK
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected]
• C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina2
Pag
ina2
TEHNICAL PROPOSAL NR. EXT01/05.07.2012
SOLARIS ENERGY SOLAR PARK
PROJECT DEVELOPER : SOLARIS ENERGY ALBINA S.R.L. - Timisoara
PROJECT TYPE : ground fix – grid connected – full feed
NR. OF PV PANELS : 217.382 solar panels – 230W poly
PEAK POWER INSTALLED : 50.000 Kwp DC [50Mwp DC] – 49.000 Kw AC [ 49 MW AC ]
FIXED SYSTEM: inclination=30 deg.,orientation=0 deg. (optimum)
DETAILS : The PV Solar park will be built on a flat land near Timisoara, Timis County, Romania.
AREA : 954.200 m2
LOCATION : Mosnita Noua Village, Timis County - 45.70351 North, 21.33171 East, Elevation: 60 m
a.s.l.,
ENERGY PRODUCTION (P50) : 61883 MwH or 1238Kwh/Kwp
INVESTMENT VALUE : 73.500,000.00 €
INCOME G.C. : 20.421.230,00 €
INCOME ELECTRICITY : 2.475.320,00 €
LAND LEASE : 50.000 €/Year
PAYBACK : 5 years in net terms
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected]
• C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina3
Pag
ina3
Location : Mosnita Noua Village, Timis County - 45.70351 North, 21.33171 East, Elevation: 60 m a.s.l.,
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected]
• C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina4
Pag
ina4
SSOOLLAARR PPLLAANNTT AARREEAA MMAAPP
A.859/6
A897/1
/830000.0
0m
p
15000.0
0m
p
A897/1
/16
20000.0
0m
p
A897/1
/17
20000.0
0m
p
A897/1
/18
22000.0
0m
p
A897/3
/10
20000.0
0m
pA897/3
/11
5000.00mp
A897/3/8
1800.00mp
15200m
p
A897/3
/320000m
pA897/3
/415000m
p
A897/3/6
A897/3
/718200m
p
15251m
p
20067m
p
15050m
p
18739m
p
A887/4
20000.0
0m
p
A887/5
20000.0
0m
p
A887/6
20000.0
0m
p
A887/7
A897/3
/2
A897/2
/640000m
p
A897/2
/713000m
pA897/2
/848900m
p
A897/2
/99400m
p
A897/2
/10
20200m
p
A897/2
/11
6200m
p6175.8
5m
p
20121.3
2m
p9363.3
9m
p
48709.5
3m
p
12949.3
7m
p
39844.2
0m
p
15000.0
0m
p
A888/5
15000.0
0m
p
A888/6
17300.0
0m
p
A870/1
22700m
p
A870/2
20000m
p
A870/3
6000m
p
19110.8
8m
p
5733.2
6m
p
DE 865/1
DE 865/2
DE 889
DE 869
DE
878
-4.44%
NR.50977/09
2
7
8
5
6
A84935446/2010-licitatii
3
4
5
67
8
9
10
11
1415
18
A85935450/2010-licitatii
3
4
5
10
12
131415
1617
18
A86435452/2010-licitatii
1
2
3
35454/2010-licitatii
4
5
6
35456/2010-licitatii
1
2
3
4
6
7
A873
35458/2010-licitatii
45
6
8
5
62
34
6
7
8
10
1116
17
18
20
21
22
23
24
25
26
27
28
29
30
31
3031
17
21
23
29
3
4
5
6
910
12
1316
78
11
A987/2
410381
407242
410382
410383
410562
410385
410387
402051
410389
410181
409540
410184
410185
410186
410994
410187
410188
410191
410199
410345
410455
410456
410330
407976
410329
410038
410896
410189
410897
410898
410900
410438
410439
406821
410375
410537
410422
410573
410339
410538
410539
4103
22
4103
46
4103
50
410483
410490
410492
4104944
10748
410497
410518
410519
410520
410521
410522
410523
410541
411079
411081
411089
411090
411123
411082
411086
410412
410413
410409
410407
410400
410397
406817
A 8
77/4
A 8
77/4
A877
407747
A.859/6
A89
7/1/
8300
00.0
0mp
150
00.0
0mp
A89
7/1/
16
200
00.0
0mp
A89
7/1/
17
200
00.0
0mp
A89
7/1/
18
220
00.0
0mp
A89
7/3/
10
200
00.0
0mpA
897/
3/11
5000.00mp
A897/3/8
1800.00mp
152
00m
p
A89
7/3/
3200
00m
pA89
7/3/
4150
00m
p
A897/3/6
A89
7/3/
7182
00m
p
152
51m
p
200
67m
p
150
50m
p
187
39m
p
A88
7/4
200
00.0
0mp
A88
7/5
200
00.0
0mp
A88
7/6
200
00.0
0mp
A88
7/7
A89
7/3/
2
A89
7/2/
6400
00m
p
A89
7/2/
7130
00m
pA89
7/2/
8489
00m
p
A89
7/2/
9940
0mp
A89
7/2/
10202
00m
p
A89
7/2/
11620
0mp
617
5.85
mp
201
21.3
2mp
936
3.39
mp
487
09.5
3mp
129
49.3
7mp
398
44.2
0mp
150
00.0
0mp
A88
8/5
150
00.0
0mp
A88
8/6
173
00.0
0mp
A87
0/1
227
00m
p
A87
0/2
200
00m
p
A87
0/3
600
0mp
191
10.8
8mp
573
3.26
mp
DE 865/1
DE 865/2
DE 889
DE 869
DE
878 -4.44%
NR.50977/09
2
7
8
5
6
A84935446/2010-licitatii
3
4
5
67
8
9
10
11
1415
18
A85935450/2010-licitatii
3
4
5
10
12
131415
1617
18
A86435452/2010-licitatii
1
2
3
35454/2010-licitatii
4
5
6
35456/2010-licitatii
1
2
3
4
6
7
A873
35458/2010-licitatii
45
6
8
5
62
34
6
7
8
10
1116
17
18
20
21
22
23
24
25
26
27
28
29
30
31
3031
17
21
23
29
3
4
5
6
910
12
1316
78
11
A987/2
410381
407242
410382
410383
410562
410385
410387
402051
410389
4101
81
4095
40
4101
84
4101
85
4101
86
4109
94
4101
87
4101
8841
0191
4101
99
410345
410455
410456
410330
407976
410329
410038
410896
410189
410897
410898
410900
410438
410439
406821
410375
410537
410422
410573
410339
410538
410539
4103
22
4103
46
4103
50
410483
410490
410492
4104944
10748
410497
410518
410519
410520
410521
410522
410523
410541
411079
411081
411089
411090
411123
411082
411086
41041
2
410413
41040
9
41040
7
41040
0
41039
7
40681
7
A 8
77/4
A 8
77/4
A877
407747
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected]
• C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina5
Pag
ina5
GGRRIIDD CCOONNNNEECCTTIIOONN
Existing 220Kv Electric Line
Existing 220Kv Electric Line
New 63MVA 20/110Kv Station Estimated Grid Connection Cost – 3,5 Mil.Euro
Mosnita Noua
Mosnita Noua Solar Park Location
95 HA – multiple land plots leased
New 20/110kv Station
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina6
Pag
ina6
Solar Radiation and Energy Output
Solar Radiation & Plant Output
Mosnita Noua, Timis
SOLAR RADIATION : Mosnita Noua is located approximately in the western part of Transylvania, Romania in an area with high radiation levels. To calculate
the dimension of the pv array we have taken into consideration a radiation level
for optimally inclined solar panels of 1540 kWh/m2.
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina7
Pag
ina7
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina8
Pag
ina8
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina9
Pag
ina9
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
0
Pag
ina1
0
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
1
Pag
ina1
1
P50 – PvSyst Initial Energy Yield
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
2
Pag
ina1
2
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
3
Pag
ina1
3
Solar Radiation and Energy Output
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
4
Pag
ina1
4
TECHNOLOGY :
Photovoltaic cells are made of special materials called semiconductors such as silicon, which is
currently used most commonly. Basically, when light strikes the cell, a certain portion of it is
absorbed within the semiconductor material. This means that the energy of the absorbed light is transferred to the semiconductor. The energy knocks electrons loose, allowing them to flow freely.
PV cells also all have one or more electric field that acts to force electrons freed by light absorption
to flow in a certain direction. This flow of electrons is a current, and by placing metal contacts on the
top and bottom of the PV cell, we can draw that current off for external use. This current, together
with the cell's voltage (which is a result of its built-in electric field or fields), defines the power (or
wattage) that the solar cell can produce.
PV systems provide direct current (DC) voltage. To feed to the grid, this DC voltage has to be
inverted to the grid alternating current (AC) voltage by a grid-tied inverter, synchronizing automatically its AC output to the exact AC voltage and frequency of the grid.
This MPP fluctuates during operation in an interval depending on the radiation, the cell temperature and the cell type und has so to be tracked by the inverter controlling unit.
The second important job of the solar power inverter is to control the PV system to run near its
Maximum Power Point (MPP), the operating point where the combined values of the current and
voltage of the solar modules result in a maximum power output. This MPP fluctuates during
operation in an interval depending on the radiation, the cell temperature and the cell type und has so
to be tracked by the inverter controlling unit.
SOLAR PV
PANELS INVERTERS +
MEDIUM AND
HIGH VOLTAGE
TRANSFOMER
ROMANIAN
NATIONAL POWER GRID
Technology Description
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
5
Pag
ina1
5
FINANCIAL SUSTAINABILITY OF THE INVESTMENT
SOLARIS ENERGY 49 MW SOLAR PARK
Project Financials – SOLARIS ENERGY Solar Park
Location – Mosnita Noua Village, Timis County, Romania
Land Area – 954.200 m2
Land Ownership – 30 Years Rent (with a buying option)
Land Lease Cost – 50.000 € / Year (included in the Operational Costs)
Global Horizontal Radiation – 1321 Kwh/m2
Global opt.angle Radiation – 1540 Kwh/m2
Distance to 110kv Line – 50 m
Optimum tilt angle – 330
Azimuth - 00
Installed Power -50 MWp dc – 49MW ac
Project Cost - 73,50 Mil. €
Specific Cost - 1.5 €/Wp
Energy Production - 61.883 Mwh
Operational Costs - 304.500 €
Total Income - 22.896.710 € (GC’s at 55€) max
17.327.240 € (GC’s at 40 €) med
13.614.260 € (GC’s at 30 €) min
Ebitda - 22.592.210,0 € (GC’s at 55€) max
17.022.740,0 € (GC’s at 40 €) med
13.309.760,0 € (GC’s at 30 €) min
IRR - 34 % (GC’s at 55€)
26 % (GC’s at 40 €)
NPV - 228.314.230,4 € (GC’s at 55€)
153.841.850,1€ (GC’s at 40 €)
Payback - 5 years own capital (GC’s at 55€)
6 years own capital (GC’s at 40 €)
Estimated start of financing & works –January 2013
Estimated start of plant operation - April 2013
Financial Input Data :
Table 1 – Energy – 40 € / Mwh
Green Certificates – 6 X 30 € / Mwh
Table 2 – Energy – 40 € / Mwh
Green Certificates – 6 X 40 € / Mwh
Table 3 – Energy – 40 € / Mwh
Green Certificates – 6 X 55 € / Mwh
Investment Financials
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Solaris Energy 49MW Pv Park Teaser
Pag
ina1
6
Pag
ina1
6
Investment Costs : Solaris Energy Solar Park
Civil Works
Acces and inner lanes
Foundations,
Ditches and drainage,
Vegetation clearance,
Plot fencing.
Electrical Installation
AC & DC cabling and protections installation
Grounding
Monitoring & Lighting
New 63MVA 20/110kv Transformer Station with 50m -
110kv line
Safety and Security
Microwave barrier & CCTV
Equipment & Materials
Central Inverters
0.4/20kv Transfomers
PV Modules
Structures
AC & Dc materials and cabling
Surveillance material
SPV Land, license, permits, taxes and green bonds contracts. + Full
tehnical project for the solar park and transformer station
WITHOUT VAT VAT INC.VAT
TOTAL COST 73.500.000,00 EURO 17.640.000,00 EURO 91.140.000,00 EURO
SPECIFIC COST 1.5 €/Wp 0.36 €/Wp 1.86 €/Wp
Investment Financials
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
e17
Cash Flow Table I:GC at 30 Euro Year 1 2 3 4 5 6 7 8 9 10
Income 13614260 14158830,4 14725183,62 15314190,96 15926758,6 16563828,94 17226382,1 17915437,38 18632054,88 19377337,08 Total operating
costs 304500 319.725,00 335.711,25 352.497 370.122 388.628 408.059 428.462 449.885 472.379
Investment 73.500.000,00 0,00 0,00 0 0 0 0 0 0 0 Cash-Flow
operational 13309760 13.839.105,40 14.389.472,37 14.961.694 15.556.637 16.175.201 16.818.323 17.486.975 18.182.170 18.904.958
Profi tax 16 % 2129561,6 2214256,864 2.302.316 2.393.871 2.489.062 2.588.032 2.690.932 2.797.916 2.909.147 3.024.793 Net Cash Flow 11180198,4 11.624.848,54 12.087.156,79 12.567.823 13.067.575 13.587.169 14.127.391 14.689.059 15.273.023 15.880.164 Cash-Flow net
operational cum.
-62.319.801,60 -48.734.953,06 -34.687.796,28 -20.159.973,19 -5.132.398,16 10.414.770,86 26.502.162,16 43.151.221,42 60.384.243,96 78.224.408,37
Year 11 12 13 14 15
Income 20152430,56 20958527,78 21796868,89 22668743,65 23575493,39
Total operating costs
495.998 520.798 546.838 574.180 602.889
Investment 0 0 0 0 0 Cash-Flow
operational 19.656.432 20.437.729 21.250.031 22.094.563 22.972.604
Profit tax 16 % 3.145.029 3.270.037 3.400.005 3.535.130 3.675.617 Net Cash Flow 16.511.403 17.167.693 17.850.026 18.559.433 19.296.988 Cash-Flow net
operational cum.
94.735.811,37 113.863.504,11 133.673.529,85 154.192.963,17 175.449.950,72
Investment Financials
PI at 6% cc:
2,42 €
NPV at 10% cc :
52.519.579,27 €
NPV at 6% cc:
104.193.596,5 €
PI at 10% cc:
1,71 €
IRR
FINANCIAL
INDICATORS
20%
Chart No.1. Evolution of the main financial indicators during the analysed period of time
MOSNITA 49 MW
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
e18
Cash Flow Table II:GC at 40 Euro Year 1 2 3 4 5 6 7 8 9 10
Income 17327240 18020329,6 18741142,78 19490788,5 20270420,04 21081236,84 21924486,31 22801465,76 23713524,39 24662065,37 Total operating
costs 304500 319.725,00 335.711,25 352.497 370.122 388.628 408.059 428.462 449.885 472.379
Investment 73.500.000,00 0,00 0,00 0 0 0 0 0 0 0 Cash-Flow
operational 17022740 17.700.604,60 18.405.431,53 19.138.292 19.900.298 20.692.609 21.516.427 22.373.004 23.263.639 24.189.686
Profi tax 16 % 2723638,4 2832096,736 2.944.869 3.062.127 3.184.048 3.310.817 3.442.628 3.579.681 3.722.182 3.870.350 Net Cash Flow 14299101,6 14.868.507,86 15.460.562,49 16.076.165 16.716.251 17.381.792 18.073.799 18.793.323 19.541.457 20.319.336 Cash-Flow net
operational cum.
-59.200.898,40 -42.372.390,54 -24.951.828,05 -6.915.663,03 11.760.587,61 31.102.379,25 51.136.178,09 71.889.501,18 93.390.958,12 115.670.294,30
Year 11 12 13 14 15
Income 25648547,98 26674489,9 27741469,5 28851128,28 30005173,41
Total operating costs
495.998 520.798 546.838 574.180 602.889
Investment 0 0 0 0 0 Cash-Flow
operational 25.152.550 26.153.692 27.194.631 28.276.948 29.402.284
Profit tax 16 % 4.024.408 4.184.591 4.351.141 4.524.312 4.704.365 Net Cash Flow
Cash-Flow net
operational cum.
21.128.142 21.969.101 22.843.490 23.752.636 24.697.919
136.798.435,94 160.727.536,85 185.531.027,10 211.243.663,52 237.901.582,28
PI at 6% cc:
3,09 €
NPV at 10% cc :
87.722.865,16 €
NPV at 6% cc:
153.841.850,1 €
PI at 10% cc:
2,19 €
IRR
FINANCIAL
INDICATORS
26%
Chart No.2. Evolution of the main financial indicators during the analysed period of time
MOSNITA 49 MW
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
e19
Cash Flow Table III :GC at 55 Euro Year 1 2 3 4 5 6 7 8 9 10
Income 22896710 23812578,4 24765081,54 25755684,8 26785912,19 27857348,68 28971642,62 30130508,33 31335728,66 32589157,81 Total operating
costs 304500 319.725,00 335.711,25 352.497 370.122 388.628 408.059 428.462 449.885 472.379
Investment 73.500.000,00 0,00 0,00 0 0 0 0 0 0 0 Cash-Flow
operational 22592210 23.492.853,40 24.429.370,29 25.403.188 26.415.791 27.468.721 28.563.584 29.702.046 30.885.843 32.116.778
Profi tax 16 % 3614753,6 3758856,544 3.908.699 4.064.510 4.226.526 4.394.995 4.570.173 4.752.327 4.941.735 5.138.685 Net Cash Flow 18977456,4 19.733.996,86 20.520.671,04 21.338.678 22.189.264 23.073.726 23.993.410 24.949.719 25.944.109 26.978.094 Cash-Flow net
operational cum.
-54.522.543,60 -32.828.546,74 -10.347.875,70 12.950.802,20 37.100.066,25 62.133.791,84 88.087.201,99 114.996.920,84 142.901.029,36 171.839.123,19
Year 11 12 13 14 15
Income 33892724,12 35248433,09 36658370,41 38124705,23 39649693,43
Total operating costs
495.998 520.798 546.838 574.180 602.889
Investment 0 0 0 0 0 Cash-Flow
operational 33.396.726 34.727.635 36.111.532 37.550.525 39.046.804
Profit tax 16 % 5.343.476 5.556.422 5.777.845 6.008.084 6.247.489 Net Cash Flow
Cash-Flow net
operational cum. 28.053.250 29.171.213 30.333.687 31.542.441 32.799.316
199.892.372,78 231.023.585,97 263.317.272,98 296.819.714,04
331.579.029,62
PI at 6% cc:
4,11 €
NPV at 10% cc :
140.527.793,9 €
NPV at 6% cc:
228.314.230,4 €
PI at 10% cc:
2,91 €
IRR
FINANCIAL
INDICATORS
34%
Chart No.3. Evolution of the main financial indicators during the analysed period of time.
MOSNITA 49 MW
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
0
Pag
ina2
0
Note : All the financial indicators where calculated taking into consideration a 1% drop in module
efficiency each year.
Due to its extensive experience in the renewable energies field, Armand Consulting always keeps the
following criteria in their investments:
Caution: We handle all the activities, from the company constitution (which owns all the
licences), land leases, regulations, suppliers, etc.
Minimal risk: getting all warranties, product certificates (all bankable),contracts maintenance, all
kinds of insurance (production, theft...).
Tranquillity Financial: Although we are protected by the law 220/2008 and it has a power
purchase obligation, we have signed a private contract with a major electricity distributor, to
ensure a fixed income during the loan repayment banking. This ensures a stable return and
guarantees income.
Operation & Maintenance :
All the projects will have the minimum required employees for plant surveillance and security.
The solar parks will be remotely monitored with CCTV camera. The plant will be equipped with
the control and monitoring system that will allow the remote operation of the plant, with
immediately stops and faults detection, letting a fast response. The monitoring of the plant will
be done at string level, in order to facilitate the early detection of any malfunction in the strings
and/or modules. The Monitoring of the strings is done directly by the inverter, with SCADA
system interconnected to a WEB interface system, for the remote diagnose and control for the
plant.
EPC guarantees :
Modules – 10 years for product defects and materials
- 10 years for 90% of the panels minimum power output
- 25 years for 80% of the minimum power output
Inverters – 10 years standard warranty ( extension to 15 years possible )
Structures – 25 years rust warranty
Sales :
The law 220/2008 states that the solar energy producers will receive 6 green certificates per 1
Mwh produced.
The energy will be sold at 40 Euro/Mwh with a fixed income power purchase agreement
The green certificates will be sold at 55 Euro/G.C. to a energy supplier with a fixed price based on a
green certificates purchase agreement.
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
1
Pag
ina2
1
Permits and Authorizations
Topographic study – Yes
Geological study – Yes
Feasabillity Study – Yes
Land Ownership – 30 years lease – Yes + Buying Option
Urban Planning – Yes
Enviroment Permit – November 2012
Electrica Company Location Permit – Yes
Grid Connection Permit – August 2012
Build Permit for Solar Park – November 2012
Build Permit for Grid Connection – November 2012
ANRE license authorization – after the plant construction
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
2
Pag
ina2
2
GREEN CERTIFICATES MARKET IN ROMANIA
Solar energy is one of the most important priorities of the local and foreign investors that operate on
the renewable energy market. The technology for producing solar panels follows an ascending trajectory
due to the investments that have been made into this domain oriented towards innovation with the
objective of increasing returns of the solar cells and so of the solar photovoltaic energy production capacities.
During the year 2007 the installed capacity in Romania was 0.81 MW.
Until now, the less clear aspects of the Romanian energy market legislation have restricted the amount
of foreign investments.
Through the new adopted form of law 220/2008 that became 139/2010 , for every 1 MwH produced
from solar pv source are granted 6 green certificates, 2 green certificates for electricity obtained of wind sources, the minimum value fo a certificate being 27 euros, maximum value 55 euros.
The specialists’s opinion says that this will lead to more investments in the energy sector.1
According to Transelectrica, the demand for energy in Romania will double in the next 20 years.
Otherwise, according to the Romanian National Energetic Strategy, the solar potential of the country
can generate 1,2 TWH of electricity annualy, meaning 2,5% of the present national consumption. The West of the country and Dobrogea area are the most appropriate areas for this kind of investments.
The rapid increase of the investments in solar photovoltaic energy production capacities is expected to
follow this trend at least for the next 3 years and as a result it is estimated an ascending trend of the
installed capacity until 2013 according to the predictions made by EastInvest.
1 Wall-street.ro, INTERVIEW-Schneider-The investors were carried away by wind wave and forgot about the solar
energy
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
3
Pag
ina2
3
Romanian Renewable Energy Policy
• in accordance with the EU resolution as of December 2008, Romania has to achieve 33% of its gross
energy consumption out of Renewable Energy Sources (RES) by 2010 which it has already achieved based
on Eurostat data;
• Law no 220/2008 regarding the incentives for RES developments sets new goals for the years 2015 (35%)
and 2020 (38%). The law no 220/2008 is expected to become effective by the end of 2011;
Romanian Green Certificate System
Incentives for RES Producers
• Green Certificates (GC) incentive structure:
o The governing bodies have set a mandatory quota for energy distributors in Romania requiring
them to purchase a certain percentage of energy produced from RES each year or to alternatively
acquire a suitable number of GCs (Appendix 1);
o The penalty for not complying with mandatory quota is EUR 110/MWh;
o A Green Certificate (GC) is a document that certifies the generation of 1 MWh of non-pollutant
energy;
o GCs are traded on a special purpose market (the Green Certificate Market);
o 3 GC for 1 MWh E-RES delivered into the network from hydro power plants - 10 MW – new
o 2 GC for 1 MWh E-RES delivered into the network from hydro power plants - 10 MW -
refurbished.
o 1 GC for 2 MWh E-RES produced in hydropower plants of 10 MW (not refurbished and not new)
o 2 GC for 1 MWh E-SRE for wind power plants until 2017 and 1 GC for 1 MWh starting with 2018
o 3 GC for 1 MWh E-RES delivered into the network from biomass, bio liquid, gas from wastes
fermentation, geothermal
o 6 GC for 1 MWh E-RES delivered into the network from photovoltaic installations
Provisions of
GCs
Eligible
Renewable
Energy
Producers
Regulator
Quota=mandatory
quota*energy sold to
final customers
Power Suppliers Trading
Platform:
Bilateral and
Centralized
Market
GC offer GC
demand
Transelectrica
Penalty if less GCs
purchased as obliged
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
4
Pag
ina2
4
o The market price for one GC is established by free market mechanisms with a floor and cap at
EUR 27 and EUR 55.
Romanian Green Certificates Evolution:
Indicator 2007 2008 2009 2010
Total RES production MWh
46,299
132,445
241,517
676,606
- micro hydropower
38,752
121,452
13,525
290,045
- wind
7,547
10,993
197,802
277,439
- biomass
30,190
112,115
- photovoltaic
-
7
Total RES installed capacity MW 47 47.3 97.4 547.9
- micro hydropower
40.3 40.4 74.3 75.7
- wind
6.7 6.9 14.2 448
- biomass
0 0 8.00 23.3
- photovoltaic
0.9 0.9
Number of participants
99 136
- Nr of RES producers
registered to GCM
80 87 95 115
- micro hydropower
6 11 14 17
- wind
11 12 15 22
- biomass
0 0 1 3
- photovoltaic
0 0 1 1
- Nr. of suppliers registered to
GCM
63 64 64 72
Total GC available on the
market
46,229
132,445
256,635
693,463
- total GC issued
46,229
132,445
241,517
676,606
- total GC reported from the
previous year
15,118
16,857
Number of GC traded
38,939
111,948
207,398
345,611
- on bilateral contracts producers-
suppliers
0 14904
56,389
74,514
- on centralized GC Market
37703 95593
141,607
238,398
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
5
Pag
ina2
5
- on bilateral contracts suppliers-
suppliers
1236 1451 9402
32,699
Final gross consumption of
electricity MWh
53,368,00
0
54,610,00
0
54,630,00
0
49,920,00
0
Time period for granting Green Certificates:
15 years for E-RES produced in new installations;
7 years for E-RES produced in installations from import, which were used out of Romania, but not older
than 10 years and according with the environmental standards;
10 years for E-RES produced in hydro installations until 10 MW refurbished; and
3 years for E-RES produced in hydro installations until 10 MW non refurbished
Chart No.1. The evolution of energy production in installed capacities(MW) following the capitalizatin of
the solar potential in Romania over the period 2011-2020
Source:calculated using Table No.2. database
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
6
Pag
ina2
6
Projections Green Certificates Market and Solar Energy Romania
Year Supply GC Demand GC Total Energy
Consumption
Mandatory
quota GC
2008 132376 2477292 47096816 0,0526
2009 256635 2905779 42858103 0,0628
2010 400000 3557000 42850000 0,083
2011 630720 4370700 43707000 0,10
2012 1576800 5139943,2 42832860 0,12
2013 1655640 5936634,396 42404531,4 0,14
2014 1738422 6551500,101 43676667,34 0,15
2015 1825343,1 7023208,109 43895050,68 0,16
2016 1916610,255 7514393,726 44202316,03 0,17
2017 2012440,768 7399467,704 41108153,91 0,18
2018 2113062,806 8357287,69 43985724,68 0,19
2019 2218715,946 8748760,64 44865439,18 0,20
2020 2329651,744 8703895,201 43519476 0,20
Supply and Demand Evolution on Green Certificates market in Romania, 2008-
2020 period
Source: calculated using Table No.3 database
From the upper table it is not difficult to notice the gap between Supply and Demand.
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
7
Pag
ina2
7
If we assume that the current level of energy consumption will remain constant at around 43.000.000
Mwh/year and the obligatory quota goes up to 20% (even ignoring the long-term GDP growth-
which will favour the energy producers in this model), the Demand(GC) must be around 9.000.000 in 10 years from now.
It is expected that the Supply will not reach the Demand level very soon. In this case the Supply remains consistently smaller than the Demand(at 55 euro).
The equilibrium price is above 55 euro and the price ceiling system will return the price 55(+ inflation-indexed growth –which is also in the advantage of the suppliers).
If we look at the transaction statistics published by OPCOM (the trading system for green certificates in
Romania), the gap between the Demand and the Supply is confirmed also at the monthly level( even if the Demand has an annual component too).
The quotas for 2011-2030 period are established by the resort ministry and will not be smaller that the established quota for year 2020.
The conclusion reveals the long-term profitability with a mininum risk associated to the investments in
solar photovoltaic energy production capacities.
The project has it’s own SPV and is fully permitted (ready to build) :
Land Planning approval
Electrical Company location approval
Firefighter approval
Enviroment approval
Eelctrical Company grid connection approval
Building permit (including conection build permit)
There are topographic studies and geological studies for the land. We are working on the
feasabillity study and the full tehnical project for the park and grid connection.
Important aspect : the SPV will be sold with both build permits : for the solar park and for the
new grid connection !
The SPV has leased the land – 954.200 sqm for 30 years. The rent cost’s is 50.000 Euro/Year.
SOLARIS ENERGY ALBINA LLC - SPV Share Price :
For this project we can take into consideration the full sale of the shares owned by the SPV at an
estimated cost of 200.000 Euro/ authorized MW for wich the buyer receives an SPV with the ready
to build project, topographic studies, geotehnical study, all the licenses and permits, the feasability
study and the full tehnical project and our full support in implementing the project.
The deadline for obtaining all the permits is December 2012
300431 Timişoara, Romania, Str. Piata A.Mocioni nr. 6 • Tel: 0747-047.800 • Fax: 0356-414.175 • [email protected] • C.U.I RO 25347464 – Registrul. Comerţului. J35/709/2009 – www.armandconsulting.eu
Pag
ina2
8
Pag
ina2
8
For more info please contact :
D A R I U S G E O R G I U R E N A T O D O I C A R U
+ 4 - 0 7 3 2 0 2 7 4 1 5 + 4 - 0 7 2 7 1 5 6 2 5 5
Tel: +40-356.414.175 / Telefon mobil: +40-747.047.800 / Fax: +40-356.414.173
www.ArmandConsulting.eu
www.ArmandEnergy.ro