Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s...

18
Solar Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27, 2015

Transcript of Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s...

Page 1: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

Solar Resource Assessment: An EPC Contractor’s Perspective

NREL Solar Resource Workshop

Owen Westbrook – juwi solar Inc

Feb. 27, 2015

Page 2: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

 

juwi solar Inc. (“JSI”)

juwi solar Inc.

Based in: Boulder, Colorado

Employees: 50+

Business Unit: Solar Photovoltaic (>128 MW)

juwi Global

Based in: Wörrstadt, Germany

Founded/CEOs: 1996, Fred Jung and Matthias Willenbacher

Employees: >1,250 for all divisions

Business Units: Two renewable energy generation business units: • Solar Photovoltaic

(1.5 GW) • Wind (1 GW)

juwi solar Inc. (“JSI”), a Delaware corporation founded in 2008, is an experienced and reliable solar developer and engineering, procurement and construction (“EPC”) contractor with a proven track record of working successfully with major utilities across the U.S. to realize reliable, cost competitive projects.

JSI has constructed over 128 MW of solar PV capacity across the U.S. since 2009, and has successfully financed over $497 million of JSI-developed projects.

juwi provides O&M and/or monitoring services for more than 600 MW of projects worldwide.

JSI and juwi AG have installed over 1,500 solar PV installations (1.5 GW) throughout the world.

19 MW Badger I Solar Facility

Page 3: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

           

Outline

1. Proposal Phase a. Objectives of Solar Resource Assessment b. Constraints c. Typical Process d. Best Practices e. Potential Improvements

2. Financing/Construction Phase

3. Operations Phase

4. Real-World Monitoring Challenges

Page 4: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

         

       

Solar Resource Assessment Proposal Phase

• Objectives: - Create & optimize initial system design (fixed-tilt vs. tracking, DC/AC ratio, etc.) - Estimate energy generation - Determine energy price - Characterize long-term variability

• Constraints: - Short lead times - Long-term ground-based data usually not available - Underestimating the solar resource may result in an uncompetitive bid; overestimating may make the project uneconomic to finance - At this stage, solar resource may not be the greatest source of pricing uncertainty (geotech/civil costs, interconnection costs, etc.)

Page 5: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

       

         

Solar Resource Assessment Proposal Phase

• Typical Process - Rely on satellite-based data - NREL Solar Power Prospector or third-party services - Base generation estimates on typical year data

• Best Practices - Avoid taking data at face value - verify that typical year data is indeed “typical!” - Check for terrain that may increase satellite model error - Check for data anomalies in adjacent tiles - If local high-quality ground data sources are available, spot check individual years

Page 6: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

     

Typical Year Data Verification

GHI DNI

Long-term Mean Long-term Mean Typical Year Data Typical Year Data

• Check for consistency by comparing typical year data against long-term mean: - Annual and monthly GHI, DNI, DHI totals - Annual and monthly irradiance-weighted ambient temperatures

• How much inconsistency is too much?

• How to rectify inconsistencies?

Page 7: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

   

Solar Resource Assessment Proposal Phase

• Potential Improvements - Shortage of reliable, publicly available data for the Americas ex-US (Canada, Central/Latin America, the Caribbean) in publicly-available data

- Wider availability of subhourly data; drive performance modeling software providers to enable use of subhourly data

- Phase out the use of TMY data sets; enable software to load and run long-term satellite data sets (1998-present) quickly and easily

http://maps.nrel.gov/prospector

Page 8: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

     

   

      

Solar Resource Assessment Financing Phase

• Objectives: - Validate satellite data with ground-based measurements - Provide confidence to investors that generation estimates underpinning the revenue expectations and performance guarantees can be met

• Constraints: - Solar resource can be a major lingering source of uncertainty - Investor familiarity with satellite data and sensors is critical - Development budgets are limited before financing - Sites are often in inaccessible, remote locations - Cleaning and maintenance on a regular schedule may not be possible - For most projects, DHI/DNI sensors are not practical

Page 9: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

             

       

Solar Resource Assessment Financing Phase

• Best Practices: - Ground-based data collection should last ~1 year to capture seasonal effects - At least three sensors to identify outliers and data errors - Use same sensor type that will be installed at the plant for ongoing monitoring - Regular cleaning when possible - Cross-check data with nearby ground stations when possible - Regression analysis to correct satellite data

• Potential Improvements: - Cheap, reliable, high-accuracy DHI/DNI sensors - Self-cleaning sensors - Consistent data formats for different public data sources (MIDC, NOAA, ISIS, etc.)

Page 10: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

Satellite Data in Complex Terrain

• Satellite Tile A has 1.5% lower average annual GHI than Tile B

• Tiles B and C have comparable GHI

• Ground data at the project site needed to determine the true solar resource

Page 11: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

      

     

    

Solar Resource Assessment Operations Phase

• Objectives: - Monitor and analyze performance on an on-going basis - Validate the initial generation model - Provide input data for short-term and long-term performance guarantees

• Constraints: - POA irradiance most relevant for PV performance metrics - Owner/investor may have limited appetite for paying for measurements that do not directly relate to performance - Original energy model likely used GHI/DHI - Deployment of multiple GHI sensors, DNI/DHI sensors may not be possible - Real world data is messy!

Page 12: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

         

         

Solar Resource Assessment Operations Phase

• Best Practices - Careful attention to sensor mounting locations and developing repeatable procedures - Avoid obstructions and diffuse shading effects - Verification of tilt/azimuth alignment for POA sensors -Ongoing data quality verification throughout operations

• Potential Improvements - Lower cost DHI/DNI sensors - Self-cleaning sensors - Ability to run subhourly data in performance modeling software - Ability to run POA irradiance data for trackers in performance modeling software

Page 13: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

Pyranometer Alignment Te

mp-

Adj

. PR

POA Irradiance

Pyranometer #1 Pyranometer #2

Tem

p-A

dj. P

R

Average of All Pyranometers Inverter-level PR

Tem

p-A

dj. P

R

Page 14: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

30

35

1200

Pyranometer Azimuth Verification Model vs. Measured POA Irradiance Errors

POA Pyranometer 1 - Calculated True Azimuth = 179.9o

25

POA1 POA2 POA3

fit azimuth 20 values 15

10

5

0175 176 177 178 179 180 181 182 183 184 185

Minima

0

200

400

600

800

1000

1200

Modeled POA Measured POA

indicate best-

RMSE

(W/m

2 )

Irrad

ianc

e (W

/m2 )

Irrad

ianc

e (W

/m2 )

5 10 15 20Azimuth (o) Hour of Day

POA Pyranometer 2 - Calculated True Azimuth = 177.2o POA Pyranometer 3 - Calculated True Azimuth = 180.4o

0

200

400

600

800

1000

1200

Modeled POA Measured POA

Modeled POA Measured POA

5 10 15 20

1000

800

600

400

200

Morning Shading on POA #2

Irrad

ianc

e (W

/m2 )

5 10 15 20 Hour of Day Hour of Day

Calculated azimuths: 179.9, 177.2, 180.4

0

Page 15: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

Sensor Replacement

Pyranometer Swap Date

GHI Pyranometer Satellite Data

• 30 days prior to pyranometer swap: GHI pyranometer within 1% of satellite data

• 30 days after the swap: GHI pyranometer almost 8% above satellite data

• By late June/July, good agreement again between ground and satellite data

Page 16: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

Pyranometer Shading

Treeline Shading

POA Irradiance

GHI

Equipment Mast

POA Irradiance

GHI

Page 17: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

One Last Data Curiosity…

Irra

dian

ce (

W/m

2 )

Partial Solar

Eclipse!

Page 18: Solar Resource Assessment: An EPC Contractor’s ... Resource Assessment: An EPC Contractor’s Perspective NREL Solar Resource Workshop Owen Westbrook – juwi solar Inc Feb. 27,

Contact : Adrian Anderson Direct: 720 – 838 – 2316 Office: 303 – 440 – 7430 Fax: 303 – 442 – 1981 Email: [email protected]

Address: 1710 29th Street, Suite 1068 Boulder, CO 80301 www.juwisolar.com

Thank you! Contact Info: Owen Westbrook [email protected]