Soil Excavation and Concrete Penetration Permitting Process at LLNL
Dennis ChewPlant Engineering Department
September, 2006
UCRL-PRES-224319This work performed under the auspices of the U.S. Department of Energy by the University of California, Lawrence Livermore
National Laboratory, under Contract No. W-7405-ENG-48
4
Brief History
Began with the purchase of LLNL’s first Audio Frequency instrument in the early 1990. Proactive step taken by LLNL as a result of an increasing number of utility
strikes Locates were performed out of the Craft Shop of Plant Engineering External building Locates
Between 1990 and 1998 Permit Process Documents Internal & External building Locates 30” No Dig rule Ferromagnetic scanners & Ground Penetrating Radar (GPR)
Between 1999 and 2000 Established Permit Database – issuing paper permits LLNL “One Call” center concept
Mindset / Purpose Preventing unplanned outages Reducing unplanned project costs Safety
Where we are at today
Permit Office has grown Size and responsibility Improved database tracking methods Two types of permits
• Soil Excavation and Concrete Penetration
Mindset / Purpose Preventing unplanned outages and reducing unplanned project costs Safety Culture shift
Today the permit office issues an average of 60 permits per month
Education/Training 3rd party certification required Safety Video
Incorporating new technologies Radio/Audio, GPR, and ferro-magnetic scanning Marker Ball program (open trench)
• Integrating with the Facility Information Center
The Permit Process
Responsible Individuals LLNL employees who serve as the point of contact Partnering with the Permit Office to ensure compliance Annual training requirement
Permit Office Locators
• Perform the locates and add any comments they may have on the permit – resources include As-builts / construction drawings / Utility drawings, etc…
Issue the permit upon receiving all approvals• Regulatory approvals • Utility Owner approvals• Signature Approvals
Job site field visits• Compliance Inspections
Permit Closure• Archived into the Permit database
The Permit Process
Utility Location Database
Locate Findings / Field Markings
Locating Instruments
Programmable Marker Ball Program
Documentation and Configuration Management
Governing procedures for the permit process
Continually evolving Lessons Learned & Process Improvement Customer feedback Staying ahead of the game
On-going Communication Roll-out meetings and newsletters Eyes and Ears in the field
Partnering with the Utility owners Provide up to date utility documentation Involve them in the approval process as owners
PROC-CON 0002 Concrete Penetration PROC-CON 0003 Soil Excavation
Safety Integration
* * Safety Video * ** * Safety Video * *
* * Job Safety Analysis * ** * Job Safety Analysis * *
* * Locator Field Survey * * * * Locator Field Survey * *
* * Pre-Task Hazard Analysis * ** * Pre-Task Hazard Analysis * *
* * Compliance Inspections * ** * Compliance Inspections * *
* * Outage Requirement * ** * Outage Requirement * *
* * 30” No Dig Zone * ** * 30” No Dig Zone * *
Closing Thoughts
InnovativeThinking
Continued Awareness Of the Safety Culture
Partnering
Q & A