Kavin Engineering And Services Private Limited Page 1 of 17 REFERENCE LIST S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE 1 De-bottlenecking study of BPA and BPB Offshore Platform India Dec, 2012 De-Bottlenecking Study of BPA/BPB Offshore Platforms, SBHT Lines and Process Facilities at Hazira Plant 2 Bukha Plant Processing Facility UAE Dec, 2012 FEED And Detail Engineering of BUKHA condensate facility 3 Project Bagdis Afghanistan Dec, 2012 Engineering Services for 1MW & Back-up Generators 4 Medal Ypergas Yucal Placer Expansion Project Venezuela Dec, 2012 Acid Gas Removal System 5 Pentane Phase I Project UAE Dec, 2012 FEED And Detail Engineering of Produce Pentane from Atlantis and Bukha process gas train from RAKGAS plant 6 TUPI 5 (MV24) FPSO Brazil Sep, 2012 Detailed Engineering of E-House 7 PS-2 & PS-3 Helideck Fire Fighting Foam System Project Qatar Aug, 2012 SACS Analysis Works for Structural Integrity 8 SALEH Phase II UAE Aug, 2012 Detailed Engineering of Plant Processing Capacity at Atlantis, Bukha and Saleh fields RAK Gas LLC RAK Gas LLC RAK Gas LLC

Transcript of S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Page 1: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 1 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

1

De-bottlenecking study of BPA and BPB Offshore Platform

India Dec, 2012 De-Bottlenecking Study of BPA/BPB Offshore Platforms, SBHT Lines and Process Facilities at Hazira Plant

2

Bukha Plant Processing Facility UAE Dec, 2012 FEED And Detail Engineering of BUKHA condensate facility

3

Project Bagdis Afghanistan Dec, 2012 Engineering Services for 1MW & Back-up Generators

4

Medal Ypergas Yucal Placer Expansion Project

Venezuela Dec, 2012 Acid Gas Removal System

5

Pentane Phase I Project UAE Dec, 2012

FEED And Detail Engineering of Produce Pentane from Atlantis and Bukha process gas train from RAKGAS plant

6

TUPI 5 (MV24) FPSO Brazil Sep, 2012 Detailed Engineering of E-House

7

PS-2 & PS-3 Helideck Fire Fighting Foam System Project

Qatar Aug, 2012 SACS Analysis Works for Structural Integrity

8

SALEH Phase II UAE Aug, 2012 Detailed Engineering of Plant Processing Capacity at Atlantis, Bukha and Saleh fields

RAK Gas LLC

RAK Gas LLC

RAK Gas LLC

Page 2: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 2 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

9

Garraf Field Development Project Iraq July, 2012 Nozzle Load Analysis (5 Nos.)

10

Garraf Project Iraq June2012 Project Management Consultancy

11

Sagar Samrat MOPU Project

Mumbai, India

May 2012 Design Review of Compressor Package

12

Engineering Services for Dehydration and Desalting Unit on FPSO

Offshore Mexico

May 2012 FEED for Dehydration and Desalting Unit on FPSO

13

PY34-1/35-1/35-2 Offshore Gas Field Development Project

Offshore China

April 2012 Detailed Engineering of TEG Package

14

FPSO Raroa

Maari Field, New Zealand

April 2012 Detailed Engineering of Sulphate Reduction Unit

15

TUPI 4 Offshore

Brazil April 2012

Detailed Engineering of Chemical Injection Package

16

Engineering Services for FSO Ta'Kuntah

Offshore Mexico

April 2012 Feasibility Study/ FEED for conversion of FSO Ta'Kuntah to FPSO.

Page 3: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 3 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

17

Setting-up of Stand By Flare Gas Recovery Compressor

Uran, India Apr 2012 Consultancy Service

18

Assil & Karam Gas Development Project

Egypt Mar 2012 Amine Package

19

FPSO Cidade de Ilhabela

Offshore Brazil

Mar 2012 Produced Water Package

20

Xikomba FPSO

offshore Angola

Mar 2012 Topside Sand Removal Package

21

Membrane CO2 Separation Project

Dayung-Grissik, South

Sumatera Mar 2012 CO2 Membrane Package

22

TML Bunga RAYA-A (BR-A) Platform

Gulf of Thailand

Mar 2012 Sand Cleaning System

23

Jordbær FPSO Topside

Offshore Norway

Feb 2012 Detailed Engineering of LP Compressor Package

24

Waste Water Treatment Plant Modification

UAE Feb 2012 Detailed Engineering

25

Aishwarya Field Development Project

India Feb 2012 Engineering Service for 2 No. of Manifolds

Technics Offshore

RAK Gas LLC

Page 4: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 4 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

26

Field Engineering Services at Bhogat, Gujarat

India Jan 2012 Field Engineering Service

27

CBM Main Compression Station Raniganj, Durgapur Project

India Jan 2012 Detailed Engineering Services For Two Stage Compressor Train

28

EPC for Naphtha and Benzene Tanks Facilities at Terminal 3

Malaysia Dec 2011 Detailed Engineering of Naphtha and Benzene Tanks

29

TUPI -5 FPSO Project Offshore

Brazil Dec 2011

Detailed Engineering of

Compressor Package

30

OSX3 FPSO Malaysia Oct 2011 Detailed Engineering of TEG

Package

31

Temporary Power Plant at Garraf

Oilfield Iraq Oct 2011 Detail Design Consultancy Works

32

Kikeh Phase II Sand Management

System Offshore

Malaysia Sep 2011 Detailed Drawings

33

RAK GAS Facility Modification

Project – Saleh Phase 1 UAE July 2011

Waste Water Treatment plant

review & de-bottlenecking

Page 5: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 5 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

34

ONGC - Piping modifications at

SHP/SHG/S1-5/II platforms India July 2011 Piping Modification Works

35

Barzan Onshore Project Qatar July 2011 Pipe stress Analysis of 150 Systems

36

TSP Offshore Crude Oil Treatment Project

Africa June 2011

Detail Engineering of Heat Exchanger,

Storage Vessels & Pumps, Oil Separators

and Electrostatic Treaters

37

Inlet Compression for RAK Gas Malaysia May 2011 Corrosion Study

38

Harvest Blackgold Oil Sand Project Canada May 2011

Detail Engineering of Free Water

Knock-out Vessel and Oil Treater Package

39

RAK GAS Facility Modification Project – Saleh Phase 2

UAE Apr 2011 FEED

40

Gas & Diesell Driven Generators on

Platform at Bokor Field Malaysia Mar 2011 Review of Structural Works

41

RAK GAS Facility Modification Project – Saleh Phase 1

UAE Feb 2011 Compression System Review

42

RAK GAS Facility Modification Project – Saleh Phase 1

UAE Jan 2011 Detailed Engineering

Page 6: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 6 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

43

Teekay Petrolarl Petrobras Tiro & Sidon FPSO

Brazil Jan 2011 Detailed Engineering of Sulphate Removal Unit

44

RAK GAS Facility Modification Project – Saleh Phase 1

UAE Jan 2011 FEED

45

E-House Design for Jurong Shipyard Brazil Dec 2010 Design & Engineering of E-House

46

E-House Design and Engineering Service

Brazil Dec 2010 Design & Engineering

47

TUPI - 3 FPSO Offshore

Brazil Nov 2010

Detailed Engineering of Gas Dehydration Package

48

Bien Dong 1 Project Vietnam Sep 2010 Detailed Engineering of Gas Dehydration and TEG Regeneration Package

49

Yemen Block-5 Development Project Yemen Aug 2010 FEED Study of Halewah Gas Plant

50

FPSO for Terang Sirasun Batur Field Development Project (TSB FPSO)

offshore Indonesia

June 2010 Detailed Engineering of Complete Topside Facility

51

Total CPF Tie-In Central Production Facility Project

Yemen July 2010 Design and Engineering of Inlet Separator Package

52

Baleia Azul FPSO

Offshore Brazil

June 2010 Detailed Engineering of Gas Processing System

PRISMA CERAH

Page 7: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 7 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

53

Petrobras FPSO Cicade De Paulo MV-23

Brazil Mar 2010 Nitrogen Generator Package

54

PUO FPSO - Pagerungan Utara Development Project

Indonesia Aug 2010 Detailed Engineering, Design Modification & Project Management

55

Lime Handling System - May 2010 Detailed Engineering Support

56

ONGC B193 Process Platform India Mar 2010 Early Engineering

57

White Tiger Oil Field BK-14 / BT-7 Wellhead Satellite Platform project

Vietnam May 2010 Operation & Maintenance Manual Preparation

58

Revamp of Gas Dehydration Units at Duyong and Pulai - A

Malaysia Feb 2010 Principal Design Consultant

59

ONGC B193 – 5 Wellhead Platform Project

India Feb 2010 Detailed Engineering

60

Rancador Field Development Project Indonesia Feb 2010 Detailed Engineering of E-House Cable Interconnection

61

TSJOC SRKP Phase 1 Development – Water Injection System

Vietnam Jan 2010 Commissioning Services

Technics Offshore

Page 8: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 8 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

62

TGT Field Development Project Offshore Vietnam

Jan 2010 Design of Compressor Module – Bid Support

63

ONGC D1 – Development Project India Dec 09 Bid Engineering

64

Doha North Sewage Treatment Works Civil Project 682/1

Qatar Nov 09 Design Support for chemical Wash Package

65

Compressor Testing Facility Project India Nov 09 Detail and Design engineering of Compressor Testing Facility

66

MHNRP – Well Head Platform 6WPP Project

Mumbai, India

Aug 09 Bid Engineering

67

ONGC B – 193 Project Mumbai,

India Aug 09

Well head Platform and process cum Well Head Platform – Bid Support

68

Dragon Tortoise Gas Utilization Project

Offshore Vietnam

June 2009 FEED – Compressor System

69

Tangga Barat Chemial Injection Package

Malaysia May 09 Chemical Injection Package

70

Tangga Barat Cluster Development Project

Malaysia Sep 09 Fuel Gas Package

BUMI ARMADA

Page 9: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 9 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

71

Platong II Project Fuel Gas & Seal Gas Package

Malaysia July 09 Fuel Gas and Seal Gas Package

72

Dulang – B Compressed Gas Capacity Enhancement Project

Malaysia May 09 Fuel Gas and Seal Gas Conditioning System

73

Al-Burj Full Field Water Injection Project

Al-Burj, Oman

July 09 Reliability and Availability Study of Water Injection Plant

74

Safah & Wadi Latham Field BK9 Qatar Apr 09 Process Design of Gas Compressors

75

PY – 1 Gas Field Development Project – Sun Wellhead Platform

Tamil Nadu, India

Mar 09 Preparation of O & M Manual for offshore facilities

76

MHN – Process Platform and Living Quarters Project

Mumbai, India

Nov 08 Bid Engineering

77

COSMOS South Field Development Project

Tunisia Aug 08 FEED – FPSO Topside

78

Dulang – B Compressed Gas Enhancement Project

Malaysia Jan 09 Design And Engineering of Gas Dehydration Module

79

FPSO P – 57 Jubarte Field Development Project

Brazil Jan 09 Design And Engineering of Gas Dehydration and TEG Regeneration Package

80

OYO FPSO Nigeria Aug 08 E-House Design

Technics Offshore

BUMI ARMADA

Page 10: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 10 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

81

Tupi Pilot FPSO Brazil Apr 09 Design And Engineering of CO2 Membrane Module

82

FPSO Capixaba Relocation Brazil Apr 09 Design And Engineering of Amine Sweetening Unit

83

FPSO - Jubilee Field Unit Ghana Mar 09 Design And Engineering of Gas Processing Module

84

FPSO - Jubilee Field Unit Ghana Mar 09 Design And Engineering of Oil Separation Module

85

Gumusut Kakp Semi FPS Offshore Malaysia

Jan 09 Design And Engineering of Glycol Regeneration Package

86

OML 120 OYO Field Development FPSO

Nigeria Sep 08 Design and Engineering of Compressor Module – Reciprocating Compressors.

87

Fahud Medium Term Surface Facility Expansion

Oman July 08 Process Design

88

North Pipeline Replacement Project – Yibal Area

Oman July 08 Process Design

89

North Pipeline Replacement Project - Lekhwair Area

Oman July 08 Process Design

90

Raydan Final Expansion Project Middle East July 08 PW Tank Design

BUMI

ARMADA Technics Offshore

Western Tanks & Pipes

Page 11: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 11 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

91

FPSO East Challenge India May 08 Bid Support

92

FPSO East Fortune - May 08 Design Verification

93

Espoir Ivoirien FPSO West Africa June 08

Design And Engineering of Process Separation Module

94

Espoir Ivoirien FPSO West Africa June 08

Design And Engineering of Gas Dehydration Module

95

Angsi Phase IV Development Project Malaysia Feb 08 Detailed Engineering of Flow Line Compact Manifold

96

Cascade and Chinook FPSO Gulf of Mexico Jan 08 Design And Engineering of Gas Dehydration and TEG Regeneration Package

97

P – 57 FPSO Project Brazil July 07 Topside Facilities Design – Bid Support

98

Van Gogh FPSO Australia Oct 07 Design And Engineering of Complete Topside Facilities

99

RasGas Offshore Expansion Project PH - 2

Middle East Apr 07 Design And Engineering of Condensate and Water Strainers ( Basket Strainers )

100

Cidade de Sao Mateus FPSO Gas Project

Brazil Aug 07 Detailed Engineering of Flare and Drain Module, water Injection, and gas dehydration / Fuel gas Module

Nortechs FPSO

Nortechs FPSO

Technics Offshore

Page 12: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 12 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

101

SHELL BC -10 FPSO Project Malaysia June 07 Gas Dehydration and TEG Regeneration Package

102

TSJOC SRKP Phase 1 Development Vietnam Aug 07

FPSO Topside Detailed Design and Engineering

103

Armada Pekasha FPSO Malaysia Feb 07 Existing System Review and Design

104

PLI BS2 Compression Project Russia Dec 06 Preparation of Mechanical GA Drawings.

105

Petrobras Opportunity Oil FPSO Brazil Jan 07 FPSO Topside Basic Design and Engineering

106

FPSO Brotojoyo Project Indonesia Sep 06 Start up and Commissioning of Process topsides

107

TUI Area Development FPSO - Nov 06 Deluge Calculation and Drawing

108

Common Sulphur Project Qatar Oct 06 Structural Design of Utility Building

109

Saxi Bataque TEG Package Angola Dec 06

Design And Engineering of Gas Dehydration and TEG Regeneration Package

110

OAG DAS Field Development UAE Sep 06 Process Design Review of Gas Compression and TEG Regeneration System.

Sakhlin Energy

WGI Middle East Inc.

Page 13: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 13 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

111

FRADE FPSO Offshore

Brazil Dec 06

Design And Engineering of Gas Dehydration and TEG Regeneration Package

112

Petrobras Opportunity Oil FPSO Offshore

Brazil Sep 06

FPSO Topside Basic Design and Engineering – Bid Support

113

Kizomba – C FPSO MONDO Angola Sep 06

Design And Engineering of Gas Dehydration and TEG Regeneration Package

114

MERU Project Indonesia July 06 Design, Review and Optimization of Marine Energy Resource Unit (MERU)

115

POLVO FPSO Project Brazil May 06

Design, Review and Optimization of Crude Oil Topping Plant(COTP)

116

EPCC for MOGA and Transit Line Sudan Mar 06 Produced Water Treatment System

117

PRA-1 FSO Project Brazil Feb 06 Fuel Gas Skid Package

118

F13 Glycol Dehydration Project Malaysia Mar 06 Gas Dehydration and TEG Regeneration Package

119

Ujung Pangkah Development Project Indonesia July 06

Gas Dehydration and TEG Regeneration Package

120

TBA / TBC – Field Development China Apr 06 FPSO Topside Process and Utilities

Global Techno Systems

Page 14: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 14 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

121

Arthit Field Development Central Facilities

Thiland Nov 05 HP Production Separator Sand Jet Design Case

122

HZ21-1 Development Project China Aug 05 Commissioning Services

123

Capixaba FPSO of IHCGUSTO Brazil July 05 Separators Design Assistance

124

SUMANDAK Processing Platform - B Malaysia Dec 05 FEED For Gas Processing Facility

125

FPSO Kikeh-Murphy Sabah Oil Co. Ltd.

Offshore Malaysia

Nov 05 Chemical Injection Package

126

FPSO Kikeh-Murphy Sabah Oil Co. Ltd.

Offshore Malaysia

Nov 05 Nitrogen Generator and Nitrogen Intensifier Package

127

FPSO Kikeh-Murphy Sabah Oil Co. Ltd.

Offshore Malaysia

Nov 05 Gas Dehydration and TEG Regeneration Package

128

HZ 19-2 Platform Development Project

China Dec 05 Feasibility Study

129

Panyu 4-2/ 5-1 Well head Platform Modifications.

China Sep 05 Pre-Commissioning and Commissioning Procedure & IOM

130

OVENG TLP Project

Equatorial Guinea

May 05 Methanol Injection System

Page 15: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 15 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

131

OKUME TLP Project

Equatorial Guinea

May 05 Methanol Injection System

132

OVENG TLP Project

Equatorial Guinea

May 05 Chemical Injection System

133

OKUME TLP Project

Equatorial Guinea

May 05 Chemical Injection System

134

SUMANDAK Processing Platform – B Malaysia May 05 Sea water Treatment and Deaeration – Conceptual Design

135

Rong Doi Gas Field Development Offshore

Korea June 05

Gas Dehydration and TEG Regeneration Package

136

Capixaba FPSO of IHCGUSTO Brazil May 05 Gas Dehydration and TEG Regeneration Package

137

FEED Mayanmar Mar 05 Pipeline Heaters

138

BAK Processing Facility Block – 51 Yeman Mar 05 Onshore Processing Facility

139

D1 WWIP India Sep 04 Fine Filters Package

140

Rehmat Gas Processing Facilities – Bid Support

Malaysia June 03 2X62MMscfd / 10 gpm

Korean National Oil Corp.

Page 16: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 16 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

141

FPSO Hai Yang She You III – De-bottlenecking Project

China June 04 FPSO Capacity Upgrade Studies

142 AMB Malaysia

PCSB – Fuel Gas Package - Bid Support

Malaysia May 04 Fuel Gas Package

143

BR-E CO2 Removal Topsides Malaysia Dec 04

Condensate Stabilization and flash Gas Recovery

144

BAOBAB FPSO Gas Processing Module

West Africa May 04 Basic and Detailed Engineering

145

BAOBAB FPSO Separation Package – IV Skids

West Africa May 04 Basic and Detailed Engineering

146

Gas Dehydration and TEG Regeneration Facility

Venezuela July 03 2x17 MMscfd / 3.4gpm

147

CO2 Removal Facility - Bid Support Thiland June 03 426 MMscfd, CO2 Mole Frac. 0.4535

148

Training for IBA / EXXON Mobil – Gas Dehydration and TEG Regeneration System

Malaysia May 03 Training – Operators and Engineers

149 Prai Power

TENAGA Nazar – Combine Cycle Gas Turbine Project

Malaysia Feb 03 Trouble Shooting of Diesel Handling Systems

150

Salman Oil & Gas Field Development Iran Offshore July 03 Gas Dehydration and TEG Regeneration Unit

Page 17: S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

Kavin Engineering And Services Private Limited Page 17 of 17

REFERENCE LIST

S.NO CLIENT CUSTOMER PROJECT LOCATION PERIOD SCOPE

151

KINARUT Development – ERB West Tie - In

East Malaysia May 03 60 MMscfd / 14 GPM

152

MISC – FPSO Project Thailand May 03 Gas Dehydration Package

153

BOABAB Field Development – FPSO Topside – Bid Support

West Africa Nov 03 100 MMscfd

154 Espadarte Field Development Brazil Dec 03

Trouble Shooting of gas Dehydration Facility

155

Turbine Enclosure Structural General Arrangement

Dec 03 -

156

OKUME & OVENG Field’s – FPSO Topsides – Bid Support

Equatorial Guinea

Oct 03 230,000 BPD with 60% water cut. Gas Flow Rate 70 MMscfd

157 Santa Fe Energy Resources

of China, Ltd China Offshore Oil Nantias

West Corp. Process Design Engineering of PANYU FPSO Topsides

China May 02 Design & Engineering of Oil Separation, Produced Water & Vent System