SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1...

74

Transcript of SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1...

Page 1: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer
Page 2: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

Flash Technology, 332 Nichol Mill Lane, Franklin, TN, 37067(615) 261-2000

SN

FTB 302-1DDual, Medium Intensity Obstruction Light

FTB 224-1FTB 225-1

Dual, High Intensity Obstruction Beacon

Reference ManualPart #7912251

Page 3: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

ii Revision 11 —10-14-03 FTB 302-1D, 224-1, and 225-1

Front MatterAbstractThis manual contains information and instructions for installing, operating, and maintaining the FTB 302-1D,FTB 224-1, and FTB 225-1 Obstruction Lights.

Copyright

Copyright © 1997-2003 Flash Technology®, Franklin, TN, 37067, U.S.A.

All rights reserved. Reproduction or use of any portion of this manual is prohibited without express written per-mission from Flash Technology and/or its licenser.

Trademark Acknowledgments

Flash Technology® is a registered trademark name.

ElectroFlash™, Flash Tech™, Flash Technology™, FTCA™, Flash™ and the Flash Technology Logo are alltrademarks of Flash Technology.

All trademarks and product names mentioned are properties of their respective companies, and are recognizedand acknowledged as such by Flash Technology.

Applicable SpecificationThis equipment meets or exceeds requirements for an FAA Type L-849 Styles A, C, and E, and Type L-859, StylesB, D, and F.

DisclaimerWhile every effort has been made to ensure that the information in this manual is complete, accurate andup-to-date, Flash Technology assumes no liability for damages resulting from any errors or omissions in thismanual, or from the use of the information contained herein. Flash Technology reserves the right to revise thismanual without obligation to notify any person or organization of the revision.

In no event will Flash Technology be liable for direct, indirect, special, incidental, or consequential damages aris-ing out of the use of or the inability to use this manual.

WarrantyFlash Technology warrants all components, under normal operating conditions, for two years.

Replacement PartsThe use of parts not manufactured or supplied by Flash Technology or unauthorized modification ofthis equipment voids the warranty and could invalidate the assurance of complying with FAA require-ments for Type L-849 Style A and E lights as published in Advisory Circular 150/5345-51.

Pub. No. 0594-302/224/225-0010

Page 4: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 —10-14-03 iii

PERSONNEL HAZARD WARNINGDangerous line voltages reside in certain locations in this equipment.Also, this equipment may generate dangerous voltages. Although FTCAhas incorporated every practical safety precaution, exercise extreme cau-tion at all times when you expose circuits and components, and when youoperate, maintain, or service this equipment.

Avoid Touching Live CircuitsAvoid touching any component or any part of the circuitry while the equip-ment is operating. Do not change components or make adjustmentsinside the equipment with power on.

Dangerous Voltages Can Persist with Power DisconnectedUnder certain conditions, dangerous voltages can be present becausecapacitors can retain charges even after the power has been discon-nected.

Protect yourself — always turn off the input (primary) power and wait forone minute for storage capacitors to drain their charge. Then checkbetween the red and blue wires on the TB2 terminal block with a voltme-ter for any residual charge before touching any circuit element or compo-nent.

Do Not Depend on InterlocksNever depend on interlocks alone to remove unsafe voltages. Alwayscheck circuits with a voltmeter. Under no circumstances remove or alterany safety interlock switch.

Page 5: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

iv Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

This page is intentionally left blank.

Page 6: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 v

Table of ContentsSection Page

Front Matter .............................................................................................................................ii

Section 1 — Introduction and Operation ............................................................................... 1-1System ................................................................................................................................... 1-1Specifications ........................................................................................................................ 1-2

Options ............................................................................................................................ 1-3Operation .............................................................................................................................. 1-3

Marker Lights ................................................................................................................. 1-3FTB 302-1D Light .......................................................................................................... 1-3FTB 224-1 ....................................................................................................................... 1-3FTB 225-1 Beacon .......................................................................................................... 1-3

PCB1 Programming .............................................................................................................. 1-4Cutting Jumpers ........................................................................................................ 1-4

PCB1 Indicator LEDs and Lamps ........................................................................................ 1-4FTB 302-1D Operation Check ........................................................................................ 1-5

Observing FTB 302-1D Day Operation .................................................................... 1-5LED Daylight Response ........................................................................................... 1-5Observing FTB 302-1D Night Operation ................................................................. 1-5LED Nighttime Response ......................................................................................... 1-5

FTB 224-1 Operation Check ........................................................................................... 1-6Observing FTB 224-1 Day Operation ...................................................................... 1-6Observing FTB 224-1 Night Operation .................................................................... 1-6

FTB 225-1 Operation Check ........................................................................................... 1-6Observing FTB 225-1 Day Operation ...................................................................... 1-6Observing FTB 225-1 Night Operation .................................................................... 1-6

Section 2 — Outline, Mounting, and Installation .................................................................. 2-1Unpacking ............................................................................................................................. 2-1Tools ..................................................................................................................................... 2-1Access ................................................................................................................................... 2-1

Power Converter or Beacon ............................................................................................ 2-1Flashhead ........................................................................................................................ 2-1

Mounting ............................................................................................................................... 2-1Power Converter or Beacon ............................................................................................ 2-1Flashhead ........................................................................................................................ 2-1

Flashhead Leveling ................................................................................................... 2-2Wiring ................................................................................................................................... 2-2

PC 302-1D Power Converter .......................................................................................... 2-2PC 224-1 Power Converter or FTB 225-1 Beacon ......................................................... 2-2FH 306 or FH 307 Flashhead .......................................................................................... 2-2

Securing the Cable .................................................................................................... 2-3Installation Checklist ............................................................................................................ 2-3

Page 7: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

vi Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

Section 3 — Maintenance and Troubleshooting .................................................................... 3-1Safety .................................................................................................................................... 3-1Preventive Maintenance ........................................................................................................ 3-1Storage .................................................................................................................................. 3-1Diagnostic Testing ................................................................................................................ 3-1

RFI Problems .................................................................................................................. 3-1Diagnostic Troubleshooting .................................................................................................. 3-2Troubleshooting Charts ......................................................................................................... 3-2Component Testing ............................................................................................................... 3-5

Power Converter or Beacon ............................................................................................ 3-5Capacitors ................................................................................................................. 3-5C1 and C2 Capacitor Banks ...................................................................................... 3-6C3 and C4 Capacitors ............................................................................................... 3-6Relays ........................................................................................................................ 3-6K1 — High Intensity Relay ...................................................................................... 3-6K2 — Low Intensity Relay ....................................................................................... 3-6K3 — Discharge Relay ............................................................................................. 3-6K4 — Transfer Relay ................................................................................................ 3-6K5 — Marker Relay ................................................................................................. 3-6L1 — Burst Choke .................................................................................................... 3-6PCB1 — Timing and Trigger Board ......................................................................... 3-6PCB2 — HV Rectifier Board ................................................................................... 3-6PCB3 — Filter Detection Board ............................................................................... 3-6PCB4 — Sense Board ............................................................................................... 3-6R1 — Discharge Resistor ......................................................................................... 3-6R2 — Burst Resistor ................................................................................................. 3-7T1 — Power Transformer ......................................................................................... 3-7T3 — Coupling Transformer .................................................................................... 3-7VR1 — Suppressor Assembly .................................................................................. 3-7

Flashhead Component Testing ........................................................................................ 3-7FT101 — Flashtube .................................................................................................. 3-7T101 — Trigger Transformer ................................................................................... 3-7T102 — Coupling Transformer ................................................................................ 3-7

Component Removal and Replacement ................................................................................ 3-7Power Converter or Beacon ............................................................................................ 3-8

C1A - C1x Capacitors ............................................................................................... 3-8PC 302-1D and PC 224-1 Capacitors ....................................................................... 3-8FTB 225-1 Capacitors ............................................................................................... 3-8PCB1 — Timing and Trigger Board ......................................................................... 3-9PCB2 — HV Rectifier Board ................................................................................... 3-9PC 302-1D, PCB3 — Filter Detection Board ........................................................... 3-9PCB4 — Sense Board ............................................................................................... 3-9PC 302-1D, PC 224-1 Sense Board .......................................................................... 3-9FTB 225-1 Sense Board ............................................................................................ 3-9T1 — Power Transformer ....................................................................................... 3-10T3 — Coupling Transformer .................................................................................. 3-10

Page 8: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 vii

All Other Power Converter or Beacon Components .................................................... 3-10Flashhead ............................................................................................................................ 3-11

FH 306 Flashhead ......................................................................................................... 3-11Flashtube (FT101) ................................................................................................... 3-11Trigger Transformer, T101 ..................................................................................... 3-11Coupling Transformer, T102 .................................................................................. 3-11FH 306 Flashtube Mounting Assembly .................................................................. 3-11

FH 307 Flashhead ......................................................................................................... 3-12Flashtube (FT101) ................................................................................................... 3-12Trigger Transformer (T101) .................................................................................... 3-12Trigger Coupling Transformer (T102) .................................................................... 3-12

FH 204 Flashhead, FTB 225-1 Beacon ........................................................................ 3-12FT101 Flashtube ..................................................................................................... 3-12Flashtube Clip Assemblies ...................................................................................... 3-13Trigger Transformer T101 ...................................................................................... 3-13

Section 4 — Spare & Replaceable Parts ................................................................................. 4-1Customer Service .................................................................................................................. 4-1Ordering Parts ....................................................................................................................... 4-1Power Converter/Beacon Parts ............................................................................................. 4-1Flashhead Parts ..................................................................................................................... 4-1Returning Equipment ............................................................................................................ 4-1Repackaging .......................................................................................................................... 4-1

Power Converter, Beacon, or FH 204 Flashhead............................................................. 4-1Flashhead (FH 306, FH 307) .......................................................................................... 4-1

Index ........................................................................................................................................I-1

Page 9: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

viii Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

List of TablesFigure Page

Timing and Trigger Board LEDs and Lamps .............................................................................. 1-5Basic Power Converter or Beacon Operation for Troubleshooting ............................................. 3-2Troubleshooting Tables ............................................................................................................... 3-3Major Troubleshooting Symptoms .............................................................................................. 3-3FTB 302-1D Fault Locator .......................................................................................................... 3-4FTB 224-1 and FTB 225-1 Fault Locator.................................................................................... 3-5Power Transformer Voltage Ranges............................................................................................ 3-7Power Converter or Beacon Major Replaceable Parts................................................................. 4-2Flashhead Major Replaceable Parts ............................................................................................. 4-3

Page 10: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 ix

List of FiguresFigure Page

Related Equipment .................................................................................................................. 1-1PCB1 Timing and Trigger Board............................................................................................. 1-7PC 302-1D and PC 224-1 Power Converter Mounting and Outline ...................................... 2-4FTB 225-1 Beacon Mounting and Outline .............................................................................. 2-5FH 204 Flashhead Mounting and Outline.............................................................................. 2-6FH 306 and FH 307 Flashhead Mounting and Outline ......................................................... 2-7FH 324 Flashhead Mounting and Outline.............................................................................. 2-8FH 204 Flashhead and FTB 225-1 Optical Assembly Internal Wiring................................. 2-9FH 307 Flashhead Internal Wiring....................................................................................... 2-10FH 324 Flashhead Internal Wiring....................................................................................... 2-11FH 306 Flashhead Internal Wiring....................................................................................... 2-12PC 302-1D Power Converter Internal Wiring (FH 306)....................................................... 2-13PC 302-1 Power Converter Internal Wiring (FH 324) ......................................................... 2-14PC 224-1 Power Converter Internal Wiring ......................................................................... 2-15FTB 225-1 Beacon Internal Wiring ....................................................................................... 2-16Typical FTB 302-1D and FTB 224-1 or FTB 225-1 Structure Installation......................... 2-17Typical Tower Lighting Scheme with High-Intensity Lights and Red Night Lights ......... 2-18Junction Box; Three-Phase Wiring Guideline ...................................................................... 2-19FTB 302-1D and FTB 224-1 Installation Wiring Guideline ................................................ 2-20FTB 302-1D and FTB 225-1 Installation Wiring Guideline ................................................ 2-21PC 302-1D Power Converter Component Locations............................................................... 4-4PC 224-1 Power Converter Component Locations ................................................................. 4-5FTB 225-1 Beacon Component Locations ............................................................................... 4-6FH 204 Flashhead Component Locations ............................................................................... 4-7FTB 225-1 Optical Assembly Component Locations .............................................................. 4-8FH 306 Flashhead Component Locations ............................................................................... 4-9FH 307 Flashhead Component Locations ............................................................................. 4-10FH 324 Flashhead Component Locations ............................................................................. 4-11

Page 11: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

x Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

This page is intentionally left blank.

Page 12: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 —10-14-03 1-1

Section 1 — Introduction and Operation

SystemThe FTB 302-1D, FTB 225-1 and FTB 224-1 ElectroFlash™ Lights are flashing lights designed and manufactured by Flash Technology Corpora-

tion of America® (FTCA) for obstruction lighting applications. Flash Technology’s ElectroFlash Lights meet or exceed the requirements for lights as published in FAA Advisory Circular 150/5345-43.

ch10001

Figure 1-1 Related Equipment

Page 13: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

1-2 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

SpecificationsThese specifications do not include the power required to operate marker lights (side lights).

Dimensions and Weight:

PC 302-1D Power Converter:(H x W x Depth, Wgt.):

23 x 17.1 x 9.44 in., 90 lbs.584 x 435 x 240 mm., 41 kg.

PC 224-1 Power Converter:(H x W x Depth, Wgt.):

23 x 17.1 x 9.44 in., 67 lbs.584 x 435 x 240 mm., 30 kg.

FTB 225-1 Beacon:(H x W x Depth, Wgt.):

22.5 x 20.5 x 9.25 in., 85 lbs.572 x 521 x 285 mm., 38.6 kg.

Flashhead:(H x Diam, Wgt.):

FH 307 17 x 18.25 in., 17 lbs.431 x 464 mm., 7.72 kg

FH 306 17 x 18.25 in., 23 lbs.431 x 464 mm., 10.5 kg

FH 324 37.25 x 18.25 in., 31 lbs.946 x 464 mm., 16.4 kg

FH 204 23 x 18.2 x 12.8 in., 18 lbs.584 x 463 x 326 mm., 8.2 kg.

Performance Characteristics:

Application:FTB 302-1D L-865 (white), L-864 (red)FTB 224-1 L-856 (white)FTB 225-1 L-856 (white)

Flash Intensity1 (nominal):FH 306, 324 Day 20,000 ±25% ECD

FH 306, 307, 324 Night 2,000 ±25% ECDFH 204 & FTB 225-1Day intensity 270,000 ±25% ECDTwilight intensity 20,000 ±25% ECD

Beam Spread:FH 307, FH 306, FH 324Horizontal 360º (omnidirectional)Vertical 5º

FH 204 & FTB 225-1 Optical Assembly:Horizontal 120°Vertical 3°

Flash Rate:All:Day & Twilight 40 flashes per minuteNight 20 flashes per minute

Electrical: All:

AC Voltage:120, 208, 240, 480 ±10% at 60 Hz ±1%

230 ±10% at 50 Hz ±1%FTB 302-1D:Volt-Amperes: 250 VA peak; 175 VA avg.Watts: Day: 130

Night (red): 75FTB 224-1 or FTB 225-1:Volt-Amperes: 600 VA peak; 400 VA avg.Watts: Day: 255

Night: 145Aerodynamic Wind Area:

Flashheads:FH 204 1.99 sq. ft., .18 sq. m.FH 307, 306 1.1 sq. ft.; .10 sq. m.FH 324 1.86 sq. ft.; .173 sq. m.Power Converters:PC 302-1D 2.75 sq. ft.; .255 sq. m.PC 224-1 2.2 sq. ft., .2 sq. m.Beacon:FTB 225-1 2.9 sq. ft., .27 sq. m.

Environmental:FAA Advisory Circular 150/5345-43E compliance.Control and Monitoring:

ElectroFlash FTC 121-1 System Controller

1. Intensity values in Effective Candelas (ECD) is determined by the method in the IES Lighting Hand-book, 1981 Reference Volume, page 3-25.

Page 14: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 —10-14-03 1-3

OptionsCall Customer Service at 1-800-821-5825 for available options.

OperationEQUIPMENT CAUTION

Do not operate any power converterswith parts missing. Doing so may dam-age the equipment.

The lights begin to operate as soon as power is applied and they flash together synchronously. All lights in the FTB 302-1D, FTB 224-1, and FTB 225-1 Systems communicate with and are under the control of an FTC 121-1 System Controller. The controller monitors the status and operating parameters of the lights. The lights can be inter-rogated by the controller, or remotely by using a computer and a telephone line connected to the controller. The controller sends light intensity information, sensed by a photocell, to the lights to make them operate in the correct mode for day, twilight, or night lighting. The controller sends and receives coded signals over a two-wire shielded communications cable (COMM LINK). Programming allows a controller to distinguish the signal of each individual light for monitoring and control purposes.

The PCB1 Timing and Trigger Board in each unit controls the internal operations of the power con-verter or beacon. See Section PCB1 Programming and Figure 1-2. PCB1 contains indicator lights that are useful in performing an operational check and troubleshooting.

Marker LightsSystem power converters may also operate a tier of marker lights depending on the installation requirements. Each power converter is connected to the designated tier of markers through a Marker Interface Unit that contains a marker power relay, and sensing circuits for total marker current and socket voltage.

An example of a typical installation is shown in Figure 2-14.

FTB 302-1D Light

The FTB 302-1D is a two-part light consisting of a PC 302-1D Power Converter and an associated FH 306 or FH 324 Flashhead. The flashhead has dual red/white operation. The FTB 302-1D usu-ally operates with the simultaneous operation of FTB 224-1 or FTB 225-1 High Intensity Lights.

In a system that incorporates an AOL, the FTB 302-1D is the sole light of the top tier, and is pro-grammed as Beacon 2 of that tier. The FTB 302-1D contains circuitry for two flash intensity levels and switches from one intensity level to the other in response to a signal from the controller. If the system controller should be disconnected or fail, the FTB 302-1D continues to flash at full intensity. Simultaneous flashing with the other lights usually continues even without the control-ler.

The flashhead and PC 302-1D Power Converter are in separate outdoor enclosures. (See Figure 2-15.) An electrical flashhead cable connects these two units. If a very long cable is required, consult Flash Technology by calling Customer Service at 1-800-821-5825.

FTB 224-1 System

The FTB 224-1 is a dual system operating in white day and twilight, and red night modes. The FTB 224-1 consists of a PC 224-1 Power Con-verter and a separate FH 204 Flashhead. The flashhead flashes white during the day at 270,000 ECD and during twilight at 20,000 ECD. At night, the red FH 307 Flashhead flashes at 2,000 ECD.

FTB 225-1 System

The FTB 225-1 is a dual system operating in white day and twilight, and red night modes. The FTB 225-1 operates a self-contained Optical Assembly that flashes white during the day at 270,000 ECD and during twilight at 20,000 ECD. At night, the red FH 307 flashhead flashes at 2,000 ECD.

Page 15: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

1-4 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

PCB1 ProgrammingThe factory programs PCB1 in each power con-verter or beacon for its tower address and func-tions. The program is done internally and with jumpers on the surface of PCB1 that encode a spe-cific light’s status signal that is sent to the con-troller. Jumpers JP2 through JP12 on the board determine the location of the power converter that contains the board on the structure. The part number for a specific board depends on its desired function, the power converter in which it resides, and location on the structure at your site. Pro-gramming may alter the last two digits of the part number (PN) of PCB1.

Programming for a position on the structure con-sists of opening one or more of a group of wire jumpers labelled JP2 to JP12 on PCB1. The pat-tern of open (O) and closed (X) links for each light is determined by two factors: the light’s height on the structure, know as its tier, and its location or compass point around the structure (Beacon 1 is northerly; Beacon 2 is easterly; Beacon 3 is south-erly; and Beacon 4 is westerly). According to FTCA convention, the lowest tier of lights on a structure is designated Tier 1, the next highest tier is Tier 2, and so on.In a lighting system that incorporates an AOL, the FTB 302-1D is the sole light of the top tier, and is programmed as Beacon 2 of that tier. See jumper programming for beacon and tier in Section Cutting Jumpers.

Cutting Jumpers

Circuit boards do not normally require field changes. Replacement circuit boards may require

programming in the field by a factory authorized technician. Do not change the jumpers without consulting FTCA first, and under their direction. Internal programming for PCB1 may also have to be changed.

Before programming a circuit board, turn power off before opening the power converter. To program a circuit board, you must open wire links. Cut the selected wire link near its center and bend the ends up for clearance from surrounding objects. Cut only those links that you want open or out of the circuit. The open links program the position. Thus, Beacon 2 of Tier 3 requires jumpers JP4 and JP10 to be cut.

To change the cut link programming of a board, bend the cut wires and reconnect them by solder-ing them.

PCB1 Indicator LEDs and LampsPCB1 contains indicators that are useful in per-forming an operational check and troubleshoot-ing.

Eight indicator LEDs and one neon lamp on PCB1 monitor equipment operation. A name imprinted on the board adjacent to the indicator identifies it. The neon lamp has no name next to it. Figure 1-2 shows the location of the LEDs and lamp on the board.

Page 16: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 —10-14-03 1-5

FTB 302-1D Operation CheckOperate the FTB 302-1D from the controller. You can switch the operation of the FTB 302-1D from day mode to night mode. As you do so, you can observe the operation of the flashhead and the LED indicators on PCB1.

Observing FTB 302-1D Day Operation

Switch the controller to day mode and observe the operation of the flashhead connected to the PC 302-1D Power Converter. It should be operating at 40 flashes per minute at normal bright white day intensity. Observe the LED indicators.

LED Daylight Response

1. I 1 DAY is on indicating that the current oper-ation is day mode.

2. I 2 TWI is off.3. I 3 NITE is off.4. I 4 SYNC flashes each time a valid sync signal

is received from the System Controller. 5. I 5 CONF blinks on indicating that PCB1

issued a flash confirmation signal because the flash was good.

6. I 6 MRK is on if markers are turned on. It is off if markers are off.

7. I 7 STAT is off indicating that PCB1 has no status condition. On indicates a status condi-tion that must be read and reset by the con-troller.

8. I 8 ALARM is off indicating that no alarm is present in the board. On indicates a flash fail-ure but it may indicate other failures.

9. NEON I 9 is on indicating that trigger voltage is present on PCB1.

Observing FTB 302-1D Night OperationSwitch the controller to night mode and observe the operation of the flashhead connected to the PC 302-1D Power Converter. It should be operating at 20 flashes per minute at normal red night intensity. Observe the LED Indicators.

LED Nighttime Response1. I 1 DAY is off.2. I 2 TWI is off.3. I 3 NITE is on indicating that the current

operation is night mode.4. I 4 SYNC flashes each time a valid sync signal

is received from the System Controller.5. I 5 CONF blinks on indicating that PCB1

issued a flash confirmation signal because the flash was good.

Table 1-1 Timing and Trigger Board LEDs and LampsLED/Lamp Name Color Function

DAY I 1 Red Indicates that the current operating mode is day mode.TWI I 2 Red Indicates that the current operating mode is twilight mode.NITE I 3 Red Indicates that the current operating mode is night mode.SYNC I 4 Red Indicates that a valid sync signal was received from the system controller (once

every 6 seconds).CONF I 5 Red Indicates that the power converter flash sensing circuit issued a flash confirmation

signal because the flash energy was good.MKR I 6 Red Indicates that markers are on (if installed). It is off if markers are off.STAT I 7 Red Indicates that the board has a status code present (it should be read and cleared

by the operation of the system controller).ALARM I 8 Red Indicates a flash failure, usually. Other alarms may be present (determined at the

system controller).NEON Lamp

(Trigger)

I 9 Clear Indicates the presence of 120VAC trigger voltage on the trigger capacitor. This lamp may flicker when a triggering pulse is applied to the flashtube.

Page 17: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

1-6 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

6. I 6 MRK is on if markers are turned on. It is off if markers are off.

7. I 7 STAT is off indicating that PCB1 has no status condition. On indicates a status condi-tion that must be read and reset by the system controller.

8. I 8 ALARM is off indicating that no alarm is present in the board. On indicates a flash fail-ure but it may indicate other failures.

9. NEON I 9 is on indicating that trigger voltage is present on PCB1.

FTB 224-1 Operation CheckOperate the FTB 224-1 from the controller. You can switch the operation of the FTB 224-1 from day mode to night mode while observing the oper-ation of the flashhead and the LED indicators on PCB1.

Observing FTB 224-1 Day Operation

Switch the controller to day mode and observe the operation of the FH 204 flashhead connected to the PC 224-1 Power Converter. It should be oper-ating at 40 flashes per minute at normal bright white day intensity. Observe the LED Indicators as discussed in LED Daylight Response for the FTB 302-1D.

Observing FTB 224-1 Night Operation

Switch the controller to night mode while observ-ing the operation of the FH 307 Flashhead con-

nected to the PC 224-1 Power Converter. It should be operating at 20 flashes per minute at normal red night intensity. Observe the LED Indicators as discussed in LED Nighttime Response for the FTB 302-1D.

FTB 225-1 Operation CheckOperate the FTB 225-1 from the controller. You can switch the operation of the FTB 225-1 from day mode to night mode while observing the oper-ation of the beacon and the LED indicators on PCB1.

Observing FTB 225-1 Day OperationSwitch the controller to day mode while observing the operation of the beacon. It should be operating at 40 flashes per minute at normal bright white day intensity. Observe the LED Indicators as dis-cussed in LED Daylight Response for the FTB 302-1D.

Observing FTB 225-1 Night OperationSwitch the controller to night mode while observ-ing the operation of the FH 307 Flashhead con-nected to the FTB 225-1 Beacon. It should be operating at 20 flashes per minute at normal red night intensity. If you do this during daylight, the flashes may be difficult to observe at a location near the tower base because the lens directs the light in a horizontal pattern. Observe the LED Indicators as discussed in LED Nighttime Response for the FTB 302-1D.

Page 18: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 —10-14-03 1-7

ch3031

Figure 1-2 PCB1 Timing and Trigger Board

Page 19: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

1-8 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

This page is intentionally left blank.

Page 20: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-1

Section 2 — Outline, Mounting, and Installation

UnpackingInspect cartons for signs of damage before open-ing. Check package contents against the packing list and inspect each item for visible damage. Damage claims should be reported promptly to the freight handler.

ToolsAlthough no special tools are necessary, the fol-lowing hand tools are suggested for installation:

• Phillips®-head screwdriver, #2• 9- or 12-inch (# 2 - 3⁄16"), flat-blade screwdriver• 9- or 12-inch (# 3 - 5⁄16"), flat-blade screwdriver• Medium, slip joint pliers• Set of combination wrenches• Long-nose pliers• 8-in. adjustable wrench• Assorted nut-driver handles (1⁄4", 5⁄16", 3⁄8")• Universal terminal crimper• Triplett™ Model 630-NA VOM, or equivalent

analog volt-ohm meter

AccessWARNING

Before proceeding, read the warning onPage iii. Disconnect the primary powerbefore opening the power converter cover.

Power Converter or BeaconLatches secure the cover. When you release these, you can swing open the cover for internal access.

FlashheadYou may pivot the lens open by disengaging quick-release latches. Be careful that the lens or

glass window clears nearby objects when you open and close it.

MountingPower Converter or BeaconMounting and outline dimensions for the power converter and beacon are shown in Figure 2-1 and Figure 2-2. FTCA does not furnish mounting hardware unless ordered as part of an installation kit. Use the following guidelines for mounting the power converter:

• Ensure that adequate space exists around the equipment for access during installation, maintenance and servicing.

• Allow space for air flow around the power con-verter.

• You must use a bonding strap on a bolt through the power converter case leg. Connect the strap to the site grounding system.

FlashheadMounting dimensions for flashheads are shown in Figure 2-2 through Figure 2-4. The flashhead must be protected from lightning strikes. The flashhead may be mounted to painted or unpainted surfaces. One of the mounting holes in the base of the flashhead contains a built-in elec-trical ground connection. Use the following guide-lines for mounting the flashhead:

• Use a lightning rod extended above the flash-head to protect it when it is mounted at the uppermost part of the structure.

• Avoid locating a lightning rod where it would prevent tilting the lens open or interfere with access by maintenance or service personnel.

• You must use a bonding strap with a flashhead mounting bolt when mounting the flashhead to the structure, using the mounting bolt to fas-ten the strap to the leg that contains the ground connection.

Page 21: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-2 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

Flashhead LevelingThe FH 306 and FH 307 Flashheads must be level for correct vertical beam alignment. Two leveling vials—aligned with the mounting feet—are per-manently attached to the flashhead assembly. Typically, the mounting surface for the flashhead is level and no adjustments are required. When the flashhead is level, bubbles in both leveling vials are centered. For leveling, use the following guidelines:

• If adjustment is necessary, raise the appropri-ate mounting foot with shims or washers. Raising one foot by 1/16 inch (1.6 mm) tilts the beam about 1/2 degree.

• Take extreme care to ensure that all four feet rest snugly against a firm mounting surface before tightening the mounting bolts. Failure to do so could result in serious damage to the base when you tighten the bolts.

WiringThis manual may not contain all the information about installation wiring required for your instal-lation.

NOTEIf installation drawings prepared specificallyfor your site disagree with information pro-vided in this manual, the site installationdrawings should take precedence. Consultany site-specific installation wiring diagramsupplied with your equipment.

Primary power connections for single-phase sys-tems use the same phase for all beacons.

Installation wiring is shown in Figures 2-16 through 2-18. NOTE: FTCA wiring diagrams define minimum requirements recommended for satisfactory equipment operation. It is the respon-sibility of the installer to comply with all applica-ble electrical codes.

The factory wires the power converters to the volt-age and frequency imprinted on the equipment label. Two internal fuses reside in the power con-verter, sized according to the operating voltage.

You can find conduit and other distribution wir-ing details on electrical installation diagrams pro-vided by FTCA or others. Installation instructions concerning red light marker fixtures are not part of this manual.

All installation wiring should have an insulation rating of 600 volts. Size power service wiring to satisfy the load demand of the red light system (if present) and the power converters. Read the notes on the installation wiring diagrams supplied both in this manual and with the equipment.

PC 302-1D Power ConverterFor service wiring, consider the voltage, length of the wire run, and the total load (number of lights). Assume a load of 175 volt-amperes per light, and do not permit the line voltage to drop by more than 5% caused by wire resistance. Also assume a load of 175 volt-amperes per light to determine the appropriate slow-acting fuse ratings at the power distribution panel. Use a value of 250 volt-amperes per light to determine fast-acting fuse ratings at the power distribution panel and to select a system feeder transformer (if used).

PC 224-1 Power Converter or FTB 225-1 BeaconFor service wiring, consider the voltage, length of the wire run, and the total load (number of lights). Assume a load of 400 volt-amperes per light, and do not permit the line voltage to drop by more than 5% caused by wire resistance. Use a value of 400 volt-amperes per light to determine circuit breaker or slow-acting fuse ratings at the power distribution panel. Use a value of 600 volt-amperes to determine fast-acting fuse rating and to select a system feeder transformer (if used).

FH 306, 307, 324 FlashheadThe wiring between the power converter and flashhead requires five conductors with 600 volts (minimum) insulation. Two of the conductors must be #10 AWG. The other three may be #16 AWG (minimum; for mechanical strength) if you are cabling together individual wires. FTCA rec-

Page 22: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-3

ommends using FTCA Part Number 6340 shielded cable, which does not require conduit for this application.

For reliable operation, FTCA recommends contin-uous wiring between the power converters and their associated flashheads without intervening junctions or splices.

If you use FTCA Part Number 6340 cable without electrical conduit, you should secure it to the main structure.

Securing the CableUse the following method for securing the flash-head cable to a skeletal structure:

1. Run the cable along one of the tower legs and wrap one full turn of two-inch Scotchrap™ #50 tape, or the equivalent, around the cable and tower leg at regular intervals of about 5 feet (1.5 meters).

2. Wrap three full turns of one-inch Scotchrap Filament #890 tape, or the equivalent, over the Scotchrap #50 tape.

3. Wrap four full turns of two-inch Scotchrap #50 tape, or the equivalent, over the Scotchrap Fil-ament #890 tape.

4. Perform steps 1 through 3 also directly above and below any tower leg flanges that the cable may cross.

Installation Checklist

Complete the following steps before applying power:

1. Equipment Damage:Inspect all equipment for damage.

2. Required Equipment:Verify the received equipment against the packing list to ensure completeness.

3. Power Converter Mounting:Position and mount each unit allowing ade-quate clearance for opening the covers. Also, use the following guidelines:

– Ensure that the case is mounted upright and grounded.

– Check hardware inside the case to ensure that the chassis mounting screws and nuts are tight.

– Ensure that only the bottom of the case has drain holes and that they are clear.

– Ensure that no holes are punched or drilled on the top surface of the case.

– Ensure that air can flow around the case.

– Mount the power converter away from radio frequency interference (RFI).

4. Power Converter Wiring:Examine the installation drawings and use the following guidelines:– Check for proper incoming service volt-

age.– Wire each unit according to the instruc-

tions.– Ensure that all three power converters

are on the same main line breaker.– Check all electrical connections for

tightness.– Check all terminal strip connections for

tightness.– Ground the power converter.

5. Flashhead Mounting:– Ensure that the flashhead lens can be

opened without striking other objects.– Level and aim the flashhead.

6. Flashhead Wiring:– Protect the top flashhead against light-

ning strikes.– Ground the flashhead.– Check the wiring of the flashhead cable

to the flashhead.– Secure the flashhead cable to the tower.

Support and tape the cable to prevent its movement by the wind.

After completing all the steps listed above, turn on the power and perform an operational check-out from procedures in Section 3 of this manual.

Page 23: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-4 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

20457821

Figure 2-1 PC 302-1D and PC 224-1 Power Converter Mounting and Outline

1.32 (33.4) DIA.ACCESS HOLE

2. DIMENSIONS ARE IN INCHES (MILLIMETERS).

3 PLACES

1.06 (27.0) DIA.

1. WIND AREA = 2.4 SQ.FT. (.22 SQ.M)

3. THIS BOTTOM HOLE IS PLUGGED AT FACTORY IF PHOTOCONTROL IS NOT REQUIRED.

(NOTE 3)

NOTES:

.440 (11.2) DIA. MOUNTING HOLE2 places

23.0(584)21.8

(553)

.750 (19.1).440 (11.2)

17.1 (435)

12.3 (311)

17.5 (445)CLEARANCEREQUIRED

16.75 (425.5)2.50

(63.5)(TYP)

6.75(172)

4.75(121)

3.00(76.2)

7.00(178)

4. WEIGHT = 70 LBS. (31.8 KG.)

9.44 (239.8)

20.9(530)

3704801D

Page 24: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-5

ch2023

Figure 2-2 FTB 225-1 Beacon Mounting and Outline

20.0

2x Ø1.31

0.10

17.8

0.62

9.23

11.2

2.00

2.60 (TYP)

20.9

TOP VIEW

FRONT VIEW

BOTTOM VIEW

RIGHT SIDE VIEW REAR VIEW

NOTES:

1. WEIGHT: 85 LBS. (38.6 KG.)2. WIND AREA: 2.9 SQ. FT. (.27 SQ. M.)3. DIMENSIONS ARE IN INCHES (MILLIMETERS)

(568)22.4

20.0

21.3(540)

(508)

(33.3)

(2.54)

(66.0)

(50.8)

(15.7)

(234.4)

(285)

(508)

(530)

(453)

31.23(793.2)

0.88(22.4)

1.12(28.5)

5.5(139.7)

2.00

(50.8)

5.5(140)

1.68

(42.7)

4.00(102)

7.00(178)

3771701M

Page 25: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-6 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

ch2024

Figure 2-3 FH 204 Flashhead Mounting and Outline

(76.2)3.00

3.00(76.2)

16.3 (413)

12.8 (326) MIN

NOTES:

(552)21.8

REQUIREDCLEARANCE16.9 (429)

(584)23.0

(235)9.25

1.06 DIA. (26.9)

(531)20.9

A

A

VIEW A-A

1. Weight: 18 lbs (8.2 kg)2.3. Dimensions are in inches (millimeters)

Wind area: 1.99 sq ft (.18 sq m)

(TY

P)

(63.5)2.50

ADD 0.40 (10.2) FOREACH DEGREE OF TILT

MOUNTING SLOTS0.56 X 0.63

(14.2 X 16.0)

0.44(11.2)

ENTRANCE HOLE

18.6 (472)

18.2 (463)

9.41 (239)

17.1 (435)

Page 26: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-7

ch2021

Figure 2-4 FH 306 and FH 307 Flashhead Mounting and Outline

18.3

17.0(430)

(463)

23.8

CLEARANCEREQUIRED

Ø13.25 BOLT HOLE CIRCLE

NOTES:1. WEIGHT (FH 307): 17 LBS (7.72 KG)

2. AERODYNAMIC WIND AREA: .93 FT (.0864 M )3. DIMENSIONS ARE IN INCHES (MILLIMETERS)4. ACCESS TO THE FLASHHEAD MUST REMAIN UNOBSTRUCTED5. FLASHHEAD SHOULD HAVE LIGHTNING PROTECTION

22

(603)

.625 (15.9) DIA. MOUNTING HOLE(4 PLACES EQUALLY SPACED)

(FH 306): 23 LBS (10.44 KG)

Page 27: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-8

FH324IW

Figure 2-5 FH 324 Flashhead Mounting and Outline

Page 28: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-9 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

FH204IW

Figure 2-6 FH 204 Flashhead and FTB 225-1 Optical Assembly Internal Wiring

Page 29: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-10

308IW

Figure 2-7 FH 307 Flashhead Internal Wiring

Page 30: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-11 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

324IW

Figure 2-8 FH 324 Flashhead Internal Wiring

Page 31: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-12

3062IW

Figure 2-9 FH 306 Flashhead Internal Wiring

Page 32: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-13 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

302-1DIW

Figure 2-10 PC 302-1D Power Converter Internal Wiring (FH 306)

BLU SI

DE

G1

G3

3-8 1

89-0

2H

PCB

4T3

3 M

FC

4

WH

T/R

ED8

F3 1

/2A

WH

T/B

LUC

ENTE

R

GR

NG

1

6 2 1

4

WH

T/R

ED

DIS

CH

AR

GE

REL

AY

RED

K3 7 5

3

BLU

R1

P2P1

TRA

NS F

OR

MER

T1B

UR

STC

HO

KE

G2

11109

WH

T/VI

O

GR

N

WH

T/B

RN

WH

T /VI

O2

7 8

WH

T/VI

O1

65

WH

T/O

RN

GR

NG2

WH

T/R

EDR

2R

ESIS

TOR

NO

TE 2

BU

RST

L1

P4

RED P3

POW

ER

BU

RST

C3

CA

P

L2FL

ASH

CH

OK

E

RE D

2G

2

GR

N

RED

1

K2

OR

N

35 8 6

4

REL

AY

7

LOW

INTE

NSI

TY RED

WH

T/G

RY

GR

N

GRN/YELGRN/YEL

GRN

24VA

C -

24VA

C +

G1

GR

N10

GR

OU

ND

11W

HT/

GR

YG

RN

TRI G

GER

RED

WH

T

WH

T/B

L UG

RN

NI G

HT

DA

Y

CO

M -

7 986

120V

AC

1

BLK

GR

Y

WH

T/VI

O

WH

T/B

RN

CO

M +

5SE

NSE

3 42TB3

WH

T/YE

LB

AN

K V

MK

R C

TRL

RED

CTR

L

MK

R V

OLT

S

MK

R S

ENSE

RED

SEN

SE

ID S

ENSE

1

RED

WH

T/YE

L

GR

Y

BR

N4 235

TB1

TIM

ING

&

BC

N V

OLT

S

T RIG

GER

GN

D

PCB

1

G3

GR

N

BLK

68 7

WHT/GRN

WHT/GRNWHT/GRN

YEL

(TYP

)

BLU

(TYP

)

BLU

(TYP)

YEL

BLU

C1

(TYP)

GR

OU

ND

TEST

HV

2

AC

HV

1T B4

PCB

2H

V R

ECTI

FIER H

V 3

-HV

AC

FLA

SH S

ENSE

-2

RED

T RIG

RTN

T RIG

GER

G2

VIO

FILT

ER M

ON

876

BLU

BLU BLK

GR

NG

RN

GR

N

CA

THO

DE

5432

12

GR

Y

GR

NSEN

SEM

OD

ULE TB

1

T B2 A

NO

DE

1

GR

N

BLU

CO

UPL

ING

TR

AN

SFO

RM

ER

WH

T/Y E

LB

RN

WH

T/G

RN

RED

STR

OB

EFI

LTER

PO

SITI

ON

MA

RK

ER S

ENSE

CO

MM

ON

3 4 65

YEL

10 11W

HT/

YEL

WH

T/O

RN

GR

N

8 9

OR

N6 7

G2

RED

5

BLU

RED

BLU

2 3 4

WH

T/R

ED1

BLU

MA

RK

ERR

ELA

Y

WH

T/B

LK

WH

T /G

RN

K5

96 A B

RED

1 4 3

7

SEN

SEG

RN

/YEL

DET

ECTI

ON

FILT

E RP C

B3

BR

NW

HT/

GR

NO

RN

BLU

BLK VIO

FLA

SH S

ENSE

+

SEN

SE P

WR

INFH

CA

BLE

WH

T

1J2

120

VAC

6 7 8

FH C

AB

L E B

LK

TRIG

ER X

FMR

OU

TPU

T

FH C

AB

LE V

IO4 52 31J1

GR

N/Y

EL

764 5

BLK

SIG

RTN

RTN

SOC

KET

VOLT

S

WH

T /B

LK

WH

T/G

RN

31 2

GR

YR

TN SIG

SIG

32W

HT

RTN

1TB

201

BLK

SIG

CO

MM

STA

RT

LIN

K

BR

NF4

WH

T/B

LU

14 15 1716

WH

TQ

C1

POW

ER V

AR

IATI

ON

SSE

E IN

PUT

BLK

QC

2

3C3C

3C3C

115V

WH

T/G

RY

WH

TW

HT

T 1 IN

PUT

POW

ER V

AR

IATI

ON

S

230V

3A 4AW

HT

3A 4AW

HT

120V

13 4C20

8V

13 4C

13 4C24

0VW

HT

480V

WH

T

13 4C

60 H

ZB

LU

BLK

BLK

3 4

BLK

50 H

Z

3 4

44

4A 3B 4B3A 12

4A 3B 4B3A 12

3B

LK3

44

3A 12 3B 4B4A4A 3B 4B3A 12

BLK

3B

LK3

WH

T/B

LU

BLU

WH

T/B

LU

QC

5

QC

6

8 9 10 11 12 13 14 15 16 17 18

TB20

2

AB

RED

BA

YELP5

(NO

TE 1

)

INPU

T PO

WER

115,

120

V

LIN

E 2

LIN

E 1

CO

MB

LK

F2

N/O

VR1

WH

T

BLK

QC

1

(NO

TE 4

)

208,

220

, 230

VIN

PUT

POW

ER

LIN

E 1

240,

480

VLI

NE

2C

OM

CO

M

WH

T

F1F2N

/O

S1

N/O

VR1

S2

BLK

F1S1

P OW

ER V

AR

IATI

ON

SSE

E IN

PUT

QC

2

WH

TQ

C1

BLK

QC

2

4 . S

2 U

SED

IN 2

08, 2

20, 2

30, 2

40 &

480

V IN

PUT.

3.

DEN

OTE

S TY

PIC

AL

GN

D C

ON

NEC

TIO

N.

2. V

ALU

ES O

F R

2 A

ND

C3

MA

Y VA

RY

WIT

H A

PPLI

CA

TIO

N.

1. F

2 IS

REP

LAC

ED B

Y A

JU

MPE

R W

HEN

LIN

E 2

IS N

EUTR

AL.

NO

TES:

QC

3Q

C4

G1

REC

TIFI

ERB

R1

G2

+-

AC

AC

Page 33: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-14

302-1DIW

Figure 2-11 PC 302-1 Power Converter Internal Wiring (FH 324)

Page 34: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-15 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

PC224-1IW

Figure 2-12 PC 224-1 Power Converter Internal Wiring

BLU SI

DE

G1

G3

3 -81

88-0

2E

PC

B4

3 M

FC

4

WH

T /R

ED

8

F3 1

/2A

WH

T/BL

UC

ENTE

R

GR

NG

1

6 2 1

4

WH

T/R

ED

DIS

CH

ARG

ER

ELAY

RED

K3 7 53

BLU

R1

P2

P1

TRA

NSF

OR

ME R

T1

G2

11109

WH

T/VI

O

GR

N

WH

T/BR

N

WH

T/V

IO2

7 8

WH

T/V

IO1

65

WH

T/O

RN

GR

NG

2

WH

T/R

EDR

2

RE

SIST

OR

NO

TE 2

BU

RST

L1

P4

RED P3

POW

ER

BU

RST

C3

CAPYE

L

YEL

L2F L

ASH

CH

OKE

RE

D

2

G2

GR

N

RE

D1K2

OR

N

35 8 6

4

REL

AY7

L OW

INTE

NS

ITY

RE

D

GRN/YEL

GRN/YELGRN

24VA

C -

24VA

C +

G1

GR

N10

GR

OU

ND

11W

HT/

GR

YG

RN

TRIG

GER

RED

WH

T

WH

T/BL

UG

RN

NI G

HT

DAY

CO

M -

7 986

120V

AC

1

BLK

GR

Y

WH

T/V

IO

WH

T/BR

N

CO

M +

5SE

NS

E3 42TB

3W

HT/

YEL

BAN

K V

MK

R C

TRL

RED

CTR

L

MKR

VO

LTS

MKR

SEN

SER

ED S

ENSE

ID S

EN

SE

1

RE

DW

HT/

YEL

GR

Y4 235

TB1

TIM

ING

&

BCN

VO

LTS

TRIG

GER

GN

D

PC

B1

G3

GR

N

BLK

68 7

WHT/GRN

WHT/GRN

YE

L (T

Y P)

BLU

(TY

P)

BLU

(TYP)

YEL

BLU

C1

(TYP)

GR

OU

ND

TEST

HV

2

AC

HV

1T B4

PC

B2H

V R

ECT I

FIER H

V 3

-HV

AC

RED

WH

T

BLK

TRIG

1

G2

876

BLU

BLU

BLK

GR

NG

RN

BLU

5432

12

GR

Y

GR

NSEN

SEM

OD

ULE TB

1

TB2 R

ED1

YEL

10 11W

HT/

YEL

WH

T/O

RN

GR

N

8 9

OR

N6 7

G2

RE

D5

BL U

RE

D

BLU

2 3 4

WH

T/R

ED1

BLU

MAR

KER

REL

AYWH

T/BL

K

WH

T/G

RN

K5

96 A B

RED

1 4 3

7

SE N

SEG

RN

/YEL

GR

N/Y

EL

764 5

BLK

SIG

RTN

RTN

SO

CKE

TV

OLT

S

WH

T/BL

K

WH

T/G

RN

31 2

GR

YR

TN SIG

SIG

32W

HT

RTN

1T B

201

BLK

SIG

CO

MM

STA

RT

LIN

K

OR

N

14 15 1716W

HT

QC

1

PO

WE

R V

AR

IATI

ON

SS

EE I N

PU

T

BLK

QC

2

3C3C

3C3C

115V

WH

T/G

RY

GRN G2

WH

TW

HT

T1 IN

PUT

POW

ER

VA

RIA

TIO

NS

230V

3A 4AW

HT

3A 4AW

HT

120V

13 4C

208V

13 4C

13 4C

240V

WH

T

480V

WH

T

13 4C

60 H

ZB

LU

BLK

B LK

3 4

BL K

50 H

Z

3 4

44

4A 3B 4B3A 12

4A 3B 4B3A 12

3B

LK3

44

3A 12 3B 4B4A4A 3B 4B3A 12

B LK

3B L

K3

WH

T /BL

U

BLU

WH

T /B

LU

8 9 10 11 12 13 14 15 16 17 18

TB20

2

RED

BA

1267 85

43

C2

G1A

GR

N

RE L

AYH

IGH

INTE

NSI

TYK

1

YEL

YEL

6 BA3417 9

(NO

TE 1

)

INP

UT

PO

WER

115 ,

120

VLI

NE

2

LIN

E 1

CO

MBL

K

F 2

N/O

VR

1W

HT

BLK

QC

1

(NO

TE 4

)

208 ,

220

, 230

VIN

PU

T P

OW

ERLI

NE

1

240,

480

VLI

NE

2C

OM

CO

M

WH

T

F1F2N

/O

S1

N/ O

VR

1S

2

BLK

F1S1

PO

WE

R V

AR

IATI

ON

SS

EE

INP

UT

QC

2

WH

TQ

C1

BLK

QC

2

4. S

2 U

SED

IN 2

08, 2

20, 2

30, 2

40 &

480

V IN

PUT.

3.

DE

NO

TES

TYP

ICAL

GN

D C

ON

NE C

TIO

N.

2. V

ALU

ES O

F R

2 AN

D C

3 M

AY V

ARY

WIT

H A

PPLI

CAT

ION

.1 .

F2

IS R

EPLA

CED

BY

A J

UM

PER

WH

EN L

INE

2 IS

NEU

TRAL

.

NO

TES:

K4

TRAN

SFER

REL

AY

WH

T/Y

EL

BLU

GR

N

BLK

TR

IG 2

BLK

OR

N

OR

N

WHT/GRY

QC

6G

RN

T3

QC

5

TRA

NS F

OR

MER

CO

UPL

ING Q

C3

QC

4G

RN

BLU

AC

-AC

+

BR

1

BUR

STC

HO

KE

Page 35: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-16

PC2251IW

Figure 2-13 FTB 225-1 Beacon Internal Wiring

LIN

E 1

LIN

E 2

INPU

T PO

WER

WH

T

WH

T/VI

O11

T1 IN

PUT

POW

ER V

AR

IATI

ON

S

F2VR

1

F1B

LKN

/O

WH

T

BLK

CO

M

S1B

LK

C4W

HT/

VIO

WH

T/VI

O

WH

T/B

RN

109G

RNG2

21

WH

T/B

LUW

HT/

OR

N7 86

GR

NG2

POW

ERTR

AN

SFO

RM

ERT1

WH

T/R

ED5

NO

TES:

1. F

2 IS

REP

LAC

E B

Y A

JU

MPE

R W

HEN

LIN

E 2

IS N

EUTR

AL.

2. V

ALU

ES O

F R

2 A

ND

C3

MA

Y VA

RY

WIT

H A

PPLI

CA

TIO

N.

3.

DEN

OTE

S TY

PIC

AL

GN

D C

ON

NEC

TIO

N.

14 15 16 17G

1B

R1WHT/BLU

GRN

BLU

WH

T/G

RY

WH

T

BLK

4A3A43

115V

230V

SEE

INPU

TPO

WER

VA

RIA

TIO

NS

N/O

CO

M

S2

4. S

2 U

SED

IN 2

08, 2

20, 2

30, 2

40 &

480

V IN

PUT.

BLK

WH

T

WH

T

(NO

TE 4

)

208,

220

, 230

V

115,

120

VIN

PUT

POW

ER

BLK VR

1F2

LIN

E 2

(NO

TE 1

)

LIN

E 1

F1

WH

T

BLK

N/O

CO

M

S1

50 H

Z12 4A

WH

T4C13

BLK

4 3A3 3C4B3B

208V

240V

480V

60 H

Z WH

TBLK

WH

TBLK

WH

TBLK 12

0V

3C 4C134 4A 4B3B123A3

3C 4C134 4A 4B3B123A3

3C 4C134 4A 4B3B123A3

4 4A3A3

3-81

90-0

3 R

EV J

RED

BLU

WH

T/R

EDG

RN

GRN/YEL

G1

INTE

NSI

TYR

ELA

Y

K3

SOC

KET

VOLT

SR

ETU

RN

GR

N/Y

EL1110TB

1

SEN

SE

STA

RT

SIG

NA

L R

ETU

RN

SIG

NA

L

SIG

NA

L R

ETU

RN

LIN

KC

OM

MR

ETU

RN

SIG

NA

L

GR

N

GR

NG

RY

BLK

98

WH

T/B

LK6 752 43

BLK

WH

T1

WH

T/R

ED

WH

T/B

LUGR

NG

2

RED

18 6 2

4

REL

AY

7 53

YEL

1

WH

T/B

LU

TRA

NSF

ER

GR

NB SI

DE W

HT/

BLK

RED

WH

T/G

RN

K5

REL

AY

MA

RK

ER

A B

963

BLK

71 4

CEN

TER

G1

F3

GR

N BLUWH

T/G

RY

WH

T/YE

L

1

TRIG

GER

K4

9

A6

7

34

GR

N

WH

T/R

ED

P7G

RN

BLU

RED

BLU

BLU

GR

N

TRA

NSF

OR

MER

CO

UPL

ING

FLA

SHH

EAD

TRIG

GER

RTN

T3G2

5

CA

THO

DE

TRIG

GER

3 42A

NO

DETB

21

TRIG

GER R

1A R1B

P1

10G

RN

GR

NW

HT/

RED

11

WH

T/B

LU

G1

7YE

L

GR

N98

WH

TB

LK

WH

T/O

RN

65

DIS

CH

AR

GE

BLE

ED R

ESIS

TOR BLU 20P2

GR

N

ORN G1

48 265

37K1

HIG

H

BC

N V

OLT

SM

KR

VO

LTS

ID S

ENSE

MK

R S

ENSE

RED

SEN

SEM

KR

CTR

LR

ED C

TRL

GR

OU

ND

NIT

E

TRIG

GER

PW

RD

AY

CO

M +

CO

M -

WH

T/YE

LRED

GR

Y

BLK

TB3

BR

N

WH

T/VI

OW

HT/

BR

N

GR

Y3 421

GN

D24

VAC

-24

VAC

+

SEN

SE

BA

NK

V

PCB

18

TB1

GR

N

GRN

P4

BU

RST

CH

OK

E

L1WH

T/R

EDW

HT/

OR

N BU

RST

RES

ISTO

R

NO

TE 2

R2A

P3

1

RED

GR

NG

1G

3

HV

REC

TT1

01

K2 2

FLA

SHTU

BE

C2 BLU

MED

INT

FLA

SHC

HO

KE

YEL

YEL

ORN

L2

G1

GR

N

BLU

HIG

H IN

T

C1AYE

L (T

YP)

BLU

(TYP

)

WHT/GRN

C1GYE

L

BLU

OR

N

TRIG

GER

CA

THO

DE

TRA

NSF

OR

MER

P6

FT10

1

REL

AY R

ED

RED

48 657

3

INTE

NSI

TYLO

W

RED

C3

LOW

INT

WH

T/R

EDAN

OD

E

P5

8

BLU

11

AC

GR

OU

ND

1095H

V 3

HV

1H

V 2

76

-HV

43

OPT

ICA

L A

SS'Y

QC

3Q

C4

WH

T/G

RY

GR

N

PCB

2A

C1 2

TB4

BLU

SEN

SEM

OD

ULE

GRY

TB1

PCB

41 2

G1

BR

N

WH

T/O

RN

GR

N

YEL

OR

NBLU

RED

GRN

240,

480

V

QC

2

QC

1

QC

1

QC

2

QC

2

QC

1

7 6 5 4 3 2 1

BA

NK

V

R2B

QC8

QC7

QC

5Q

C6

G2

G10

1GR

N

-+

AC

AC

Page 36: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-17 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

ch3032

Figure 2-14 Typical FTB 302-1D and FTB 224-1 or FTB 225-1 Structure Installation

Page 37: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-18 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

ch2025

Figure 2-15 Typical Tower Lighting Scheme with High-Intensity Lights and Red Night Lights

L-810 MARKERS

COMM. LINK

CO

MM

. LIN

K

TO FTC 121 SYSTEM CONTROLLERTO AC POWER SOURCE

FTB 225 BEACONS (3)

CABLEFLASHHEAD

FTB 302-1D ANTENNA OBSTRUCTION LIGHT WITH FH 306 DUAL FLASHHEAD AND CABLE.

FH 306

TYPICAL TIER IS SHOWN.A TIER MAY ALSO CONSIST OF PC 224 POWERCONVERTERS AND FH 204 FLASHHEADS, WITHCORRESPONDING FH 307 RED FLASHHEADS.

PC 302-1D, OPERATING AS THE ANTENNA OBSTRUCTION LIGHT (AOL) IN THIS ILLUSTRATIONMAY ALSO OPERATE AN ASSOCIATED TIER OF MARKERS IN SOME INSTALLATIONS.

CONFIGURATIONS, NUMBER OF LIGHTS, AND EQUIPMENT TYPEMAY VARY FROM SITE TO SITE, DEPENDING ON TOWER HEIGHT, TOWER LOCATION, AND OTHER REQUIREMENTS.

FH 307FLASHHEADCABLE

TYPICAL DUAL (RED/WHITE) TOWER LIGHTING SCHEME, WITHHIGH-INTENSITY DAY LIGHTS AND MEDIUM INTENSITY RED NIGHT LIGHTING.- DAY LIGHTS OPERATE AT HIGH DAY INTENSITY AND REDUCED TWILIGHT INTENSITY.- RED NIGHT LIGHTS OPERATE AT A LOWER INTENSITY, PROPER FOR NIGHT TOWER ILLUMINATION.

FH 306 FLASHHEAD

PC 302-1D

PO

WER

POWERPOWER

CO

MM

. LIN

K

FH 307 FLASHHEADS (3)

Page 38: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-19

3PHASEWRNG

Figure 2-16 Junction Box; Three-Phase Wiring Guideline

THREE-PHASE CONNECTION CHART

BEACON 1 BEACON 2 BEACON 3 BEACON 4(IF USED)

TIER F1 F2 F1 F2 F1 F2 F1 F2

6

5

4

3

2

1

B C

A C

A B

B C

A C

A B

A C

A B

B C

A C

A B

B C

B C

A C

A B

B C

A C

A B

A B B C

A C

A B

B C

A C

PHASE: A BLACK WIREB RED WIREC BLUE WIRE

4. PRIMARY POWER CONNECTIONS FOR THREE-PHASE SYSTEMS ARE CONNECTED AS REQUIRED BY THE THREE-PHASE CONNECTION CHART.

PRIMARY

INTERCONNECT

FTCA 3360FTCA 3360

JUNCTION BOX(TYPICALLY SUPPLIED BY OTHERS)

NOTES 1 & 4

BELDEN #8719 OR EQUIVALENT

NOTES:

1. CONDUCTOR GAUGE DEPENDS ON THE SERVICE VOLTAGE, THE LENGTH OF THE WIRE RUN,

2. DENOTES WIRE NUT CONNECTION.

AND THE NUMBER OF BEACONS CONNECTED. USE 400 VOLT-AMPERES PER BEACON TO DETERMINETHE VOLTAGE DROP CAUSED BY WIRE RESISTANCE. THE VOLTAGE DROP MUST NOT

(PHASE BC)

3. UNUSED WIRES IN THE JUNCTION BOX MUST BE CAPPED WITH WIRE NUTS.INDICATES A CAPPED WIRE END.

BLU

GROUND BUSOUTER SHIELD

REDBLK

PURYEL

BLUWHTBLKSHIELD

OUTER SHIELD

REDBLKYELPUR

BLUWHTBLK

OUTER SHIELD

SHIELD

PUR

BLKYEL

RED

WH

TBLK

RED

B LU

GR

N

BLK

S HIE

LD

SHIELDBLKWHT

TO OTHER TIERS ASREQUIRED

NOTES 2, 3

COMM. LINK

CABLE

INTERCONNECT(PHASE AC)CABLE

POWER

TO SYSTEMCONTROLLER

NOTE:CONTROLLER WIREDTO PHASE AC

(PHASE AB)INTERCONNECTCABLE

EXCEED 5% AT ANY BEACON. SEE THE EQUIPMENT LABEL FOR UNIT VOLTAGE AND FREQUENCY.

Page 39: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-20 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

302224INSTW

Figure 2-17 FTB 302-1D and FTB 224-1 Installation Wiring Guideline

7. IF YOUR POWER CONVERTER HAS A CABLE CONNECTOR WITH GROUND SCREWS AFFIXED TO IT ON THE INSIDE, FASTEN THE INNER AND OUTER SHIELDS TO THESE GROUND SCREWS.

NOTE 7

BLK

RED

YEL

VIO

LIN

E 2

LIN

E 1

RED

BLU

PURWHTBLK

TRIG RTNTRIGGERCATHODE

ANODE FLASHHEADCABLE CHART

MINIMUM REQUIREMENTSFOR USER'S CABLE

MIN. INSULATION 600VCOLORS FOR REF. ONLY

BELDEN #8719

5. WHEN LINE 2 IS NEUTRAL, FTCA REPLACES F2 BY A JUMPER.

REDBLUBLKWHTPUR

10 AWG10 AWG16 AWG16 AWG16 AWG

TOP OF THE STRUCTUREWHEN INSTALLING IT AT THE

PROTECTION FOR THE FLASHHEADFTCA RECOMMENDS LIGHTNING

VIO

SHIELD

PUR

WHT

GND

BLK

WHT

BLK

RED

BLU BLU

RED

FH 306 FLASHHEAD

MARKERINTERFACE

UNIT

NOTES 1, 2, 3, AND 4

1. TB202-4 AND TB202-5 TURN ON MARKERS.2. TB202-6 AND TB202-7 SENSE MARKER CURRENT.3. TB202-8 AND TB202-9 SENSE MARKER VOLTAGE.

GND

SHIELDTB201 TB202

SHIELD

FLA

SH

HEA

D C

AB L

E

SHIELD

8

7

TB2

6

5

4

3

1

2

VR1

F1 F2 F4B

A

G3

1 2 3 4 5 6 7 8 9 10 111213 1415 1621 2 3 1718

BLA

CK

WH

I TE

MARKER INTERFACE

STA

RT

RTN

STA

RT

SIG

SO

CK

ET

RTN

SO

CK

ET

LIN

ES

EN

SE R

T NS

EN

SE S

IG

FILTER MON.

PC 302-1D POWER CONVERTER

INNER SHIELD

OUTER SHIELD

6. UNUSED WIRES IN THE POWER CONVERTER SHOULD BE CAPPED WITH WIRE NUTS.INDICATES A CAPPED WIRE END.

157321 654 11

TB31098 141312 1817161 5432 9876 121110

TB2

BLK

WH

T

COMMLINK

SHIELD

FTC 121-1 SYSTEM CONTROLLERPHOTOCELL

COMM. LINK

PHOTOCELL

BLU

NOTE 5

NOTE 12

8. FACTORY WIRES THE EQUIPMENT TO THE NAMEPLATE VOLTAGE.

4. RECOMMENDED MINIMUM IS #14 AWG, 600 VOLT WIRE.RUN THE WIRES IN A CONDUIT.

NOTES:

OR EQUIVALENT

INTERCONNECT CABLE

NOTE 6

NOTE 7

BLK

LIN

E 1

RE D

LIN

E 2

YEL

PUR

RED

BLU

PUR

WHT

BLK

TRIG RTNTRIG 1CATHODE

ANODE

PUR

SHIELD

PUR

WHT

GND

BLK

WHT

BLK

RED

BLU BLU

RED

FH 307 FLASHHEAD

MARKERINTERFACE

UNITNOTES 1, 2, 3, AND 4

GND

FLA

SHH

EAD

CAB

LE

INNER

SHIELD

TB2

1

VR1

F1 F2 F4B

A

COMM LINK

WH

ITE

BLA

CK

TB201

321 2 15

SHIELD

SEN

SE R

TN

MARKER INTERFACE

SEN

SE S

IG

STA

RT

SIG

STA

RT

RTN

SO

CK

ET L

INE

SO

CK

ET R

TN

G3

7321

SHIELD

654 11

TB202

1098 141312 181716

23

45

6

7

8

PC 224-1 POWER CONVERTER

BLU

PUR

WHT

BLKBLU

RED

TRIG 2

FLA

SHH

EA

D C

ABLE

FH 204 FLASHHEAD

BLU

RED

BLK

WHT

PUR

SHIELD

RED

BLU

GND

WHT

BLK

PUR

NOTE 5

NOTE 12

OUTERSHIELD

SHIELD

NOTE 6

Page 40: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, and 225-1 Revision 11 — 10-14-03 2-21

302225INSTW

Figure 2-18 FTB 302-1D and FTB 225-1 Installation Wiring Guideline

11. IF YOUR POWER CONVERTER OR BEACON HAS A CABLE CONNECTOR WITH GROUND SCREWS AFFIXED TO IT ON THE INSIDE, FASTEN THE INNER AND OUTER SHIELDS TO THESE GROUND SCREWS.

NOTE 11

BLK

RE D

YEL

PU

R

LIN

E 2

LIN

E 1

RED

BLU

PURWHTBLK

TRIG RTNTRIGGERCATHODE

ANODE FLASHHEADCABLE CHART

MINIMUM REQUIREMENTSFOR USER'S CABLE

MIN. INSULATION 600VCOLORS FOR REF. ONLY

BELDEN #8719

9. WHEN LINE 2 IS NEUTRAL, FTCA REPLACES F2 BY A JUMPER.

REDBLUBLKWHTPUR

10 AWG10 AWG16 AWG16 AWG16 AWG

TOP OF THE STRUCTUREWHEN INSTALLING IT AT THE

PROTECTION FOR THE FLASHHEADFTCA RECOMMENDS LIGHTNING

VIO

SHIELD

PUR

WHT

GND

BLK

WHT

BLK

RED

BLU BLU

RED

FH 306 FLASHHEAD

MARKERINTERFACE

UNIT

NOTES 4, 5, 6, AND 7

5. TB202-4 AND TB202-5 TURN ON MARKERS.6. TB202-6 AND TB202-7 SENSE MARKER CURRENT.7. TB202-8 AND TB202-9 SENSE MARKER VOLTAGE.

GND

SHIELDTB201 TB202

SHIELD

FLA

SHH

EA

D C

ABL

E

SHIELD

8

7

TB2

6

5

4

3

1

2

VR1

F1 F2 F4B

A

G3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1621 2 3 1718

BLA

CK

WH

ITE

MARKER INTERFACE

STA

RT

RTN

STA

RT

SIG

SO

CK

ET

RTN

SO

CK

ET

LIN

ES

ENS

E R

TNS

ENS

E S

IG

FILTER MON.

PC 302-1D POWER CONVERTER

INNER SHIELD

OUTER SHIELD

10. UNUSED WIRES IN THE POWER CONVERTER OR BEACON SHOULD BE CAPPED WITH WIRE NUTS.INDICATES A CAPPED WIRE END.

157321 654 11

TB31098 141312 1817161 5432 9876 121110

TB2

BLK

WH

T

COMMLINK

SHIELD

FTC 121-1 SYSTEM CONTROLLERPHOTOCELL

COMM. LINK

PHOTOCELL

BLU

NOTE 9

NOTE 12

12. FACTORY WIRES THE EQUIPMENT TO THE NAMEPLATE VOLTAGE.

NOTES 1, 2, 3, AND 4

4. RECOMMENDED MINIMUM IS #14 AWG, 600 VOLT WIRE. RUN THE WIRES IN A CONDUIT.

1. TB1-6 AND TB1-7 TURN ON MARKERS2. TB1-8 AND TB1-9 SENSE MARKER CURRENT3. TB1-10 AND TB1-11 SENSE MARKER VOLTAGE

NOTES:

FTB 225-1 BEACON

LIN

E 1

LIN

E 2

RE

D

BL K

BLA

CK

WH

ITE

PUR

YEL

MARKER INTERFACE

SE

NS

E R

TN

ST A

RT

RTN

STA

RT

SIG

SE

NS

E S

IG

SO

CK E

T R

TNS

OC

KET

LIN

E

UNITINTERFACE

MARKER

F2

321

F1 F1

F2

G4 G5

VR1

104 5 6

TB1

97 8 11G2

PCB4

1

TB2

2

NOTE 11

3

4

5

FH 307 FLASHHEADRED RED

ANODE

TRIGGERCATHODE

PUR

WHT

BLK

BLU

SHIELD

GND

BLK

BLU

WHT

VIO

RED

FLA

SH

HE

AD

CA

BLE

BLKBLU

PURWHT TRIG RTN

SHIELDGNDGND

BLU

NOTE 9

NOTE 12

OUTERSHIELD

INNERSHIELD

NOTE 10

OR EQUIVALENT

COMM. LINK

NOTE 10

INTERCONNECT CABLE

Page 41: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

2-22 Revision 11 — 10-14-03 FTB 302-1D, 224-1, and 225-1

This page is intentionally blank.

Page 42: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-1

Section 3 — Maintenance and Troubleshooting

SafetyWARNING

Before proceeding — read the warningon Page iii.

Work safely as follows:

1. Remove rings and watches before opening the equipment.

2. Shut off the equipment.3. Remove the component or connect the test

instrument.4. Replace the component.5. Turn on the power and test the system.6. Turn off the power and disconnect the test

equipment.

Preventive MaintenanceCarry out the following inspection and cleaning procedures at least once a year:

1. Verify that moisture does not accidentally enter the equipment through gaskets or seals, or collect as condensation.

2. Verify that all drain holes are clear.3. Check terminal blocks and relays for evidence

of corrosion and electrical arcing. Clean or replace any component that shows evidence of high-voltage damage.

4. Check flashtube connections for signs of pit-ting or arcing. Verify that anode and cathode connections are firmly tightened.

5. Check all electrical connections for tightness and ensure the absence of corrosion or electri-cal arcing.

6. Clean the inside and outside surface of the glass on the FH 204 or the FTB 225 Beacon with liquid detergent and water. Wipe it gen-tly with a soft cloth or paper towel.

7. Clean the inside surface of the lens on the FH 306 or FH 307 with an FTCA-approved profes-

sional plastic cleaner. Wipe the lens with cheesecloth only. Do not use regular cloth or paper towels. A lens cleaning kit, PN 8630801, is available from FTCA. Call Customer Ser-vice at 1-800-821-5825.

StorageNo special considerations are required for long-term storage of any major assembly, such as the power converter or beacon, flashhead, photo-electric control or any internal component. Circuit boards, when not installed in the equipment, should be kept in antistatic bags or containers.

Diagnostic Testing

RFI ProblemsPresence of radio frequency interference (RFI) can cause a light to flash intermittently, at the wrong rate, or at the wrong intensity. RFI can enter the light by way of any wire to or from the unit. For example:

• RFI on primary power wires could cause errors in flash rate and intensity.

• RFI on the COMM LINK wire could cause a light to stay at NITE mode. RFI would not nor-mally cause a light to stay at DAY mode. Also, it could cause lights and the system controller to malfunction.

• Strong RFI could burn out circuit board com-ponents.

While FTCA designed circuits to reject or bypass RFI, complete immunity cannot be guaranteed beforehand. It may be necessary after installation to add external filters or use other methods to reduce RFI entering the equipment. FTCA pro-vides all reasonable technical assistance to achieve satisfactory operation.

Page 43: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-2 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

Diagnostic Troubleshooting

The most effective troubleshooting begins with careful observation of operating behavior. This often leads directly to the cause of the problem. Therefore, become familiar with operation of the power converter or beacon in your system. Note how the LED indicators operate in daytime and nighttime conditions. Observe the power con-verter or beacon at the same time that you observe the LEDs on PCB1. Listen to the sounds of the power converter or beacon as it triggers the flashhead in both daytime and nighttime condi-tions, and watch LEDs and relays as the power converter or beacon switches from day to night and night to day.

Check LED and neon indicators. Are they lit? Are the correct ones lit? Check the power cable and flashhead cable screw connections. Are they tight? Corroded? Has water entered the unit?

Refer to Section 1 — Introduction and Operation for power converter or beacon operation specifics and LED functions. Table 3-1 describes basic operation.

You can control the operation of the power con-verter or beacon from the System Controller. You can also interrogate and receive status informa-tion from the controller if you have a computer connected to it over a telephone line.

Troubleshooting ChartsTable 3-1 through Table 3-6 provide an approach and some solutions to troubleshooting problems that you may encounter with the lighting sys-tems.

See Table 3-2 to direct you to the correct trouble-shooting tables for your system. For example: Table 3-3 lists some symptoms a malfunctioning light might exhibit. Table 3-4 and Table 3-5 corre-late these symptoms with component assemblies or conditions that might cause the malfunction.

Table 3-1 Basic Power Converter or Beacon Operation for Troubleshooting

PowerConverter

orSystem

Lights SystemType

Daylight/Twilight/NightOperating Mode†

PC 302-1D One dual FH 306 flashhead

Dualwhite/redsystem

Operates FH 306 white at 20,000 candelas in daylight and twilight.Operates FH 306 red at 2,000 candelas at night and turns on tower marker lamps if so installed.

PC 224-1 One white FH 204 flashheadOne red FH 307 flashhead

Operates FH 204 white at 270,000 candelas in daylight and white at 20,000 candelas in twilight.Operates FH 307 red at 2,000 candelas at night and turns on tower marker lamps if so installed.

FTB 225-1 One white beaconOne red FH 307 flashhead

Operates beacon white at 270,000 candelas in daylight and white at 20,000 candelas in twilight.Operates FH 307 red at 2,000 candelas at night and turns on tower marker lamps if so installed.

† The combined operation of a photocell and an FTC 121-1 System Controller determine intensity mode.

Page 44: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-3

For example, each item in Table 3-3 is weighted to indicate the estimated likelihood that it would be causing the problem. For example, suppose the light does not flash at all but some of its circuits are still functioning; that is, fuses are not blown, relays operate, and so forth. This is symptom C in Table 3-4. Table 3-4 indicates that symptom C behavior would most likely be caused by a defec-tive PCB1 board. The next most likely cause

would be a defective rectifier board. The third would be the NITE capacitor, and so on.

You can check out most suspect components by following the procedures in this section. When you trace a problem to a specific component, see Sec-tion Component Testing and Section Component Removal and Replacement for further assistance.

Table 3-2 Troubleshooting Tables

System Symptoms Fault Locator

FTB 302-1DTable 3-3

Table 3-4FTB 224-1FTB 225-1 Table 3-5

Table 3-3 Major Troubleshooting Symptoms

SymptomsFlash Conditions

Code†

Day/twilight Night

All circuits are dead NO NO APrimary line fuse repeatedly blows NO NO B

Some circuits functioning NO NO CNo confirmation OK OK DNight flash fails OK NO E

Night too bright - ragged flash OK HIGH F-- SKIPS OK G-- LOW HIGH H-- LOW SKIPS I-- SKIPS SKIPS J

Resistor on PCB2 burned out NO NO KInconsistent and erratic flash behavior -- -- L

No fail indication NO NO M

Flash errorsNO OK NOK NO NNO NO N

† See Table 3-4.

Page 45: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-4 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

Table 3-4 FTB 302-1D Fault Locator

Probable Cause A B C D E F G H I J K L M N

Day capacitor bank C1A-C1x 4Night capacitor C3 3 5

Tuning capacitor C4 2Primary line Fuses F1/F2 1

Flashtube FT101 6 2Low intensity relay K2 3 2 1 1 1 2

Burst choke L1 4Timing and trigger board PCB1 1 1 1 2 2 2 2 3

Rectifier board PCB2 2 2Filter detection board PCB3 4

Sense module PCB4 2Flashhead baseplate A101 1

Burst resistor R2 1Interlock switch S1 2

Power transformer T1 3 2 5Trigger transformer T3 7 3

Suppressor assembly VR1 1Note 1 1Note 2 1Note 3 1 3Note 4 3Note 5 1 1Note 6 4

Note 1 Blown fuse in one leg of 3-phase power distribution: all beacons on the same phase would be affected.

Note 2 Wrong phase between system controller and light.Note 3 Trigger potential arcing to chassis.Note 4 Wrong confirmation programming at light.Note 5 RF interferenceNote 6 Poor connection in discharge circuit between capacitors and flashtube or arcing to chassis.

Page 46: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-5

Component Testing

The following procedures describe how to check most of the unit's major electrical components. Always make resistance measurements with the primary power turned off. However, you must make voltage measurements with power applied. Thus, for your safety, carry out all preliminary steps such as connecting test leads or circuit jumpers, or disconnecting existing circuit connec-tions with the power turned off and storage capac-itors discharged.

Power Converter or Beacon

Capacitors

You may test capacitors with an analog ohmmeter capable of measuring one megohm or greater. Use the procedure described below. Resistance mea-sured between the terminals of a fully discharged capacitor is initially zero and increases steadily with time if analog ohmmeter leads are left across the terminals. Eventually, an open circuit condi-tion occurs. The time it takes for the complete transition depends upon the total amount of

Table 3-5 FTB 224-1 and FTB 225-1 Fault Locator

Probable Cause A B C D E F G H I J K L M N

Day capacitor bank C1A-C1x 4Night capacitor C3 3 5

Tuning capacitor C4 2Primary line Fuses F1/F2 1

Flashtube FT101 6 2Low intensity relay K2 3 2 1 1 1 2

Burst choke L1 4Timing and trigger board PCB1 1 1 1 2 2 2 2 3

Rectifier board PCB2 2 2Sense module PCB4 2Burst resistor R2 1

Interlock switch S1 2Power transformer T1 3 2 5Trigger transformer T3 7 3

Suppressor assembly VR1 1Note 1 1Note 2 1Note 3 1 3Note 4 3Note 5 1 1Note 6 4

Note 1 Blown fuse in one leg of 3-phase power distribution: all beacons on the same phase would be affected.

Note 2 Wrong phase between system controller and light.Note 3 Trigger potential arcing to chassis.Note 4 Wrong confirmation programming at light.Note 5 RF interferenceNote 6 Poor connection in discharge circuit between capacitors and flashtube or arcing to chassis.

Page 47: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-6 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

capacitance. A capacitor, disconnected from other circuitry, is defective if it does not exhibit this behavior. The capacitor must be manually dis-charged before this measurement can be repeated. This procedure may not detect a failure that occurs only at high voltage.

A bank of capacitors connected in parallel may be checked as a single unit. First disconnect any leads that connect the capacitors to external cir-cuits. Connect the ohmmeter leads to the termi-nals of any one of the capacitors. If a short circuit is indicated, the individual capacitors must be dis-connected and checked separately. A shorted capacitor is indicated if the measured resistance does not rise above zero after several seconds of measurement.

NOTESome instruments may have erroneousreadings when used near a radiatingantenna. Make measurements when thepower to the antenna is turned OFF oruse a meter known to be unaffected byan RF field.

C1 and C2 Capacitor Banks

Check these capacitor banks as described in Sec-tion Capacitors. Each bank can be checked as a whole at one time by connecting the meter leads to the terminals of anyone of the individual capac-itors in the bank and pressing the armature of the K3 Bleeder Relay.

C3 and C4 Capacitors

Check these capacitors as described in Section Capacitors.

Relays

A malfunctioning relay may have faulty contacts, a sticky mechanism or a defective coil. The first two possibilities may be determined by inspection and manually exercising the armature. A defec-tive coil can be confirmed by measuring the resis-tance.

K1 — High Intensity Relay

To measure the resistance of this relay, first remove PCB1. The resistance from TB3-8 and TB3-10 or chassis should be approximately 290 ohms.

K2 — Low Intensity Relay

To measure the resistance of this relay, first remove PCB1. The resistance from TB3-7 and TB3-10 or chassis should be approximately 290 ohms.

K3 — Discharge Relay

The K3 coil should measure approximately 290 ohms.

K4 — Transfer Relay

The K4 coil should measure approximately 290 ohms.

K5 — Marker Relay

The K5 coil should measure approximately 290 ohms.

L1 — Burst Choke

L1 should measure approximately 15 ohms.

PCB1 — Timing and Trigger Board

Replace this circuit board with one known to be in good condition.

PCB2 — HV Rectifier Board

Replace this circuit board with one known to be in good condition.

PCB3 — Filter Detection Board

Replace this circuit board with one known to be in good condition.

PCB4 — Sense Board

Replace this circuit board with one known to be in good condition.

R1 — Discharge Resistor

R1 should measure 35K ohms.

Page 48: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-7

R2 — Burst Resistor

Each resistor of this component should measure 500 ohms.

T1 — Power Transformer

To test this transformer, first remove PCB1 and PCB2. Apply power to the unit and measure sec-ondary winding voltages at the terminals indi-cated.

T3 — Coupling Transformer

Check the continuity of the wires in the primary and secondary windings of this transformer. Ensure that the transformer core is not cracked.

VR1 — Suppressor Assembly

To check this component first remove one of its leads from a fuse block terminal. The measured resistance across VR1 on the x110k ohm scale should be infinite.

Flashhead Component Testing

FLASHTUBE HANDLING PRECAUTIONSFH 204 AND FTB 225-1 OPTICAL ASSEMBLY

Always handle a flashtube by grasp-ing the metallic end caps. Nevertouch the glass section with barehands because skin oils or other con-taminants can shorten flashtube life.

One quick way to determine flashhead malfunc-tion is to switch the flashhead cables on multi-ple-unit installations. If the flash problem moves with the cable, the problem is likely in the flash-head or the flashhead cable. Of the two possibili-ties, the flashhead cable is less likely to fail than the flashhead. However, a flashhead cable can fail because of damage caused by improper installa-tion (stretching excessively or sharp bends), light-ning strikes, or physical deterioration (age, cuts, and so forth).

A failing flashtube can produce either defective light output, intermittent light output (skip), or no light at all. Most likely, a flashtube will fail completely.

Replace the entire Flashtube Mounting Plate Assembly (A101) in the FH 306 Flashhead (see Section 4 — Spare & Replaceable Parts) if the fil-ter motion is defective or if the flashhead mal-functions with a good flashtube installed.

FT101 — FlashtubeVisually inspecting a flashtube reveals little about its working condition or performance. A darkened envelope does not necessarily mean the light output would be unacceptable. Before con-cluding that a faulty flashtube is responsible for an inadequate flash, first rule out other possible causes such as weak or absent discharge voltage or triggering pulses.

T101 — Trigger TransformerThe measured resistance of the secondary wind-ing (potted assembly) should be approximately 1.5 ohms. Check the ferrite core for cracks. Check the mounting screws for tightness.

T102 — Coupling Transformer

Check the continuity of the wires in the primary and secondary windings of this transformer. Ensure that the transformer core is not cracked.

Component Removal and ReplacementThis section contains instructions for removal and replacement of most major replaceable compo-nents. Section 4 — Spare & Replaceable Parts

Table 3-6 Power Transformer Voltage Ranges

Terminals Voltage Range Allowed

From TB4-1 to TB4-9 900-1050 volts AC1

From TB3-9 to TB3-10 110 to 120 VDC (full-waverectified AC)

From TB3-2 to TB3-3 22 to 26 VAC

Fuse F3 120 VAC

Across C4 550 to 600 VAC

1. If this AC voltage is substantially below the spec-ified minimum value, check the C4 Tuning Capacitor.

Page 49: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-8 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

provides component location diagrams. For the internal wiring, see Section 2 — Outline, Mount-ing, and Installation.

Power Converter or Beacon

C1A - C1x Capacitors

Before removing or replacing a capacitor always make sure it is discharged by checking with a voltmeter directly across the terminals. You may manually discharge a capacitor by placing a resis-tance (25 watts, 10,000 ohms or greater) between its terminals. Direct shorting may damage the capacitor, while connecting the terminals to the equipment chassis may fail to discharge it.

Remove Fuse F1 for this procedure to prevent accidental application of power if the interlock switch is accidently pressed.

PC 302-1D and PC 224-1 Capacitors

Removal1. Remove circuit boards PCB1 and PCB2 for

access to the capacitors.2. Loosen two screws at the corners of the circuit

boards.3. Loosen the screws holding the boards to their

respective terminal blocks.4. Slide the board to clear the screw heads.

Remove the boards from the unit. 5. Remove the wires on TB3 and TB4 that come

from the internal cabling.6. Remove any external connecting wires from

TB201 and TB202.7. Loosen the screws that hold the bracket that

supports PCB1 and PCB2.8. Slide the bracket up to clear the screws and

remove the bracket for access to the capaci-tors.

9. The capacitors are mounted in holes in a bracket and held down to the chassis with a bolted washer. Disconnect the wires leading to capacitors.

10. Remove the bolt and washer.

11. Lift the capacitors from their receiving holes.

Replacement

1. Insert the capacitors into their respective receiving holes.

2. Replace the hold-down bolt and washer to secure the capacitors to the chassis.

3. Reconnect the wires to capacitors and verify that wiring is the same as shown in Figure 2-12 PC 224-1 Power Converter Internal Wir-ing. Wires must be replaced exactly as removed. In some instances, a quick-connect wire terminal does not seat properly if it is not placed on the terminal cluster exactly as it was before removal. This is caused by interfer-ence between the insulation on the wire termi-nal and the insulation surrounding their terminal cluster on the capacitor. FTCA rec-ommends that you lightly squeeze the quick-connect wire terminals with pliers before reinstalling them over the capacitor terminal blades.

FTB 225-1 Capacitors

Removal1. Disconnect the wires leading to capacitors.2. The capacitors are mounted in holes in a

bracket and held down to the bracket with a screw. Remove the screw.

3. Lift the capacitors from their receiving holes.

Replacement1. Insert the capacitors into their respective

receiving holes.2. Replace the hold-down screws to secure the

capacitors to the chassis.3. Reconnect the wires to capacitors and verify

that wiring is in accordance with Figure 2-13 FTB 225-1 Beacon Internal Wiring. Wires must be replaced exactly as removed. In some instances, a quick-connect wire terminal does not seat properly if it is not placed on the ter-minal cluster exactly as it was before removal. This is caused by interference between the insulation on the wire terminal and the insu-lation surrounding their terminal cluster on the capacitor. FTCA recommends that you lightly squeeze the quick-connect wire termi-nals with pliers before reinstalling them over the capacitor terminal blades.

Page 50: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-9

PCB1 — Timing and Trigger Board

Removal1. Loosen (but do not remove) the two screws

near the corners of the board. 2. Disconnect the plug (PCB1-TB1) on the board.3. Loosen the screws holding the board to its ter-

minal block.4. Slide the board to the right and lift the board

from the chassis.

Replacement1. Use the steps of the Removal procedure in the

reverse order.

PCB2 — HV Rectifier Board

Removal1. Loosen the two screws near the corners of the

board.2. Loosen, but do not remove, the screws holding

the HV rectifier board to the terminal block.3. Slide the circuit board out from under the ter-

minal block screws.

ReplacementUse the steps of the Removal procedure in the reverse order.

PC 302-1D, PCB3 — Filter Detection Board

Removal1. Remove the two screws that fasten the board

to the chassis.2. Unplug J1 and J2.3. Remove PCB3.

ReplacementUse the steps of the Removal procedure in the reverse order.

PCB4 — Sense Board

PC 302-1D, PC 224-1 Sense Board

Removal1. Remove the two screws that fasten the PCB4

board to the chassis.

2. Loosen, but do not remove, the screws holding the two wires to the TB1 terminal block on PCB4.

3. Disconnect the red wire from the relay that passes through the coil on PCB4. Important: Note the position and connections of this wire. It must be replaced exactly as it was removed.

Replacement

1. Use the steps of the Removal procedure in the reverse order.

2. Pass the red wire from the relay through the coil on PCB4 in the same direction that it was originally.

FTB 225-1 Sense Board

Removal

1. Remove the flashhead cable wires from TB2.

2. Remove the wires from TB2 that are internal to the chassis.

3. Remove the screws that hold the flashhead cable bracket to the chassis.

4. Carefully lift the bracket from the chassis and remove any wires that may hold down the bracket and prevent it from clearing the chas-sis.

5. Remove the two screws that fasten the PCB4 board to the bracket.

6. Loosen, but do not remove, the screws holding the two wires to the TB1 terminal block on PCB4.

7. Disconnect the two red wires from the relay that pass through the coil on PCB4. Impor-tant: Note the position and connections of these wires. They must be replaced exactly as they were removed.

Replacement

Use the steps of the Removal procedure in the reverse order. Pass the red wire from the relay through the coil on PCB4 in the same direction that it was originally.

Page 51: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-10 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

T1 — Power Transformer

PC 302-1D, PC 224-1, FTB 225-1:

Removal1. Disconnect wires attached to the transformer

and observe how each wire is routed from the harness to its terminal on the transformer.

2. Remove the four screws holding the trans-former to the chassis and remove transformer from the chassis. NOTE: The T1 Transformer in FTB 225-1 is fastened by nuts. A socket wrench is useful here.

Replacement1. Carry out the steps of the removal procedure

in reverse order.2. Verify that wiring is in accordance with Figure

2-10, Figure 2-12, or Figure 2-13 and that you restore wire routing to its original state.

T3 — Coupling Transformer

PC 302-1D, 224-1 Coupling Transformer:

Removal1. Remove the two blue wires from the primary

(small number of turns) of the coupling trans-former.

2. Remove the two blue wires from the secondary of T3 (large number of turns) to TB2-4 and TB2-5.

3. Remove the two 4-40 x 2" Phillips-head screws holding the transformer assembly to the bracket. Note the orientation of the molded secondary winding with respect to fixed fea-tures on the bracket, because it must be rein-stalled with this same orientation.

4. Remove the outer half of the core and lift off the molded secondary winding. The seven turns of the primary winding remain hanging in place.

5. Remove the inner half of the core, taking care not to uncoil any turns of the primary wind-ing.

FTB 225-1 Coupling Transformer:

Removal1. Remove the flashhead cable wires from TB2

on the remote flashhead bracket.2. Remove the harness wires from TB2 that are

internal to the chassis.3. Remove the screws that hold the remote flash-

head bracket to the chassis.4. Carefully lift the bracket from the chassis and

remove any wires that may hold down the bracket and prevent it from clearing the chas-sis.

5. Remove any components that prevent access to T3.

6. Remove the two blue wires from the primary (small number of turns) of T3.

7. Remove the two blue wires from the secondary of T3 (large number of turns) to TB2-4 and TB2-5.

8. Remove the two 4-40 x 2" Phillips-head screws holding the transformer assembly to the bracket. Note the orientation of the molded secondary winding with respect to fixed fea-tures on the bracket, because it must be rein-stalled with this same orientation.

9. Remove the outer half of the core and lift off the molded secondary winding. The seven turns of the primary winding remain hanging in place.

10. Remove the inner half of the core, taking care not to uncoil any turns of the primary wind-ing.

Replacement1. Reassemble the primary and secondary wind-

ings over the two halves of the core. Attach the core to the bracket using the two long screws.

2. Reattach the electrical wires. Verify that wir-ing is in accordance with Figure 2-13 FTB 225-1 Beacon Internal Wiring.

All Other Power Converter or Beacon ComponentsAll other components are mounted in the base or attached to the side walls of the power unit. They

Page 52: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-11

are attached by Phillips-head screws. You may need a short screwdriver for some removals.

Removal1. Carefully note the position and color of wires

on the connectors to the component you want to remove.

2. Note any other components, and its wires and connections, that you may need to remove to access the component that you are replacing.

3. Remove the wires either fastened by screws or connector plugs (this depends on the compo-nent you are removing).

4. Remove the screws that hold the component to the chassis.

ReplacementReplace components in the reverse order of removal. That is:

1. Attach the component with its mounting screws.

2. Reattach the connecting wires by using the plugs or hold-down screws. (Because of posi-tion or convenience, some wires may have to be connected before you mount the compo-nent.)

Flashhead

FH 306 FlashheadNote that the only replaceable parts in the flash-head assembly are the FT101 flashtube, RC101 and RC102 resistor-capacitor networks, and T102 Coupling Transformer. Any other defective part inside the flashhead located on the mounting plate requires that you replace the entire mount-ing plate as an assembly.

Flashtube (FT101)

Removal1. Manually lift the red filter actuator arm to

allow access to the three screws under the flashtube that hold the flashtube assembly in place.

2. Loosen the three screws (on screw lugs) directly under the flashtube, which hold the flashtube connector pins. Doing this enables you to disengage the flashtube. Carefully lift the flashtube upward from the assembly.

Replacement1. Align the pins on the flashtube base with the

clamps of the terminal screw lugs, making sure that the red dot on the flashtube base coincides with the red dot marked on the sup-port column directly under it.

2. Insert the flashtube and settle it into place, making sure the ceramic base is resting directly on the tops of the screw lugs. Secure the flashhead by tightening the three screws on the screw lugs.

Trigger Transformer, T101

The trigger transformer is not replaceable in the field. You must replace the entire baseplate assembly.

Coupling Transformer, T102

Removal and ReplacementRemoval and replacement are similar to the pro-cedure for the T3 Coupling Transformer in the power converter or beacon.

FH 306 Flashtube Mounting Assembly

Replace the entire A101 Flashtube Mounting Plate if the filter motion is defective or if the flashhead malfunctions with a good flashtube installed.

Removal 1. Remove the flashhead cable wires from the

ceramic posts on the flashtube mounting plate assembly.

2. Loosen the three mounting screws that hold the flashtube mounting plate assembly to the flashhead.

3. Turn the flashtube mounting plate assembly slightly to allow the screws that you loosened to clear the mounting holes.

4. Lift the flashtube mounting plate clear of the base.

Page 53: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-12 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

Replacement1. Replace the flashhead mounting plate assem-

bly in the reverse sequence to that of Removal.

FH 307 Flashhead

Flashtube (FT101)

RemovalLoosen the three screws (on screw lugs)—this enables you to disengage the flashtube. Carefully lift the flashtube upward from the assembly.

Replacement1. Align the pins on the flashtube base with the

clamps of the terminal screw lugs, making sure that the red dot on the flashtube base coincides with the red dot marked on the bracket directly under it.

2. Carefully insert the flashtube and settle it into place, making sure the ceramic base is resting directly on the tops of the screw lugs. Secure the flashhead by tightening the three screws on the screw lugs.

Trigger Transformer (T101)

Removal1. At the trigger wire post adjacent to the flash-

tube, remove the large diameter wire coming from the trigger transformer.

2. At one of the smaller, side-mounted ceramic posts, remove the small wire to the molded trigger transformer. Do not disconnect the pri-mary winding wires (seven turns of insulated wire).

3. Remove the two 4-40 x 2" Phillips-head screws holding the transformer assembly to the base. Note the orientation of the molded secondary winding with respect to fixed features on the bracket, because it must be reinstalled with this same orientation.

4. Remove the outer half of the core and lift off the molded secondary winding. The seven turns of the primary winding remain hanging in place.

5. Remove the inner half of the core, taking care not to uncoil any turns of the primary wind-ing.

Replacement1. Reassemble the primary and secondary wind-

ings over the two halves of the core. Attach the core to the bracket using the two long screws.

2. Reattach the electrical wires. Verify that wir-ing is in accordance with Figure 2-7.

Trigger Coupling Transformer (T102)Removal and replacement are similar to the pro-cedure for the trigger transformer (T101).

FH 324 FlashheadRed Lens Section: Removal1. Unlatch the two latches and lift the red lens to

allow access to the three screws holding the flashtube pins.

2. Using a #2 Phillips-blade screwdriver, loosen the three screws (on screw lugs) directly under the flashtube, which hold the flashtube con-nector pins. This enables you to remove the flashtube.

Replacement1. Align the pins on the flashtube base with the

clamps of the terminal screw lugs, making sure that the red dot on the flashtube base coincides with the red wire on the support col-umn directly under it.

2. Insert the flashtube and settle it into place, making sure the ceramic base is resting directly on the tops of the screw lugs.

3. Ensure that the tube is vertical.4. Tighten the three screws on the screw lugs to

secure the flashtube.

White Lens Section: Removal1. Loosen the two screws securing the upper

flashtube assembly and lift the plate up and out of the way to allow access to the bottom flashtube.

2. Pull out the flashtube in the white lens bottom section. You may have to rock it back and forth slightly to remove the tube.

Page 54: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 3-13

Replacement1. Align the pins on the flashtube base with their

sockets. Notice that the spacing of the flash-tube pins must match that of its sockets.

2. Insert the flashtube and settle it into place, making sure the ceramic base is resting directly on the tops of the pin sockets.

3. Ensure that the tube is vertical.4. Close the top red lens section and secure the

latches.

Trigger Transformer, T101Refer to Figure 4-2 FH 324-2 Flashhead Compo-nent Location.

Removal1. At the trigger wire post adjacent to the flash-

tube, remove the large diameter wire coming from the trigger transformer.

2. At one of the smaller, side-mounted ceramic posts, remove the small wire to the trigger transformer. Do not disconnect the primary winding wires (seven turns of hook-up wire).

3. Remove the two 4-40 x 2" Phillips®-head screws holding the transformer assembly to the bracket. Note the orientation of the molded secondary winding with respect to fixed features on the bracket, since it must be reinstalled with this same orientation.

4. Remove the outer half of the core and lift off the molded secondary winding. The primary winding will remain hanging in place.

5. Remove the inner half of the core.Replacement1. Reassemble the primary and secondary wind-

ings over the two halves of the core. Attach the core to the bracket using the two long screws.

2. Reattach the wires. Verify that wiring is in accordance with Figure 2-8 FH 324 Flashhead Internal Wiring.

Coupling Transformer, T102Refer to the flashhead component locations dia-gram Figure 4-2 and internal wiring diagram Fig-ure 2-8.

Removal and replacement are similar to the pro-cedure for the trigger transformer (T101).

FH 204 Flashhead, FTB 225-1 Beacon

FT101 Flashtube

FOLLOW FLASHTUBEHANDLING PRECAUTIONS

Always handle a flashtube by graspingthe metallic end caps. Never touch theglass section with bare hands becauseskin oils or other contaminants canshorten flashtube life.

Removal1. Loosen two screws that hold each plate that

covers each end of the flashtube on the optical assembly.

2. Disconnect the trigger wire at the P101 ceramic post on the left side of the optical assembly viewed as in Figure 4-4.

3. The flashtube is supplied with connecting leads soldered to its ends. Loosen the screw on the end of each flashtube lead.

4. At one end of the flashtube, use a slender, pointed tool between the end of the flashtube and the spring-loaded clip to pop the flashtube up and out of the clip. Do the same at the other end and carefully pull the flashtube out of the optical assembly.

ReplacementObserve the flashtube handling precaution noted previously.

1. Determine the anode and cathode ends: the anode has red wire soldered to it and red ink or dye on the end of the tube.

2. Ensure that the trigger extension wire has a short length of high voltage sleeving installed.

3. Insert the flashtube with the cathode end (no red ink) toward the trigger lead ceramic post.

4. Align the flashtube with the retaining clips at each end and press it down into the clips one end at a time. Press only at the metallic end caps.

5. Attach the trigger wire (white insulation) at the ceramic post P101. Remove any excess wire and do not leave a tail extending from under the screw. Do not forcefully tighten the screw.

Page 55: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

3-14 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

6. Attach the red anode wire to its connection directly above the tube mounting clip.

7. Attach the black cathode wire of the flashtube to the screw on the upper end of the plate on the left side of the optical assembly viewed as in Figure 4-4.

8. Reinstall each plate on each side of the flash-tube and tighten the screws.

Flashtube Clip AssembliesRemoval1. Remove the flashtube as described in Section

Flashtube (FT101).2. Remove two 8-32 screws from each flashtube

clip plate.

Replacement1. Reverse the Removal procedure. Be sure that

joining surfaces are clean. Tighten the screws firmly.

Trigger Transformer T101Removal1. At the flashtube, remove the large diameter

white wire to the molded secondary winding of the transformer.

2. At a chassis ground screw remove the small wire to the transformer secondary winding.

3. Do not disconnect the primary winding wires (seven turns of the hook-up wire).

4. Remove the two 4-40 x 2-inch screws phil-lips-head screws that hold the transformer assembly to the plate.

5. At this point note the orientation of the molded secondary winding with respect to fixed features on the plate because its replace-ment must be installed with this same orien-tation.

6. Remove the outer half of the core and lift off the molded secondary winding. The seven turns of the small primary winding remain hanging in place.

7. Remove the inner half of the core taking care not to uncoil any of the turns of the small pri-mary winding.

Replacement1. Reassemble the small primary and molded

secondary windings over the two halves of the core and attach the core to the bracket by means of the long screws. Do not overtighten.

2. Reattach the electrical wires. Refer to the internal wiring in Figure FH 204 Flashhead and FTB 225-1 Optical Assembly Internal Wir-ing to verify the connections.

Page 56: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 4-1

Section 4 — Spare & Replaceable Parts

Customer ServiceCustomer Service: 1-800-821-5825Telephone: (615) 261-2000Facsimile: (615) 261-2600Internet Address:

http:\\www.flashtechnology.comShipping Address:

Flash Technology Corporation of America332 Nichol Mill LaneFranklin, TN, 37067

Ordering PartsTo order spare or replacement parts, contact FTCA Customer Service at 1-800-821-5825.

Power Converter/Beacon PartsTable 4-1 lists the major replaceable parts.

Flashhead PartsTable 4-2 lists the major replaceable parts.

Returning EquipmentContact Customer Service at 1-800-821-5825 for a Return Material Authorization (RMA) number before returning equipment.

RepackagingYou must return the equipment in a container that provides maximum protection during ship-ping and handling. If the original cartons and packaging material are no longer available, pack-

age the power converter or beacon and flashhead separately as described in the following subsec-tions.

Power Converter, Beacon, or FH 204 FlashheadPackage and ship the unit in an upright position; that is, with the feet downward. Pad the power converter or beacon so that the feet cannot pene-trate the box during shipment. Box each power converter or beacon separately using a double thickness cardboard container and adequate pad-ding. Do not drop. Use appropriate warning labels on the outside of the container.

Flashhead (FH 306, FH 307, FH 324)Package and ship the flashhead in an upright position. Box each flashhead separately and use adequate padding. Attach the flashhead base to a plate an inch wider than the width of the flash-head (e.g., 3/8" plywood). Use a double thickness cardboard (or wood) container that clears the width, height, and depth of the flashhead by at least one inch (inside dimensions). Use soft pack-ing or a cardboard collar around the lens to pre-vent tipping inside the container. Do not drop. Use appropriate warning labels on the outside of the container.

Page 57: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

4-2 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

Table 4-1 Power Converter or Beacon Major Replaceable Parts

Item Power Converter/Beacon Description Part Number

C1A - C1x All Capacitor, 70 mfd, main 6720401C2 224-1, 225-1 Capacitor, 40 mfd, twilight 6386503

***C3 All Capacitor, 1 mfd, burst 6848202C4 All Capacitor, 3 mfd, tuning 6577903L1 All Choke, Burst 4850601L2 All Choke, Flash 4175200

BR1 All Diode Bridge 6902806F1/F2 All ‡Fuse, Power, FNM 8, 120V †4900307F1/F2 All ‡Fuse, Power, FNM 4, 208, 230, 240V †4900303F1/F2 All ‡Fuse, Power, KTK 8,480V †4900335

F3 All ‡Fuse, Marker 4900294K1 PC 224-1, FTB 225-1 ‡Relay, 24V, High Intensity 8900494K2 All ‡Relay, 24V, Low Intensity 8900494K3 All ‡Relay, 120V, Discharge 8900493K4 PC 224-1, FTB 225-1 ‡Relay, 24V, Trigger Transfer 4901233K5 All ‡Relay, 24V, Marker 4901233

**PCB1 All ‡Timing and Trigger Board 24990xxPCB2 All ‡HV Rectifier Board 2458005PCB3 PC 302-1D ‡Filter Detection Board 2804001PCB4 All Sense Module 2811101

R1A & R1B All Resistor (2), Discharge, 35K 50W 6900541***R2A & R2B All Resistor (2), Burst, 500 Ohm, 50W each 6900532

S1 & S2 All Switch, Interlock (2) 8205501ALL T1 Power Transformer, 120V, 60 Hz †8841501ALL T1 Power Transformer, 208V, 60 Hz †8841502ALL T1 Power Transformer, 240V, 60 Hz †8841503ALL T1 Power Transformer, 480V, 60 Hz †8841504ALL T1 Power Transformer, 230V, 50 Hz †8841001T3 PC 302-1D Transformer, Coupling 8336701T3 PC 224-1, FTB 225-1 Transformer, Coupling 8336701

TB201 PC 302-1D Terminal Strip, 3 Position 4902157TB202 PC 302-1D Terminal Strip, 18 Position 4901930

TB3, TB4 PC 302-1D, PC 224-1 Terminal Strip, 11 Position 8721011TB201 PC 224-1 Terminal Strip, 3 Position 4902157TB202 PC 224-1 Terminal Strip, 18 Position 4901930

TB1, TB3, TB4 FTB 225-1 Terminal Strip, 11 Position 8721011TB2 FTB 225-1 Terminal Strip, 5 Position 4902154VR1 All ‡Suppressor Asm., 120V 8250801VR1 All ‡Suppressor Asm., 230/240V 8250802VR1 All ‡Suppressor Asm., 480V 8250804

† The part number of power fuses, power transformers, and suppressors depend on the voltage of the equip-ment. The voltage is printed on a label on the equipment case.

‡ Recommended as a spare part.** The part number for PCB1 may vary with the specific installation. When you order this part, call Customer Ser-

vice. The part number varies with types of internal board programming for structure configuration and lighting scheme. Be prepared to answer questions about the type, number, lighting sequence, and arrangement of lights on the structure.

*** Value and part number varies with application.

Page 58: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 4-3

Table 4-2 Flashhead Major Replaceable Parts

Item System Unit Description PartNumber

P1, P2, P4, P5, P12 FH 307, FH 324 Ceramic Spacer, 3/4" X 1-1/4" 5900844P1, P2, P3, P4, P5 FH 306 Ceramic Spacer, 3/4" X 1-1/4" 5900844

P3, P11 FH 307, FH 324 Ceramic Spacer, 1/2" X 1" 5900842P6, P7, P13, P14, P15,

P16 FH 306 Ceramic Spacer, 1/2" X 1" 5900842

P6, P7, P8 FH 307, FH 324 Ceramic Spacer, 1/2" X 1-1/4" 5900843FT101 FH 204, FTB 225-1 ‡Flashtube 8671301FT101 FH 307 ‡Flashtube 8384309FT101 FH 306 ‡†Flashtube 8384308FT101 FH 324 ‡Flashtube 8384329FT102 FH 324 ‡Flashtube 8384309A101 FH 306 †Flashhead Mounting Plate Assembly 8812405A101 FH 307 *Flashhead Mounting Plate Assembly 8812401

RC101 FH 306, 307, 324 †R.C. Network 1403411RC102 FH 306, 307, 324 †R.C. Network 1403412T101 FH 307, FH 324 †Transformer, Trigger 8288201T101 FTB 225-1, FH 204 Transformer, Trigger 8288201T102 FH 204 Transformer, Coupling 8336701T102 FH 306, 307, 324 †Transformer, Coupling 8336701

† If you suspect or find any failing parts in the FH 306 flashhead (except the flashtube, RC networks, ceramic spacers, or coupling transformer), replace the entire flashhead baseplate. The flashtube may be replaced as a single unit.

‡ Recommended as a spare part.

* A flashhead mounting plate assembly for the FH 307 flashhead may be mounted in a separate location for testing power converters or troubleshooting. An alternate scheme is to use it as a portable flashhead to isolate a problem to the flashhead or to the power converter. Doing this may help you avoid climbing to the tower flashheads if you thus immediately prove the problem is in the power converter.

Page 59: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

4-4 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

302-1DCL

Figure 4-1 PC 302-1D Power Converter Component Locations

3-8189-02H

K5 RELAY DETAIL

K514

7

25

8

36

9

A B

PCB4

HV RECTIFIER

PCB2

MODULESENSE

BURSTCHOKE

RELAYINTENSITY

220, 240 AND 480 VAC S2 IS USED FOR 208,

SWITCHFOR 480VAC

ALTERNATE

SWITCHINTERLOCK

RESISTOR DETAIL

P2

BLEEDRESISTOR(S)

R1G1

P4

R2BURST

RESISTOR(S)

P1 P3

G2

INPUT

POWER6 5

GND(UNDER)R1

DISCHARGERELAY

3

1TRANSFORMER

R2(UNDER)

L1

SHIELD

K38 7

TB201

S1

S2

10

11

C4

T1

TUNINGTB202

SHIELD

BURST

C3

LOWK2

6

8

PCB1TIMING & TRIGGER

2

6

8

9

7

4

5

3

TB31

C1C C1B

10

FLA

SHH

EAD

CA

BLE

SHIELD

8

7

TB2

6

5

4

3

G2

TRANSFORMER

BR1

1

2

COUPLING1

3

T3

FLASHCHOKEL2

11

2

6

8

9

7

4

5

3

TB41

PCB3

VR1

F1 F2

F3 F3

C1A

G3

4

2

F4

G1

C1D

Page 60: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 4-5

PC2241CL

Figure 4-2 PC 224-1 Power Converter Component Locations

Page 61: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

4-6 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

PC225-1CL

Figure 4-3 FTB 225-1 Beacon Component Locations

3-8190-03 REV J

OPTICAL ASSEMBLY(REAR VIEW)

CATHODE

T101

(RED MARKER)ANODE

FT101

PCB4

G5

F2

G4

F1

C4

T1

T3

K3

F3

C1A 1 2

C1B11

109

TB3

6543 87 9TB1

3C1D

C1C

5

4

78

6

21

PCB1

10 11G1A

R1G2B

R1

910

11

TB4

PCB2

34

5

78

6

12

C1E C1F C1G C2 C3

G3

K5K4P7

L1

TB212

3

K2

L2

K1

F2F1 VR

1S1INTERLOCKSWITCH

BR1

8(J1)

7 6 5 4 3 2 1

R2B

R2A

P3

12

34

56

78

8 7

6 5

2 1

4 3

Page 62: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 4-7

CH6064

Figure 4-4 FH 204 Flashhead Component Locations

P1P2P3P4

REDBLKWHT BLUANODECATHODETRIGTRIG RTN

T102COUPLINGTRANSFORMER

GND

P7

PUR

LARGE CERAMICPOST

(REAR VIEW)

BLACK

WHITETRIGGERWIRE

CERAMICPOST

CATHODE

ANODE

T101

WIRE

END

ENDREDTIPREDWIRE

P101

FLASHTUBE TRIGGER WIRE(WHITE INSULATION)

Page 63: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

4-8 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

CH6065

Figure 4-5 FTB 225-1 Optical Assembly Component Locations

Page 64: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 4-9

3062CL

Figure 4-6 FH 306 Flashhead Component Locations

RC

102

RC10

1P1

P2

P3

P4

P5

P6

P7

T101

T102

P13

P14

P16 P15

C101 C102

MP101CLUTCH

B101MOTOR

L101

BR102LOCATED ON ANGLEDTAB, UNDER MP101

SW102

SW101

(TOP)

(BOTTOM)

BR101

GROUNDSCREW

RED

BLU

BLK

WHT

PUR

SH

IEL D

TRIGGERTRANSFORMER

COUPLINGTRANSFORMER

RING FILTER FLASHTUBESUPPORT

TRIGGER

ANODE

CATHODE

FLASHTUBELUG

RED

WHITE

BLUE

Page 65: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

4-10 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

307308CL

Figure 4-7 FH 307 Flashhead Component Locations

RED BLU BLK PURWHT

P8

P7

P6

CABLE ACCESS

SHIELDRC102

P1 P2 P4 P5 P12

RC101

P3

P11

FT101 FLASHTUBE

RED DOT

T102 COUPLINGTRANSFORMER

T101 TRIGGERTRANSFORMER

Page 66: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 4-11

FH324CL

Figure 4-8 FH 324 Flashhead Component Locations

Page 67: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

This page is intentionally blank.

Page 68: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 I-1

INDEXA

Accessflashhead 2-1power converter 2-1

BBeacon

component locationFTB 225-1 4-6

replaceable parts 4-2

CC1 and C2

testing 3-6C1-Cx

removal and replacement 3-8C3 and C4

testing 3-6Cable

flashheadsecuring 2-3

Capacitorremoval and replacement 3-8testing 3-5

Checklistinstallation 2-3

Componentlocation

beaconFTB 225-1 4-6

flashheadFH 204 4-7FH 306 4-9FH 307 4-10, 4-11FTB 225-1 optical assembly 4-8

power converterPC 224-1 4-5PC 302-1D 4-4

removal and replacement 3-7flashhead 3-11power converter 3-8

Component testing 3-5C1 and C2 3-6C3 and C4 3-6capacitors 3-5flashhead 3-7

FT101 3-7K1 Relay 3-6K2 Relay 3-6K3 Relay 3-6K4 Relay 3-6K5 Relay 3-6L1 burst choke 3-6PCB1 3-6PCB2 3-6PCB3 3-6PCB4 3-6power converter 3-5R1 discharge resistor 3-6R2 burst resistor 3-7relay 3-6T1 transformer 3-7T101 3-7T102 3-7T3 3-7VR1 3-7

Conductor size 2-2Connection

electricalmaintenance 3-1

Controllersystem

function of 1-3Customer service 4-1Cutting jumpers 1-4

DDamage in shipment 2-1Daylight response

LED 1-5Diagnostic testing 3-1Dimension and weight 1-2

EEquipment

related 1-1returning 4-1

FFAA requirements 1-1Factory programming 1-4Fault locator

FTB 224-1 3-5FTB 225-1 3-5

Page 69: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

I-2 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

FTB 302-1D 3-4FH 204 flashhead

component location 4-7internal wiring 2-8, 2-9mounting and outline 2-6T101

removal and replacement 3-14FH 306

mounting and outline 2-7FH 306 flashhead

component location 4-9internal wiring 2-12mounting and outline 2-7relation to FTB 302-1D 1-3

FH 307mounting and outline 2-7

FH 307 flashheadcomponent location 4-10, 4-11internal wiring 2-10, 2-11

FH 307/306 flashheadmounting and outline 2-7

Flashheadaccess 2-1cable securing 2-3component testing 3-7configurations 1-1FH 204

component location 4-7internal wiring 2-8, 2-9mounting and outline 2-6removal and replacement 3-12

FH 306baseplate service 3-11component location 4-9internal wiring 2-12relation to FTB 302-1D 1-3removal and replacement 3-11

FH 307component location 4-10, 4-11internal wiring 2-10, 2-11removal and replacement 3-12

leveling 2-2mounting 2-1mounting and outline

FH 306/307 2-7mounting check 2-3

packaging 4-1removal and replacement 3-12replaceable parts 4-3window maintenance 3-1wiring 2-2wiring check 2-3

FlashtubeFH 204

removal and replacement 3-12clips 3-14T101 3-14

removal and replacementFH 306 3-11FH 307 3-12

FT101testing 3-7

FTB 224-1fault locator 3-5operation

check 1-6observing day 1-6observing night 1-6

FTB 225-1component location 4-6fault locator 3-5internal wiring 2-16mounting and outline 2-5operation

check 1-6observing day 1-6observing night 1-6

optical assemblycomponent locations 4-8internal wiring 2-8, 2-9

service wiring 2-2FTB 302-1D

fault locator 3-4operation check 1-5

GGauge

wiring 2-2

IIndicator

See Lamps and LEDsInstallation

Page 70: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 I-3

checklist 2-3drawings

site 2-2flashhead cable

securing 2-3junction box

three-phase wiring 2-19tools 2-1typical structure 2-17wiring

flashhead 2-2FTB 302-1D & FTB 224-1 2-20FTB 302-1D & FTB 225-1 2-21

Internal wiringFTB 225-1 2-16optical assembly 2-8, 2-9PC 224-1 2-14, 2-15PC 302-1D 2-13, 2-14

JJumper cutting 1-4

KK1 Relay testing 3-6K2 Relay testing 3-6K3 Relay testing 3-6K4 Relay testing 3-6K5 Relay testing 3-6

LL1 burst choke

testing 3-6Lamps

See Lamps and LEDsLamps and LEDs

daylight response 1-5nighttime response 1-5PCB1 1-5

Lensmaintenance 3-1

Levelingflashhead 2-2

Lightarrangement on tower 2-18configurations 1-1

Lightingconvention 1-4

tower 1-4

schemetypical 2-18

Lightning protection 2-1Location

on structure 1-4

MMaintenance 3-1

flashhead window 3-1flashtube 3-1lens 3-1preventive 3-1relays 3-1tools 2-1

Marker Interface Unit 1-3Marker lights 1-3Moisture in equipment 3-1Mounting

flashhead 2-1flashhead check 2-3power converter 2-1power converter check 2-3

Mounting and outlineFH 204 2-6FH 306/307 2-7flashhead

FH 306/307 2-7FTB 225-1 2-5PC 302-1D 2-4

NNighttime response

LED 1-5

OOperation

FTB 224-1 1-3observing day 1-6observing night 1-6

FTB 225-1 1-3observing day 1-6observing night 1-6

general 1-3PC 302-1D 1-3

observing day 1-5observing night 1-5

power converterbasic 3-2

Page 71: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

I-4 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

Operation checkFTB 224-1 1-6FTB 225-1 1-6FTB 302-1D 1-5

Optical assemblyinternal wiring 2-8, 2-9

Options 1-3Ordering parts 4-1

PPackaging

flashhead 4-1power converter 4-1

Partsflashhead replaceable 4-3ordering 4-1replaceable

beacon 4-2power converter 4-2

PC 224-1component location 4-5internal wiring 2-14, 2-15mounting and outline 2-4service wiring 2-2

PC 302-1Dcomponent location 4-4internal wiring 2-13, 2-14mounting and outline 2-4operation

observing day 1-5observing night 1-5

power converterservice wiring 2-2

PCB1figure 1-7indicator LEDs and Lamps 1-4lamps and LEDs 1-5programming 1-4

field change 1-4removal and replacement 3-9testing 3-6

PCB2removal and replacement 3-9testing 3-6

PCB3removal and replacement 3-9testing 3-6

PCB4removal and replacement 3-9testing 3-6

Performance characteristics 1-2Power converter

access 2-1basic operation 3-2component location

PC 224-1 4-5PC 302-1D 4-4

location by tier 1-4mounting 2-1mounting check 2-3packaging 4-1replaceable parts 4-2

Power transformervoltages 3-7

Preventive maintenance 3-1Programming

factory 1-4jumpers 1-4PCB1 1-4

field change 1-4wire jumpers 1-4

RR1 discharge resistor

testing 3-6R2 burst resistor

testing 3-7Radio frequency interference 3-1Relay testing 3-6

general 3-6K1 3-6K2 3-6K3 3-6K4 3-6K5 3-6

RemovalT101 3-13T102 3-13

Removal and replacementC1-Cx 3-8component 3-7FH 204

flashtube 3-12flashtube clips 3-14

Page 72: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

FTB 302-1D, 224-1, 225-1 Revision 11 — 10-14-03 I-5

T101 3-14FH 306

flashhead 3-11flashtube 3-11T101 3-11T102 3-11trigger transformer 3-11

FH 307flashhead 3-12flashtube 3-12T101 3-12T102 3-12

general 3-10PCB1 3-9PCB2 3-9PCB3 3-9PCB4 3-9power converter component 3-8T1 3-10T3 3-10

Repackagingshipping 4-1

ReplacementSee Removal and replacement

ResistorSee specific component

Returning equipment 4-1RFI problems 3-1

SSafety 3-1Service

FH 306 flashhead baseplate 3-11Shipping

repackaging 4-1Specifications 1-2Storage 3-1Symptoms

major troubleshooting 3-3troubleshooting 3-3

System described 1-1

TT1

removal and replacement 3-10testing 3-7

T101

removal 3-13removal and replacement

FH 306 3-11FH 307 3-12

testing 3-7T102

removal and replacementFH 306 3-11FH 307 3-12

testing 3-7T102, removal 3-13T3

removal and replacement 3-10testing 3-7

Terminal blockmaintenance 3-1

Testing, See Component testingTier convention 1-4Tools

for installation and maintenance 2-1Transformer

powervoltages 3-7

See specific componentTrigger transformer See T101Troubleshooting 3-1, 3-2

charts 3-2major symptoms 3-3symptoms 3-3tables 3-3

Typical structure installation 2-17

UUnpacking 2-1

VVoltage and frequency 2-2Voltage range

power transformer 3-7VR1

testing 3-7

WWeight and dimensions 1-2Wiring

FH 204 flashhead 2-8, 2-9FH 306 flashhead 2-12FH 307 flashhead 2-10, 2-11

Page 73: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer

I-6 Revision 11 — 10-14-03 FTB 302-1D, 224-1, 225-1

flashhead 2-2flashhead check 2-3FTB 225-1

optical assembly 2-8, 2-9gauge 2-2installation

FTB 302-1D & FTB 224-1 2-20FTB 302-1D & FTB 225-1 2-21three-phase junction box 2-19

internalFTB 225-1 2-16PC 224-1 2-14, 2-15PC 302-1D 2-13, 2-14

power converter check 2-3service

FTB 225-1 power converter 2-2PC 224-1 power converter 2-2PC 302-1D power converter 2-2

~ End of Document ~

Page 74: SN · 2019-10-02 · SN FTB 302-1D Dual, Medium Intensity Obstruction Light FTB 224-1 FTB 225-1 Dual, High Intensity Obstruction Beacon Reference Manual ... 3-7 T1 — Power Transformer