Smart Metering InitiativeADWEA Program
Saeed NassouriTechnical Advisor
Abu Dhabi Water & Electricity Authority (ADWEA)
Dec 2010
Content
• Company Background
• SMART GRID Basics
• AMI Project Strategy
• Project Scope
• Implementation
• Status
• Challenges
• Next Step
Background
• In 1998 the Water& Electricity Department Privatized & ADWEA Was established
• The sector Evolved into distinct Generation, Transmission, Distribution, and into 9 separate companies
• Independent Regulation & Supervision Bureau (RSB)
• There are two distribution companies AADC & ADDC
Background ……continue
• The companies set goals to:
– Offer future proof solution for energy
– Improved Customer service , CRM & Billing and
– Comprehensive Energy data management
– Paving the way towards a SMART network
• CRM / Billing project was completed in 2005
• AMI project was established in Aug 2006
Corp Office
Industrial Facility
Transmission Station Transmission
System
Power PlantDistribution SystemDistribution
Station
Residential Consumer
Power Plant
+ -
Wind Tower generation
Solar Generation
Battery Power Storage
Industrial Facility
Residential Consumer
Corp Office
Electric Cars
Basics
SMART GRID – BASICS
Drivers and Comparisons – An Outlook
Conventional Networks Smart Grid Networks
• Unsustainable Energy System . Sustainable Energy System .
• Generation Follows Load . Load Follows Generation .
• Fossil Energy Sources. Integration of Renewable Energy Sources
• Centralized Power Generation. Decentralized Power Generation .
• Outages and restoration are fault driven Outage Prevention & Restoration
SMART GRID - BASICS
0
1000
2000
3000
4000
5000
6000
7000
8000
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5
Po
we
r (M
W)
Energy Saving
Time (Hrs)
Peak Demand
Shaved Demand
ADWEA - AMI Project Strategy
• Towards High performance Business
• Corporate Strategy alignment
• Incorporate Innovation process
• Change & Program Management
• Master schedule - Strategic goals
Project Scope
• Objective: Implement a fully automatic meter reading and meter intelligence monitoring and data capturing system to encompass the entire consumers of water & electricity in the Emirate of Abu Dhabi
• Key Performance Indicators (KPI): Reliable and timely meter reading, instant meter read & two way data sharing between meters and CRM/Billing systems
• Benefits for ADWEA: Improved consumer bill accuracy, faster revenue collection, ability to push consumption data to consumer, accurately aggregate consumption within Distribution network. Pave the way for a SMARTER NETWORK.
VISION
Distribution Area NetworkHOME APPIENCE
NETWORKCore Utility Network
Substation
Distribution System
Transmission System
Corp Office
Power Plant
Utility Core Systems
Meter Aggregation Network
DESIGN
• Water & Electric meter data collected by “End Point Units”
• A multi point system collects data via Power Line Carrier (PLC) at the base of high rise buildings
• Data is then transmitted via Meshed wireless & Fiber Optic network to the servers
• Locations where the meters are far apart, RF technology is utilized instead of PLC
TopologyUtility
Operations
Wireless Collector
WirelessElectricity Meters
High-Rise Collector
Wi-Fi CPE Meshed Wireless Network
Ethernet over Power Line/ MBUS
Network
Meter Management
System
12
Implementation
• Four Phase Approach
1. Collection & Initial Validation of meter data
2. Verify & Analyze data for the purpose of billing
3. Integrate into the CRM & Billing system (bi-directional process)
4. Integration into the entire ADWEA SMART network
Controls
Head-End Systems MDMS CC&B
Billing Data
Exchange/info
•Premise ID
•Customers ID
•Customer
Profile
•Accounts ID
•Billing
•Tariff
Schemes
Meter Data
Exchange
•Validation
•Estimation
•Analysis of Meters
Data
•Consumption
Calculation
•Trends & demands
•Forecasting
Wi-Fi Network
•Register a meter
•Receive Meter
Reading
•Perform Initial
Validation
•Change / Reset a
Reading
•Detect Alarms
•Connect /
Disconnect a Meter
AMPEPAMR Application
AAS-WEBAmplight Appl.
LVLV Application
GIS
ERP
D
a
t
a
B
u
s
Meters Data
Phase IIPhase I Phase III
Implementation
• Design
– Flexible solution that satisfy company needs and regulatory demands
– To cater for immediate and future requirements
– Proven, current and fail safe technology
– Implementation with minimum interruption to customers
Shoebox-sized radios unobtrusively mounted on sub-stations and street light poles
Connected through ADWEA sub-station fiber infrastructure
Leveraging ADWEA Assets
AMR Metering Points:Abu Dhabi Island
AMR Metering Points:A Close-up
1.6
0%
0.2
8%
0.3
3% 1
.46%
1.4
9%
1.5
7%
4.0
0%
2.6
0%
1.7
4%
2.2
2%
2.5
2%
2.6
2%
2.6
7%
2.8
4%
3.1
0%
3.1
0% 3.8
7%
3.8
3% 5
.05%
4.8
4% 5.7
2%
4.0
4%
3.2
3%
3.2
3%
3.0
9%
3.1
7%
3.5
8%
2.4
3%
2.4
3%
2.4
3%
2.4
3%
2.4
3%
1.5
9%
0.9
0%
1.5
4%
0.2
1%
0.2
5%
1.5
5%
1.9
0%
2.4
4%
2.5
6%
1.2
7%
1.1
1% 1.9
5%
1.1
6%
0.7
8% 1.7
3%
0.7
7%
0.3
4%
0.4
2%
0.4
0%
7.3
7%
0.5
1%
0.4
4%
8.9
7%
0.6
9%
0.7
2%
0.0
5%
2.1
8%
0.7
5%
1.3
1%
0.4
7%
0.4
7%
8.1
2%
8.1
2%
8.1
2%
8.1
2%
7.2
8%
6.5
9%
1.60%
9.50%9.83%11.29%
12.78%14.34%
18.34%20.94%
22.68%24.90%
27.41%30.03%
32.70%35.54%
38.64%41.74%
45.61%
49.44%54.49%
59.32%
65.04%
69.08%72.32%
75.54%78.63%
81.80%
85.37%87.80%
90.23%92.66%
95.09%97.52%
99.10%100.00%
1.54%
10.26%10.50%12.05%
13.95%16.39%
18.95%20.22%21.33%23.28%24.45%25.23%
26.96%27.73%28.07%28.49%28.88%
36.26%38.06%38.50%
47.47%48.16%
48.88%48.93%
51.10%51.85%53.16%53.63%53.63%
61.76%
69.88%
78.00%
86.13%
93.41%
100.00%
0%
10%
20%
Ap
r/0
6
Au
g/0
8
Se
p/0
8
Oc
t/0
8
No
v/0
8
De
c/0
8
Jan
/09
Feb
/09
Ma
r/0
9
Ap
r/0
9
Ma
y/0
9
Ju
n/0
9
Ju
l/0
9
Au
g/0
9
Se
p/0
9
Oc
t/0
9
No
v/0
9
Dec/0
9
Jan
/10
Feb
/10
Ma
r/1
0
Ap
r/1
0
Ma
y/1
0
Ju
n/1
0
Ju
l/1
0
Au
g/1
0
Se
p/1
0
Oc
t/1
0
No
v/1
0
De
c/1
0
Jan
/11
Feb
/11
Ma
r/1
1
Ap
r/1
1
(%)
Cu
mu
lati
ve
Pro
gre
ss
(%)
Mo
nth
ly I
nc
rem
en
tal P
rog
res
s
Months
SUPPLY AND INSTALLATION OF THE AUTOMATED METER READING (AMR) TECHNOLOGY SYSTEM
Contract No. G-3923 - (Original & VO1 )OVERALL PROGRESS S-CURVE
REV (0)OVERALL 'S' - CURVE FOR ORIGINAL & VARIATION1
Challenges
• Technical issues
• Challenges Communication(TRA) & Asset Installation
• Risks (Reliability & Interoperability)
• Villas, buildings, farms
• Multiple meter manufacturersRF
Next Step
• Building blocks towards the SMART GRID
• Mobile workforce management
• LV AMR enabling
• Distribution NMS
• Alternative Generation
• In Home monitoring devices
High VoltageSub-Station
DIR IDSSDHCP
DNS
ISP POPRADIUS
Etc.
AMR NOCDHCP
TROPOSControl
ADWEA NOC
RADIUS
10GE Ring
10GE
1GE1GE
1GE
100FX
100FX
Low VoltageSub-Station
High VoltageSub-Station
1GE
StreetLight
23