SMART Board Meeting021109

download SMART Board Meeting021109

of 35

Transcript of SMART Board Meeting021109

  • 8/13/2019 SMART Board Meeting021109

    1/35

    Marin County Board of Supervisors Chambers

    3501 Civic Center Drive

    San Rafael, CA

    February 11, 2009

    Operations Committee Meeting

  • 8/13/2019 SMART Board Meeting021109

    2/35

    Back to the Future (December 1996)

  • 8/13/2019 SMART Board Meeting021109

    3/35

    Who is Siemens

    Active in three Business Sectors

    Healthcare

    Medical Solutions

    Energy

    Power Generation

    Power Transmissionand Distribution

    Industry

    Automationand Drives

    Industrial Solutionsand Services

    Siemens BuildingTechnologies

    OSRAM

    MobilitySystems

    Cross-SectorBusinesses

    Siemens IT Solutionsand Services

    Siemens FinancialServices

    External sales of Sectors excluding Other Operations (as of September 30, 2008)

    6.7%14.2%

    27.8%

    51.3%

  • 8/13/2019 SMART Board Meeting021109

    4/35

    Mobility Division: Integrated

    transportation and logistics solutions

    from a single source

    Rolling Stock

    Infrastructure Networks

    Traffic Solutions

    Infrastructure Logistics

    Rail Automation Electrification Turnkey Systems

    Turnkey Systems

    Airport

    LogisticsPostal

    Automation

    Integrated

    ServicesComponentsPublic Transit

    Road & Air Traffic Solution

    Airfield Solutions

  • 8/13/2019 SMART Board Meeting021109

    5/35

    STS Sacramento Facility Commitment to

    the North American market with 300,000sq ft

    of Manufacturing Floor Space

  • 8/13/2019 SMART Board Meeting021109

    6/35

    Siemens is the number 1 light rail

    vehicle supplier in North America with

    over 1,000 vehicles sold

    Portland LRV

    Sacramento LRV

    Los Angeles LRV

    Escondido - DMU

    San Diego - LRV

    Houston LRV

    St. Louis LRV

    Denver LRV

    Utah LRV

    Boston HRV

    Pittsburgh LRV

    Charlotte LRV

    Edmonton LRV

    Calgary LRV

    Valencia LRV

    San Juan PR HRV

  • 8/13/2019 SMART Board Meeting021109

    7/35

    Siemens has a long heritage of

    building DMUs through the ownership of

    DUEWAG A.G.

  • 8/13/2019 SMART Board Meeting021109

    8/35

    Potential DMU offerings for the

    SMART Project from Siemens

    Desiro Classic European basedDMU technology

    Siemens DMU built to North

    American Standards

  • 8/13/2019 SMART Board Meeting021109

    9/35

    Desiro Classic

    NCTD Sprinter DMU

  • 8/13/2019 SMART Board Meeting021109

    10/35

    NCTD Sprinter DMU Desiro Classic

    General Dimensions

    Doschil , 03.07.03

    Drawing 7 T01Z 13049870

    Oceanside-Escondido General Arramgement Drawing

    FO 575

    N C T DN C T D

    1300

    625

    1130

    920

    3 300

    1 480

    300 1 350 300

    8 250

    1 085

    1 650850

    535

    1 650

    20 350

    6 600 3 650

    8661 0851 085

    1110

    2504 600

    3 320770

    16 000

    2 650

    41 200

    16 000

    1 900 1 435

    2 830

    3659

    3869

    4279

    41 700

  • 8/13/2019 SMART Board Meeting021109

    11/35

    NCTD Sprinter DMU Desiro Classic

    Spec Sheet

  • 8/13/2019 SMART Board Meeting021109

    12/35

    Desiro Car Structure

    Carboby - large size extrusions,AlMgSi

    Carbody - plates, AlMg4,5Mn

    Fiberglass-reinforced plastic witha rigid PVC foam core

    Front skirt fully laminated

    Noise reduction skirt, basic aluminium panelwith an intermediate sound-absorbant layer

  • 8/13/2019 SMART Board Meeting021109

    13/35

    NCTS Sprinter Carshell component

    Manufacturing

  • 8/13/2019 SMART Board Meeting021109

    14/35

    NCTD Sprinter DMU

    Carshell Manufacturing

  • 8/13/2019 SMART Board Meeting021109

    15/35

    NCTD Sprinter DMU Desiro Classic

    manufacturing in Krefeld, Germany

  • 8/13/2019 SMART Board Meeting021109

    16/35

    NCTD Sprinter DMU Desiro Classic

    Shipping to the U.S.

  • 8/13/2019 SMART Board Meeting021109

    17/35

    NCTD Sprinter DMU at the NCTD

    Maintenance Building

  • 8/13/2019 SMART Board Meeting021109

    18/35

    NCTD Sprinters began revenue service

    December 2007

    NCTD Sprinters operate over 23 miles

    between Oceanside and Escondido, CA

  • 8/13/2019 SMART Board Meeting021109

    19/35

    Siemens North American DMU

    (Full FRA Compliance)

  • 8/13/2019 SMART Board Meeting021109

    20/35

    The Basic Concept for FRA Compliant

    DMU and EMU Platform

    Will meet all applicable requirements of US Regulations for

    Tier 1 passenger rail vehicles (e.g. FRA, ADA, AREMA)

    The basic configuration will be the Married-Pair (MP)

    51 floor height for high level (48) platform service, steps for

    low level platform service

    Maximum operating speed will be 79 mph

    Vehicle dimensions governed by AMTRAK clearance limits

    (85 feet long, 10 feet wide)

    Car shell constructed from stainless steel material

    Doors will be electrically powered sliding plug doorsBridge plates and/or wheelchair lifts when required for ADA

    accessibility

    DMU will have diesel-electric power generation

    DMU and EMU will have the same propulsion system

  • 8/13/2019 SMART Board Meeting021109

    21/35

    Carshell Concept

    Design Evolution

    x2x8

    x2

    x4

    x4

  • 8/13/2019 SMART Board Meeting021109

    22/35

    Carshell Concept

    Design Evolution

    Modules Modified for

    FRA Dimension

    FRA Modules

    Integration

  • 8/13/2019 SMART Board Meeting021109

    23/35

    Carshell Concept

    Compliance with FRA 49 CFR 238 Tier 1

    and APTA SS-C&S-034-99

    Static Worst Case - preliminary reviews

    confirm existing Siemens' designs can be

    reasonably modified to comply with FRA

    requirements (800,000 lbs draft gear load)

    Dynamic Rules of 01 August 2007 will have a major

    impact on traditional walk through cab and forward step

    well. Preliminary calculations have begun to determinedesign impact on carshell and cab arrangement.

    Possible next in house FEA steps,

    Fatigue Response i.e. Hot Spot Method

    Buckling Stability

    Further Crash Dynamics

    Heavy Equipment Loads, 5g long., 3g vert., 2g lat.

  • 8/13/2019 SMART Board Meeting021109

    24/35

    Power Distribution Overview

  • 8/13/2019 SMART Board Meeting021109

    25/35

  • 8/13/2019 SMART Board Meeting021109

    26/35

    DMU Married-Pair A-Car View 1

  • 8/13/2019 SMART Board Meeting021109

    27/35

    DMU Married-Pair A-Car View 2

  • 8/13/2019 SMART Board Meeting021109

    28/35

    DMU Married-Pair B-Car View 1

  • 8/13/2019 SMART Board Meeting021109

    29/35

    DMU Married-Pair B-Car View 2

  • 8/13/2019 SMART Board Meeting021109

    30/35

    Trucks

    Candidate Truck - TSBG SF500-DSW

    Power Truck

  • 8/13/2019 SMART Board Meeting021109

    31/35

    Renderings

    Traditional Walk Through Cab

  • 8/13/2019 SMART Board Meeting021109

    32/35

    Renderings

    Traditional Walk Through Cab

  • 8/13/2019 SMART Board Meeting021109

    33/35

    Renderings

    Aerodynamic Full Width Cab

  • 8/13/2019 SMART Board Meeting021109

    34/35

    Renderings

    Aerodynamic Full Width Cab

  • 8/13/2019 SMART Board Meeting021109

    35/35

    Thank You!