BEFORE THE NATIONAL GREEN TRIBUNAL,PRINCIPAL BENCH, NEW DELHI
M.A. No.879 of 2013In
Original Application No.299 of 2013
IN THE MATTER OF:
Krishan Kant Singh & Anr.Vs.
National Ganga River Basin Authority & Ors.
CORAM : HON'BLE MR. JUSTICE SWATANTER KUMAR, CHAIRPERSONHON'BLE MR. JUSTICE M.S. NAMBIAR, JUDICIAL MEMBERHON'BLE DR. D.K. AGRAWAL, EXPERT MEMBERHON'BLE DR. R.C. TRIVEDI, EXPERT MEMBER
Present: Applicant : Ms. Preeta Dhar and Ms. Pallavi Jalware,AdvocatesMr. Aagney Sail, Local Commissioner
Respondent No. 1&2: Mr. Vikas Malhotra and Mr. M.P. Sahay,Advocates
Respondent No. 3: Mr. Alpana Poddar and Mr. Raj Kumar,Advocates with Mr. S.L. GuncUhi, Law Officer
Respondent No. 4: Mr. B.V. Niren, AdvocateRespondent No. 5: Mr. Mr. Raman Yadav and Ms. Nauras
SuhrawardyRespondent No. 7: Mr. Vikas Malhotra and Mr. Arjun MahajanRespondent No. 8: Mr. Arvind Kumar Shukla, Advocate
Mr. Pradeep Misra and Mr. Daleep KumarDhayani, Advocates, UPPCBMr. Anil Airi, Advocate for CETPMr. Rohit Gupta, Advocate for Rosa PowerSupply Co., Ltd.,Noticee - IFFCO - Mr. Motish K. SinghNoticee - Mr. M.Z. Chaudhary and Mr. S.A.Zaida Advocates for Mr. Tonnery Kapur for UnitSmall Scale on a Large ScaleNoticee - Mr. Shiv Kumar for Mr. Anil Sharma,AdvocateNoticee - Mr. Gitanshu Rushtagi and Mr.Mishika Singh, Advocates for M/s. Yaov SugarMills, M/s. Neoli Sugar Mills, M/s. Obeetee Pvt.Ltd., and M/s. Lalji Board IndustriesNoticee - Mr. Pawan Upadhyay, Advocate - DCMfor Shri Ram IndustriesNoticee - Mr. Bharat Sangal, Ms. Srijana Lamaand Ms. I. Hsenla Aier, Advocates for NTPCNoticee - Mr. V.N. Kovra, Ms. Angeli Dayal forIOCLNoticee - Ms. Ranjana Roy, Mr. Abhishek Rao,Advocates for M/s. Bhushan SteelNoticee - Mr. Sudhir Kulshreshtha, Ms. SushmaSingh and Mr. Akhil Kulshreshtha, Advocatesfor AI-Faheem Meatex Pvt. Ltd.,Noticees - Mr. Ankur Khandelwal, Advocate forM/s. Khaitan & Co., M/s. Radico Khaitan andM/s. Ultratech Cements and M/s. United SpiritsLimited.Noticees - Mr. Manoj Singh, Advocate for M/s.Tat Chemicals Ltd.,
Date andRemarks
Orders of the Tribunal
Item No.11
September15, 2014
Learned Counsel appearing for the Central Pollution
Control Board submits that they would file the Report
during the course of the day in the Registry. Liberty is
granted. Learned Local Commissioner submits that he
would also file the Report during the course of the day.
Liberty is granted.
We direct the Central Pollution Control Board as
well as the Learned Local Commissioner to put the Report
prepared by the Committee and as well as the Learned
Local Commissioner on the website of the Central
Pollution Control Board within three days from today. All
the industries which are mentioned in the respective
Report should accept Notice through the website and file
their Replies/objections of the Report, if any, within ten
days thereafter.
The matter in relation to pollution being caused by
Distillery and Sugar Industry directly or indirectly to River
Ganga shall be taken up on 29th October, 2014.
,CP(Swatanter Kumar
,JMM.S. Nambiar)
,EM(Dr. D.K. Agrawal)
,EM(Dr. R.C. Trivedi)
04. (f,
Page No.
12-54
55-73
74-103
104-133
134-191
192-241
242-278
BEFORE THE NATIONAL GREEN TRIBUNAL
PRINCIPAL BENCH, NEW DELHI
M.A No. 879 of 2013 in Original Application No. 299 of 2013
Krishan Kant Singh & Anr. Applicant
Vs
National Ganga River Basin Authority & Ors Respondent
Compliance Statement on behalf of Central Pollution Control Board.
In compliance of the order passed by the Hon'ble Tribunal dated 05-08-2014 the
status of Grossly Polluting Industries (GPI) operating in the state of Uttar
Pradesh is enclosed.INDEX
Annexure
VIII.
IV.
II.
ContextInspection Reports with regards to the industrieslisted in Annexure A of the report dated 2nd
July,2014 received from Zonal Office, CPCB,Lucknow Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCB,Bijnor Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCB,Bulandshahar Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCB,Ghaziabad Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCB,Meerut Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCB,Moradabad Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCBMuzzaffarnagar Inspection reports of GPIs (sugar mills & distilleryunits) operating under Regional Office, UPPCB,Saharanpur
VII.
Submission:
All the grossly polluting industries listed in the Annexure A of the joint report
(dated July 2nd , 2014) and submitted to Hon'ble Tribunal have been inspectedexcept M/s Harduaganj Thermal Power Station, Kashimpur, Aligarh of M/s UttarPradesh Rajya Vidyut Utpadan Ltd. The unit is scheduled to be inspected
during September 16-17, 2014.25 units out of 63 distillery and fermenting units and 37 mills out of 125 sugarmills have been inspected and monitored at the time of submission of this
compliance statement.
1
No sugar mill was found in operation due to off season. Only 2 distillery unitsand 2 bottling plants were found in operation. The effluent and emission
samples, as and where applicable, were collected and are subjected to analysis.The effluents analysis is complete and has been incorporated in the respectivereports, whereas the emission sample analysis is in progress at the time of
submission of this statement.The sugar mills are expected to restart production sometime between October-November, 2014 which will follow the distillery units to restart their operation inJanuary,2015.The Hon'ble Tribunal may allow time for inspection until the sugarmills and distillery units come into operation in their full production capacity.
DELHIThe September 10, 2014
Encl. As Above
Sun DaveSr. Environmental Engineer & Incharge NGRBA
Central Pollution Control BoardParivesh BhawanEast Arjun Nagar
Delhi -110032
Through Raj KumarAdvocate
Chamber No. 774Lawyers Chamber
Saket New Delhi
2
Joint Inspection of identified Seriously polluting Industries which havenot installed Anti Pollution Devices, in Uttar Pradesh (UP)
In Compliance of
NGT Order dt. 05.08.2014,Krishna Kant Singh & Anr. Ws National Ganga River Basin Authority & Ors.
A Report
01. Background
Taking note of the Report Dt. 02.07.2014 filed in the Registry of the Tribunal on 24.07.2014wherein, 972 industries have been categorized under different heads, Hon'ble NGT vide itsorder dated 05.08.2014 in the matter of MA 879 of 2013 in OA 299 of 2013, Krishna Kant Singh& Anr. V/s National Ganga River Basin Authority & ors, directed ".....Central Pollution ControlBoard and Uttar Pradesh Pollution Control Board to conduct a joint inspection of all theindustries which are shown in Annexure-A to this Report. These industries are categorized asseriously polluting industries which have not installed any anti-pollution devices." Hon'ble NGTfurther directed that "... . The Committee shall confirm that the contents of Annexure-A of theReport are correct. In respect of the industries which were served with Show Cause Notice forclosure it shall be reported as to what is the fate after the issuance of such notices and thepresent status of the industry whether they are operating or not ? "
In compliance to the order, CPCB Zonal Office Lucknow carried out joint inspection of17 (seventeen) industries, as per Annexure-A under reference. These industries are located inKanpur, Farrukhabad, Meerut and Aligarh districts (UP)
The joint inspection was executed by a team comprising of following members:
Dr. R.K.Singh, Scientist 'D' CPCB ZO LucknowSh T.U.Khan, Regional Officer, UPPCBSh J.P. Meena, Scientist 'B', CPCB ZO LucknowSh Girish Arya, AEE, UPPCB
e. Sh Prakhar Katiyar, UPPCB
02. Scope of Investigation
In strict compliance of the Hon'ble NGT Order referenced above, the joint inspection wasfocused on following aspects :
Confirmation of the contents of Annexure-AStatus of corrective measures taken by the industries, served with show Cause Noticefor Closure
c. Present Status of the industry whether they are operating or not.
NGT Report (OA 299 of 20131, Aug. 2014 Page 1 of 5
The joint inspection was undertaken for the following 17 (seventeen) industries as identifiedAnnexure-A:
M/s Popular Tannery, Dargah Road, Jajmau, Kanpur" Kanpur Tannery, 9/6 Gajjupurwa, Jajmau, Kanpur" A.S. Leather Finishers, 369 B, Sheetla Bazar, Jajmau, Kanpur" Sumit Dyeing & Bleaching, 100 A ( i nadvertently mentioned as 101 A,Dadanagar, Kanpur" Kanpur Texcel (P) Ltd., 12 B/3, Dadanagar, Kanpur" Bhardwaj Textile,76 A, Dadanagar, Kanpur" Slaughter House, Bakarganj, Babupurwa, Kanpur" Slaughter House, Colonelgang, Kanpur" Slaughter House, Bakarmandi, Kanpur" Slaughter House, Fazalganj, Kanpur" Kalpana Dyeing, Ambedkar Nagar, Narkasa, Farrukhabad" Kushwaha Printers, Narkasa, Farrukhabad" Sethu Sadh, Angoori Bagh, Farrukhabad" Tandon Brothers, Angoori Bagh, Farrukhabad" Slaughter House, Shamsabad, Farukhabad" Pash uvadhshala, Nagar Nigam, Ghosipur, Meerut
17. " Harduaganj Thermal Power Station, Kasimpur(Unit-1), Aligarh
In order to execute surveillance and monitoring as per the order of Hon'ble NGT, jointinspection of all the above industries was undertaken during Aug 27-29, 2014.
Findings
A. Abridged status
Except for a few units observed with evidence of operation, most of the industries inspected
were observed closed for a considerable period of time. The closure have either been aresults of closure orders issued by UPPCB or due to Management Decision of theindustries.
In many cases it was noted that the industry premises were either vacant or used forconstruction of permanent residential flats and commercial activities.
The Committee experienced difficulty in locating industries in Farrukhabad, as there were nosignboards outside industry premises to ascertain industry name and other relevant detail.
The industries issued with Show Cause Notice or Closure orders were observed with noappreciable corrective measures initiated.
NGT Report (OA 299 of 2013), Aug. 2014
Page 2 of 5
B. Specific issues
Out of all the fifteen industries inspected, there were three units classified as tanneries,seven textile dyeing / printing and/or bleaching units and five slaughter houses.
Out of the three units at Kanpur, identified as tanneries, premises of two units namelyM/s Popular Tannery and M/s Kanpur Tannery, were observed with no industrial activity.Prem1tes of M/s Popular Tannery was noted with an operational Weigh Bridge (Dharam
Kanta), built:up houses and commercial activities. Premises of M/s Kanpur Tannery waspartly a vacant land and partly occupied with residential flats. Premises of the third unitnamely M/s A.S. Leather Finishers, was noted with ongoing stitching operations of shoeupper, a visibly dry operation. As such there was no infrastructure facility of leatherprocessing.
There were three textile units inspected at Kanpur. During inspection, production in all thethree units was found closed. Barring the exception of M/s Kanpur Texcel (P) Ltd., 12 B/3,Dadanagar, Kanpur, wherein, provision of effluent collection and treatment was observed inplace, at the other two units namely M/s Sumit Dyeing & Bleaching, 100 A, Dadanagar,Kanpur and M/s .Bhardwaj Textile,76 A, Dadanagar, Kanpur, there was no proper provisionof collection and treatment of industrial effluent. The ETP at these two latter units was poorlydamaged and practically defunct. The Committee observed evidence of occasionaloperation of industry based on stored effluent in drains and in and around process areaswithin industry premises.
Out of four slaughter houses inspected in Kanpur and the one inspected at Farrukhabad, itwas noted that UPPCB has issued closure orders (21.11.2013) under the Water Act 1974 toall the above slaughter houses. Subsequently, Nagar Panchayat Farrukhabad and KanpurNagar Nigam have submitted Compliance Report declaring closure of one slaughter houseat Farrukhabad and all the four slaughter houses in Kanpur vide reports dt. 21.12.2013 and24.12.2013 respectively. It was noted that there have been no provision of effluent treatmentat all the above mentioned slaughter houses.
All the four identified Textile Printing units at Farrukhabad were observed closed.
Refer Annexure- A.1 and A.2 for summarized status of industries.
NGT Report (OA 299 of 2013), Aug. 2014 Page 3 of 5
k.
03. Recommendations
A. Action to be taken by Industries
All the industries issued with Show Cause Notice / Closure orders shall ensure that theirproduclion is stopped till such time they establish organized system of effluent collection andtreatment in compliance of the notified standards for treated effluent.
Before resuming operations all the industries shall apply for seeking consent andauthorization (as the case may be) of UPPCB
M/s Kanpur Texcel (P) Ltd., 12 B/3, Dadanagar, Kanpur, the only unit granted consent byUPPCB amongst all the identified fifteen industries under reference, shall undertake regularoperation of Effluent Treatment Plant (ETP). Additionally the industry shall ensure provisionof Oil and Grease removal unit at source (within the process yard), Water meter at theborewell, Flow Meter at the outlet of ETP, sludge drying units (beds) and shall maintainLogbook for ETP operation. The industry is operational as a result of shifting of dyeing plant,earlier existed at its parent plant (self closed) at 19, Govt. Industrial Estate, Kalpi Road,
Kanpur.
Textile units operational in Farrukhabad shall jointly come up with a proposal forestablishment of a Common Effluent Treatment plant.
All the textile printing units in Farrukhabad shall display their name, address and relevantdetail outside their premises.
All the industries (self) closed due to their Management Decision shall resume their operationonly after seeking consent of UPPCB
B. Action to be taken by UPPCB
Undertake periodic surveillance of all the units served with Closure Orders to ensure theiroperation remain stopped.
Possibility shall be explored to establish a Common Effluent Treatment Plant for printing unitsat Farrukhabad.
NOT Report (OA 299 of 2013), Aug. 2014 Page 4 of 5
C. Action to be taken by District Administration
Kanpur
Considering that the existing slaughter houses in Kanpur city are served with closure ordersby UPPCB, the Municipal Corporation Kanpur shall strictly ensure that unauthorizedslaughtering in all the four slaughter house premises is not undertaken.
The Corporation shall further come out with a comprehensive action plan to explorepossibility to establish a modernized Slaughter House elsewhere, preferably in the cityoutskirts appropriately.
Farrukhabad
Farrukhabad Nagar Palika and District Administration shall take note of the Dyeing and Printingunits served with closure orders by UPPCB under the Water Act 1974. In spite of the Closureorders currently enforced, there is a generation of polluted (colored) effluent by a phenomenalnumber of unauthorized printing units operational in non-attainment areas (houses).Indiscriminate discharge of polluted (colored) effluent through drains in the city especially inAngooribagh area was observed by the Committee. Farrukhabad District Administration andNagar Palika shall ensure that such unauthorized units are not allowed to operate in strictaccordance to Hon'ble Supreme Court, orders dt. 23.09.2013 under WP no. 4295 / 2011
NGT Report (OA 299 of 2013), Aug. 2014 Page 5 of
(1)
C
00.
C
CJ
did
4n10
c qt"ai
NN>
C •CO0
.0 encO
,a)
•
a
C
C
zO0.
O
a)
64-O
Le)dm•
*60 L4) alc) 4.-.1... CO
= zo -N
V L.D=
a)-..
0 g0 --
-0cD
20 -
-0 L.c 0D ..-'0 ti)0
V L.c a)D +0 g
0 ---
V L.c 0D -.40 al‘...0
V L..C a)= .-2 060
+0C•5il2.......3 .3Q=a) yre -...6.I:co
c.-
$' 15II) C7 (I) .._-to Jo .--.g ..- +(;)L. 0 00 C -00...3 . 00 nmn(130(0C0 0 -0 .g1 • a) (. 6y E F. Le5co 5 to a0 13 >007.3>o
c-a . -5
175 CD (1) ..,_..o .0 c..--.g ...,,._ y„,_ U jal) C 0)a-0 . c0= u)
0(3C'0 0 -0 CI):_, • a) itsy E F cy)oo 4) a
ca" -5
171 C7 >"
s c ,, 17;y_ 0 MU) C -0a -0 .0N= coa/ 0 (13C-o 0 -0 .5221 • a) ro
Eco :6 Ci5 2).ou>oSa)
8.7:,6U,-0C0(-C0
,...-z,10 E
"D V)
c.-i'.' ."-6; C= 2 -,g If N,_O=Za)C-0O. -0 .00= 0(150(t C'0 0 -0 . gII . a) it5y E F- .--tN mi a) 0.013> o,-15
c.-›, ....," •
TA C= n,-0
. g - 7),... 0 cQL)C-00. -3 .0V) 6 u)CO 0 cal C
.0 0 -0 .P.:.:1 • cu ray E LE L-.
*L_ 170 ,,, w 0.> 0
(1)=.1.co(.4%)Cl.i.-Lu
0.I-u.1oz
.7-o c0a 01 4-
1- 0.1 Q)LLIE°co -0-0 c
c
t.)1:3 DQ) =
CL 0) 4--BOOCD11E°o -o-0 c
c
Ncn)7<(1)a,1-Lii
a.HLIIoz
a.HLIJoz
0c44
0ToC0
.....-,
'a
0
C0,2 =6-a) $a0,_ 8...'-::OZ -
C0 _..-: •- a)0 C c- n 1.-..(1.)a O -o0
@'' f5C C(1) a) oa z0- 0 (v2 . a (jj
co aOcoc.: .., c„o 0 _
c 1:3 D 15CD '0 a)c3 a) v) a> o (u LoLU c 3 • c
CO..la E c,.. 0 .a) a c -00 0- ..;..,- coC 0 C(D Ill 0' a ..".:CS (0C2 g. 4-)4- 0) atco
,_-- Oa) • . ''''' 0o 0-c -0 D r)Na (1)70 a) u) a
0LU c 3 _C.5 a501:3 6. 0 u)
co'-' C- 4,....
0 ET)
C 0,.. t0 • -n• PsT. • 2T. c 2,„ • -7'. 7 E0 10 (1)a ii- M 0c ,_>,0 O.„" • - ,,0 rt.) .;.',. "n m w ;9.)E o 73 .0
c.2tv E,^- wM 00(:),C (..)
Z ....
1'2
Oma) U1.. 0.
C 03 a,- o n8 5..,, 4.-co o,-.„, a) a).... 0 t1o_ c 5,0 co cv.c ti-•tr's E )a., 244, 0 Li_... c...) -
C ocrj
61. 0;I.
t 0 n,_to 0 -co - a.=
CI C AA0 43
Q
coo
•3
v.
ooo
2
..:).oo0có0
,-co0LtiN
C.-co0o60
,--oo0cc)0
Z'00)
Sa.i•0
06 0.)cn cC :-.-- ca) .-›(!:o
a)a-a)>-.0
c'5 c2cn.--ca)E c
o›, •rn op
11.)-'...xt-
06 0)0) cC 47-i5 •S
(.6-
06 0)a cC '-r-,-..) •e>,0 cl-.
0,^0
2 aTs -'0 t,<
17iC43 Z013E ' C'2
,...-co
gi 2) .05 Z co0 c'15 11
Cm 1 )ti a, _ D 1 5,a ra ..i. ,..To E co (6Y < Z LL
oa_y MC>--
0U Fa k,..- . I.-. 0), - co
u).50.zOa 0 -0.c
03,-- -0c
a5>, di a) na31..
, . - Eu =02 , , ,a i - „ ,E cc 0 CO co .9.) a- O aoc0 02 C) UJ Y
< -6co' _N-. -65 8„,- ..p, 0,. ...., iv.- c-;< _z0 W...
i
. FT f0 (-)`'''' •
. ' ' #•. e.e - LI; E.0 "'0 c
,.,Thc 1% co- () UJ Y
(D I..
3.7j._j,:-
1 a,
_•• co-62( 0?
a) -2F.- a"- "Ei. V, ag 1.1.1 C5 ( N-- V`C
1.2a)c,..-0_ '00 C).0 - (0ct 2 z
a 3 ._=0 l... "7 (IC) It.Y 2 LL
000-C co 0"0 co 4400 eoU) z .c
= 8, D-`- Ct) 1-al cisU) < U.
6ZU)
r- N CY') "tt (C) (0
21-
'3 ,_C (03 4-'0 ›C°
0 >
1 1 '
*
EcocuH
0I
coL.)CLU>,.0
IDa).=(i).-c
,...a).o
S2cfo°
E
,:('c_
-0 ,_C 03 -.-',
2 �w0 ..›
C_>,1... Z5
17) C= a)1:I .0 t.'. C ...., 17;
L. 0 0(1,) C -0CI -0 .0to 00 o al c-c U -0 0
;..--J ,..: CD CO
t ...z ,--c) (13 if) ao 71.3 > o
, 1
,
C
'''';+V) CD 0 >,,17 .0 I..C .1.,,... 0 z0 C -00- 2 ...q.(,) z 00 o co c-0 o .0 o-_-) ,. a) t';y t E ,-..- i_ a)o 0 a) a.ce) T.3 > 0
0_}-Luoz
.
, , ,a.I-al0z
a.1-woz
.
E'a)-06 cof § 3 eLo C 0
- o nc ,, >,0 '-' 1:147, 4"0 o ,_,,_acq 8'° 03 CV
,C Ti •- U....., E a)Lion2 0 ....
—c
1-A,_x0L.1
(1)ca0 (iico a)E .u)
E.Z (1)co (-
0.0.002Z :Pi
-..co._C 0oa.) .—72. 2 -t.',),2 6,- co c,9_ o -
co. >,.0 s- tt0 R .>a) '`..-`'0
iii co._U) U —cD 1... 03
.0 a) . 0E E 7n'
Ea..2 8 .-cd.
o'a cp.0 36 m"etja) wt.' 2
" ah S" 11 .... 0
4:2 0 -0 75a) -- 0) ,_
t.- 0 C 0.. 5 .E a0 0 V., 02 0) .-P,>,ri) ,C th I-m a)" t.... (:)C cn 40 ----**E 4) -0 45' u 0-
2 5)) cI2 0.05
t 0a)
R. .0a.) t13 .E0) „,L.-
zco r_a)
co. a.w '3 otco o-,cC. 0 ° ,„c0 — Z.v.,«.. ,,, tNi L.-Ey ..6 .- 03
_c:)a) ..0 N,0.a\O0 4, .." ID
c .- E- E m 0.)...,,, .0 0) (/)L., = ..._ 1:1Z(6 k 0
t
0. ,.2 id.,(Is
`bclal z'5 rf's)o
0 ay.c oc- 0 rmo Y « >, cLiCO jo 't-,-.a) -0 .1.
(•10_0-0 :LI
c 7- E- c m'X .0 0 )L., 3 .—Z (/) Z
vt,-c6oc6o
Tr,-coooico
Nr,-c60
g
cr,-ooooio
Tr,-
2,-r-
v,-06o,-r-
0)...='C.:6.
L"0cC01I-
Lsa)cCCO1-
as(I)cCe0I-
cli ,_E (L)w0 0
..0 cl_I-
ID: 0.c u)0) =7 003 1
ET.)
45..., 0).c 0co) D7 0(0 xco
L'.5.cp.c.... . -02 .c ro
co c')-'2CO COc .0 .,c0 . =
1:3 ° 2R) 2.) (‘II-- < Li.
/a0.) Ctcc =(t3 01- 0)-0 .„,,.- 7 n.5
22 r.... (13 0.r.:-, E a
8. - .6a. 0, -) y
>:". (13L..a)cc Cl-RI 3H :,„.,_ w =- ,._= 0 co ga E ac (.6 . ccr, -a-, ar MIY --) Y
.
111 .a) '03
-t N(/) 03-c coir. 0,-...7,CD a)
..c Ill,„,-C
cu VJ 5 5-....) co (ty E.
0 0) ,E c. (ID tt
< CO -5 y.
76E 7̂4)" ...t,,c CH n...., .„.„c -63 c0, o° \-0 .w L-2 (i) n013 f7..i (..- E ,_
>a) . r...,aacri › v, 0)'....•.- 0 CO ....za. y <oco—
«5a.C
6 coo Y
8 Ei co
...:.; , 2),,," c ,w al ..-..E. 0) 6_ S,cs.) i_. 0 cc (13 0) am ..)C (t) C.a. (I z CO
.,.
---:.
a.C
ai cocn y0o . 8.-,
c coL. 03 .cr)° M Z..-•-C IT) ,.. "cy) c 0 0
co 03 a(0 — (t) C— 0en z RI
c.)—
s. co 0.) 0, , cvS co,-
a_
0
a.
0
L
0
N
3X01CC
C)U
0
3
0a.
C
001
Tv
C
+.1
Cri
> 0N•
CO.0 0
:E m3 ccn o
,„<
44 %win.
C
OA
14":3
6
)0,
30
0
3
(0cl)
co- ›,t' c< <..... hl-H c
1. tpco .x
ITw
,
.0 a.,i'2 8(3) ,...-2 a-o c
92 coa (..)U) a.
.9_ 0.0 0
>, (1)
-0 (Dv2 8-2 ao c(3) En'a- oU)
9- 0_C.) 0
>, (il
a.) ,_ .(12.„)c„,c1.,„0-•
" Z 10..T u) ,,._, To
00 0.37- co lir, .!-:- -
>, 0 '4 in, -R, (t"-..c E -Tic-V) M U) CO .-' - 2-0 c - co *"' co.0 .o_ 5 mo- ,t Tow 5 .9. cli -.-. c o - 0 '
" 7 - III E' (9 6 c0 ) 11) y ) a ) - 11.)-C O. >, 5i 2 cr) (13)- 0
0,_ -0 a) 0., < Y
5 04-•:.6 c .c o o-- -12).>-' 2 U''-' aU.) tt
_c9 0 a)c (/)
COo (..)c.) 0. 0,cuz 0 03 8- ... (,)a 0 O. 0E " E0 -
0UV)
a)c'5,aEo
C.)
-ciZ
a)a'5,aEo0
-ciz
'0 tj 0.2-1 -c TO a)El, > `N._ ci) GO CNI
U) 0 A"-a) 4-. •c cl. ,,-a cow o_ 0,
E c D c)o o >,5�.() C.) .o a
0 20. c)tn 47,
C73 If)C.) 6Ct. ES0
al
oZ
0) "0 (I.)
030 '''z 0ou " C(1)- _oco o
C -03 n" •q-0 ° N. '.10 CD
a) ''.- 82 g -o-0 0 < N
(1) '-U JP,
000zu9 43 oc'a T...
C Vi 600 Ns °-0 a) I
a) -A)2 (,)= -,, ....u) 2 < 0
0Z
0Z
42 g)C 2 Eth 0CDa 0 1,5m I: >4
0 ..
,c
-C • -u Ea a) wu) .., 0
(i)0 >,, OZ 0 o.
c-Cu EN
w 0TA U0 >, 03
Z 0 o.
c-C(-) E a)V) (1).... 00 (I) CO>, -Z th o_
c.0 '-u EU)(1)
T0ii ()o >, to
Z 0 0_
chyi0
. Eco a).0. s'U)
,,
0 Ch
=4.ea
(7)
o«,- ,...,va -a,-- a)C1- (1)o0c u. 4.-1:i (11z (1)
tn
w 5 ._03 X, c (1)- 0 ..a) .- 0 ci)
= (I) '5 c-(600 ,_ 4-.(1) c. a CD
1.. (I)7) a) ..'''- ,.. ,,,.....
CO CJO Ca) z ‘... a),-.0o_z*' (i) 0n .-1:3- c w
tn,t,- 0 .-P3 Xa, c a)
.4.' - oc IT) - Zfa) - lb (I)a 5 c
)t.--(NO n-•-.... ,... .-,a) a o_ moo.0 a) 6- i:00)0 -,_ 0.MCOOCa) z ,.- a)
0.=*E. .s9 2D -o a)
4- 12o ai o-E c cp'a) .2 ..0in' .-',, 5>, in 00 - L._,,,, -5 0.sj -o-'CD 0 CN 4,:--' 0)'C''' Em aj, Ot) '' (13- E (2).0U ..
g. ..'' S 0c 8
T.15. 5rl) E __*-
3 0 0)-0 (i)c
-0w u)
's2 EV(/) 0a) Z
cr.
<E.' S113- .-,- U0) t'..a -5.
Z<
L U
< ,0. 3LI-ii545 4=a .4760 Z<
<- c(3_ 0--- 4.,-L.1.1 CI3
U45 4=
0sa.'n-10
Z<
a ,
6.: ...-:.wP30(r) ..
0a •;-•"0
Z<
a ,..-. -
a. o_- .,-11.1 RI,. U
24)0Z<
137
_.p̀ 2'Di -'0 t.< 17')08 :a) 13E .503
Z
,.-0; ac ..(.'i -05, z. as0 0-' -0co - 2C "t3 2 .YLE -, 2
-(T) E (‘5 c̀B< z U_
0 .(-) 15 ki< 5-; g0 (1),_, 0 D z
`c" 0 '0 ca.„,, ,- _c -0`.', cii a) am0 c ?-.' IC- rp 6 5
' 0) 6.. Iii ca(i) CD C) Ill Y
-ti.'63. co=-2gc
a)>
al ';''-- T. 2-5•'‹ n, ay
a) L. 17;-1..- 0 u j tb-.-‘ (7)co 0 - co3 0 23 z12 ..... 5
re,-' (c) 2 (t) (0"' l's __ C) Y
^ coO. -0
coli 0(,-)‹ -a) 5.2./- Cr-1,-- cv2. - '5
2-„a3 zi a) (t'.* 11 i! Y
Y ).a)c
0. '0(13cb .o.0 - (pco (1) r3 ia)z _le 2CO 6- L-i (13 (13Y Z u.
Czui
,- CV 01 v• in
0
c.5 =C O..ps.>: a)z a-0 0c
c_-5 Cc _
15.'Co' cl)a-2, oc
∎ I
'4(' ) za) .0 N 0.) >,L7, „, c ,_= ,,,,),) .E0 W . F 0 ---,a 0 c -It ,...0 2, in, a,17) ,,-, a-,co --0- 8 (:). 0i.- 45„ = 0E n 4) a a) 0°-.- (I) a) o O co • )-7( in , ,_Z 9 a) i u) a
aa)0
5
-a,a)0o5
iii cur-c =, 0*di c (,;))10 .?*.', Ec - 0- > ,_otaZ 0
"iii ,(1)c. - 0.6' c ,?•,)a - --0 >-. EE. •- 0> LotaZ cD
U)U,a)02aa)c -c.)C
a)C CO(I3 0I- 73
Ema)F-0ICO0
-0
8r.)
aCO L 00 () co
ay 0w 0. cE D 00 5 45 1-n .. cp2 -0 < a) 0N w 52 r- (Niu) 0 s , . 00 0 0 r, to5 12 3 < c)
aCO ,_ a)(...) -.1-, co
CD
0 CL c2 n o
0 ).:*ci ..or 0n N2 -0 < a) °co .,,; T'- 6ico 0 s . . r-o
,,C2 u) t c,i0 .525 ct ,-
,
-a
00 a)
(..) 45 ro
,... 0_ (13 0
0 0- 012 D o
0 >:*6 .1-2 -° < 6-- 8-a cy)
CD (0
0 D Cf) - 0
2 0 t") (Ni0 2). a < N
.oa) czco " 00 (1) .I. 0: ,..„N 00 n s,:=, 6T2 , . 0o `6' t) c,ia) 10 < N,5 n ,..
- a)0 n -, a)
C.) :do 5 Of0 ..,,CD ca
O..0>,.0aa)Lu)E'5a)).no
8foEOC
a) -0a a)0 4- 4-,NY to,_ a)a) c'E oo IT) ,..1-
7
,..02 < 0).cr)a ‘• :-u) m - --
0 15() z < cv
c.c(-) E3 a) a)0 - o
(n0 >, coZ o o_
c-c.) E(,9 _a) 80 (1)>,, (0Z o a
cn0 E
0 a)- - u0 (;)., c0Z o a
c_c0 Ec a) a)- 44, 00 (4), MZ o 0_
c.co Ec a) a)Cn -4, Q
u.)0 >, MZ o a
n c
0 ) a)0 .., 0a)0 >, ca
Z en 71
c_15 cc 0LP4 .' 27, .
-g 0c.C-
c
O gc
Lsr,2in' a)-0° oclC_
To2 -cY',- a) ....,
'42 E w °-a E a c0 0 C U0_, 0 r.,- 2.., __ ... ,..,
;- - c '-'-W M CU) (13a) ...= a.)- -f.1) C LO >sEa - a° ) 0 ." ->. _
CI_ c..- a. co
0—
22`5t522=t)
Tt)e Tti
.., Q) +,
u E w a)00-a E a c0 c, C 0u), (-) n 2- •. ,...,- c -
Ca) 47-..... ai -, V) " 0 >,t S r ->
Ct. c.. a ct)
,..a)a ,_a a)
8 ' - ra4_m0-a 5, c 3cpc cp 4..
0 0 0 °n ,_ n a)-6 -,:-.3 0
(1) Dal 0) Lntn C CO a)- E- - 5- 00 g2V,,2>CL (n O. E
>, ,,,.0 w-0 viu) E0 .-
CO .$3 0) E- - • a)cr., E z on" a)4, r) 1.- — L..Z 3 ft 3 . . . . . .... "2 no" 2co .-a) t 0a Z a0 ° N (1)C Na_ , . . . a :- a)
C N.6 45 co 't .0Z SO. Y C.\..I 0
< c6,1 0'---..7,uJ c0
045 €:a tcu) Z<
< ,...-. .-0. 0
LI' r00,̀:D 4._a t0 Z<
<,--. C0.,___,• 0;L-W CO0`cr) 4---CI t0 Z<
< ,,,-.4. 1...0. 0.-----. -r-,1.1.1 0ua" t",o0 Z<
< ,.--.. .-0.--- o-0L1J CS
u4. ...,0 4.4°*--o
Z<
< ,--.. -0_ o......r.,-UJ CO0'(f) =ct.t Z
<
< _...... ,..0.. 0--. 7.,ILI M
utti 474...a 45
Z<
.an "0.6 -- co10 to .0co (130 ..cCz 0 ,
,..„,,......C„- L..(1) C a3u) < Li.
V2.--c(5 - 10i- = co03 a) n
co co
Con
-C2 5-0C Or, ‘..03 r k,
1.-- .‹ u_
5:a) L,c CCc ..cCIS (10
I-- cy)2 -
5 N , a01.1.1... C C
0.0-,, yy
6,0\00asz
0,_600*,,a)
5: 645c mc 10F- —-
n
Fs' '-.5a c aC,..- c c
a) --)Y
co0) 8-i_ (00 ,-,-) N
.c@Lij' ma) a) (t5 '.-5-.J.c .-(130 a) c a.co -E- a) , a
_.cc0m<U. 0 --)Y
- L. .....C w -;_,co 7,-
0 C1.., a. ?.._ ,„
70 Et- n6(0E0E-I ,_ - - co
ui 2 76 y2 2)w —ZI-WY<
w-coa EI a),_ co0 E._.,, (0 4_ ...:-.
2 ,.. 8 8)° 0 a4,, a aa
(o. 4, t (73 g0 8 z...-YY
(0 N CO 0) o1--r-e-
Ne-
, ,
Eala)
1—0Iao(..)o_0>N.0
'0a)r.0c
,..'
a)
0
C0.C.
Et)
"E_
va)oo0
-0, a)
0o0
va)oo
Z..5
va)005
-0a) -to0 0(/) s- •-•u) a) CD
. n,.. CO 0Q) c
12 0
0 "6 Tr co2 ,...,< r8 -7 s , A- r-
8 ' --.(4 il ,5 = < N
-0a) 1:30 a.)0 s- -,u) a) a),.. OS 0.E c
06- "a •tr
r--. co2 5 cm ‘--7 , • 1- 1--co co ,o 0 —— ..., o r-(..) = < CV
-0a) TsZ la)(/) s- 4-,(I) Q) CO
Iii 0'a c-2 oo 0 ,:r
r-- co2 5 -••00 N- e-
0 V/ . 1-o— ,u) Ur0 7 < f \I
-0O (L)
CI.) CO,... CO0.) czp_ — o0 4 •4.6
r-- c''2 ,.< CY) 7= • • e- v-0 (.°
-12 ,(1) 'C.) ..-
0 = < (•1
C
c) E„a)c„-- coco>, co
Z (r) a.
C
(-) E,w 8
u)O coIsZ co a
C.c .of, a) c 1 )cn ,.., 0
u)O >, asZ u) a_
Cc) Eu) a) a)
11) °o >, ssZ u) ci
co 4)='E 2.0 0w 7i) 4.. (6,7- c 1 ) (3:615 a c x
O a)it) a) ui --,0 F2') - (Is
*ro al 80 , 6 . L -
.., o coraC V) n a)n -8 a 1.-,
8 t=a) —4E.
a)
0,,,@
z. 6 ".' u)2 (I; " -A
0 5 ;'‹.. c ci,0z:1 a) - -,-,a.) et, (1) C±-; L- 5 a)(00E2 -c n' --,— o — coC 0 0 a)
D -c) c ...,
, -=(a a)=— a) Ec .-8 0
a) (7) U)
2 in * 06
O Ro 0_ c 00-cs CD - ...0 0) 0 7.-, 6- 5 a)vocu0 E2 z It —.,... o — ciC (.11 0 a)
D -6 c .-..,
u) Zal a.)=— a) -,.-c _T-a a)
@ .6 U)
2 u) 46 ,t'-- O _ R'a) a. - a)0-0 (1) - -'-'(i) 0) ti) C4-, 6- 5 a)ca as 2 E2) -c a, .-0 — coC In 0 a)
n '6 c .67,
QCE 0
.7,tr co
uZ 6 ' 40- f5
0 z<
< t...--.. —0.. o
.,LLJ a)L. oa t:
0
_..u) z-4.
< c---.a. 0_liJ It
045 40- '4
0
0 z<
< ,..., ,..a. 0...—.7,LLJ caoCD 40 . 4
,...0 2sr.
< ,_— ....a. o.......rzLIJ a),.. 0
€" '5_.0 2-.k
N(IT7
O EE, al
L. 03 57).:12 in z ,....;.cGS 2 ,,,5 E E0 o 0) a °-a) _ co c cEn 8 z 2 Q
a).co7
0 _EJ- -5 a
it) 2 2 __,1' E ,..*: ,..a) 6. (ii = ia) 0) 0. Cl.
(75 c2 z 21coz.yrocca3Nalcc
aiu)7
0 E1 COL. - .0)o E 2 _....,:E.al ‘_. ,..0)2 d̀i == ay a) 0. 0.
w P.. 2 (1 ('
4--;ai a)V) >
7 a)0 -cI 0 V
74- c- 5 ca .o.a) ri. a3.c -2 -c0*) ,„ N5= c 0) 2alcai I.-
c7 (T) z 2
M
Fa ..c0 E.c as-0 01 -cv — 6 -> z a —7` — 2.c co (4) wVil gz a,
(!illz 02
M,- vr,-•
in,-•
(0e-
N.e.-
12.
CENTRAL POLLUTION CONTROL BOARD(Co-ordination Cell)
Date :05-09-2014Sub: Joint inspection of Sugar and Distilleries operating and
discharging the effluent in river Ganga and Yamuna-reg
As per Office order No B-190153/NGRBA/CPCB/2013-14/2035 Dated25-08-2014 and subsequent meeting with Member Secretary,undersigned was deputed to carry out the inspection of the sugar anddistillery industries in the region of Bijnor (UP) jointly with concernedregional officer of UPPCB.
Following industries were inspected during 1-2September, 2014 jointlywith representative of UPPCB.
SN Name of Industry Type1 Bajaj Hindustan Ltd., Bilai, Bijnor (UP) Sugar2 Dhampur Sugar Industries Ltd.
Dhampur, Dist-Bijnor (UP)Sugar
3 Dwarikesh Sugar Industries Ltd., Sugar Unit,Dwarikesh Nagar, PO Bundki, Bijnor (UP)
Sugar
4 Kisan Sehkari Chini Mills Ltd.Sneh Road, Nazibabad, Dist-Bijnor (UP)
Sugar
5 PBS Foods (sugar) Pvt. Ltd, Sugar Unit, Chandpur,Bijnor (UP)
Sugar
6 Upper Ganges Sugar & Industries Ltd.Sugar Unit, Seohara, Dist-Bijnor (UP)
Sugar
7 Uttam Sugar Mills Pvt. Ltd., Sugar Unit, Barkatpur,Bijnor (UP)
Sugar
8 Wave Industries Pvt. Ltd., Sugar Unit, Bijnor (UP) Sugar9 Dhampur Sugar Industries Ltd.
Dhampur, Dist- Bijnor (UP)Distillery
10 M/s Dwarikesh Sugar Industries Ltd. •
Distillery Division, Dwarikesh Nagar,Bundki, Dist-Bijnor
Distillery
11 Jain Distillery Pvt. Ltd., 8 tt' Km stone, Nagina road,Village Khadanpur, Bijnor
Distillery
12 Mohit Petro Chemicals Pvt. Ltd.8°' Km stone, Nagina road, Bijnor
Distillery
13 Upper Ganges Sugar & Industries Ltd.Distillery Unit, Seohara, Dist-Bijnor
Distillery
14 Uttam Sugar Mills Ltd., Distillery Division, BarkatpurDist-Bijnor (UP)
Distillery
During inspection all the above industries were found closed. Theinspection reports of individual industries are placed below for furthernecessary action please.
(Vijay Push Yadav)Scientist 'D'
I/c NGRBA
VIFr
CE)4(0CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: General InTormationName of the unit and address Wave Industries Pvt. Ltd.
Sugar Unit, Bijnor (UP)
Name of the Proprietor/ Contact person —DesignationContact No.
Uttam Kumar Singh, Sr. Manager
Year of Commissioning. 1930
Sector PrivateProduction details.
• Products Sugar
Cane crushing capacity 3500 TCD
Cane crushed last year 28,58,000 Qts
Operational Status It is seasonal industry and presentlyIndustry is not in operation due to offseason.
B: Water Pollution and its Control:Water Supply Source(s) GW through tube well
Water Meter to show consumption Installed
Flow measuring device installed at outlet ofETP
No arrangement
Waste Water generation No effluent was found generated due to
non-operation of unit.
Waste Water treatment capacity (KLD) 1000 KLDDetails of ETP
ETP Description with flow diagramIndustry has installed the ETP which iscomprising of Oil & grease Trap,Equalization Tank, Chemical dosing,Aeration Tank, followed by Secondaryclarifier
7. Waste water discharged (aftertreatment)(KLD)
No effluent discharge was found duringinspection
I H
2
Mode of disposal of treated effluent(Details)
On own land adjacent to ETP havingeucalyptus plantation.
8.
Poll utio nAir its ControlSources of Air Pollution Boiler 2 Nos. 35 TPH each
> Type of Fuel used with consumption...
Bagasse
â Stack details stack of 40 m Height
> APCS details Wet scrubber
5. Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
Photographs indicating locations:
► 5
3
RemarksDue to off season the industry was not in operation and no effluent was observedto be generated from the factory premises.The ETP was found in ruined condition and all around the ETP water logging wasobserved. The ETP is also not easily accessible. ETP requires complete renovationand modification before start of cane crushing.Since the industry has no proper discharge outlet so it is require for the industry toutilize its 100% effluent after proper treatment and no way can it be allowed todischarge on land in unscientific manner.Adequacy of the pollution control system may be assessed once the industryresumes its operation.
Date of Inspection: 01-09-2014
Name of officials inspecting : Sh. V. P. Yadav, Sc. 'ID', CPCB
(Name & Designations) Sh. Shashi Vindkar, AEE, UPPCBMs. Garima Dublish, RA, CPCB
16
G711:10)CENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
A: ienerai inTormationName of the unit and address Uttam Sugar Mills Pvt. Ltd.
Sugar Unit, Barkatpur,Bijnor (UP)
Name of the Proprietor/ Contact person -Designation
Sh Shailendra SinghHOD, Production
Sector PrivateProduction details.
• Products Sugar
Cane crushing capacity 7000 TCD
Cane crushed last year 79,50,000 Qts
7. Operational Status It is seasonal industry and presentlyIndustry is not in operation due to offseason.
B: Water Pollution and its Control:Water Supply Source(s) Ground Water through 2 tube well
Water Meter to show consumption Installed
Flow measuring device installed at outlet ofETP
Not installed
Waste Water generation No effluent was generated due to non-
operation of unit.
Waste Water treatment capacity (KLD) 750kld
Details of ETPETP Description with flow diagram
Industry has installed ETP which comprisesof Oil trap, Equalization Tank, PrimaryClarifier, Aeration Tank, SecondaryClarifier, Sludge drying Beds and LagoonNo effluent discharge was observedduring inspection
Waste water discharged (aftertreatment)(KLD)
Mode of disposal of treated effluent(Details)
As per information provided by theindustry most of the treated effluent isreused in the process and balance is used
One stack of 60 m Height
Wet scrubber
2
for irrigation on their 58 Acre land.
C: Air Pollution and its ControlSources of Air Pollution
Type of Fuel used with consumption
Boiler 2 Nos. 70 TPH each
Bagasse
Samples collections points(if collected)
Photographs indicating locations:
Sample could not be collected due to non-
operation of unit.
Stack details
APCS details
3
RemarksDue to off season the industry was not found in operation. Also no effleunts wasobserved to be discharged from factory premises.For the treatment of effluent generated from industrial process, industry hasinstalled an ETP. The ETP consists of Equalization.. Tank, Primary Clarifier,Aeration Tank, Secondary Clarifier, Sludge drying Bed and Lagoon.As per information provided by the industry representative, the treated effluent iscollected in a lagoon and used for ferti-irrigation on own land and no effluent isdischarged to any drain /river.Adequacy of the pollution control system may be assessed once the industryresumes its operation.
Date of report inspection 01/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCBr(j(frn
Sh. Shashi Vindkar, AEE, UPPCB
Ms. GArima Dublish, RA, CPCB
3
cepCENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
General InformationName of the unit and address Upper Ganges Sugar & Industries Ltd.
Sugar Unit, Seohara, Dist-Bijnor (UP)
Name of the Proprietor/ Contact person -Designation
Sukhveer Singh, Executive President,
Year of Commissioning. 1959
Sector PrivateProduction details.
• Products Sugar( Double sulphitation process)
Cane crushing capacity 10,000 TCD
7. Cane crushed last year 6,21,238 Qts
Water Pollution and its Control:Water Supply Source(s) Ground Water through tube well
Water Meter to show consumption Installed
ETPFlow measuring device installed at outlet of V-notch available
Waste Water generation No effluent was generated due to non-
operation of unit.
Waste Water treatment capacity (KLD) 2000 KLD
Details of ETPâ ETP Description with flow diagram
Industry has installed a full-fledgedEffluent Treatment Plant whichcomprises. of Oil Skimmer,Equalization/Effluent storage Tank,Primary clarifier 2 Nos, Diffuseaeration tank, Aeration Tank,Secondary Clarifier, Treated waterreceiving Tank, Activated carbon filter
and sand filter, Sludge drying beds,
2,0
2
Waste water discharged (aftertreatment)(KLD)
No effluent generation was observedduring inspection
Mode of disposal of treated effluent(Details)
On own land, 78 Acre, and recycling60% recycle and 40% for irrigation asreported by industryIf at all any discharge comes fromindustry it will go to Nasiya drain whichflows to 19 Km before meeting to RiverRam•an•a.
C: Air Pollution and its ControlSources of Air Pollution Boilersâ Type of Fuel used with consumption Fuel: Bagasse
â Stack details Three stack of 74 m and 2 nos of 40 m
Height
â APCS details Wet scrubber on two stacks and one
ESP .
5. Samples collections points(if collected)
Sample could not be collected due to
non-operation of unit.
Photographs indicating locations:
V.:41,,,,,
.-..,
....,,,;
2.1
3
Remarks
Due to off season the industry was not in operation and also no industrial effluentwas observed to be generated from the industry premises.As it is a time for maintenance work of sugar industries to be ready for nextcrushing season, the maintenance is going on.Industry has installed full-fledged ETP based on primary, secondary and tertiarytreatment process. ETP comprises of Oil Skimmer, Equalization/Effluent storageTank, Primary clarifier 2 Nos, Diffuse aeration Tank, Aeration Tank, SecondaryClarifier, Treated water receiving Tank, Activated carbon filter and sand filter,Sludge drying bed.No effluent was found generated from the industry premises and ETP units wereobserved empty except some rainy water.As per information provided by industry representative, most of the effluentgenerated from the industry is reused in the process and balance is used forirrigation on own land of 78 acre. If at all any discharge comes from industry it willgo to Nasiya drain which flows to 19 Km before meeting to River Ramganga.Adequacy of the pollution control system and its water and effluent managementmay be assessed once the industry resume its in operation.
Date of report inspection 02/09/2014 ,.
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB ( -,o".,'
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
____,
22
CO)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
A: General InformationName of the unit and address Dhampur Sugar Industries Ltd.
Dhampur, Dist-Bijnor (UP)
Name of the Proprietor/ Contact person -DesignationContact No.
Sh Vijay Mishra,Manager, Co-ordination
Year of Commissioning. 1933 .
Sector PrivateProduct Sugar
Cane crushing capacity 14,000 TCD
7. Operational status Not in operation due to off season
B: Water Pollution and its Control:Water Supply Source(s) Ground Water through 4 tube well
Water Meter to show consumption Installed
Flow measuring device installed at outlet ofETP
Not installed
Waste Water generation No effluent was generated due to non-
operation of unit.
Waste Water treatment capacity (KLD) 4500 KLD
LDetails of ETPETP Description with flow diagram
Oil & grease Trap, Screen, EqualizationTank, Primary Clarifier, Aeration Tank,Secondary Clarifier, Sludge drying beds
Waste water discharged (aftertreatment)(KLD)
No effluent generation was found duringinspection
Mode of disposal of treated effluent(Details)
Any discharge comes from industry willgo to Ikra Nala which joins Karula river,river Karula meets to river Gagan whichis a tributary of river Ramganga
23
........n....nn•nn•nnnnnn•
2
â APCSt eta ils
Samples collections points(if collected)
Sample could not be collected due to
non-operation of unit.
4.
Photographs indicating locations:
Boiler 2 Nos. 170 TPH eachSources of Air Pollution
Stack details3. One stack of 60 m Height
C: Air Pollution and its Control
> Type of Fuel used with consumption BagasseCoal
2 L1
3
Remarks
Due to off season the industry was not operation and due to agitation of farmersmaintenance work has also been stopped.No effluent was found generated from the industry premises and ETP units wereobserved empty except some rainy water.Industry has ,installed an ETP for the treatment of effluent generated duringoperation. ETP consists of Oil & grease Trap, Screen, Equalization Tank, PrimaryClarifier, Aeration Tank, Secondary Clarifier, Sludge drying bed.Adequacy of the pollution control system may be assessed once the industryresumes its operation.
Date of report inspection 02/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCBC-(47'
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
25
loweuxe)
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
A: General InformationName of the unit and address Dwarikesh Sugar Industries Ltd.
Sugar Unit, Dwarikesh NagarPO Bundki, Bijnor (UP)
Name of the Proprietor/ Contact person —DesignationContact No.
Salil S. Arya, CGM
Year of Commissioning. 1995Sector PrivateProduction details.
• Products Sugar
Cane crushing capacity 7500 TCD
Cane crushed last year 7263772 Qts
Operational status of industry Due to off season industry is not inoperation.
B: Water Pollution and its Control:Water Supply Source(s) Ground Water through tube well
Water Meter to show consumption Installed
Flow measuring device installed at outlet ofETP
V-notch
Waste Water generation No effluent was generated due to non-
operation of unit.
Waste Water treatment capacity (KLD) 750 KLDETP comprises of Oil & grease Trap,Equalization Tank, Primary clarifier,Aeration Tank 2 nos., Secondaryclarifier followed by Settling tank.
Details of ETP> ETP Description with flow diagram
Waste water discharged (aftertreatment)(KLD)
No effluent generation was foundduring inspection
Mode of disposal of treated effluent(Details)
Effluent is discharged to road side drainwhich meets with river Gagan , a
2
tributary of River Ramganga.
C: Air Pollution and its ControlSources of Air Pollution Boiler 2 no, 60 TPH each
â Type of Fuel used with consumption Bagasse
> Stack details stack of 60 m
â APCS details Wet scrubbers
5. Samples collections points(if collected)
Sample could not be collected due to
non-operation of unit.
Photographs depicting status of
. . -, :.-.*:, •
. .
1.: ...,.:4,-,....4...,. ...4
industry:
.
t q.,..-
•
....
2.
3
Remarks
Due to off season the industry was not in operation and also no industrial effluentwas observed to be generated from the industry premises.Industry has installed ETP based on primary, secondary. treatment process. ETPcomprises of Oil Skimmer, Equalization/Effluent storage Tank, Primary clarifier,Aeration Tank, Secondary Clarifier, Treated water receiving tank and Sludge dryingbed.No effluent was found generated from the industry premises and ETP units wereobserved empty except some rainy water.As per information provided by industry representative, most of the effluentgenerated from the industry is reused in the process and balance is used for greenbelt development inside the factory premises. Any discharge if comes out from theindustry, it will go to road side drain which meets with river Gagan which flows to70 Km before meeting to River Ramganga.Adequacy of the pollution control system and its water and effluent managementmay be assessed once the industry resumes its operation.
Date of report inspection 02;09/2014 •
Name of officials inspecting(Name &, Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
2.8
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
A: General InformationName of the unit and address Bajaj Hindustan Ltd.
Bilai, Bijnor (UP)
Name of the Proprietor/ Contact person -DesignationContact No.
Amod Bishnoi, Sr. DGM
Year of Commissioning. 2005
Sector PrivateProduction details.
• Products Sugar
Cane crushing capacity 9000 TCD
Cane crushed last year 8538847.9 Qts
Operational status It is seasonal industry and presentlyindustry is not in operation due to offseason.
B: Water Pollution and its Control:Water Supply Source(s) Ground Water through 3 tube wells
Water Meter to show consumption Installed
Flow measuring device installed at outlet ofETP
V-notch (dismantled)
Waste Water generation No effluent was observed to be generated
from the industry.
Waste Water treatment capacity (KLD) 1000 KLDDetails of ETP> ETP Description with flow diagram
_
Industry has installed Effluent TreatmentPlant comprising of Oil & grease Trap,Equalization Tank (chemical mixingTank), Primary Clarifier, Aeration Tank,Secondary Clarifier and Sludge dryingbeds
7. Mode of disposal of treated effluent(Details)
Road side drains which after 5 Km joinsBan River. Ban river meets to riverGagan, a tributary of river Ramganga
2
C: Air Pollution and its Control
Sources of Air Pollution Boiler 2 Nos,90 TPH eachType of Fuel used with consumption Bagasse
Stack details One stack of 30 m Height
APCS details Wet scrubbers
5. Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
Photograph depicting status of industry:
. ..7 rit,-. 1
'0,....
. —
--...-, '... 1.- ..'
''..4 1,71 11111TMIA1 .UT!
*M lingrlit,r-1.04
nearI— 4 we
Itt
7.77'
3 o
3
RemarksDue to off season the industry was not in operation and no worker was inside thepremises and industry was found locked out due to agitation of local farmers (canegrowers).Although it is a time for maintenance work of sugar industries to be ready for nextcrushing season but due to agitation no maintenance work was observed.Industry has installed Effluent Treatment Plant for the treatment of its effluent. ETPcomprises of Oil & grease Trap, Equalization Tank, Primary Clarifier, Aeration Tank& Secondary Clarifier. In addition to this industry has constructed a storage lagoon.Due to rainy season the wild grass was observed around the ETP area giving it thedeserted look.No effluent was found being generated in the industry premises and ETP unitswere observed empty except some rainy water.Adequacy of the pollution control system may be assessed once the industryresumes its operation.
Date of Inspection: 01-09-2014
Name of officials inspecting : Sh. V. P. Yadav, Sc. 'D', CPCB(Name & Designations) Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
31
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
A: cienerai imormationName of the unit and address Kisan Sehkari Chini Mills Ltd.
Sneh Road, NazibabadDist-Bijnor (UP)
Name of the Proprietor/ Contact person -DesignationContact No.
P.K. Shrivastav, Chief Chemist
Year of Commissioning. 1989
Sector Co-operative..Production details.
• Products Sugar
Cane crushing capacity 3000 TCD
Cane crushed last year 45,00,000 Qts
Operational status It is seasonal industry and presentlyIndustry is not in operation due to offseason.
B: Water Pollution and its Control:Water Supply Source(s) Ground Water through tube well
Water Meter to show consumption Installed .
Flow measuring device installed at outlet ofETP
No arrangement
Waste Water generation No effluent was generated due to non-
operation of unit.
Waste Water treatment capacity (KLD) 1200 KLDDetails of ETP
â ETP Description with flow diagramIndustry has installed ETP which comprisesof Oil and grease trap, Equalization Tank,Primary Clarifier, Aeration Tank,Secondary Clarifier, Sludge drying Beds
7. Waste water discharged (aftertreatment)(KLD)
No effluent discharge was observedduring inspection
Mode of disposal of treated effluent(Details)
It was informed that balance treatedeffluent of industry is used for irrigation onown nearby cane fields (about 75 Acrearea
8.
Photographs depicting status of industry:
32.
2
.Air Pollution and its Contro lSources of Air Pollution Boiler 2 Nos. 32 TPH each
> Type of Fue used with consumption Bagasse
â Stack details One stack of 30 m Height
â APCS details Wet scrubber
5. Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
3
Remarks Due to off season the industry was not found in operation. Also no effleunts wasobserved to be discharged from factory premises.For the treatment of effluent generated from industrial process, industry hasinstalled an ETP. The ETP consists of Equalization Tank, Primary Clarifier,Aeration-Tank, Secondary Clarifier, Sludge drying Beds.Thick wild grass was observed all around ETP and units of ETP were not easilyaccessible.As per information provided by the industry representative, the excess treatedeffluent is used for irrigation on own land and no effluent is discharged to any drain/river.Adequacy of the pollution control system may be assessed once the industryresumes its operation.
Date of report inspection 02/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB (.../<1,•(''
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
A: General InformationName of the unit and address PBS Foods (sugar) Pvt. Ltd.
Sugar Unit, ChandpurBijnor (UP)
Name of the Proprietor/ Contact person -Designation
Sh Israr AhmedChief General Manager
Year of Commissioning. 1976
Sector PrivateProduction details.
• Products Sugar
Cane crushing capacity 4500 TCD
Cane crushed last year 39,74,000 Qts
Operational Status Due to off season industry is not inoperation.
B: Water Pollution and its Control:Water Supply Source(s) Ground Water through 2 tube well
Water Meter to show consumption Installed
Flow measuring device installed at outlet ofETP
No arrangement
Waste Water generation No effluent was generated due to non-
operation of unit.
Waste Water treatment capacity (KLD) 1800 KLDDetails of ETP
â ETP Description with flow diagramETP comprises of Oil and grease trap,receiving pit, Aeration Tank,Secondary Clarifier, polishing Tank,Sludge drying beds,
Waste water discharged (aftertreatment)(KLD)
No effluent discharge was observedduring inspection
Mode of disposal of treated effluent(Details)
Treated effluent is used for irrigation inadjacent cane fields owned by industry.
2
No facility for storage of treatedwastewater exists
C: Air Pollution and its ControlSources of Air Pollution
'
Boiler 4 Nos.3 nos in operation70, 20, 20 TPH in operation20 TPH non-operation
> Type of Fuel used with consumption Fuel: Bagasse
> Stack details Two stack of 40 m Height
(One Non-Operation)
> APCS details Wet scrubber on 70 TPH Boiler
Cyclone on 20 TPH boilers
5. Samples collections points(if collected)
Sample could not be collected due to•non-operation of unit.
Photographs depicting status of industry:
..„4.4.'
x.•
If •-•',
-,:-....-..
3
Remarks
Due to off season the industry was not found in operation. Also no effleunts wasobserved to be discharged from factory premises.For the treatment of effluent generated from industrial process, industry hasinstalled an ETP. The ETP consists of receiving pit, chemical dosing, AerationTank, Secondary Clarifie r , polishing pond and Sludge drying Beds.ETP is not properly accessible. Thick wild grass was observed all around ETP.As per information provided by the industry representative, the excess treatedeffluent is used for irrigation on own land and no effluent is discharged to any drain/river.Adequacy of the pollution control system may be assessed once the industryresumes its operation.
Date of report inspection 02/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
(6A
wirCSOD
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery,
A: General InformationName of the unit and address Uttam Sugar Mills Ltd.
Distillery Division, BarkatpurDist-Bijnor (UP)
Name of the Proprietor/ Contactperson - Designation Contact No.
Sh 3. P. TripathiGeneral Manager
Year of Commissioning. 2012
Sector Private5. Production details.
ProductsInstalled Prod. Cap.
Rectified Sprit, ENA, Ethanol75 KLD
6. Raw materials Molasses
7. Operational status Non-operational due rainy season
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Ground water, 1 Tubewell
Industrial 750 KLD (when industry was inoperation)
Water Meter to show consumption Installed •
Waste Water generation (KLD) No effluent generation was observed, theindustry was not in operation
Details of Effluent Management Industry has installed Bio-gas digester, MEEand bio-composting facilities for managementof its effluent.As per information provided by industryrepresentative, the effluent from the digestergoes to MEE and concentrate of MEE is usedwith press mud for bio-composting or mixedwith bagasse and fired in boiler.Industry has developed about 10 Acre of HDPElined bio compost platform with catch drain andcatch pit.
5. Waste water discharged(after treatment)(KLD)
Industry claims to operate on Zero Dischargehowever it can be verified at the time, onceindustry comes operational.
2
6. Mode of disposal of treated effluent(Details)
There are chances of discharge of effluent intoMalan River a tributary of River Ganga.
C: Air Pollution and its ControlSources of Air Pollution 35 TPH boiler
â Type of Fuel usedconsumption
with Bagasse
â Stack details 50 m
â APCS details Bag filter and wet scrubber
5. Samples collections points(if collected)
Sample could not be collected due to non-operation of unit.
Photographs indicating locations:
= ,.
I a :
:,....4,
,
et r .
,:.
•--
y
1
- -.... a-wf‘:Jar,
3
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
If at all any discharge comes from industry it will go to Malan River a tributary of River
Ganga.
Remarks
During inspection the industry was not found in operation due to rainy season andno effluent was observed generating from the industry.The industry has installed the system for utilization of spent wash generated fromthe process. The spent wash generated goes to bio-gas digester. The effluentfrom the digester goes to MEE and concentrate of MEE is used with press mud formaking bio-compost.Industry has also developed the facility of mixing concentrated spent wash withbagasse and using it as a fuel in the boiler.Rows of semi finished bio compost was observed on the bio-compost yard.Bio-compost yard was observed having liner, catch drain and catch pit.Industry may be inspected for adequacy of its system once it comes in operationand also its claim for zero liquid discharge may be verified.
Date of report inspection 01/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. ID', CPCB t-r.-
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
A: General InformationName of the unit and address Upper Ganges Sugar & Industries Ltd.
Distillery Unit, SeoharaDist-Bijnor (UP)
Name of the Proprietor/ Contactperson - DesignationContact No.
Sukhveer Singh, Executive
Year of Commissioning. 1959
Sector Private5. Production details.
ProductsInstalled Prod. Cap.
Rectified Sprit, Absolute alcohol, ENA30,000 KL/Annum
6. Raw materials Molasses
7. Operational status Non-operational due to rainy season
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Ground water, Tube well
Industrial
Installed
2200-2300 KLD (when industry was in operation)
Water Meter to show consumption
Waste Water generation (KLD) No effluent generation was observed, theindustry was not in operation Industry has installed 2 no Bio-digesters forthe treatment of its effluent. Treated effluentfrom bio-digesters is further treated throughRO Plant and Multi effect Evaporators forrecovery of permeate and condensaterespectively. Permeate and condensate isreused in the process while concentrate / ROReject is utilized for making bio compost withpress-mud.Industry has constructed about 23 Acre linedplatform for bio-composting having catchdrain and catch pit.Requirement of press-mud is met through itsown sister sugar mill . adjacent to it.
Details of Effluent Management
5. Waste water discharged(after treatment)(KLD)
Industry claims to operate on Zero Dischargehowever it can be verified at the time, onceindustry come operational.
2
6. Mode of disposal of treated effluent(Details)
If at all any discharge comes from industry itwill go to Nasiya drain which flows to 19 Kmbefore meetin • to River Ram • an • a.
C: Air Pollution and its ControlSources of Air Pollution Boilerâ Type of Fuel used
consumptionwith Bio-gas 55,000-60,000 m 3/day with Bagasse
145-155 Ton/day
â Stack details 45 m
â APCS details 1. Wet Scrubber
5. Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
Photographs depicting status of industry:
3
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
If at all any discharge comes from industry it will go to Nasiya drain which flows to 19 Kmbefore meeting to River Ramganga and Ramganga meets with river Ganga after travelling
about 200km.
RemarksDuring inspection the industry was not found in operation due to rainy season andno effluent was observed generating from the industry.The industry has installed the system for utilization of spent wash generated fromthe process. The spent wash generated from the process is taken into bio-
digester and effluent of bio-gas digester goes to RO/MEE, the reject of RO andconcentrate of MEE is beIng used for making bio compost using press-mud.Bio-compost was observed lying on bio-compost yard. It was covered by tarpaulinsheet to protect with rain.Bio-compost yard has been provided with catch drain and catch pit.Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection 02/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
106
'NowCO)
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
A: General InformationName of the unit and address Mohit Petro Chemicals Pvt. Ltd.
8th Km stone, Nagina roadBijnor (UP)
Name of the Proprietor/ Contactperson - DesignationContact No.
Sh. Suresh ParmarDirector
Year of Commissioning. 2005
Sector Private5. Production details.
ProductsInstalled Prod. Cap.
Rectified Sprit, Ethyl alcohol, ENA40 KLD
6. Raw materials Molasses
7. Operational status Non-operational due to rainy season and as perrecord , Industry is not in operation since 30thJuly, 2014
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Ground water, Tubewell
Industrial 550 KLD (when industry was inoperation)
Water Meter to show consumption Installed
3. Waste Water generation (KLD) No effluent generation was observed, theindustry was not in operation. It is estimated
that industry will generate about 400 KLDeffluents at full production.
Industry has installed Bio digester fortreatment of effluent (spent wash andother effluent) generated from distillery.The effluent from the digester goes toRO plant and reject of RO Plant is usedwith press mud for bio-composting.Capacity of RO plant is 400m3/day.Industry has constructed 12.8 Acre linedplatform for bio composting. Biocomposting area is provided with catchdrain and catch pit.Industry has constructed lined storagelagoon of for bio composting purpose ofcapacity 18000 m3.
4. Details of Effluent Management
2
Waste water discharged(after treatment)(KLD)
Industry claims to operate on Zero Dischargehowever it can be verified at the time, onceindustry come operational.If at all any discharge comes from industry itwill go to Chuiyya drain which flows about 60-70 Km before meeting with River Ganga.
Mode of disposal of treated effluent(Details)
C: A'r Pollution and its ControlSources of Air Pollution boiler, 8TPH
â Type of Fuel used withconsumption
Bio-gas+ rice husk
â Stack details 31 m
â APCS details Wet Scrubber
5. Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
Photographs depicting status of industry:
.e,
. •,..,
h5
3
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Discharge from industry will go to Chuiyya drain which travels about 60-70 Km beforemeeting with River Ganga.
RemarksDuring inspection the industry was not found in operation due to rainy season andno effluent was observed generating from the industry.The industry has installed the system for utilization of spent wash generated fromthe process. The spent wash generated from the process is taken into the bio-digester and effluent of bio-gas digester goes to RO Plant. The reject of RO isbeing used for making bio-compost along with press.It was observed that press mud and Bio-compost both was observed lying on bio-compost yard. Industry has not made any arrangement for protection of Bio-compost with rain.Bio-compost yard was observed having liner, catch drain and catch pit.Industry may be inspected for its adequacy of the system once it comes inoperation.
Date of report inspection 01/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB ,/
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
103
Nor(0211
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
A: General Information 1. Name of the unit and address Jain Distillery Pvt. Ltd.
8th Km stone, Nagina road,Village Khadanpur, Bijnor
Name of the Proprietor/ Contactperson - DesignationContact No. Year of Commissioning.
Sh. Navneet Jain, Director
2008
4. SectorProduction details.
ProductsInstalled Prod. Cap.
Raw materials
Operational status
Private
Rectified Sprit, ENA40 KLDMolassesNon-operational due to rainy season
B: Water Pollution and its Control:1.
Waste Water generation (KLD)
Waste water discharged(after treatment)(KLD)
Details of Effluent Management
Ground water, Tubewell
700 KLD (when industry was inoperation)
Installed
No effluent generation was observed, theindustry was not in operation. It is estimatedthat industry will generate about 320 KLDeffluents at full production.
Industry has installed Bio digester fortreatment of effluent (spent wash andother effluent) generated from distillery.The effluent from the digester goes toRO plant of • capacity 400 m 3/day andreject of RO Plant is used with pressmud for bio-compostin g while permeateis reused in the process.Industry has constructed 11 Acre linedplatform for bio composting. Biocomposting area is provided with catchdrain and catch pit.Industry has constructed lined storagelagoon for bio composting purpose.
Industry claims to operate on Zero Dischargehowever it can be verified at the time, onceindustry come operational.
Water Supply Source
Water Consumption (KLD)
Water Meter to show consumption
Industrial
Wet Scrubber + MDCâ APCS details
1. Sources of Air Pollution
2
If at all any discharge comes from industry itwill go to Chuiyya drain which flows 60-70 Kmbefore meeting to River Ganga.
C: Air Pollution and its
)%. Type of Fuel used withconsumption
â Stack details 30 m
Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
Photographs indicating locations:
Control
Mode of disposal of treated effluent(Details)
boiler, 8TPH
Bio-gas+ rice husk
3
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
If at all any discharge comes from industry it will goes to Chuiyya drain which flows to 60-
70 Km before meeting to River Ganga.
RemarksDuring inspection the industry was not found in operation due to rainy season and
no effluent was observed generatin g from the industry.The industry has installed the system for utilization of spent wash generated fromthe process. The spent wash generated from the process is taken into bio-gasdigester and effluent of bio-gas digester goes to RO Plant, the reject of RO is
being used with press mud for bio-composting.Press mud and Bio-compost both was observed lying on bio-compost yard and
nearby .Bio-compost was covered under polythene sheet to protect it from rain.Bio-compost yard was observed having liner, catch drain and catch pit.Industry may be inspected for its adequacy of the system once it comes in
operation.
Date of report inspection
Name of officialsinspecting(Name & Designations)
01/09/2014
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
3.
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
Z11,2011
A: General InformationName of the unit and address Dhampur Sugar Industries Ltd.
Dhampur, Dist- Bijnor (UP)
Sh. Vijay MishraManager (Co-ordination)
1990
Private
Rectified Sprit, Ethyl Acetate, ENA200 KLD MolassesNon-operational due to rainy season as perdirection from UPPCB
SectorProduction details.
ProductsInstalled Prod. Cap.
Raw materials
Operational status
Name of the Proprietor/ Contactperson - DesignationContact No. Year of Commissioning.
5.
B: Water Pollution and its Control:Water Supply Source Ground water, 3 Tube wells
Water Consumption (KLD)
Water Meter to show consumption
4700 KLD (when industry was inoperation)
Waste Water generation (KLD) No effluent generation was observed, theindustry was not in operation. It is estimatedthat industry will generate about 2400 KLDeffluent at full production.
Industry has installed Bio digesters fortreatment of effluent (spent wash andother effluent) generated from distillery.The effluent from the digester goes toRO plant/MEE and reject of RO Plant andMEE concentrate is used with press mudfor bio-composting.Industry has constructed 16 Acre activelined platform for bio composting. Biocomposting area is provided with catchdrain and catch pit.Industry has constructed 36000 KL linedstorage lagoon of for bio compostingpurpose.Press-mud generated from its own sugarindustry is used for making bio compost.
Industrial
Installed
4, Details of Effluent Management
5t
Waste water discharged(after treatment)(KLD)
Mode of disposal of treated effluent(Details)
C: Air Pollution and its ControlSources of Air Pollution > Type of Fuel used with
consumption
2
Industry claims to operate on Zero LiquidDischarge however it can be verified at thetime, once industry resumes its operation. If at all any discharge comes from industry itwill go to Ikra drain which joins Karula river,river Karula meets to river Gagan which is atributary of river Ramganga.
BoilerBio-gas+ rice husk
> Stack details 60 m height3.
â APCS details Wet Scrubber4.
5. Samples collections points(if collected)
Sample could not be collected due to non-
operation of unit.
Photographs indicating locations:
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Any discharge comes from industry leads to Ikra drain which joins Karula river, river Karulameets to river Gagan which is a tributary of river Ramganga. River Ramganga meets withriver Gana after traversin g about 200km.
51
3
Remarks
During inspection the industry was not found in operation due to rainy season andno effluent was observed generating from the industry.The industry has installed the system for utilization of spent wash generated fromthe process. The spent wash generated goes to bio-gas digesters and outlet ofbio-gas digester goes to RO/MEE, the reject of RO and MEE concentrate is beingused for making bio-compost using press mud.All the process units of the industry were not in operation during inspection.Press mud and Bio-compost both was observed lying on bio-compost yard coveredunder tarpaulin sheets to protect with rain.Bio-compost yard was observed having liner, catch drain and catch pit.Industry may be inspected for its adequacy of the system once it comes inoperation.
Date of report inspection 02/09/2014
Name of officialsinspecting(Name &Designations)
Sh. V. P. Yadav, Sc. 'D', CPCBoc.-i
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
52
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distiller
A: General Information1. Name of the unit and address
M/s Dwarikesh Sugar Ind. Ltd.Distillery Division, Dwarikesh Nagar,Bundki, Dist-Bijnor
Sh. Salil S. AryaCGM
2005
Private
Rectified Sprit, ENA30 KLDMolasses
Non-operatio nal due rainy season
Ground water, Tubewell
Industrial 450 . KLD (when industry was in0 eration
Installed
No effluent generation was observed sinceindustry was not in operation. It is estimatedthat industry will generate about 300KLDeffluent at full •roduction.
Industry has installed Bio digester fortreatment of effluent (spent wash andother effluent) generated from distillery.Treated effluent from Bio-gas digester isused for bio composting using press-mud generated from its sugar mill.Industry has constructed 30283 m2 linedplatform for bio composting. Biocomposting area is provided with catchdrain and catch pit.Industry has constructed lined storagelagoon of capacity 4500 m3 for biocomposting purpose.
Name of the Proprietor/ Contactperson - DesignationContact No.Year of Commissioning.
SectorProduction details.
ProductsInstalled Prod. C
Raw materials
7. Operationa l status
B: Water Pollution and its Control:1. Water Supply Source
Water Consumpti on (KLD)
Water Meter to show consumption
Waste Water generation (KLD)
4. Details of Effluent Management
se6
2
Requirement of press-mud is metthrough adjacent sister sugar factory.
Industry claims to operate on Zero Dischargehowever it can be verified at the time, onceindustr resumes its o•eration.If at all any discharge comes from industry itwill go to nearby drain which will meet withriver Gagan which finally meets to riverRamganga.Rive r Ramganga meets with riverGana at Kannau'
No boiler in distillery unit, the steam is suppliedby their own adjacent sugar unit
Sample could not be collected due to non-operation
of unit.
Waste water discharged(after treatment)(KLD)
Mode of disposal of treated effluent(Details)
C: Air Pollution and its Control1 Sources of Air Pollution
Type of Fuel used with
consumption
Stack details
APCS details
Samples collections points(if collected)
Photographs indicating locations:
Date of report inspection 02/09/2014
Name of officials inspecting(Name & Designations)
Sh. V. P. Yadav, Sc. 'D', CPCB
Sh. Shashi Vindkar, AEE, UPPCB
Ms. Garima Dublish, RA, CPCB
3
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Discharge from industry will go to road side drain which leads to Gagan river which finallymeets to river Ramganga after traversing about 60km and River Ramganga meets with riverGanga after traversing about 200km.
RemarksDuring inspection the industry was not found in operation due to rainy season andno effluent was observed generating from the industry.The industry has installed the system for utilization of effluent generated from theprocess. Industry has installed bio digester for recovery of energy from its effluentand treated effluent from bio-digester is utilized for making bio compost alongwith press-mud. Industry claims that it operates on zero liquid discharge.Bio compost was observed lying on Bio compost yard under tarpaulin cover forprotection of rain.Industry may be inspected for its adequacy of the system once it comes inoperation.
Central Pollution Control BoardPCI-Ill Division
Dated: 09/09/2014
Sub: Inspection report of 04 industries under NGT order-Regd.
Placed below at flag 'A' is the inspection reports of the following 04 industriesconducted in accordance to the NGT order dated 06 1) August 2014-
M/s A.B. Mauri Yeast Ltd. Ind. Area, Sikandrabad, Distt. BulandshahrM/s Jagatjeet Industries Ltd. Ind. Area, Sikandrabad, Distt.BulandshahrM/s Kothari Fermentation & Biochem Ltd. Ind. Area, Sikandrabad,Distt. Bulandshahr
4. M/s Wave Industries Ltd. (Sugar Unit), Panni Nagar, Bulandshahr, UP
Submitted for kind perusal and further necessary action please.
I/c NGRBA CELL
Kamlesh SinghSc 'C'
55
lo I Dr,
CerjE0CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar Mill
Date of Inspection: 01/09/2014
A: General Information1. Name of the unit and address M/s Wave Industries Ltd. (Sugar Unit),
Panni Nagar, Bulandshahr, UP
Name of the Proprietor/ Contactperson - DesignationContact No.Year of Commissioning,
Sector Private
Production details.ProductsInstalled Prod. CapOperating capacity
Sugar
Consent expired on 31.12.2012
, Cane crushing capacity 3500 TCD
7, Cane crushed last year Closed since March,2014 due to off season
Molasses generation No record available with Unit
Press Mud generation No records available with Unit
10. Operational status CLOSED due to off season/Non crushingseason
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
Tubewell-2 No; No logbooks available
Industrial 1500 KLD
Domestic .
Water Meter to show consumption VAvailable / Not available
3. Flow measuring device installed atoutlet of ETP
VAvailable / Not available
Waste Water generation (KLD)(before treatment)> Industrial';0 Domestic
No records available
Waste Water treatment capacity(KLD)
Industrialâ Domestic
ngrba.cpcb(ugnuil.com Sugar Format modified considering NGT directions
2
Details of ETP
â ETP Description with flowdiagram
> Details of Reverse Osmosisplant, if any
ETP Details: ETP in Defunct state and Hotapproachable due to plant grointth aroundETP.Equalization tank-) Primary Clarifier-)Aeration tank (surface aerators)-* 4Secondary clarifier-* Kali(E) ( after 01 km)Sludge drying beds
Waste water discharged (aftertreatment)(KLD)â IndustrialDomesticMode of disposal of treatedeffluent (Details)
VOn land/ Surface water
Sample distributed into no. ofparts (2/3)
No samples taken as sugar mill was closedsince March 2014
Sludge disposal mode Sludge drying beds
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BODOng/0
CODOng/0
TSSOng/0
OutletOthers
(I) Information regarding Ferti-irrigation N/ADetails of treatment effluentbefore Ferti-irrigation
NA
Command area for irrigation(available land area)
NA
System for dilution of treatedeffluent required for ferti-irrigation
NA
System of transportation oftreated effluent upto field.
NA
Formal agreements with farmersfor using treated effluent
NA
Storage facility available fortreated effluent during lowdemand period
NA
7. Quality of effluent being used forferti-irrigation
NA.
8, Ground water monitoring network (Available /Not available)C: Air Pollution and its Control
Sources of Air Pollution Two Boiler of 32 TPH each; P-32KgCogeneration plant of 2x2.5 MW
â Type of Fuel used withconsumption
Bagasse as fuel
â Stack details
â APCS details Cyclone dust collector
ngrba.cpcb(i;gmail.corn Sugar Format modified considering NGT directions
3
5, Samples collections points(if collected)
Boilers were non-operational due to offseason therefore, nor stack monitoring done.
Photo • ra ' hs indicatin • locations: ETP was,- ,,,, ,..,.
-
*
4 1
• ,..Pic 1: Oil&Grease screen-Filled with sludge
not a ..roachable
.,.—.
-
Pic 2: Equalization tank-Filled with sludge
,,,,.. :•itn, ':' .
t.•
-
1
Pic:3 Aeration tank- EmptyPicture shows residential area around thealant
..,
,
Pic 4: Secondary clarifier-Defunct state andwith plants grown around the ETP
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)Treated effluent is discharge into the local nallah which meets River Kali (E) after 01 KM.
Treated effluent---Local Drain----Kali(E)----> Ganga
ha c mail.coin Sugar Format modified considering NGT directions
4
1 Name of officialsinspecting
,
Name & Designations Signature
Sh. Kamlesh Singh,Scientist 'C', CPCB of t5 T\Sh. A.K. Chaudhary,RO, UPPCBSh. J.B Singh,AEE, UPPCBMiss. Shradha Lonarkar,Research Associate, NGRBA
i vir.,hio..., ..
2 Date of reportSubmission
01/09/2014
ngrba.cpcb(4nutil.com Sugar Format modified considering NGT directions
G r.
a v.
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Yeast
Date of Inspection: 01/09/2014
A: General InformationName of the unit and address M/s Kothari Fermentation & Biochem
Ltd. Ind. Area, Sikandrabad, Distt.Bulandshahr
Name of the Proprietor/ Contactperson - DesignationContact No.
Mr. Pramod Kothari,••
3, Year of Commissioning. 1993Sector PrivateProduction details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Raw materials & theirrequirement
Yeast40 TPD
Molasses from Sugar mills6,
7. Operational status Operating at 33 TPD
•
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Borewell -3 Logbooks were Maintained
Industrial 300
Domestic
Water Meter to showconsumption
AvailableTotal fresh water consumption=5639m 3/month(Aug'14); (@29.52 TPD production)- 6.36 m 3/Ton of production
Flow measuring device installedat outlet of ETP
NA; Unit informed to be on Zero LiquidDischarge (ZLD)
280 KLD
Waste Water generation (KLD)(before treatment)â Industrial> Domestic
ngrba.cpcWgmail.corn Distillery Format modified considering NGT directions
5, Waste Water treatment capacity(KLD)'i, Industrialâ DomesticDetails of ETP
â ETP Description with flowdiagram
â Details of Reverse Osmosisplant, ,-if any
â Details of Multi EffectEvaporator (MEE), if any
ETP:Effluent-*Tube settler---Sand Filter-) UltraFiltration- Nano Filtration4 R.O. Filtration-)Polishing R.O.--> Gardening & cooling towers
RO Reject -) MEE Feed Tank -) MEE -) MEEConcentrate + Mustard Husk--Agro Fuel Mixer—> Agro fuel based Boiler
Sand Filter, Ulta Filter, Reverse Osmosis, MEEwas found operational.Bio-digester was non-operational.
MEE Detail: Capacity=300 KLD
Industry has installed five effect forcedcirculation evaporator of capacity 300 KLD feed.Evaporation takes place in five stages incalandria having tubes where spent wash (ROReject) is heated through steam under vacuum.MEE Feed rate during inspection:193 litr/minMEE condensate rate:162.5 litr/min
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
ZLD
g . Mode of disposal of treatedeffluent (Details)
On land/ Surface waterRO Permeate- Used in Gardening & coolingtowerRO Reject- Mixed with mustard husk and burntin boiler
Sample distributed into no. ofparts (2/3)
2
Sludge disOosal mode The unit had 14 sludge drying beds filled withmolasses sludge (obtain after decanting the rawmolasses) but they did not have any propersystem for its disposal. It was informed that thesludge was dried and disposed off on land fillsites but no proper arrangement was seen forthe same.About 90 0/0 of the sludge drying bedswere filled with molasses sludge.
11. Effluent collection locations & Locations Parameters
ngrba.cpcb(c-egmail.corn Distillery Format modified considering NGT directions
3
analysis results (if collected) pH BOD(mg/I)
COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Bio-composting - No Bio-composting1. Active area for bio compost
preparation (m2)
Area for press mud storage(m2)
NA• •
Area for bio compost storage(m2)
NA
Spent wash storage capacity NA
Availability of pressmud NA
Quantity of compost prepared
(Monthly statement of last year)
NA
Quantity of pressmen procured
(Monthly statement)
NA
. Details of wind roses (Number,
length, height, width of
stacking, space between two
wind rose)
NA
. Quantity of Effluent being used
for composting ( m3/day)
NA
Quantity of press mud being
used for one cycle
NA
Maturity time in days for one
cycle
NA
Arrangement for rainy season NA
Quality of ground water in the
area and depth of ground water
table
(II) Information regarding Ferti-irrigation- no fertiirrigation
n,grba.cpc1Wgmail.com Distillery Format modified considering NGT directions
34
Details of treatment of spentwash (details of biomethanisation, primary andsecondary treatment)Command area for irrigation(available land area)
NA
3. System for dilution of treatedeffluent required for ferti-irrigation
NA
4, System of transportation oftreated effluent upto field.
NA
Formal agreements withfarmers for using treatedeffluentStorage facility available fortreated effluent during lowdemand period
NA
7, Quality of effluent being usedfor ferti-irrigation
NA
8. Ground water monitoringnetwork
Not available
C: Air Pollution and its ControlSources of Air Pollution Boilersâ Type of Fuel used with
consumptionThree boilerslx10 TPH (MEE Reject + mustard husk) and2x02 TPH (furnace oil)10 TPH was operational
Stack details 35 mt height
4. â APCS details Multi-cyclone
5. Samples collections points(if collected)
Boiler of 10 TPH was operational.
Photographs indicating locations:
ngrba.cpcb(ii)gmail.com Distillery Format modified considering NGT directions
Pic 1: Sand filter and Tube settler-O•erational
Pic 4: Mustard husk used for mixing MEE
concentrated reject lying in the open fieldPic 3: Sludge drying beds-90 % filled
5
ngrba.cpcb(dgmail.00 171 Distillery Format modified considering NGT directions.
Signature
6
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
UPSIDC drain River Kali---River Yamuna
The Unit claims to be on Zero Liquid Discharge however the significant amount ofmolasses sludge was found stored and needs to be disposed off in a scientificmanner.
The Unit mixes the MEE concentrate with mustard husk (40:60 ratio) and aftersun drying, uses it in boiler (10 TPH) as fuel. MEE Condensate is treated with ROand RO permeate is stored in polishing tank from where it is re-used for boiler.
No discharge was found
1 Name of officialsinspecting
Name & Designations
Sh. Kamlesh Singh,Scientist 'C', CPCBSh. A.K. Chaudhary,RO, UPPCBSh. J.B Singh,AEE, UPPCB Miss. Shradha Lonarkar,Research Associate, NGRBA
2 Date of reportSubmission
01/09/2014
ngrba.cocb66gmail.corn Distillery Format modified considering NGT directions
416-4-411a or,
X-J-)113CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: DISTILLERY
Date of Inspection: 01/09/2014
A: General InformationName of the unit and address M/s Jagatjeet Industries Ltd. Ind.
Area, Sikandrabad, Distt. Bulandshahr
Name of the Proprietor/ Contactperson - DesignationContact No.
3, Year of Commissioning. 1997Sector PrivateProduction details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Unit closed since 04 years
Raw materials & their requirement Molasses
Operational status Unit is closed since 04 Years and verifiedby UPPCB officials.Only security guards were present.
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
No Datas available
Industrial NO Datas
Domestic
Water Meter to show consumption Available / Not available
Flow measuring device installed atoutlet of ETP
Available / Not available
Waste Water generation (KLD)(before treatment)â Industrialâ Domestic
NO Data
5. Waste Water treatment capacity(KLD)> Industrialâ Domestic
ngrba.cpcb(iisigniail.coni Distillery Format modified considering NGT directions
2
6. Details of ETPâ ETP Description with flow
diagramâ Details of Reverse Osmosis
plant, if any.)e Details of Multi Effect
Evaporator, if any
ETP in Defunct stateETP comprises of equalization tank-- -primary clarifier----aerationtank/collection tank----secondaryclarifier
7, Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
NO DATA
Mode of disposal of treated effluent(Details)
On land/ Surface water
Sample distributed into no. ofparts (2/3)
None
Sludge disposal mode Not availbie
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BODOng/0
CODOng/0
TSS(mg/0
Outlet
Others(I) Information regarding Bio-composting
Active area for bio compostpreparation (m2)
Area for press mud storage (m2)3, Area for bio compost storage (m2)4. Spent wash storage capacity5, Availability of pressmud
Quantity of compost prepared(Monthly statement of last year)Quantity of pressmen procured(Monthly statement)Details of wind roses (Number,length, height, width of stacking,space between two wind rose)Quantity of Effluent being used forcomposting ( rn 3Jday) :Quantity of press mud being usedfor one cycleMaturity time in days for one cycleArrangement for rainy seasonQuality of ground water in the areaand depth of ground water table
•
(II) Information regarding Ferti-irrigation
ngrba.cpcWgmail.com Distillery Format modified considering NGT directions
'
3
Details of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(availabl&land area) .
System for dilution of treatedeffluent required for ferti-irrigationSystem of transportation of treatedeffluent upto field.
5. Formal agreements with farmersfor using treated effluentStorage facility available fortreated effluent during low demandperiodQuality of effluent being used forferti-irrigationGround water monitoring network (Available /Not available)
C: A • r Pollution and its Control1. Sources of Air Pollution Boiler •
> Type of Fuel used withconsumption
NO DATA
â Stack details
)=. APCS details NO DATA
5. Samples collections points(if collected)
PM (mg/Nm :
Photographs indicating locations:
1A. -
, .1-14 L;it'i0 tit,f.r...
'3(.".'ic, IG*'..,,:t.. , J .4 .Ilk-
' ili4
Pic 1: Entry of unit
ft, I, 1. . IL...
it
OW
Pic 2: ETP-Non-operational
.. .
ngrba.cpcb(ii)gmail.com Distillery Format modified considering NGT directions
Pic 3: ETP-Non operational Pic 4: Industry campus
4
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
UPSIDC Drain----Karval River---Yamuna
1 Name of officialsinspecting
Name & Designations Signature
Sh. Kamlesh Singh,Scientist 'C', CPCB
(,,,,07
Sh. A.K. Chaudhary,RO, UPPCBSh. J.B Singh,AEE, UPPCBMiss Shradha Lonarkar,Research Associate, NGRBA I vtliobn-1-
A...40MA
2 Date ofSubmission
report
ngrba.cpcb(Mgmail.coni Distillery Format modified considering NGT directions
4-1110ire
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Yeast
Date of Inspection: 01/09/2014
A: General InformationName of the unit and address M/s A.B. Mauri Yeast Ltd. Ind. Area,
Sikandrabad, Distt. Bulandshahr
Name of the Proprietor/ Contactperson - DesignationContact No.
3, Year of Commissioning.
Sector Private
Production details.ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Raw materials & their requirement
Closed since March,2014Bakers Yeast
Consent rejected by UPPCBMolasses-1150-1200 tons/month (boughtfrom Anamika or Wave sugar)
Operational status Non-operationalUPPCB has rejected the consent underWater and Air Acts vide letter dated17.04.2014
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Borewell-2 No.
Industrial 221.4 KLD(12 m 3/ton ofproduction)
Domestic
Water Meter to show consumption VAvailable / Not available
3. Flow measuring device installed atoutlet of ETP
Available / Not available
4, Waste Water generation (KLD)(before treatment)â Industrial )%. Domestic
500 KLD at full capacity
5. Waste Water treatment capacity(KLD)â Industrialâ Domestic
tigrf Distillery Format modified considering NGT directions
-11
2
Equalization tank-) Digester 4 RO --- ROReject mixed with Rice husk within the plantand sold to outside agencies for final disposal
of RO Reject.
Inadequate ETP
No MEE installed
Details of ETP> ETP Description with flow
diagram
> Details of Reverse Osmosisplant, if any
â Details of Multi EffectEvaporator (MEE), if any
Waste water discharged (aftertreatment)(KLD))>. IndustrialDomestic
No treatment technology installed totreat the RO Reject within the plant
Mode of disposal of treated effluent(Details)
The effluent was being treated in the Digesterand RO but after the Reverse osmosis theUnit doesn't have any treatment technologyfor the treatment of RO Reject within theplant.However, Unit informed that the ROReject is mixed with Rice husk and driedand finally given to the agency outsidewhich burns the dried mixer in theirboilers.Unit did not provided the list of agencywhich uses their mixed fuel (Reject +Ricehusk) as fuel in boilers.
Sample distributed into no. ofparts (2/3)
None
Sludge disposal mode
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BODOng/0
CODOng/0
TSSOng/0
Outlet
Others
(I) Information regarding Bio-composting N/A1. Active area for bio compost
preparation (m2)• •
2, Area for press mud storage (m 2 ) NA
1 Area for bio compost storage (m 2 ) NA
Spent wash storage capacity NA
Availability of pressmud NA
6. Quantity of compost prepared NA
ngrba.cpcb(kmail.com Distillery Format modified considering NGT directions
3
(Monthly statement of last year)
7. Quantity of pressmen procured
(Monthly statement)
NA
. Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
NA
Quantity of Effluent being used for
composting ( m3/day)
NA
Quantity of press mud being used
for one cycle
NA•
Maturity time in days for one cycle NA
Arrangement for rainy season NA
13. Quality of ground water in the area
and depth of ground water table
(II)_ Information regarding Ferti-irrigation N/ADetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(available land area)
NA
System for dilution of treatedeffluent required for ferti-irrigation
NA
System of transportation of treatedeffluent upto field.
NA
Formal agreements with farmersfor using treated effluent
NA
Storage facility available fortreated effluent during low demandperiod
NA
Quality of effluent being used forferti-irrigation
NA.
Ground water monitoring network (Available /Not available)
C: Air Pollution and its ControlSources of Air Pollutionâ Type of Fuel used with
consumption
3. â Stack details
ngrba.cpcb(ci)gmail.com Distillery Format modified considering NGT directions
1a4
â APCS detailsSamples collections points(if collected)
No-operational therefore no stack monitoring
done
Photographs indicating locations:
Pic 1:
river Ganga/Yamuna
Pic 2: Reverse Osmosis-Non-operational
of the unit)
•i
Equalization tank- effluent present
outlet drain
Kali (E)----Ganga
E. Route of effluent to reach(Please indicate starting from the
1 Name of officialsinspecting
Name & Designations Signature
l-H,M\‘'Sh. Kamlesh Singh,Scientist 'C', CPCBSh. A.K. Chaudhary,RO, UPPCBSh. J,B Singh, ..AEE, UPPCBMiss. Shradha Lonarkar,Research Associate, NGRBA
I r., ago.
2 Date of reportSubmission
ngrba.cpcWgmail.coni Distillery Format modified considering NGT directions
-
CPI_P?- n104 t-I,H1
to _ /LTA_ IriebAAtylj 1- 41 I'5b
ettv,ativu del
b,rottA- No - F,Mo 6 - 016'3/W104V
- 25 . 08 2-01
c,r1 *-114- AAAA4A-
oVc No-K.et/
A4t_e_t, )2"-9.,,,r 3 :is 09 1, 2.: AC 1)P Pc-i)
GI ad
.A.4 0' 20 I41 -1°4‘1.
A-
are L4 g " 4VIA-O et.e-4-7--i' 16 41-.IAA.u.A)P-kA Art;t4 11?4.1
ra,,,,-44. GLMC v dm L4-1 w .
yizu ,t6,1 C, 6,r u t grwt,131„,u,
mo ti Civlocti",r)
Y1:)s l'Utit, w'r ticdr Cp).A.1,...„)
9 /y‘,61,0); A !lilt (Pa.);--ttitipvyip .a,„,. kf-ct
tA34)
1,00t1 .,,t 30,-Alt1 ftAk Tm-1
P P th-c AAA;rai: ,_ervu Pf 04,u tAt "hove_ LAA,Zt
y ca."-Pwv job-0.4
1/C IJG R13) CMG
For Sugar Unitdole - 0 ,zp
A: General InformationName of the unit and address Modi Industries ltd (Sugar Section)
Modinagar 201204
•
Name of the Proprietor/ Contactperson - DesignationContact No.
M.C. Tyagi Mgr (Personnel Manager)
Year of Commissioning. 1980
Sector Private5. Production details.
Products ,
Installed Prod. CapOperating capacity
Sugar
6. Cane crushing capacity 5000 TCD
Cane crushed last year/)-1, l)-Q' olOis - 111S 1 1 4 "(;244".
6834035.29 Qtls.
Molasses generation 347808.35 Qtls.
Press Mud generation 270270.00 Qtls.
Operational status 1. Operating - NAA. 2!Non operational due Off Season 0 ► 'S 1
Closed by direction - NA CA5po- R.
Closed by own -NA
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Bore Well - 14- 0 h P 2 14
Industrial 6200 KLD
Domestic 50 KLD
Water Meter to showconsumption
Available 97)) ta H E i
3. Flow measuring device installedat outlet of ETP
Available — V , nu to, ,
. Waste Water generation (KLD)(before treatment)
Industrial> Domestic
- '-'---3-0-'i) -,1 co K L b
40 1c l_ D (Ii 0 k L b)
8(0
ngrbacpcb®gmail.coin Sugar Format modified considering NGT directions
46
2
Waste Water treatment capacity(KLD)â Industrial.4D.nraestit
1000KL/D (3
Details of ETPâ ETP Description with flow
diagram
â Details of Reverse Osmosisplpnt, if any
â Details of Multi EffectEvaporator, if any
ErsilWedu., 4e,314 Elitto-.-0-3.--)
- —
Cr: -/
'v.1.1... 5..ri
Fxrk,...),0,„
ci-u4.-ct,
6 ..
..1.4
e4.64,7 1,.dio
re-4-A '-"--4\, - r' -')
1._......
l't‘-'41 N
/3 4A..19*....4-1__ex ,,
,-.1,Z, 0,,,,,,i,
CN �'�e4---.L
e,ykd
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
ZeFe-elfstharge
Mode of disposal of treatedeffluent (Details)
.-Ceoilliaziete.,-., - 1,vazt ,Sc.,,,w,w,t , GCLici.,4 -e - , -
r 4 4-icte 01-4*il—
—1).A.,,,,,Sample distributed into no. ofparts (2/3)Sludge disposal mode
Used for levcianti=f=i+ling — G;(e/),)►--V.4.4 e),--:y t.',....A.A.,: rk, ),,, 3,, ..),..4..4 '
11. Effluent collection locations &analysis results (if collected)
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet _2,50 74 1 qa. 38
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent
before Ferti-irrigation
NA
Command area for irrigation
(available land area)
NA
System for dilution of treated
effluent required for ferti-
irrigation
NA
System of transportation of
treated effluent upto field.
NA
Formal agreements with farmers
for using treated effluent
NA
Storage facility available for
treated effluent during low
demand period
NA
1,grbu cpsky.swailcom Sugar Format modUied considering NGT directions
- r -1-64-45X•
'',. *„.4,..44,(tn A •
3
Quality of effluent being used forferti-irrigation
NA
Ground water monitoring network Available
C: Air Pollution and its Control In)
Sources of Air Pollution Boiler — a) 2 (7,06=v "T , PH )> Type of Fuel used with
consumptionBagasse
3 oT P H
â Stack details 60M
> APCS details 1. Venturi wet scrubber —
5. Samples collections points(if collected)
ekulngiNg4244.4.29
f,,i 40..„-t,
N cmAm, CAOY.d>e
g i l— AE--)uP0c-G.
sg)e)ki
ngrhugclYiLgmail.com Sugar Formal modified considering NGT directions
For Sugar Unit
A: General InformationName of the unit and address Simbhaoli Sugars Ltd
Unit-Brijnathpur Hapur-Bulandsheer RoadBrijnathpurHapur-245101
Name+of the Proprietor/ Contactperson - DesignationContact No.
Shri Parmender Singh(GM)0122-2953458Otr P. S. cika,.).,,, - 9 G 3? Mil Li
2006Year of Commissioning.Sector Public
5. Production details.ProductsInstalled Prod. CapOperating capacity
Crystal Sugar3000TCD3000TCD
6. Cane crushing capacity 3000TCD
Cane crushed last year 5391549.60Qt1s.
Molasses generation 240085.00Qt1s.
Press Mud generation 4.5% on cane
10. Operational status1. Closed due to off season(cane)
3011'AA I>>414,-3 i>“_ R-r ei (c_ j
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tube well — L E
Industrial 3000m3
Domestic 14m3Water Meter to showconsumption
Available
Flow measuring device installedat outlet of ETP
Available
...
Waste Water generation (KLD)(before treatment)
,> Industrial > Domestic
, . ....,
300KL/D
'2°./. C itk 4c,.., , S,--K11.,1-/1.1)A"•-i.
LA,N-4
I a0•-') ►1-%-4 ctex;,-)4‘0,-- air Svrt A'j-nrt.n 04Ch,ngrha.cpcbr !'. mailcom Sugar Format modified considering NGT directions
2
Details of ETPv ETP Description with flow
V Details of Reverse Osmosisplant, if any
V Details of Multi EffectEvaporator, if any
diagram
Enclosed_;),,2„:1 t,...--4. --1 t.,-, .._.
- 1.;, --- `r"c.0,- .--4-- 06.,)
fi,") - in.,-, 1 acka-4 te-1-( LI o D -
(.i 1 , <-,'d pi,
e,. '?-
t-f J-0 1.-3i Ai
Waste mater discharged (aftertreatment)(KLD) ,â IndustrialDomestic
Lt,--c P)rt,tAse); cri,, ..14—tot`-it- ()-trr JAIL-L.4x 1,', ko-dLateLLI
NILNIL 66-0a...;..,) X
Mode of disposal of treated effluent(Details)
On land/ Surface water :- Zero dischargeBio-composting
Sample distributed into no. ofparts (2/3)Sludge disposal mode N.A "13i 0 Cerl+P-4 .- PC4-4Ley,, aAjit : A
a-,_,--[ 11. Effluent collection locations &
analysis result's (if collected)
NIA
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
ti) Information regarding Bio-compostingActive area for bio compost
preparation (m2)
1i,57 acre
Area for press mud storage ( m 2 ) 3.0acre
Area for bio compost storage (m 2 ) Equivalent to 33% of total production of
finished product/annum (approx 10.0acre)
1 . Spent wash storage capacity 20,000+16000=36,000KL I
5. Availability of pressmud 232000Qtls
6 Quantity of compost prepared
(Monthly statement of last year)
-Enclosed
7. Quantity of pressmud procured
(Monthly statement)
-Enclosed
e. Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Number-30nos,space between two wind
rose:-1.0M
Length-200M
Height-1.25M
,icrhuscpcfragnail.coin Distillery Format modified considering NGT directions
x L E T Pcfre "e'eAlt 0-47
Sa
3
Width-3.0M
Quantity of Effluent being used for
composting ( m 3/day) :-.2 03-99l< LPD
Quantity of press mud being used
for one cycle
50000Qtls
Maturity time in days for one cycle 60day.
Arrangement for rainy season Spent wash stored in lagoon N z 0A-cc–I
13. Quality of ground water in the area
and depth of ground water table
NA
,.J .1 ,s-(II) Information regarding Ferti-irrigation
Details of treatment of spent wash(ctetails of bio methanisation,primary and secondary treatment)
NA
Command area for irrigation(available land area)
NA
:. System for dilution of treatedeffluent required for ferti-irrigation
NA
System of transportation of treatedeffluent upto field.
NA
Formal agreements with farmersfor using treated effluent
NA
.. Storage facility available fortreated effluent during low demandperiod
NA
,-' 7. Quality of effluent being used for
ferti-irrigationNA
..,. Ground water monitoring network Available
' V..1 Kr Pollution and its Control1, Sources of Air Pollution Boiler r — ‘ .1, 'g-1-01, P N
1 3 > Type of Fuel used withconsumption
Bazasse+Bio gas(iiittishaWY0)/y_Y
a.-T- pi) , t:),.,..._Ism-,) 1,,s3i4^ cLt
I^ . > Stack details 45M
APCS details Dust collector – e.),., .
ell -1-1,--,... Lei cArr-t )
.
; !-...
[Samples collections points
if collectedes
)64-1i,......... .felt
17 jbo.cpc1)Agnail.com Distillery Format modified considering NGT directions St.4....:11,4 Oh 9 c
rjA ).-e-e-oty 2- =.- )14,-=C04.-,t
4 ta-An-.,r,,,...dt 0,44. C.
p
.4=CfaX=VIP•.•19014/9"Ch. fr,,Y"
gt
For Sugar Unit
A: General InformationName of the unit and address Simbhaoli Sugars Limited
(Unit:SimbhaoliSugar)P.O. Simbhaoli Distt. Hapur (U.P.)PIN-245207
Name of the Proprietor/ Contactperson - DesignationContact No.
Mr. Karan Singh (Chief General Manager)
(05731) 223117-18/223039 , vi4r, 111‘1--, ' C'ecidYear of Commissioning. ac,e4t
I g '3 3
Sector Limited co. in Private Sector5. Production details.
ProductsInstalled Prod. CapOperating capacity
White Crystal Sugar10000TCD10000TCD
6. Cane crushing capacity 10000 TCD
Cane crushed last year 11126088.12 Qtls. (season 2013-2014)
Molasses generation 475280 Qtls. (season 2013-2014)
Press Mud generation 4.68% on sugarcane crushed (season 2013-2014)
Operational status Closed by own due to Off-Season
026' (-f" ; oi`'Ae) 1244 , A 7 e C c)
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
Tube wells — n4
Industrial 10000 K.L./day Maximum
Dortiestic 300 K.L./day MAX.
Water Meter to showconsumption
Available
Flow measuring device installedat outlet of ETP
Available
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1000K.L./Day Maximum70 K.L./Day C _Ce_pAk‘c.,-1--,--k _ e,-,-,_k IA+
(kLif le-f)14.,)9„1 .2)1.0 11-0
11-4 Ckt Steevi
ngrba.cpcb@gmaitcorn Sugar Format modified considering NGT directions
2
Waste Water treatment capacity(KLD)â Industrial> Domestic
1,1 cb 0 . n <-, L I) ,--
Details of ETP> ETP Description with flow
diagram
> Details of Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
Bar screen ► oil& grease traps -. Eq. Tank .---)--• Primary clarifier* Aeration chambeF- ► -s''''
Secondary clarifier ► carbon& sand filter+V-__notch. Sludge drying beds for drying primary and
secondary clarifier's sludge. 0,,,,,L,Lu,_ ct,,,:,_ _
activated Sludge process with Extended Aerationfollowed by Carbon & Sand filter has beeninstalled for the treatment of industrial effluent.
N.A.
N.A,
Waste water discharged (aftertreatment)(KLD)> Industrial
'`---1Domestic (5.04404) - -.,
1000 K.L/Daypurpose during70 K.L. /D -.---51_
Maximumseason days..I k)..
_
XIfor use in irrigation
for irrigation
c:1-0-4...=op.L.-(-141 d, .d
purpose in
•
Mode of disposal oftreat%reffluent (Details)
On landiCh-v-Y-01-0-/Storage Lagoonsthe adjoining areas
—1/4--Sample distributed into no. ofparts (2/3)
—T
Sludge disposal mode The sludge obtained from E.T.P. is dried on Sludgedrying beds ancl-used-as4arteifri+ or as filler materialmixed with press mud for Bio-compostingprocessing in the Distillery.
11.
54,11
Effluent collection locations &analysis results (if coCo c.I.v..,4.1-1, u.,:i .4.4.,...4 ALars....4
0,1144,4:. pl-,/,e i-,4,;,- ,.4.044, •,,..r4,..,- mq.,,;1>LA ..t„, 44_, adj.A., Le_or .1114
44,4.:-., .4....L.14 Li .10.4,4., A.t.n....0-4;
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
kil.
ii ki 4,
Cc Pc 6 (4)outlet __,7-4--1-6--5G----�e
n, 6 5 13.c
7 6Niels(54 •C G -I. ) 6'? 07
(I) Information regarding Ferti-irrigationDetails of treatment effluent
before Ferti-irrigation
Activated Sludge process with Extended Aeration
followed by Carbon & Sand filter has been
installed for the treatment of industrial effluent.
Command area for irrigation
(available land area)
150 hectare
3. System for dilution of treated
effluent required for ferti-
irrigation
N.A.
f•∎ k,44- jiLL d,„.
[email protected] Sugar Format modified considering NGT directions
3
System of transportation of
treated effluent upto field.
Treated effluent is disposed in to storage04.441 ,h-7
lagoons out side of factory premises. It is... r-
either pumped or drawn through opening in
the lagoon wall to neighboring field of
farmers.
Formal agreements with farmers
for using treated effluent
Yes
Storage facility available for Brick lined lagoons with capacity of 15000
treated effluent during low
demand period
cubic meters. Storage capacity for 15 days.
Quality of effluent being used forferti-irrigation
Ph 7.6,T.S.S. 20 mg/I, T.D.S. 780 mg/I,
C.O.D. 50 mg/I, B.O.D. 16mg/I. --) iti),4.1<
8. Ground water monitoring network (Available /Not available) by-A ,-e-i-rx.,\--6Det14,./ -6.6
C: A r Pollution and its Control 4,4--k)N►Sources of Air Pollution BOILERS — '3 , Li p -4- 7 r l p T i() 14
â Type of Fuel used withconsumption
Bagasse 1925 M.T./Day
> Stack details Height 52 meters (J: 0 + 7-'3-) '-' 0 ---) rl
> APCS details 1. ESP & Multi-Cyclone type dust collector is("/ .--4-1-4- io)
installed with our boilers.
S. Samples collections points R.ItIcalgi-N-Fni)-:--1-34-rrrg/N-M3 43—(if collected)
N 16
No y. nAcT-fr-71
S A Es u e 03., a el'd„Lip
SJ-414,112R—i cn, — c ‘ ► (l
ngrba.cpcb(gmail.com Sugar Format modified considering NGT directions
et
For Distillery UnitA: General Information i 5h4)-i-cie3148.4 - 01 • 0 ci .20)k-4
Name of the unit and address MODI DISTILLERY ( Modi ind. Ltd.)MODINAGAR.Distt : Ghaziabad.Pin : 201204
Name of the Proprietor/ Contactperson - Designation Contact No.
Year of Commissioning.
Modi Industries Ltd.Mukesh Sharma—General Manager (Plant)9219440607 / o 9.2)9 6S" 'F"9-- 0 hSeptember 1959
Sector Public Ltd.Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Raw materials & their requirement
Rectified Spirit4842 KL Per Annum4842 KL Per Annum
olasses-2100 MT Per nor. ....„., , 46.4-J 6.-WG cakp,) (
Pe — A.Alz, o' 8 k L .b
h( LL,,,,,, R "(m'- I' C) lc' 06*e-*N n opera ional due to rainy season (D ,11;11,
sate 2 1 1CM 'pre .),2cD14
7. Operational status
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Rare Ck) e tt 4 o h p a P'
9'b,WIlled
Industrial 9000 Ltrs per hour
Domestic 8000 Ltrs per day
Water Meter to show consumption Available i- Q e c book rIcoOct.t )'‘ 04
Flow measuring device installed atoutlet of ETP
Avail-a-ble-at-ETR--1, '—2 L b birj, Spen-} 6,,,c01) le y\ e/odio.,.
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
- FQot,,i `01-eK" 9 Y0 0het 344Lit, -1-0,44. 04 ;:.Cr,
'L200 KL PER DAY Capp' bk i)) ci), -
8 KL PER DAY5. Waste Water treatment capacity
(KLD)Industrial
> Domestic ,
225 KL Per day -3 2 11 i< 1.--
i — k L i
1 04
Da(7 — Si2 P1( .
Co'nce)lica ac iptLIDelj et v
y et f
nw .bctcyclqgrnail.com Distillery Format modified considering NGT directions
01V
2
Waste Water treatment capacity(KLD)> Industrial > Domestic
500 KLD
Details of ETP> ETP Description with flow
> Details of Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
diagram
Activated sludge process flow sheet
attached.
r31‘06±44-/I °I kl.
seiat— N 0elo-eJ CLi.a I
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
Added two Venturi Scrubber tanks abalance as make up water in spray pond
cc) ut,-*,tAke,st4 vu,-4.1.44Mode of disposal of treatedeffluent (Details)
icirsEstgeo c+fraa
vqoy p )13. ka
0
. P;"nct _.) /
Qi cLA )1._) ,(. 0t j r 4 (,-9 1 0 arn
Sample distributed into no. ofparts (2/3)
- ka_,P_A 'y l o-e i --- 64 v`il
Sludge disposal mode Mixed in filter cake at bio-compost plant
11. Effluent collection locations &analysis results (if collected)
(Analysis report enclosed)N 0 64,--frti Giloote--4(2A-:-- LA.ag--m-A4-4 ••n/‘-‘ft.1".-v-A'41Aerft- i
._..... ....w.......,.
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information re Warding Ferti-irrigation - NA
Details of treatment effluent
before Ferti-irrigation
Command area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-
irrigation
System of transportation of
treated effluent upto field.
5. Formal agreements with farmers
for using treated effluent
6, Storage facility available for
treated effluent during low
demand period..
ngrba.cpcb@gmail,com Sugar Format modified considering NGT directions
3
Quality of effluent being used forferti-irrigationGround water monitoring network (Ayailalf.,-/Nat-a ai able)
C: Air Pollution and its ControlSources of Air Pollution> Type of Fuel used
consumptionwith Bagasse
45 TP1.1
> Stack details Stack no. 1- dia 2.3 mtr x 30.5 mtr heightStack no. 2 - dia 3.33 mtr x 40.0 mtr ht.
> APCS details Venturi type wet scrubber for a cap. Of
35 tons for each (3 nos.) boiler separately.
Venturi type wet scrubber for a cap. Of
25 tons for boiler no 4 Which is not in
operation.
5. Samples collections points(if collected)
PM (mg/Nm3):
Stack 1. 135 mg/Nm3/day
Stack 2. 129 mg/Nm3/day
51" ipt 0,4 CL. CSAci,,A)-4,I 3Ai Sc. D cPc
A CE,uP Pc6) a a 3504,-c4
14H (14,),,tte-4.2 on.,
nkrba.cpcb(a,gmail.corn Sugar Format modified considering A IGT directions
41
For Distillery Unit
A: General InformationName of the unit and address Simbhaoli Sugars Ltd
Unit-Brijnathpur, Hapur-Bulandsheer RoadBrijnathpurHapur-245101
Name of the Proprietor/ Contactperson - Designation Contact No.
Shri Parmender Singh(GM)0122-2953458Mr. P. � , ci,",, -1,.__:_a11,t2007Year of Commissioning.
Sector Public5. Production details.
ProductsInstalled. Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
ENA,RS,Ethanol C Gxx. 1.�4, 1\4 4 (--1-,-- A ioi-Tut '60KL/D Kci-fici4..0_, ,.lt 1
30KL/D30KL/D
6. Raw materials & their requirement Molasses 368182Qtls/Annum,1363Qtls/day ( a t, - N
7. Operational status 1. Non operational due to rainy seasonSri i 7 .1 k --sj.7 , ,.1„1 1 ( A4 t>(.11.11,11.01,
C c x ).-- a,.--4 te)-A4A-. o-tfois,,, , 9-C, I -! /
If
E: Water Pollution and its Control:1. Water Supply Source
Water Consumption (KLD)
Tube well —I-4 - 1 0
Industrial 300M3
Domestic 14M3
z. Water Meter to show consumption Available
3, Flow measuring device installed atoutlet of ETP
Available -
Waste Water generation (KLD)(before treatment)> Industrialâ Domestic
20‘,,, •3,.$42,/c( C_koc3)
300M3 i K 1. - i p I'- l_ kt.-0-1.11 i....-.,
14M3 c0-.-4-"4-Waste Water treatment capacity(KLD)â Industrial> Domestic
:- 720m3/day (Bio methanization):- Bio-composting:- N.A f J,L. ).t.i./ gAi i 'c 4-6--0()
J
ngrbet.c.pulYti2gmail.com Distillery Format modified considering NGT directions
Citictt,
2dux,.
f
6. Details of ETP> ETP Description with flow
diagram
> Details of Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
�pe.,J .,u,--14, ---) it;tiorr—o—ifingtOENCLOSED Gioes+,4- <— Le,- ., — cliaer
4.1t......,;,. si e'A
Cap. 300 KL PER DAY e ov---,-,-.t.-.;:.:;4....--
NA ,c,--------- -- ..
Waste water discharged (aftertreatment)(KLD)> IndustrialDomesticMode of disposal of treated effluent(Details)
Zero Discharge
671Esnoa),4:t.t1741___L___—"„C--
—1_5Zero Discharge v,(4, Cw.417),()).0, ( w, 1,0v4 h'
,72 ac re.Sample distributed into no. of parts (2/3) NJA
Sludge disposal mode. - After drying beds sent to Bio Compost
.,(2c,ap-, 1 D_I-Q)P Y11. Effluent collection locations &
analysis results (if collected)
.v..\, .
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
utlet
Others
(I) Information regarding Bio-compostingActive area for bio compost
preparation ( m 2) r rk23147.839 LA a--,..., 5.7 2
Area for press mud storage (m 2 ) 4050 square meter
Area for bio compost storage ( m 2) 1620
Spent wash storage capacity 6820 KL
Availability of pressmud 30000 MT From Sugar
Quantity of compost prepared
(Monthly statement of last year)
1380 MT Per month
Quantity of pressmud procured
(Monthly statement) 12500 MT
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
19 Windrows 225 Mtr each
5 Windrows 30 Mtr each
J Lt- ool d 7 ruii
Ct; )1 e - "4 '
Ht 1.0 mtr, Width 3.0 Mtr,Gap - 1.0 Mtr t,t it,9. Quantity of Effluent being used for
composting ( m 3/day) :
170
ngrba.cpcb(i ,gmail.com Distillery Format modified considering NGT directions
PLAA-4-(41, 11?i
cyl;e.rk
et)4' .0-01 +c,1,/ c.-de,t, A
2,3
3
Quantity of press mud being used
for one cycle 4000 MT
Maturity time in days for one cycle 60
Arrangement for rainy season
Quality of ground water in the area
and depth of ground water table
LatestOn. 1 eport from approved labe.121
-
r
t.44enc :. r)-y0,A:ctrd 6.1 -1k4 ,4elf"i ou .1' Pb‘...y 1..4,-,-.. .,,.4 •
---NA(II) Information regarding Ferti-irrigationDetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(available land area) —
3. System for dilution of treatedeffluent required for ferti-irrigation r-
4: System of transportation of treatedeffluent upto field.Formal agreements with farmersfor using treated effluentStorage facility available fortreated effluent during low demandperiodQuality of effluent being used forferti-irrigationGround water monitoring network (Available /Not available)
C: Air Pollution and its ControlSources of Air PollutionD Type of Fuel used with
consumptionPartially Baggass and approx. 98 % Bio Gasutilized to generate steam whenever Weoperate our boiler. Generally steam andpower are utilized from Su•ar Plant
3, â Stack details 01 No. Sa rn e4e-,
4. D APCS details Multi cyclone dust collector – S tfo
HolO-rell cAY (A Y‘ e 741 0 ,, l- cl-y)),141/1 - e d
5. Samples collections points(if collected)
PM (mg/Nm3):
Sample point is at the top of the Stack 30
mtr above from ground floor.
ngrbacpcb(4)gmail.com Distillery Format modified considering NGT directions
i7k ) .b.cmo)>^ c Pc 6/ Ltlk,s
(iv A-e PPOI,
nn44.
NSW" 30
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report:
Date of Inspection: 0 r 0 9 ,2 t1
A: General Information1. Name of the unit and address
..,M IS t1441-0,1, Nte,J44: 11-0(‘
koka4-- KA T-t, i-k_ct,.ida..4.
2. Name of the Proprietor/ Contactperson - DesignationContact No. Year of Commissioning.
.„, Siwi Ha,iAk 1:ittito,
-0W(i'tev (Min pauo,(,,,, (c( (i i
s-3 I, 1 3 2._ 9 321 3
1 9 ,6 ISector
_.,46 , cLo._ i
4 cinCali;---1-11a`'
6° 1 " °',TC
OperatingNon operationalClosedClosed
Cooperative/Public/Private
p Hwtx - 1-174—(76-4;;;.'
30,c kam 1 p il9 1
1) 0, ( foi S OuGU)1A)
1)) 1 I ( '`I f..))
' toli . --)44,),t,
- GM() P- t &I) (.112in
due rainy season" 4.-.,-- by directionby own
5.' Production details.ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Raw materials & their requirement -3
Operational status
Water Pollution and its Control: Water Supply Source .
Water Consumption (KLD)
aoecodC Lo ti p , i /1),.
____%13 kk I / e d
0 p .2 rto Im4 g lici ,o1 Po-)
.2p i4 P ., I r g 4. 9sp„, C,sea fey to
" aLl'ill("4)
1,
Industrial TQCN — 60
Co (0' i G
r5.7 eoey A
., .,._."
Domestic ..--) -r I 66' „.„,(4..,
Water Meter to show consumption Availabve / Not available L+ r`'`
Flow measuring device installed atoutlet of ETP
Waste Water generation (KLD)(before treatment) --)
> Industrial> Domestic .-
Waste Water treatment capacity(KLD)> Industrial
Available / 14et-rwa-i-lerbte
_r_D5- k_i_ Dy
g ej fetW- 41r7u)( 30
6 c, p.0 1
V AO KL
Ices T uw‘tris-------6-----we ,,e,..) 1.1
L 1.-t° /, f-6 E TPv,,5 1op S r t.- B
.)
1 k 4- C;QcNk I- Domestic Ul,h_t
01“
10) t.1,4A
ngrba.cpcb(agmail.corn Distillery Format modified considering .IVGT directions13cr 1-fik)v) ITN)
--to-J p e cJo-A
LtA- 4-kt
lokflt,
ETP
jc ) theIS 14 le (,)(k.1)"1)
Poti 'Pl., t
Details of ETP -)> ETP Description with flow
diagram
> Details of • Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
ColWfi vi, -1-c1 h k -a i.), 7. - A. -(4_,)_)
Ei,r Z 1 st 0 1-( ' 9- a 1--) - ) , I .1- ) --.) 4) ( 1 )
—') k 0 Nil .10,-,k. .....) je,kA, ' Trio- t'
1-1 , A Pi) Jo
vi . A
Waste water discharged (after..)treatment)(KLD)â IndustrialDomestic
9-1 h,3 /Av..Cal mck,-, 1,Z-in, ).2 hcx-t. ;1 °1,...,41-0 1 H P -h...iv)-s 4•T, N{cte. Ai4ott.Q, Pur....t, ...4 }- . 4"40 ,7,-.40.3+ter kity14..... 1;,- fx..1 .P.44,41.4 4,,
Mode of disposal of treated effluent(Details)
On land/ Surface waterI\ Ci cold -1-tcl .fe } 1- k .-) lip fl t''}
Sample distributed into no. ofparts (2/3)
-71,v•-t.,
Ct-,1 r16)-0-AY ( ' JO\ e) e niAik•,Sludge disposal mode 1n-C
Effluent collection locations &analysis results (if collected)
..,Ca-is-14 tit-ilk-L.4 a-a.,,,„ E—role,,d
e.-4-0x. h..ttiti , 132...?-14frbirttiA,L ti,o1.4 +I 6,...........), .4(.._ .
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)1---'
1 If
OutletCe-PC 8 Wi)
t.,/g,„? .?
L7I t,
V34
ethersCs6,1L4) .? 11 19
(I) Information regarding Biro-compostingActive area for bio compost
preparation (m2)
'
Area for press mud storage (m )
Area for bio compost storage (m2)
Spent wash storage capacity
5. Availability of pressmud
6.' Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured
(Monthly statement)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
9. Quantity of Effluent being used for
composting ( m3/day)
[email protected] Distillery Format modified considering NGT directions
3
ngrba.cpcb(a),gmail.corn Distillery Format modified considering NGT directions
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle
Arrangement for rainy season
Quality of ground water in the area irev-,;c6/ )21and depth of ground water table i.e_p_r), - Apo , 60v-,
Storage facility available fortreated effluent during low demandperiodQuality of effluent being used forferti-irrigation
2. > Type of Fuel used withconsumption
Information regarding Ferti-irrigDetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)
(II) ation
Command area for irrigation(available land area)
loo c,-12
System for dilution of treatedeffluent required for ferti-irrigationSystem of transportation of treatedeffluent upto field.Formal agreements with farmersfor using treated effluent
"Throcli, hyij p,„tylp vH 00 4_
vbi for kyrteco„, A,' ,M LQ )-Aerviiat
L04- 11.4,00, AO( ci-Ort
3.
Ground water monitoring network (Available /Not available)8.C: Air Pollution and its Control
Sources of Air Pollution
> Stack details
> APCS details
4.
1.
3.
4., 1.
Samples collections points(if collected)
PM (mg/Nm3):5.
4
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry of unit Pic 2: ETP (at least 1)
Pic 3: Compost Yard Pic 4: RO & MEE
ngrba.cpcb(a),gmail.com Distillery Format modified considering NGT directions
Name of officialsinspecting
( I /
0: 1 f
Name 8
Negitil,k ,
� , b
ita:t‹kAlz
2 Date of reportSubmission
Designations Signature
roc6, 4E6
5
Pic: 5 Chimney (All visible)Pic 6: Discharge points
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
kirk, te, 6404,- etaciA4 !--fc:c4 ciA4()=4P-t- cAtt-).04.,J
.."ck "64% Lei-QA -L4
[email protected] rn Distillery Format modified considering NGT directions
WiW
CODCENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Distillery
Date of Inspection: 0 I ' a 9 'c2- 0 / I-(
A: General Information1. Name of the unit and address
AI s GCS A-a6,4, c2. li-ct.-t31,.4 j).:, , Oto-rk N
, Name of the Proprietor/ Contactperson - DesignationContact No.
itito,,,:„4, Atej1 .).0, . e k 47),,_ _ ce_s....9ss.94,co, cm,,,,( Nii„.„,., (4 .e 0,,,,,: (.4)
okAN-e-4.-11-1• ''--.0 3 ..)- 23. Year of Commissioning.
4, Sector Cooperative/Public/Pr.v e5. Production details.
ProductsInstalled Prod. Cap.
Sils:=-' i-ier CPI/
Ce, PC L___Consented Prod. CapRestricted Prod. Cap.
6. Raw materials & their requirement
7. Operational status 1. Operating‘ 2 Non operational due rainy seasonAl Closed by directionV Closed by own i
C5 I I
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)Industrial
q)-cuy,ek LA-e;
Domestic li
Water Meter to show consumption Available / Not ayable
Flow measuring device installed atoutlet of ETP
Available / Not avilable
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
4,--.
5. Waste Water treatment capacity(KLD)
> Industrial> Domestic
—
[email protected] Distillery Format modified considering NGT directions
.94
Details of ETP
> ETP Description with flowdiagram
> Details of Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
2
N
ye
U S )1 ( \e, a -n1-1‘62-910,)-'—) LiP1H
\i/ IC+7-1
Sample distributed into no. ofarts 2/3
Sludge disposal mode
Effluent collection locations &analysis results (if collected)
On land/ Surface water
Locations Parameters
I Information re s ardin Bio-com i ostinActive area for bio compostpreparation (m2)
Spent wash storage capacity
Availability of pressmud
Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured(Monthly statement)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used for
composting ( m3/day)
rigrbcpck@rvicLils2Ln Distillery Format modified considering NGT directions
3
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle —
12, Arrangement for rainy season .,_-
13. Quality of ground water in the area
and depth of ground water table
(II) Information regarding Ferti-irrigation1, Details of treatment of spent wash
(details of bio methanisation,primary and secondary treatment)
2. Command area for irrigation(available land area)
. System for dilution of treatedeffluent required for ferti-irrigation
4. System of transportation of treatedeffluent upto field. _
S. Formal agreements with farmersfor using treated effluentStorage facility available fortreated effluent during low demandperiodQuality of effluent being used forferti-irrigation
8. Ground water monitoring network (Available /Not available) —C: A r Pollution and its Control
Sources of Air Pollution> Type of Fuel used with
consumption
3. â Stack details — C°vNrKe diz,../ -to:. 'U 9-c c,w,g_i,
4. > APCS details
5. Samples collections points(if collected)
PM (mg/Nm ):_
[email protected] Distillery Format modified considering NGT directions
4
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry of unit Pic 2: ETP (at least 1)
•
Pic 3: Compost YardPic 4: RO & MEE
[email protected] Distillery Format modified considering NGT directions
99
5
Pic: 5 Chimney (All visible) Pic 6: Discharge points
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
----)
1 Name of officials.inspecting
, i
W
Name & Designations Signature
NI cxv,e,:, C-1104k.eb-,. Nx.**-t.t ,
sc_ 1.) , cec 6,, ildim,
6' 120-1,4 gt,:neki , A E E
U PP( 8 G,clirisab,_.4
2 Date of reportSubmission
--.' q ' ,c3ty
[email protected] Distillery Format modified considering NGT directions
For Distillery Unit
A: General InformationName of the unit and address Simbhaoli Spirits Limited
P.O. Simbhaoli Distt. Hapur (U.P.)PIN-245207
Name of the Proprietor/ Contactperson - DesignationContact No.
R.K. Singh (C.G.M.)Mob.No. 09927200836P.S. Chauhan G.M.(W)Mob.No. 09837781148
Year of Commissioning. 1943
Sector Limited Co. in Private Sector-,44 !.-._6 C O P P=
Alcohol ekl -I-Lt .17,:-, c+
90 K.L. PD
..e. c__PC5
t c k t-D C." - - 4 42- f- 43r -A r *- - t t : - 4
Molasses 40 MT/Day(approximate)For 90 KLPD of Alcohol
5. Production details.ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Raw materials & their requirement6.
7. Operational status Closed *cli;teetkm eL.J, Ire er":444 ')I-c:
..._ ue p C 6
) n y ,) , 14
A4 k...t, ilifki,+z, G/ C-i--ye b..+0 .
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube wells — ‘-2-
Industrial 2214M 3/Day (maximum)
Domestic 50 M3/Day
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Available
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1080 M3/Day(maximum)50 M3/Day t & 4< I, Se-0c )))-)
I 0 0
[email protected] Distillery Format modified considering NGT directions
3e4IOar
INA— 74 d '
0 I,-
2 0
ko NEC
Waste Water treatment capacity(KLD)> Industrial
> Domestic
c g,,: A. ,
Anaerobic digester-3/Day), Reverse OsmosisEffect Evaporator , .plant. — a..0,4,,,,,V,1Soak Lt/SettI'ank_...-
,,,,x-i.vy
Nos.(375+650+550 K.L. RSWPlant 72Q m3/day, Multi-
720 m3/day ,BIO-composting& 0 i., 6(2_4 n.A.-k...4
<liraj").Ceir-.c.-4, tower4 An. Digestor
R.O. /MEE-► Storage lagoonsplant. Sludge drying beds for
Details of ETP> ETP Description with flow
diagram
> Details of Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
Distillery Doling9'. Lagoons ►
-p Bio-compostingdrying of sludge.
7. Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
,...v4t- 'Zero discharge/in bio-composting. )50 K.L./Day ts
. Mode of disposal of treated effluent(Details)
On land/ Surface. water : zora=liiaeherrge inBio-composting.
Sample distributed into no. ofparts (2/3)
..-.---- /0144,f4.-Sludge disposal mode The sludge obtained from E.T.P. is being used for
manufacturing of good quality orBio-manure in theBio-composting process with the help of Sugar millsPress Mud and primary treated and concentratedeffluent of Disti lery.+ ET P 4-t-• 4. a)v- --C1-
11. Effluent collection locations &analysis results (if collected)
(\) / A-
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Bio-composting1. Active area for bio compost
preparation (m2)
1 ha =10,000m Z Active area 16 Acres1 acre = 0.4046863 h
1 acre = 4046.825 m2
2. Area for press mud storage (m ) 2 Acres
Area for bio compost storage (m2) 1200m2 .
Spent wash storage capacity 20000 m3 L0-74,.. 0 b fro k l_. ,; 0) 3
Availability of press mud 50000 M.T.
Quantity of compost prepared 17000 M.T.
[email protected] Distillery Format modified considering NGT directions
(Monthly statement of last year)
Quantity of press mud procured
(Monthly statement)
Press mud is being procured from our Sugar
Unit.
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Plot A: L 150 M,W 3.0 M, H 1.5 M
Plot B: L 125 M,W 3.0 M, H 1.5 M
Plot D: L 185 M,W 3.0 M, H 1.5 M
Space 3.0 meters
12. Arrangement for rainy season
Quantity of Effluent being used for
composting ( m 3/day) :
Quantity of press mud being used
for one cycle
Maturity time in days for one cycle
Bio-composting process stopped due to rainy
season. 3 K.L./M.T of Press mud.
13200 M.T.
45-60 daysA shade is made for sto ge of prepared
manure„)ress_ncovered- with1413:erve-dttrifig-rainy-season
13 Quality of ground water in the area
and depth of ground water table4.v4w=aa;ALIA.PideP#'
(II) Information regarding Ferti-irrigation 1. Details of treatment of spent wash N.A.
(details of bio methanisation,primary and secondary treatment) Command area for irrigation(available land area) System for dilution of treatedeffluent required for ferti-irrigationSystem of transportation of treatedeffluent upto field. Formal agreements with farmersfor using treated effluent Storage facility available fortreated effluent during low demandperiod
N.A.
N.A.
N.A.
N.A.
N.A.
8.
Quality of effluent being used forferti-irrigation Ground water monitoring network
N.A.
(Available /Not available): N.A.
C: Air Pollution and its Control 1. Sources of Air Pollution2 Type of Fuel used with
7.5 TPH AND 10.5 TPH BoilerBio-gas 40000 m3/day .
[email protected] Distillery Format modified considering NGT directions
1..'"31D-e-CD e-c141 Co-v-vt-d AAA-04 '
t9)„.„);' -0,o* Je.
ctitc -0-46
Height 52 meters, dia 2.4 meters.
Bagasse fired boiler 7.5 TPH is equipped with
Multi cyclone type dust collector.
â Stack details
â APCS details
Bagasse 60 M.T. /DAY consumption
Samples collections points(if collected)
A
4
NoAAL cikrk,c(44, b\&,)
5i.;..e.1► ET) v P
0), 10)
[email protected] Distillery Format modified considering NGT directions
Central Pollution Control Board
Sub: Visit Report of the Units of Baghpat & Meerut
As per the office order no. i3.190153/NGRBA/CPCB/2013-14/2035 dated 25.08201and the discussions held in the chamber of MS on 29.08.2014, a team of officialsfrom Head Office comprising of Shri Shriance Jain, Scientist 'D', Dr. Sananda Sinha.RA and Shri K.S. Rawat, JLA visited the following industries on 0ili.09.2014 underthe project "National Ganga River Basin Authority (NGRBA)":
M/s. Bagpat Cooperative Sugar Mills Ltd. Bagpat, Uttar PradeshM/s. Ramala Sahkari Chini Mill Ltd., Baraut, Bagpat, Uttar PradeshM/s. Bajaj Hindustan Limited (Sugar Unit), Kinauni - 850 502, Meerut,. Uttar Pradesh
. M/s. SBEC Sugar Limited, Village Layon, Mallakhpur, Baraut, Bagpat,Uttar Pradesh
5. M/s. Bajaj Hindustan Limited (Distillery Unit), Kinauni - 850 502,Meerut, Uttar Pradesh
The inspection reports are submitted for further necessary action please.
Te)141,b'Y‘ 1
N 6̂2e OS1114(Shriance Jain)
Team Leader5 j l/c. NGRBA Cell
Central Pollution Control Board
Sub: Visit Report of the Units of Meerut
As per the office order no. B-190153/NGRBA/CPCB/2013-14/2035 dated25.08.2014 and the discussions held in the chamber of MS on 29.08.2014, a teamof officials from Head Office comprising of Shri Shriance Jain, Scientist 'D', Dr.Sananda Sinha, RA and Shri Girish Chand, Attendant visited the followingindustries on 10.09.2014 under the project "National Ganga River BasinAuthority (NGRBA)":
M/s. U. P. State Sugar Corporation Ltd. Unit - Mohiuddinpur,Meerut, Uttar Pradesh - 250 205M/s. Nagar Nigam Pashuvadhshala, Ghoshipur, Meerut, U.P.
The inspection reports are submitted for further necessary action please.
(Shriance Jain)Team Leader
10.09.2014
1/c. NGRBA Cell
106VW"
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 10.09.2014
A: General Information 1. Name of the unit and address
Name of the Proprietor/ Contactperson - DesignationContact No.Year of Commissioning. SectorProduction details.
ProductsInstalled Prod. CapOperating capacity
M/s. U. P. State Sugar Corporation Ltd.Unit - Mohiuddinpur, Meerut, U.P. - 250 205Mr. Sheeshpal Singh, I/c. Chief [email protected] / Public
White Sugar250 Ton/day on 10% recovery2500 TCD
Cane crushing capacity Cane crushed last yearMolasses generationPress Mud generation
10. Operational statusB: Water Pollution and its Control:1. Water Supply Source(s)
3331374.60 Quintals168899.00 Quintals 75 ton/dayNon operational
1. Tubewell (2-Operational +1 standby)Industrial Domestic 780 KLD
Water Consumption (KLD) Water Meter to show consumptionFlow measuring device installed atoutlet of ETP
Not availableNot available
Waste Water generation (KLD)(before treatment)â Industrial
DomesticWaste Water treatment capacity(KLD)
IndustrialDomestic
Details of ETP);, ETP Description with flow
diagramâ Details of Reverse Osmosis
plant, if anyDetails of Multi EffectEvaporator, if any
Waste water discharged (aftertreatment)(KLD)
Industrials)=. Domestic Mode of disposal of treated effluentails)
690 KLD
1000 KLDSeptic TankAnnexure - I.
670 KLD (Non Operational)
Surface Water.
Sample distributed into no. of parts(2/3)
N.A.
Sludge disposal mode Used by farmersLocations Parameters11.
(I)
Effluent collection locations &
analysis results (if collected) pH BOD(mg/0
COD(mg/I)
TSS(mg/I)
Outlet - - -Others - -
Information regarding Ferti-irrigationDetails of treatment effluent before Ferti-irrigation
-
Command area for irrigation ,(available land area)
-
System for dilution of treatedeffluent required for ferti-irrigation
-
System of transportation of treated effluent upto field.
-
Formal agreements with farmers for using treated effluent
-
Storage facility available for treatedeffluent during low demand period
-
Quality of effluent being used for ferti-irrigation
-
Ground water monitoring network -C: Air Pollution and its Control
Sources of Air Pollution Boilers - 3 nos.25 tonnes/hr, 25 tonnes/hr and 30tonnes/hr.
> Type of Fuel used withconsumption
Bagasse - 750 Ton/day
> Stack details 2 stacksBoth the Boiler of 25 tonnes/hr connected toone stack of height 30 m and 30 tonnes/hrboiler connected to another stack of height40 m.
> APCS details Multi cyclone N.A.5. Samples collections points
(if collected)
Photographs indicating locations:
Entr Gate Multicyclone
Chimney Drain to carry effluent to ETP
Pipe from industry to ETP after crossingdrain
Inlet to ETP
got
Secondary Clarifier Non Approachable ETP
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Shekhpura drain 4 Kadrabad drain 4 Kali East River 4 River Ganga
Remarks :
The wild grass was observed all around the ETP area giving it the deserted look
and was also not accessible.No effluent was found being generated in the industry premises and ETP unitswere observed empty except rainy water.Adequacy of pollution control system may be assessed once the industry
resumes its operation.No railings on ETP.No attention given on maintenance of pollution control measures.As per their information, effluent is used in irrigation by farmers.
Poor maintenance of the ETP.As per the information given by the plant representative they had awarded thework for operation and maintenance of the entire sugar plant including ETP to a
private party which will resume its work very soon.
Name of officialsinspecting
Name & Designations Signature
Shri Shriance Jain, Sc. 'D', CPCB
Shri Ankit Singh, AEE, UPPCB,Meerut
Shri N.K. Tyagi, AEE, UPPCB,Meerut
Shri N.M. Tripathi, S.A. UPPCB,Meerut
Dr. Sananda Sinha, RA, CPCB ,
Shri Girish Chand, Attendant
Date of , reportSubmission
10.09.2014
1
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 05.09.2014
A: General Information1. Name of the unit and address M/s. Bajaj Hindustan Limited (Sugar Unit),
Kinauni - 850 502, Meerut, Uttar PradeshMr. K.P. Singh, Unit Head0121-3290521
Name of the Proprietor/ Contactperson - DesignationContact No.Year of Commissioning. November 2004Sector PrivateProduction details.
ProductsInstalled Prod. CapOperating capacity
Sugar12000 MT/day
Cane crushing capacity 12000 TCDCane crushed last ear 137738.2 MT (2013-14)
10.
Molasses generation 70690 MT (2013-14)49613 MT (2013-14)Press Mud generation
Operational status Non operationalB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tubewell (2 nos.)Industrial 12000 KLDDomestic 70 KLD
Water Meter to show consumption Not available3. Flow measuring device installed at
outlet of ETPV-Notch could not be observed as the entirearea for discharge of treated effluent full ofshrubs.
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1200 KLD70 KLD
Waste Water treatment capacity(KLD)
Industrial> Domestic
1200 KLD70 KLD
6. Details of ETP> ETP Description with flow
diagram> Details of Reverse Osmosis
plant, if any> Details of Multi Effect
Annexure - I.
Evaporator,Tany
ngrbacpclyikignail.com Sugar Format modified considering NGT directions
10-
Waste water discharged (aftertreatment)(KLD)Y Industrialâ Domestic
Non Operational
Mode of disposal of treated effluent(Details)
Direct into Hindon River.
Sample distributed into no. of parts(2/31
N.A.Non operational.
Sludge disposal mode For farming11. Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD(mg/I)
COD(mg/I)
TSS(mg/I)
Outlet -Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent beforeFerti-irrigation
-
Command area for irrigation (available land area) .
-
System for dilution of treated effluent required for ferti-irrigation
-
System of transportation of treated effluent u •to field.
-
Formal agreements with farmersfor using treated effluent
-
Storage facility available for treatedeffluent during low demand period
-
Quality of effluent being used for ferti-irrigation
-
Ground water monitoring network -C: Air Pollution and its Control
Sources of Air Pollution Boilers - 2 nos. (90 TPH each)â Type of Fuel used with
consumptionBagasse
â Stack details RCC made, Height - 55 m each> APCS details Multi-cyclone and Wet scrubber in each boiler
5. Samples collections points(if collected)
N.A.
ngrba.cpcbtgmail.com Sugar Format' modified considering NGT directions
Photo_g_ra hs indicatin
Primar Clarifier
Aeration Tank
Secondary Clarifier
111
ogrbu.cocfra)ginail.coin Sugar Format modified considering NGT directions
Carbon Filter
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Direct discharge into Hindon River.
Remarks:No effluent was found being generated in the industry premises and ETP units wereobserved empty except rainy water.Adequacy of pollution control system may be assessed once the industry resumes itsoperation.
Name of officialsinspecting
Name & Designations Signature
Sh. Shriance Jain, Sc 'D', CPCB
Dr. B.B. Awasthi, R.O. UPPCB,MeerutShri A.K. Tiwari, AEE, UPPCB,MeerutShri J.N. Tiwari, JEE, UPPCB,MeerutDr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCBet'
Date of reportSubmission
08.09.2014
[email protected] Sugar Format modified considering NGT directions
OXE2)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar,
Date of Inspection: 05.09.2014
..k: benerat mormayon
Name of the unit and address M/s. SBEC Sugar Limited, Village Layon,Mallakhpur, Baraut, Bagpat, Uttar PradeshMr. Vijay Kr. Jain,Manager (Commercial)09927921119
!.
3.3.5.
5.
Name of the Proprietor/ Contactperson - DesignationContact No.Year of Commissioning. 1998Sector PrivateProduction details.
ProductsInstalled Prod. CapOperating capacity
Sugar8000 TCD8000 TCD
Cane crushing capacity 8000 TCD7 . Cane crushed last year 10281538 Quintals3. Molasses generation 504000 Quintals
429241 Quintals).30.
Press Mud generationOperational status Non-operational
L.3: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tubewell (4 nos.) 230 m 3ihr eachIndustrial 3600 KLDDomestic No colony
Z. Water Meter to show consumption Not observed3. Flow measuring device installed at
outlet of ETPV-Notch not found.
1.
5.
Waste Water generation (KLD)(before treatment)
Industrial,- Domestic
1500 KLD70 KLD
Waste Water treatment capacity(KLD)
Industrial‘i- Domestic
2000 KLD70 KLD
5. Details of ETP'.. ETP Description with flow
diagramDetails of Reverse Osmosisplant, if any
' Details of Multi EffectEvaporator, if any
Annexure - I.
•
nkrba.cpcbfilsmail.coin Sugar Format modified considering NGT directions
Waste water discharged (aftertreatment)(KLD)> Industrial> Domestic
Khas Nalla which ultimately meets YamunaRiver after 25 K.M. however as per theinformation given by the unit the treatedeffluent is used by farmers for irrigation.
Mode of disposal of treated effluent(Details)
Through Drain.
11.
(I)
Sample distributed into no. ofparts 2/31
N.A.Non-operational
Sludge disposal mode For farmingEffluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD( m9/0
COD0119/0
TSS(1119/0
Outlet -
OthersInformation re' ardin . Ferti-irri . ation -
Details of treatment effluent beforeFerti-irrigation
-
Command area for irrigation (available land area)
-
-27. System for dilution of treatedeffluent re•uired for ferti-irrigationSystem of transportation of treatedeffluent uoto field.
-
Formal agreements with farmers for using treated effluent
-
30. Storage facility available for treated effluent during low demandperiod
-
Quality of effluent being used for ferti-irr
-
Ground water monitoring network -C: A r Pollution and its Control
Sources of Air Pollution> Type of Fuel used with
consum •flonBagasse68 TPH
10.
> Stack details Boilers - 2 nos.Height 50 mtr, dia. 4.2 mtr.Height 40 mtr, dia. 3.0 mtr.
> APCS details Fluidized Bed Nye-Tray followed by Wetscrubber in each boiler
Samples collections points(if collected)
N.A.
ryba.cocbriOmail.com Sugar Format modified considering NGT directions
Discharge PointETP (Secondary Clarifier)
Photo ra • hs indicatin • locations:
;,0414*L;iit#111.L1
Chimney-1E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Khas Nala 4 Baraut Drain 4 Yamuna River (total length 25 km)
ngrba.cpcbiitIonail.com Sugar Format modified considering NGT directions
Disposal of press mud along roadside and fields
Remarks:The wild grass was observed around the ETP area giving it the deserted look and
was also not accessible.No effluent was found being generated in the industry premises and ETP unitswere observed empty except rainy water.Adequacy of pollution control system may be assessed once the industry resumesits operation.Boiler ash disposed along the approached road to the unit.Discharge point was concealed and only outside the industry's premises the outletwas found after crossing the road.No attention given on maintenance of pollution control measures and as informedby the unit representative they have been allowed to enter the premises only after
four months.7. As per their information, effluent is used in irrigation by farmers.
Name of officialsinspecting
Name & Designations Signature
Sh. Shriance Jain, Sc 'D', CPCBq)141—' ---'"
Dr. B.B. Awasthi, R.O. UPPCB,Meerut
Shri A.K. Tiwari, AEE, UPPCB,Meerut
Shri J.N. Tiwari, JEE, UPPCB,Meerut
Dr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB or.".. t,
Date of reportSubmission
08.09.2014
[email protected] Sugar Format modified considering NGT directions
7,b
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 5.9.2014
A: General InformationName of the unit and address M/s. Ramala Sahkari Chini Mill Ltd., Baraut,
Bagpat, Uttar PradeshName of the Proprietor/ Contactperson - DesignationContact No.
Mr. S.K. Verma, Chief Chemist9758083953
Year of Commissioning. 1979Sector Cooperative
Sugar2750 TCD2750 TCD
Production details.ProductsInstalled Prod. Capoperating capacity
Cane crushing capacity 45.98 Lakh Quintal2.32 Lakh QuintalsCane crushed last year
Molassesgeneration 0.16 Lakh Quintals 3.5% of total cane crushedPress Mud generation
Operational status Non operational
B: Water Pollution and its Control:1. Water Supply Source(s)
Water Consumption (KLD)
1. Tubewell (3 nos.) - 40 HP, 40 HP & 15 HPIndustrial 2700 KLDDomestic 193 KLD
Water Meter to show consumption Not availableFlow measuring device installed atoutlet of ETP
V-Notch found broken.
6.
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1200 KLD-
Waste Water treatment capacity(KLD)-)-. Industrial),- Domestic
1200 m 3/day - drainSeptic Tank
Details of ETP`:. ETP Description with flow
diagram> Details of Reverse Osmosis
plant, if any'>- Details of Multi Effect
Evaporator, if any
Oil & Grease Trap, Equalization Tank, AerationChamber, Clarifier, Sludge Sump & Pump andSludge Drying Beds.
ngrba.cpcfrii)gtnail.com Sugar Format modified considering NGT directions
Waste water discharged (aftertreatment)(KLD), Industrialr, Domestic
DrainSeptic Tank
Mode of disposal of treated effluent(Details)
On land.
11.
(I)
Sample distributed into no. of parts(2/3)
N.A...
Sludge disposal mode For farmingEffluent collection locations &analysis results (if collected)
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet - - -Others -
Information regarding Ferti-irrigationDetails of treatment effluent beforeFerti-irrigation
-
Command area for irrigation(available land area)System for dilution of treatedeffluent required for ferti-irrigationSystem of transportation of treatedeffluent upto field.Formal agreements with farmersfor using treated effluentStorage facility available for treatedeffluent during low demand period
-
Quality of effluent being used forferti-irrigationGround water monitoring network -
C: Air Pollution and its Control1. Sources of Air Pollution Chimney - 2 nos. (15 T & 15 T) (30 T)
Boilers - 3 nos. (15 tonnes, 15 tonnes and 30tonnes)
:= Type of Fuel used withconsumption
Bagasse
Stack details Stack - 2 nos.Height - 30 m each
'>=. APCS details Wet scrubber in each boiler
Samples collections points(if collected)
N.A.
nizrba.cpcb r alzmail.com Sugar Format modified considering NGT directions
Photographs indicating locations:
Chimney and pollution control system Discharge PointE. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Local drain 4 Krishna River 4 Hindon River 4 Yamuna
ngrba.cpcbialgmail.com Sugar Format modified considering NGT directions
Direct discharge of oil and greases into drain
Remarks :The wild grass was observed around the ETP area giving it the deserted look and wasalso not accessible.No effluent was found being generated in the industry premises and ETP units wereobserved empty except rainy water.Adequacy of pollution control system may be assessed once the industry resumes itsoperation.Poor maintenance of the ETP.Effluent from wet scrubbers attached to the boilers is directly discharged outside theindustry's premises.The maintenance work was going on in the unit and oil and grease was beingdischarged directly in the drain.
Name of officialsinspecting
Name & Designations Signature
Sh. Shriance Jain, Sc 'D', CPCBC154:-...,--
Dr. B.B. Awasthi, R.O. UPPCB,MeerutShri A.K. Tiwari, AEE, UPPCB,MeerutShri J.N. Tiwari, JEE, UPPCB,MeerutDr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB41 +-
Date of reportSubmission
08.09.2014
ngrha.cocbir Sugar Format modified considering NGT directions
(71)
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 05.09.2014
A: General InformationName of the unit and address M/s. Bagpat Cooperative Sugar Mills Ltd.
Bagpat, Uttar PradeshMr. Narendra K. Sharma, Chief Chemist94112874980121-2221029
Name of the Proprietor/ Contactperson - DesignationContact No.Year of Commissioning. 1965Sector Cooperative
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar2500 TCD2500 TCD
10.
Cane crushing capacity 2500 TCDCane crushed last year 4567182 QuintalsMolasses generation 267130 Quintals
138430 QuintalsPress Mud_generationOperational status Non operational
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tubewell (2 nos.) - 35000 GPM/tubewellIndustrial 375.50 KLDDomestic
Not available
200 KLD
Water Meter to show consumptionFlow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)r Industrialr Domestic
1200 KLD160 KLD
Waste Water treatment capacity(KLD)r Industrialr Domestic
1200 m3/daySeptic TankETP consist of following units namely:-Primary Clarifier, Aeration Tank, SecondaryClarifier and Sludge Drying Beds.
Details of ETPETP Description with flowdiagram
fr Details of Reverse Osmosisplant, if any
fr.Details of Multi EffectEvaporator, if any
2
ngrba.cparkmail.com Sugar Format modified considering NGT directions
11.
Waste water discharged (aftertreatment)(KLD)fr. Industrial`fr Domestic
Non Operational
Mode of disposal of treated effluent(Details)
In local drain, outside the premises, stretchlength 5 kms. Meets River Yamuna. Howeveras informed by the unit the treated effluent isbeing used by farmers for irrigation andreaching River Yamuna.
Sample distributed into no. of parts(2/3)_
-
Sludge disposal mode For farmin•Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOA11911
-
CODm • /II
TSSm• /I
Outlet -Others
(I)1.
Information regarding Ferti-irrigationDetails of treatment effluent beforeFerti-irrigation
-
Command area for irrigation(available land area)
-
System for dilution of treatedeffluent required for ferti-irrigation
-
-System of transportation of treatedeffluent upto field.Formal agreements with farmersfor using treated effluent
-
Storage facility available for treatedeffluent during low demand period
-
-Quality of effluent being used forferti-irrigation
8. Ground water monitoring network -
C: Air
3.
Pollution and its ControlSources of Air Pollution Boilers - 3 nos.
30 tonnes, 30 tonnes and 20 tonnes.'fr Type of Fuel used with
consumptionBagasse
Hei•ht - 30 m eachStack detailsAPCS details Multi cyclone & Wet scrubber in each boiler
N.A.Samples collections pointsif collected
ngrba.cpcb(agmail.com Sugar Format modified considering NGT directions
Photo ra • hs indicatin
Entry Gate
ETP (Aerator) ETP (Secondary Clarifier
ChimneE. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Through local drain (5 km) 4 Yamuna
Discha Point
ligrbacycbfa'Lginail.com Sugar Format modified considering NGT directions
Disposal of boiler ash at backyard
Name & DesignationsSh. Shriance Jain, Sc 'D', CPCB
1 Name of officialsinspecting
Signature
Dr. B.B. Awasthi, R.O. UPPCB,MeerutShri A.K. Tiwari, AEE, UPPCB,MeerutShri J.N. Tiwari, JEE, UPPCB,MeerutDr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB
Date of report 08.09.2014Submission
Remarks:The wild grass was observed around the ETP area giving it the deserted look and wasalso not accessible.No effluent was found being generated in the industry premises and ETP units wereobserved empty except rainy water.Adequacy of pollution control system may be assessed once the industry resumes itsoperation.No railings on ETP.Boiler ash disposed at backyard.Discharge point was concealed and only outside the industry's premises the outletwas found after crossing the road.No attention given on maintenance of pollution control measures.As per their information, effluent is used in irrigation by farmers.
rt,grbacocb , i,i),zmail.com Sugar Format modified considering NGT directions
vow
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: DistilleryDate of Inspection: 5.9.2014
;eneral InformationName of the unit and address M/s. Bajaj Hindustan Limited (Distillery
Division), Kinauni - 250502, Meerut, UPName of the Proprietor/ Contactperson - DesignationContact No.
Mr. Mukesh Bhatnagar, Gen. Manager
0121-3290501Year of Commissioning. January 2006
PrivateSectorProduction details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
RS & ENA160 KLPD
Raw materials & theirrequirement
Molasses - 200000 MT/Annum
Operational status Non-operationalwater Pollution and its Control: "
Water Supply Source
Water Consumption (KLD)
Tube well (1 no.)Industrial 3450 KLPDDomestic 15 KLD
Water Meter to showconsumption
The unit was under lockout hence could notbe observed
Flow measuring device installedat outlet of ETP
The unit was under lockout hence could notbe observed
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1280 KLPD-
Waste Water treatment capacity(KLD)> Industrialâ Domestic
1280 KLPD
Details of ETP> ETP Description with flow
diagram> Details of Reverse Osmosis
plant, if any> Details of Multi Effect
Evaporator, if any
The unit was under lockout and hence couldnot be observed.
Waste water discharged (aftertreatment)(KLD)
Industrial> Domestic
Industry claims to operate on zerodischarge however, it can be verified at thetime once industry comes operational.
Mode of disposal of treatedeffluent (Details)
Direct into Hindon River.
Sample distributed into no. ofparts (2/3)
[email protected] Distillery Format modified considering NGT directions
A:
7.B:
6.
8.
9.
1
Sludge disposal mode___,
Effluent collection locations & Locations Parametersanalysis results (if collected) pH BOD COD TSS
(mg/I) (mg/I) (mg/I)OutletOthers
',I) Information regarding Bio-compostingI. Active area for bio compost 18 acres
preparation (m 2) [1 ha = 10,000m 2 , 1 acre = 0.4046863 hectare,1 acre = 4046.825 m21
L. Area for press mud storage (m2) 7 acres3. Area for bio compost storage 7.23 acres(m2)I. Spent wash storage capacity 1 month3. Availability of press mud From sugar uniti. Quantity of compost prepared 15751 MT (2012-13)
(Monthly statement of last year)
(Monthly statement) production1. Quantity of pressmen procured As per manufacturing data of sugar
length, height, width of stacking,space between two wind rose)
I. Details of wind roses (Number, Length of window as per yard dimension.
I. Quantity of Effluent being used 640 m3/dayfor composting ( m 3/day) :
. Quantity of press mud being used 11000 MT/cyclefor one cycleMaturity time in days for one 60 dayscycleArrangement for rainy season Shut down.
3. Quality of ground water in the -area and depth of ground watertable
(II) Information regarding Ferti-irrigation. Details of treatment of spent N.A.
wash (details of biomethanisation, primary andsecondary treatment)
. Command area for irrigation N.A.(available land area)
. System for dilution of treated N.A.effluent required for ferti-irrigation
. System of transportation of N.A.treated effluent upto field.
. Formal agreements with farmers N.A.for using treated effluent
. Storage facility available for N.A.treated effluent during lowdemand period
. Quality of effluent being used for N.A.ferti-irrigation
. Ground water monitoring network N.A.
n2rbacbcb(alvnail.com Distillery Format modified considering NGT directions
2
4
5
6
7
Photographs indicating locations:
Entry Gate E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Direct discharge into Hindon River.
C: Air Pollution and its ControlSources of Air Pollution Boiler (Cap. 40 TPH)â Type of Fuel used with
consumptionBagasse and Bio Gas
> Stack details RCC made, H=45 m and dia = 2.2 mtr.> APCS details Wet scrubber
5. Samples collections points N.A. due to non-operational due to rainly(if collected) season.
Remarks:Unit was under lock out by the Farmers hence could not be inspected andphotographs could not be taken.
Name of officialsinspecting
Name & Designations Signature
S1/1.11./Sh. Shriance Jain, Sc 'D', CPCB
Dr. B.B. Awasthi, R.O. UPPCB,MeerutShri A.K. Tiwari, AEE, UPPCB,MeerutShri J.N. Tiwari, JEE, UPPCB,MeerutDr. Sananda Sinha, RA, CPCB
Sh. K.S. Rawat, JLA, CPCB
______
uk„S.Date ofSubmission
report 08.09.2014
n.Qrba.cpcb , algmail.com Distillery Format modified considering NGT directions
1
2
Seconda TreatmentPrima Clarifier
Photographs indicating locations:
Blood Coa.ulation Unit
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
joint inspection Report: Slaughter House
Date of Inspection: 10.9.2014_
A: General InformationName of the unit and address M/s. Nagar Nigam Pashuvaishala, Village
Ghoshipur, Meerut, Uttar PradeshName of the Proprietor/ Contactperson - DesignationContact No.
Mr. Mohd Naseer S/o Mr. Khacheru, GateKeeper-
—LIE II al MIS um. wiriera it al 1111121a AMPS I I If
Activated Carbon Filter & Sand Filter Sheds
Remarks:
The industry was found closed.
Industry Is closed since 16-01-2013 as per closure order dated 15.01.2013 issued byUttar Pradesh Pollution Control Board (copy enclosed) for the reason of discharging theeffluent directly into East Kali River without having completing their construction work ofETP.
Name of officialsinspecting
Name & Designations Signature
Shri Shriance Jain, Sc. 'D', CPCB colv,,,..,,
Shri Ankit Singh, AEE, UPPCB,MeerutShri N.K. Tyagi, AEE, UPPCB,MeerutShri N.M. Tripathi, S.A. UPPCB,MeerutDr. Sananda Sinha, RA, CPCB
.Shri Girish Chand, Attendant
C2 Date of report
Submission10.09.2014
.411111441V12411.W."""'......".*
t44, 4, 4"
nicc1 sr TtV WOVE 140-4[T (fl AMAR PRADESH POLLUTION oN Rol RD
011.0111•11111n0011
vdmr,"
I cs: 6,Ti4TI Rim /Tft.---3/1,7-c4-189/4v-e/zti1o;int12
7k-4T 14,
quzwair
FAITR, ttRty,ki-a
r;(1
()8. 311 rhj
11"gd
Th O7711117Trei T'17 4 M, f;133 -60 Ili tigl'cl ;11 ib I z.1 k 153 -;;Tcy,:1;;=!;,.
W211, tr? 014,1t7 t, (Treft71 f24IIIPT .1974 -,•;;/ :1
71; w=t1 ,11 t't
771.: iltvito; ri. g .]:1 114 ii() IT31.7414-racr1 ,
1,,r7Itt ti 'et grrir(7.. ti 3t-TWItr TTZ11 • fsr114-7-7 ;r; ;; 1; ; r i ;
.3Bmg sttcb-711zf T f411 7/lit 111 , tif)t (9:41) APtpTI \7171 rAf$7T,1 ZT1'7';=:71 ki-s'3 '; t-1:17 -,FTZ ":27
fkriTur '430 ;T11 f$T..1 t 1-1. 1q crc-4711e11 UTZT tue").i . •
1i ThT ?IIt i qi?t t * ct) t .i 7ROZ:AtfuT fk<17'<ji T iiTTF:nt) 1,-) 74
31-3-17T WiT3t1 41ft'fi -ttig tt5tM--714311/ 1' i'-
fir 717.111 ctI ui rat 7-tre-zi zut745T1 ITT-H
11ZIT t 4)-4 ct)R4Ici t(13 3lThii RI 1'1,:c171 1.16'; ;:: 12 ;;:
%TIT TRIT t I r4"--11.T.T) 25.12.12 :61 rlit4.17 771-71 Z5F,,i'I Thin() 2H';
fkrz/o, Trff3-280 P:i.n/ttO cP1I
TiT7lei 3a'<fi I
7ra: 3 ,-1 :<)54:1 TITTZ`'21 t17 ;
3110171/1- 1974 LITZ1 '--33(tZ) Z;11:4 411 ! Vii*?•1 17.1
-frtzt tot,t..71 ,) 0 0 TTvi .,441-1T71 i
747(111 3) .00(fiWl :-
(Owl *or& qkln 013. 41 kV+, prbet, V.4 .4:. l'tv ;III l',I. I, .; t'" Ii. . l ,!,/iIIII kl!ao,1,
n1141(1 Tr4, Kwa-7115w, I. ;4; ti N....:,t, I t.,.I. n ,,,, !1( oft
‘7n114 ; Oh22- 2120E111. 277t1M. vneol Pho;K: (15r.- : - N s; I.
latii .-0%22 .-2?,0704 F.,. ;IS!: 27211,41
-A74- itru?;tippeb.cuin c-maii: id.: a upeci,,,,,,
4-411;ve- re wwmprch.com \N f I) Site; ,s•Am.,11.1,vt...o.,
Fokter',51x....
I lit'. ft 3tZ4 1() -,1 , 1'zi"c•RThc;11. -TV ft MI r.17:
17 1797 7.5TTRThic '41 37e, TR. I
2 1 I 4117111'1 1 .1) i)() I , i II 73
1 =.7;1. Ort57, ir477,rn fkm .. ',.! ;,; 1. • ,':1
"d-ct710 1;11.17, iblZ -it
(,,;!1.171,10 41,111
q7.7".F.; 4,017:1(74)
1^1-t10 .1-5t, i'173 31f7;f2i..0)d I2, 9-7, 3171,-, , 7,TR fkr,-...7 , tqz w)).;;
retti 3T1kAT ifEr-f
34•M711-4 zo)1117511, *ao 'TrcF
' 3TRITT't 3ftz1Tc-fl irT#R11-1, 1451
/5. 4)71141 7014077713,7i---Tur .4.'ri,A73 35,TN.:F, ;;I p.7 :77, .;:cq
.17.n-,:71
Joint Inspection Report
Sugar & Distillery Industries
Moradabad, Rampur and Sambhal Region (UP)
Hon'ble Tribunal directed, vide order dated August 5, 2014, CPCB & UPPCB
to carry out the Joint Inspection of the Sugar & Distillery units functioning on the
banks and nearby ricer Ganga and Yamuma and discharging their effluents into
river.
In this view, a team of CPCB & UPPCB comprises of the following officials
visited the Sugar Distillery units in Moradabad, Rampur and Sambhal Regions(UP)
Officials from CPCB, Delhi Officials from RO Moradabad UPPCB
Shri Vijay, AEEShM K Biswas, Sc 'C'
Shri Ananda Kumar Ngangom, JRF Shri P P Singh, JE
The following industries were inspected by the above team during 2nd
September, 2014 to 4 th September, 2014. The summery table indicating the desired
information is given below;
Summery Table: Status of Sugar and Distillery Units operating in Moradabad,
Rampur and Sambhal Region (Under regional office Moradabad, UPPCB)
SI.No.
Name &Address ofIndustry
. Category
Dateofluspection
OperationalStatus
ETPStatusY/N
APCSStatusYIN
. WaterRe q uirement(Industrial)(2013-14)
Resourceof Water
Water Meterinstalled forconsumption (Yes/ No)
PossiblerecipientwaterBodies
Detailed' i-•inspecaon report
M/s Triveni Sug 2/9/ Non- YES YES 2570 Ground Yes River Koal AnnexureEngineering &Ind. Ltd.(SugarUnit), Milak
ar 2014 operationaldue to offseason
water (Ramganga) 4
Narayanpur,Tends, Rampur
2 M/s Rana Sugar Sug 2/9/ Non-r--
YES YES 4404 Ground No RaJUilard AnnexureLtd. (Unit 3),Belwara,Manpur,Moradabad.
ar 2014 operationaldue to offseason
water drain(Ramganga)
-II
3 M/s Triveni Sug 2/9/ Non- YES YES 2700 Ground Yes Lapakana Aix le X LI 11:
Engineering &Ind. Ltd.(SugarUnit), Rani
or 2014 operationaldue to offseason
water cirri'(Ramganga)
-Ill
Nagai, Tehsil-Thakurdwara,Moradabad
4 M/s Deewan Sug 3/9/ Non- YES YES 2265 Ground No Ramganga 1 AnnexureHSugar Ltd.,Agwanpur,Kanth Road,Moradabad
ar 2014 operationaldue to offseason
water -IV
5 M/s D.S.M. Dist 3/9/ Non- YES YES 1800 Ground Yes Soar River AnnexureSiigar (DistilleryDivision),Asmauli,Moradabad
iUery
2014 operationalclosed byown since9th June 2014
Water (Gauge) -V
M/s DSM Sugar, Sug 3/9/ Non- YES YES 4050 Ground No.Soat River Annexure .
1900 Groundwater
YES
No
Non-operationaldue to offseason
ar
Sugar
Sugar
2014 operationaldue to offseason
3/9/ Non-2014 i operational
3/9/2014
Non-operationaldue to offseason
YES YES 1-3400
YES 3000
GroundWater
Groundwater
Yes
Sugar
y
4/9/2014
4/9/—2014
r—OperatitTnal
Operational
Non-operationalduo to offseason
YES
YES
YES
YES
YES,Howevas,Showc asu s enotieissuedbySpastoupgrad
tS —7050
•
GroundWater
No
Yes
11 M/s National T4/9/
Industrial filler 2014
Corporation Ltd.
Raja kasahaspur, Bilari,Moradabad.
12 M/s Ajudhya Sug 4/9/
Sugar Mills, Raja ar 2014
ka sahaspur,BilariMoradabad
Asmoli, Dist-Sambhal
7s DSM SugarMills, Vill-Rajpura, Dist-
! Sam bloat
8 M/s Rana SugarLtd. (Unit 4),Karimganj,Shahabad,Ram • ur
10
(Ganga) -VI
tviahava 7,,Glexure(Gangs) -v11
RagWg AnneLTe-VIII
Sahaspura r AnnexuTh—T,Drains-Aril _xi
Rivet.1.(Ramganga)1
Sahaspura AnneureDrains-Aril -XII
River(Ramganga)
)3.5
M/s Rudra BilasKisan SahkariChini Mill,Bilaspur,Rampur
6600 Groundwater
Yes
Kosi River Annexure.(Ramganga)
1320 GroundWater
Kulli River AnnexureWest Regul -X
River (Ramganga)`
Overall Observations:
All the nine sugar units were not in operation during inspection due to off
season. The units are having ETP and APCS installed. However, the APCS
installed in M/s Rudra Bilas Kisan Sahkari Chini Mill, Bilaspur, Rampur,
needs upgradation and UPPCB has already issued show cause notice for the
same. Since, the units were not in operation, the performan.ce. of Cne
ETP/ APCS were not be evaluated.
Two distilleries among three were in operation on the day of inspection and
one unit was closed by its own since 9 th June, 2014.
Samples (Air & effluent) were collected from the two operational distillery
units; the analysis result is awaited from laboratories.
9
Shri M iswascirClitShri Vijay, AEE
CPCB DelhiMoradabad, UPPCB
S S
(Pit{1)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
A: General InformationName of the unit and address M/S Triveni E ngineering and Industries Ltd.
Vill-Milak Na rayanpur, Tehsil-Tanda, Dist-Rampur.
Name of the Proprietor/ Contact personDesignationContact No.
-Shri Amej Ku mar Singh,AGM, HR & A dmin,MOB. No- 09 719402388
Year of Commissioning. 2007Sector Private5. Production details.
ProductsInstalled Prod. CapOperating capacity
Sugar500 MTD
6. Cane crushing capacity 5000 TCDCane crushed last year 3600200.799 MTMolasses generation (2013-14) 17909.6 MTPress Mud generation (2013-14) 16777.9 MTOperational status Non operatio al due to off season
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
Tube well
Industrial 2570 KLD
Domestic 330 KLDWater Meter to show consumption Available
Flow measuring device installed at outletof ETP Not Available
Waste Water generation (KLD) (beforetreatment) (2013-14)> Industrial> Domestic
750 KLD260 KLD5. Waste Water treatment capacity (KLD)
> Industrial> Domestic
750 KLD
[email protected] Sugar Format modified considering NGT directions
Date of Inspection: 02-09-2014
2
Details of ETP> ETP Description with flow diagram
â Details of Reverse Osmosis plant, if any> Details of Multi Effect Evaporator, if any
•
Oil Skimmer- Equalization Tank - Primary
Clarifier —Aeration Tank (I & II)
—,Secondary Clarifier --> Carbon & Sand filter
—Sludge Thinker
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
750 KLD260 KLD
Mode of disposal of treated effluent(Details)
On Land (Ferti Irrigation)
Sample distributed into no. of parts (2/3) N/A
Sludge disposal mode On land as manure
Effluent collection locations & analysisresults (if collected)
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent before Ferti-
irrigation
Treated effluent after Carbon & Sand filter is
stord in lined lagoon
2800 KL
Command area for irrigation (available
land area)
50 Acres
System for dilution of treated effluent
required for ferti-irrigation
Not Required
System of transportation of treated
effluent upto field.
Flexible pipe line
..Formal agreements with farmers for using
treated effluent
Consent by farmers
Storage facility available for treated
effluent during low demand period
As per (1)
Quality of effluent being used for ferti-irrigation
Not available
Ground water monitoring network Not available
ngrba.cpcb c„Q-mail.com Sugar Format modified considering NGT directions
C: Air Pollution and its ControlSources of Air Pollution Boiler of 90 TPH> Type of Fuel used with consumption Bagasse- 1080 MTD
> Stack details 65 Meter Stack, I.D. of Stack-3.4 M
> APCS details 1. Wet Scrubber System.
5. Samples collections points(if collected)
PM (mg/Nm3):
Pic 2: Aeration tank II
Pic 4: Treated effluents stored at Lagoons
3
otographs depicting status of industries:
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna
No Drain nearby, River Kosi about 5 KM
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB DelhiShri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Nangom, JRFCPCB Delhi
2 Date of reportSubmission
oiht r.e.e/d;*.scvt / D-4 /
[email protected] Sugar Format modified considering NGT directions
191-141Ceettfr2-C — 6
17co4e
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General InformationName of the unit and address M/s Rana Sugar Limited
(Unit: BELWARA)P.O. Manpur, Teh. & Distt-Moradabad (U.P.)
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri Sunil Kumar SrivanstavaGM (Production)Mob. No.: 9997199316
Year of Commissioning. 2008Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar600 MTD
6. Cane crushing capacity 6500 TCD
Cane crushed last year 5,10,432 MT
Molasses generation (2013-14) 26763 MT
Press Mud generation (2013-14) 19944.5 MT__.
Operational status Non operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 4404 KLD
Domestic 20 KLD
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment) (2013-14)> Industrialâ Domestic
2000 KLD16 KLD
5. Waste Water treatment capacity(KLD)> Industrial> Domestic
Capacity-2000 KLD
rigrba.cpcbagmail.corn Sugar Format modified considering NGT directions
2
Details of ETP> ETP Description with flow
diagram
â Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,irany
Oil & Grease Trap - Equalization Tank
- Primary Clarifier - Aeration Tank
- Secondary Clarifier - Sludge Drying Bed
Waste water discharged (aftertreatment)( KLD)> IndustrialDomestic
2000 KLD16 KLD
Mode of disposal of treated effluent(Details)
On land (Ferti Irrigation)
Sample distributed into no. of parts(2/3)
Not Required
10. Sludge disposal mode Oil & Grease burned in Boiler mixed withbagasse
used as manure11. Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD(mg/I)
COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigation Details of treatment effluent before --
Ferti-irrigation
Command area for irrigation 79 Hectare own (Nearby Farmers Also)
(available land area)
System for dilution of treated Not Required.
effluent required for ferti-irrigation
System of transportation of treated Through Flexible pipe line
effluent upto field.
Formal agreements with farmers for Consent by Farmers
using treated effluent
Storage facility available for treated Not Available
effluent during low demand period
Quality of effluent being used for Not Availableferti-irrigationGround water monitoring network Not available
[email protected] Sugar Format modified considering NGT directions
Pi
3
C: Air Pollution and its ControlSources of Air Pollution Boiler of 120 TPH> Type of Fuel used
consum @donwith Bagasse- 55 MTH
> Stack details 60 Meter (One) I.D.-4.0 Meter
> APCS details 1. ESP
Samples collections points(if collected)
PM (mg/Nm3)
Photographs indicating locations:
y h -.4,,' ' ,
Pic 1: Entr
- -, Atr '
.4,0---- -
...-
, r.---.---:—=
7,—-
4.TY-4....2.1
ic 2: ETP (Primary Clarifier)Aka ....
7 ,
I): s
tl
a I : /
4 '' 1 ,
iti, 41,
n
, 4. " 1 .;n .141
. Kt ' , . .,,,,e
E 1.,‘ ii::!1!..,', I
.,.. , :,-,
Pic: 3 Chimne All visible
. -,,-,
Thl
Pic 4:Cooling ,Tower
1 za.
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Road side drain- Rajhra Drain- Ramganga(15 Km travel to reach Ganga)
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi 41.1"r"Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Nangom, JRFCPCB Delhi
2 Date of reportSubmission
q et Sefilarwhan, ,3•4,
rigrba.cocb5,gmail.corn Sugar Format modified considering NGT directions
47 NU& e (" IL -r
NIOrCOD
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General InformationName of the unit and address M/S Triveni Engineering and Industries Ltd.
Unit-Rani Nagai, Thakurdwara,Moradabad.
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri V. P. Singh,Head HR & Admin.Mob No- 09690021630
Year of Commissioning. 2007Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar500 MTD
6. Cane crushing capacity 5000 TCD
Cane crushed last year(2013-14) 448909.076 MT
Molasses generation(2013-14) 22273.45 MT
Press Mud generation(2013-14) 20918.8 MT
Operational status Non operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 2700 KLD
Domestic 260 KLD
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Available
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
750 KLD200 KLD
5. Waste Water treatment capacity(KLD)> Industrial> Domestic
750 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETP> ETP Description with flow
diagram
â Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,if any
Oil & Grease Trap - Equalization Tank
- Primary Clarifier - Aeration Tank (I & II)
- Secondary Clarifier - Sludge Thinker Carbon &
Sand filter
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
•
750 KLD200 KLD
Mode of disposal of treated effluent(Details)
On land (Ferti Irrigation)
,Sample distributed into no. of parts(2/3)
N/A
Sludge disposal mode On land as manure
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD(mg/I)
COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent before
Ferti-irrigation
Line lagoons 10,500 m3
..
Command area for irrigation
(available land area)
14 Acres own (Nearby Farmers Also)
System for dilution of treated
effluent required for ferti-irrigation
Not Required
System of transportation of treated
effluent upto field.
Flexible pipe
Formal agreements with farmers for
using treated effluent
Consent by farmers
Storage facility available for treated
effluent during low demand period
As per (1)
Quality of effluent being used forferti-irrigation
No measuring device
Ground water monitoring network Not available
C: Air Pollution and its Control
1115
ngrba.cpcbggmail.corn Sugar Format modified considering NGT directions
Sources of Air Pollution Boiler of 80 TPH> Type of Fuel used with
consumptionBagasse- 864 MTD
3. â Stack details 60 Meter combined stack Inner dia-5.0 meter
4, > APCS details 1. ESP
5. Samples collections points(if collected)
PM (mg/Nm ):
Photographs indicating locations:
Pic 1: Primary Clarifier Pic 2: Chimney
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)Local forestry Drain- Lapakana - Ramganga (Approx. 11Km travels to reach Ramganga)
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
4Mr51`4""
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Nangom, JRFCPCB Delhi
2 Date of reportSubmission
1 It SeekrInboit )..-Ø/Y
[email protected] Sugar Format modified considering NGT directions
^^^
491t,ti0e.,e41 11:(
CD&CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
Date of Insoection: 03-09-2014
A: General InformationName of the unit and address M/s Deewan Sugars Ltd.,
Vill- Agwanpur, Kanth Road,Distt-Moradabad (U.P.)
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri Atul Goel,G.M. (Production)Mob. No.-07500457555
Year of Commissioning. 2000
Sector Private5. Production details.
ProductsInstalled Prod. CapOperating capacity
Sugar250 MTD
6. Cane crushing capacity 2500 TCD
Cane crushed last year 344228.428 MT
Molasses generation(2013-14) 17995.400 MT
Press Mud generation(2013-14) 15146.032 MT
Operational status Non-operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 2265 KLD
Domestic 130 KLD
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
(before treatment)> Industrial> Domestic
Waste Water generation (KLD)
1000 KLD100 KLD
5. Waste Water treatment capacity(KLD)> Industrial
Domestic
1000 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow
diagram
â Details of Reverse Osmosisplant, if any
â Details of Multi EffectEvaporator, if any
Bar Screen- Oil and Grease Trap-
Equalization Tank - Primary Clarifier-
Aeration Tank - Secondary Clarifier- Polishing
TTank- Sludge Drying Beds.
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1000 KLD100 KLD
Mode of disposal of treatedeffluent (Details)
On land (Ferti Irrigation)
Sample distributed into no. ofparts (2/3)
N/A
Sludge disposal mode On land as manure
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD(mg/0
COD(mg/0
TSS(mg/0
Outlet
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent
before Ferti-irrigation
Storage lagoon
Command area for irrigation
(available land area)
50 Acres own (Nearby farmers also)
System for dilution of treated
effluent required for ferti-irrigation
Not Required
System of transportation of
treated effluent upto field.
Through Drain/Flexible pipe line
Formal agreements with farmers
for using treated effluent
Consent by farmers
Storage facility available for
treated effluent during low
demand period
As per (1)
Quality of effluent being used forferti-irrigation
No measuring device
Ground water, monitoring network Not available
[email protected] Sugar Format modified considering NGT directions
3
I 50
C: Air Pollution and its ControlSources of Air Pollution Boiler of 77 TPH
Type of Fuel used withconsumption
Bagasse- 850 MTD
> Stack details 50 Meter, Inner dia 3.0 Meter
APCS details Wet Scrubber System
5. Samples collections points PM (mg/Nm3):(if collected)
Photographs indicating locations:
Pic 1: ETP flow diagram Pic 2: ETP
Pic: 3 Chimney Pic 4: Treated effluent Storage lagoon
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna
No Nearby Drain, River Ramganga about 2 Icrn. (after Railway crossing)
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
-k }4t-h4.0
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
2 Date of reportSubmission
Stn9 September, 2014
151
ngrba.cocKkgmail.corn Sugar Format modified considering NGT directions
152-
`ieSkr;WY
COXEICENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Distillery
Date of Inspection: 03-09-2014
A: General InformationName of the unit and address M/S DSM Sugar (Distillery Division),
(A Unit of Dhampur Sugar Mills Ltd.)Vill-Asmoli, Dist- Sambhal.
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri Subhash PandeyVice PresidentPh. No.- 05923-241438
-221441Year of Commissioning. 2008
Sector Private5. Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Rectified Spirit, ENA, Ethanol
100 KLD
6. Raw materials & their requirement Molasses - 450 TPD7. Operational status Closed by own since 9 th June, 2014
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube well
Industrial 1800 KLD
Domestic 184KLD
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1000 KLD160 KLD
5. Waste Water treatment capacity(KLD)> Industrial> Domestic
1000KLD
[email protected] Distillery Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow
diagram
â Details of Reverse Osmosis plant,if any
â Details of Multi Effect Evaporator,if any
BioR0-->MEE-->Bio compost
Two Reverse Osmosis -500 KLD each followedbyMEE-1400 KLD (5 stage) and Bio Compost-19.5 Acre
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
-
Mode of disposal of treated effluent(Details)
NA
Sample distributed into no. of parts(2/3)
Not Required
Sludge disposal mode Not required
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BODOng/0
CODOng/0
TSSOng/0
Outlet
Others
(I) Information regarding Bio-compostingActive area for bio compost
preparation (m2)
19.5 Acres
Area for press mud storage (m 2 ) 3.0 Acres
Area for bio compost storage (m 2 ) 3.0 Acres
Spent wash storage capacity 20,000 KL
Availability of pressmud From own Sugar Mills
Quantity of compost prepared
(Monthly statement of last year)
8400 MT
Quantity of pressmen procured
(Monthly statement)
21600 MT
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Stopped due to rainy season
9. Quantity of Effluent being used for
composting ( m 3/day) :
2.5 m 3/tonnes of press mud
[email protected] Distillery Format modified considering NGT directions
3
Quantity of press mud being used
for one cycle
10,800 MT
Maturity time in days for one cycle 45-50 days
Arrangement for rainy season Bio Composting Closed
Quality Of ground water in the area
and depth of ground water table
No measuring device
(II) Information regarding Ferti-irrigationDetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(available land area)
Not Required
System for dilution of treatedeffluent required for ferti-irrigation
Not Required..
System of transportation of treatedeffluent upto field.Formal agreements with farmers forusing treated effluentStorage facility available for treatedeffluent during low demand periodQuality of effluent being used forferti-irrigation
Ground water monitoring network Not availableC: Air Pollution and its Control
Sources of Air Pollution 170 TPH BoilerType of Fuel used withconsumption
1632 MTD, Bagasse(10000m3/day) 72 Meters (Inner Dia 3.4 Meter)
and
'
Biogas
> Stack details
â APCS details 1. ESP
5. Samples collections points(if collected)
PM (mg/Nm3):
[email protected] Distillery Format modified considering NGT directions
Pic 2:ROPic 1: Entry of unit
Pic 6: Spent wash storage LagoonPic: 5 Chimney
Pic 3: Compost Yard
Photographs depicting status of industry.
4
I 55
[email protected] Distillery Format modified considering NGT directions
5
E. Route of effluent to reach river Ganga/Yamuna
Soat River-River Ganga
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
444ks-F,A.,
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEE ..RO Moradabad, UPPCBShri Ananda Kumar Nangom, JRFCPCB Delhi
2 Date of reportSubmission
th9 September, 2014
156
[email protected] Distillery Format modified considering NGT directions
IL)11.1.14 i t/)(
acsCO)
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 03-09-2014
A: General InformationName of the unit and address M/s D.S.M. Sugar,
Asmoli,Dist-Sambhal.
Name of the Proprietor/ Contact person- DesignationContact No.
Shri Subhah Pandey,Vice President,Mob. No.- 05923221438
Year of Commissioning. 1994
Sector Private5. Production details.
ProductsInstalled Prod. CapOperating capacity
Sugar900 MTD
6. Cane crushing capacity 9000 TCD
Cane crushed last year 837647.314 MT
Molasses generation (2013-14) 40946.00 MT
Press Mud generation(2013-14) 32333 MT
Operational status Non operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 4050 KLD
Domestic 180 KLD
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD) (beforetreatment)> Industrial> Domestic
•1800 KLD140 KLD
5. Waste Water treatment capacity (KLD)> Industrial> Domestic
2500KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow diagram
â Details of Reverse Osmosis plant, ifany
â Details of Multi Effect Evaporator, ifany,
Bar Screen- Oil & Grease Trap - Equalization
Tank - Primary Settling Tank- Aeration Tank
- Secondary Settling Tank- Sludge Drying Bed
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1800 KLD140 KLD
Mode of disposal of treated effluent(Details)
On land (Ferti Irrigation)
Sample distributed into no. of parts(2/3)
N/A
Sludge disposal mode On land as manure
Effluent collection locations & analysisresults (if collected)
Locations ParameterspH SOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent before
Ferti-irrigation
40000 KL Lined Lagoon
Command area for irrigation (available
land area)
50 Acres own (Nearby Farmers Also)
System for dilution of treated effluent
required for ferti-irrigation
Not Required
System of transportation of treated
effluent upto field.
Flexible Pipe line
Formal agreements with farmers for
using treated effluent
Consent by farmers
Storage facility available for treated
effluent during low demand period
As (1)
Quality of effluent being used for ferti-irrigation
No Measuring device
Ground water monitoring network (Not available)
C: Air Pollution and its Control
ngrba.cpcbCcSgmail.com Sugar Format modified considering NGT directions
160
3
Sources of Air Pollution Boiler of 60 TPH (2 no. ․ )Type of Fuel used with consumption Bagasse- 672 MTD
> Stack details 60 Meter combined (Inner Dia 3.4 Meter)
> APCS details 1. Wet Scrubber System
5. Samples collections points(if collected)
PM (mg/Nm3):
Photographs depicting the status of the Industry:
hipipirTitigar Mills Lipitoci • Asmot
MR:
)s..41.-
' al. .0
f;;TZ
Pic 1: EntryPic 2: ETP
, ,..
--
. .,
•
E. Route of effluent to reach river Ganga/Yamuna
Nearby River Soat
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
'"1-4)1"-
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
2 Date of reportSubmission
th9 September, 2014
[email protected] Sugar Format modified considering NGT directions
162.•••••••n•nnn•n••
CO)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
Date of Inspection: 03-09-2014
A: General Information -Name of the unit and address M/s Dhampur Sugar Mills,
Vill & Post- Rajpura, Tehsil- Gunnaur,Dist-Sambhal.
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri Subodh SinghA.G.M.Mob. No.- 07895003355
Year of Commissioning. 2006
Sector Private5. Production details.
ProductsInstalled Prod. CapOperating capacity
Sugar700 MTD
6. Cane crushing capacity(2013-14) 7000 TCD
Cane crushed last year(2013-14) 623775.436 MT
Molasses generation(2013-14) 35128.80 MT
Press Mud generation(2013-14) 23828 MT
Operational status Non operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 3400 KLD
Domestic 200 KLD
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)> IndustrialD Domestic
2100 KLD160 KLD
[email protected] Sugar Format modified considering NGT directions
2
Waste Water treatment capacity(KLD) ,
> Industrial> Domestic
Capacity-2100 KLD
Details of ETP> ETP Description with flow diagram
> Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,if any
Bar Screen- Oil & Grease Trap - PrimarySettling Tank- Aeration Tank - SecondarySettling Tank- Sludge Drying Bed
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
2100 KLD160 KLD
Mode of disposal of treated effluent(Details)
On land (Ferti Irrigation)
Sample distributed into no. of parts(2/3)
N/A
Sludge disposal mode On land as manure
11. Effluent collection locations &analysis results (if collected)
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigation1, Details of treatment effluent before
Ferti-irrigationlined lagoons
Command area for irrigation
(available land area)70 Acre own (Nearby Farmers Also)
System for dilution of treated effluent
required for ferti-irrigationNot Required
System of transportation of treated
effluent upto field.Flexible Pipe line
Formal agreements with farmers for
using treated effluentConsent by farmers
6. Storage facility available for treated
effluent during low demand periodAs (1)
163
[email protected] Sugar Format modified considering NGT directions
3
Quality of effluent being used forferti-irrigation
No Measuring device
Ground water monitoring network (Not available)
C: Air Pollution and its ControlSources of Air Pollution Boiler of 120 TN> Type of Fuel used with
consumptionBaggase- 1250 MTD
> Stack details 60 Meter (ID 3.5m)
> APCS details 1. Wet Scrubber System
5. Samples collections points(if collected)
PM (mg/Nm3):
- -_ _,_ _
Pic 1:
' to ',•,,
Photographs indicating the status of the
\. \
Industry
le,
Pic: 2 Chimne All visible— ,
>
Arigir-i,
Pic 4: Discharge pointspipeline)
e t
(undergroundPic 3:Treated
aL-----:—
^ -.... ”stret= I
,.,
Aeration Tank
, .
effluent storage tank
[email protected] Sugar Format modified considering NGT directions
1“1
Pic 5: Underground pipeline being closed Pic 6: Underground pipeline closed
4
E. Route of effluent to reach river Ganga/YamunaUnder Ground Drain (blocked), which meets. River Mahava about 1 km and finally meetsGanga
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
.kik!)0,4,
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
2 Date of reportSubmission
"th7 September, 2014
I S
ngrba.cpcbasmail.corn Sugar Format modified considering NGT directions
DTI
coxeCENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
Date of Inspection: 03-09-2014 * A: General Information
Name of the unit and address M/s Rana Sugar Limited,Unit- Karimganj, Post-Shahabad,Distt-Rampur (U.P.)
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri Sudhir Kumar,Chief General Manager,Mob. No.-09634090209
Year of Commissioning. 2008
Sector Private5, Production details.
ProductsInstalled Prod. CapOperating capacity
Sugar500 MTD
•
Cane crushing capacity 5000 TCD
Cane crushed last year 561761.621 MT
Molasses generation 28782 MT
Press Mud generation 21066 MT
10. Operational status Non operational due to off season B: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 3000 KLD
Domestic 20 KLD
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)â Industrial> Domestic
2000 KLD16 KLD
5. Waste Water treatment capacity(KLD)> Industrialâ Domestic
Capacity-2000 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow
diagram
â Details of Reverse Osmosisplant, if any
â Details of Multi EffectEvaporator, if any
Bar Screen- Oil and Grease Trap-
Equalization Tank - Primary Settling
Tank- Aeration Tank - Secondary Settling
Tank -Carbon sand filter- Sludge Drying
Beds.
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
2000 KLD-
Mode of disposal of treatedeffluent (Details)
On land (Ferti Irrigation)
Sample distributed into no. ofparts (2/3)
Not Required
Sludge disposal mode On land as manure and oil and grease isburnt with bagasse in boiler
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD(mg/0
COD(mg/0
TSS(mg/0
Outlet
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent
before Ferti-irrigation
line lagoons 4500 K.L.
Command area for irrigation
(available land area)
30 Acres own (nearby farmers also)
System for dilution of treated
effluent required for ferti-irrigation
Not Required
System of transportation of
treated effluent upto field.
Flexible pipe line
Formal agreements with farmers
for using treated effluent
Consent by farmers
Storage facility available for
treated effluent during low
demand period
As per (1)
Quality of effluent being used forferti-irrigation
No measuring device
Ground water monitoring network (Not available)
ngrba.cpcbtemail.com Sugar Format modified considering NGT directions
3
C: Air Pollution and its ControlSources of Air Pollution Boiler of 120 TPH> Type of Fuel used with
consumptionBagasse- 1100 MTD
> Stack-details 72 Meter, Inner dia 4.0 meter
â APCS details 1. ESP
5. Samples collections points(if collected)
PM (mg/Nm3):
Photographs indicating the status of the Industry
F
Pic 1: Aeration tank Pic: 2 Chimney
E. Route of effluent to reach river Ganga/YamunaNo nearby drain. River Ramganga about 10 KM
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi -"ters—`-`"
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
2 Date of reportSubmission
in9 September, 2014
I 6 8
[email protected] Sugar Format modified considering NGT directions
I q
13 LA-tv ic PA4 E
4-0
CM[I)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Distillery
Date of Inspection: 04-09-2014
A: General InformationName of the unit and address M/S Radico Khetan Ltd.,
Bareilly Road,District-Rampur.
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri Devendra Singh,Senior Vice President .Mob No- 09837471443
Year of Commissioning. 1943
Sector Private5. Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Rectified Spirit, ENA, Absolute Alcohol(Molasses based 220 KLD, Grain based 80 KLD,Malt based 2.5 KLD)
6. Raw materials & their requirement Molasses, Grain, Malt
7. Operational status Operating
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube well
Industrial 6600 KLD
Domestic 380 KLD
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)â Industrial> Domestic
2900 KLD300 KLD
5. Waste Water treatment capacity(KLD)> Industrial> Domestic
240 KLD
[email protected] Distillery Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow
diagram
> Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,if arty
Molasses- MEE-) Biomethanisation4 RO-) BioLagoons (58000 KL, 20000KL,
separator --MEE -Cattle feed,
Composting,12000 KL)Grain- CycloneMalt- Biomethanisation
Waste water discharged (aftertreatment)(KLD)
IndustrialDomestic
240 KLD ( bottle washing, boiler blowdown)
Mode of disposal of treated effluent(Details)
Surface water (Municipal Drain)
Sample distributed into no. of parts(2/3)
03
Sludge disposal mode Mixed with Biocompost
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH BOD(mg/I)
COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Bio-compostingActive area for bio compost
preparation (m2)
52 Acre (two locations)
Area for press mud storage (m 2 ) 3.0 Acre
Area for bio compost storage (m 2 ) 3.0 Acre
Spent wash storage capacity 3 Lagoons(58000 KL, 20000KL, 12000 KL)
Availability of pressmud Sugar Mills
Quantity of compost prepared
(Monthly statement of last year)
26036 MT
Quantity of press mud procured
(Monthly statement)
89350 MT
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
31, length--100)
Height-1.5 m
Width 2.5 m
Gap-1.5 m
141
ngrba.cpcbggmail.com Distillery Format modified considering NGT directions
3
Quantity of Effluent being used for
composting ( m 3/day) :
550 KLD (provision made to burn 120 KLD in
boiler)
Quantity of press mud being used
for one cycle
36,000 MT per cycle
Maturity , time in days for one cycle 50-55 days
Arrangement for rainy season 6.5 Acres covered land for Bio composting
13. Quality of ground water in the area
and depth of ground water table
Not measuring device
(II) Information regarding Ferti-irrigation N/ADetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(available land area)
Not Required
System for dilution of treatedeffluent required for ferti-irrigation
Not Required
System of transportation of treatedeffluent upto field.Formal agreements with farmers forusing treated effluentStorage facility available for treatedeffluent during low demand periodQuality of effluent being used forferti-irrigationGround water monitoring network Not available
C: Air Pollution and its ControlSources of Air Pollution 2 Boilers of 26 TPH & 30 TPH
> Type of Fuel used withconsumption
Biogass-69600 M 3/day with 26 TPH Boiler
Rice Husk-120 MTD & Biogass 32000 M3/day
with 30 TPH Boiler
â Stack details 45 M (Inner Dia 1.5 M) with 26 TPH Boiler
45 M (Inner Dia 1.5 M) with 30 TPH Boiler
> APCS details 1. ESP with 30 TPH Boiler
[email protected] Distillery Format modified considering NGT directions
Samples collections points(if collected)
Pic 4: MEE ad'acent to distillation column
Photographs indicating the status of the Industry
4
ngrba.cpcbgmail.corn Distillery Format modified considering NGT directions
Pic 6: Discharge points (V notch notavailable)
E. Route of effluent to reach river Ganga/Yamuna
Outlet of Unit-Municipal Drain-) Kosi Rive-) Ramganga
5
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
4'14e113-1/$1
Shri Vijay, AEEMoradabad, UPPCBShri U C Shukla, ASO,Moradabad, UPPCBShri A K Vishwakarma, SA,Moradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB DelhiShri D C Mishra, Monitoring Asst.RO Moradabad, UPPCB
2 Date of reportSubmission
9 th9 September, 2014
I '4. 4
[email protected] Distillery Format modified considering NGT directions
RLA P A4 E
•••n•••••••n11.n
`''%1Ifir&--(17s
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
Date of Inspection: 04-09-2014
A: General InformationName of the unit and address M/S Radico Khetan Ltd.,
Bareilly Road,District-Rampur.
Name of the Proprietor/ Contactperson — DesignationContact No.
Shri Devendra Singh,Senior Vice PresidentMob No- 09837471443
Year of Commissioning. 1943
Sector Private5. Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Rectified Spirit, ENA, Absolute Alcohol(Molasses based 220 KLD, Grain based 80 KLD,Malt based 2.5 KLD)
6. Raw materials & their requirement Molasses, Grain, Malt
7. Operational status Operating
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube well
Industrial 6600 KLD-
Domestic 380 KLD
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)â Industrialâ Domestic
2900 KLD300 KLD
5. Waste Water treatment capacity(KLD)â Industrial)=. Domestic
240 KLD
ngrba.cpcbgmail.com Distillery Format modified considering NGT directions
2
Details of ETP> ETP Description with flow
diagram
> Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,if any
Molasses- MEE- Biornethanisation4 RO4 BioComposting, Lagoons (58000 KL, 20000KL,12000 KL)Grain- Cyclone separator -MEE -Katie feed,Malt- Biomethanisation
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
240 KLD ( bottle washing, boiler blowdown)
Mode of disposal of treated effluent(Details)
Surface water (Municipal Drain)
Sample distributed into no. of parts(2/3)
03
Sludge disposal mode Mixed with Biocompost
Effluent collection locations &
analysis results (if collected)Locations(,,,,c, D 0
ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet Cer-f9 7.% /0 24 8DL
OthersCS 9ou.4-6.4- 7 . 6 3 ii 7. 0
(I) Information regarding Bio-compostinActive area for bio compost
preparation (m2)
52 Acre (two locations)
3.0 Acre
3.0 Acre
4 Spent wash storage capacity oons(58000 KL, 20000KL, 12000 KL)
Availability of pressmud Sugar Mills
• Quantity of compost prepared
(Monthly statement of last year)
26036 MT
Quantity of press mud procured
(Monthly statement)
89350 MT
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
31, length--100)
Height-1.5 m
Width 2.5 m
Gap-1.5 m
/4+
ngrba.epcbrd),gmail.com Distillery Format modified considering NGT directions
3
Quantity of Effluent being used for
composting ( m 3/day) :
550 KLD (provision made to burn 120 KLD in
boiler)
Quantity of press mud being used
for one cycle
36,000 MT per cycle
Maturity time in days for one cycle 50-55 days
Arrangement for rainy season 6.5 Acres covered land for Bio composting
13. Quality of ground water in the area
and depth of ground water table
Not measuring device
(II) Information regarding Ferti-irrigation N/ADetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(available land area)
Not Required
System for dilution of treatedeffluent required for ferti-irrigation
Not Required
System of transportation of treatedeffluent upto field.Formal agreements with farmers forusing treated effluentStorage facility available for treatedeffluent during low demand period
•
Quality of effluent being used forferti-irrigationGround water monitoring network Not available
C: Air Pollution and its ControlSources of Air Pollution 2 Boilers of 26 TPH & 30 TPH
â Type of Fuel used withconsumption
Biogass-69600 M 3/day with 26 TPH Boiler
Rice Husk-120 MTD & Biogass 32000 M3/day
with 30 TPH Boiler
> Stack details
-
45 M (Inner Dia 1.5 M) with 26 TPH Boiler
45 M (Inner Dia 1.5 M) with 30 TPH Boiler
.> APCS details 1. ESP with 30 TPH Boiler
tisiLbAspsasoci Distillery Format modified considering NGT directions
4
Samples collections points(if collected)
PM (mg/Nm3):
Result Awaited
Pic 3: Covered Compost Yard Pic 4: MEE adjacent to distillation column
Photographs indicating the status of the Industry
I 1.3
ngrba.cpcbagmail.com Distillery Format modified considering NGT directions
Pic 6: Discharge points (V notchavailable
• '41-.4.
5
E. Route of effluent to reach river Ganga/Yamuna
Outlet of Unit-Municipal Drain4 Kosi Rive-* Ramganga
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
"kitejrivA
Shri Vijay, AEEMoradabad, UPPCBShri U C Shukla, ASO,Moradabad, UPPCBShri A K Vishwakarma, SA,Moradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
Shri D C Mishra, Monitoring Asst.RO Moradabad, UPPCB
2 Date of reportSubmission
Stnu September, 2014
[email protected] Distillery Format modified considering NGT directions
4,1
n•nn•nn••n••••n••••
WwfCDID
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 04-09-2014
A: General InformationName of the unit and address M/S Rudra Bilas Kisan Sahkari Chini Mills Ltd.,
Bilaspur,Rampur
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri A. K. Sahni,Chief ChemistMOB. No- 09412849864
Year of Commissioning. 1978Sector Cooperative
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar220 MTD
6. Cane crushing capacity 2200 TCD
Cane crushed last year 172315.499 MT
Molasses generation 7852.9 MT
Press Mud generation 5169.45 MT
Operational status No Operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
Tube well
Industrial 1320 KLD
Domestic 302.94 KLD
Water Meter to show consumption Not Available
Flow measuring device installed atoutlet of ETP
Not Available
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
400 KLD240 KLD
5. Waste Water treatment capacity(KLD)> Industrial> Domestic
400 KLD ..
[email protected] Sugar Format modified considering NGT directions
Sources of Air Pollution Two Boilers of 20 TPH each> Type of Fuel used with
consumptionBagasse- 575 MTD
D Stack details 30 Meter combined stack, Inner dia of Stack-2,3 M
> APCS details 1. Dust collector (Show cause notice issued by
UPPCB to upgrade AMCS)
5. Samples collections points(if collected)
PM (mg/Nm3):
Photographs indicating locations:
., I -,,A,
.'II
r
III
Pic: 2 Chimney (one
Ita
in operation)
. 1;1
II
Pic 1:ClarifierE. Route of effluent to reach river Ganga/Yamuna
Kulli River-) West Begul River 4 Ramganga
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
-kilVftrk/A
Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEE ..RO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
2 Date of reportSubmission
th9 September, 2014
[email protected] Sugar Format modified considering NGT directions
2
Details of ETP> ETP Description with flow
diagram
Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,if any
Bar Screen- Oil & Grease Trap- Equalization
Tank - Aeration Tank —Secondary Clarifier ,
Sludge Drying Beds
..
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
400 KLD240 KLD
Mode of disposal of treated effluent(Details)
On Land (Ferti Irrigation)
Sample distributed into no. of parts(2/3)
N/A
Sludge disposal mode On land as manure
Effluent collection locations &analysis results (if collected)
Locations ParameterspH SOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet
Others
(I) Information regarding Ferti-irrigationDetails of treatment effluent before
Ferti-irrigationStorage Lined Lagoon 4000 KL
Command area for irrigation
(available land area)50 Acre own (Nearby Farmers Also)
System for dilution of treated
effluent required for ferti-irrigationNot Required
System of transportation of treated
effluent upto field.through Flexible pipe line
Formal agreements with farmers for
using treated effluentConsent by farmers
Storage facility available for treated
effluent during low demand period
As per (1)
Quality of effluent being used forferti-irrigation
No measuring device
around water monitoring network Not availableC: Air Pollution and its Control
[email protected] Sugar Format modified considering NGT directions
3 (4
ow...armor
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
pate of Insnection: 04-09-2014
A: General InformationName of the unit and address M/S National Industrial Corporation Ltd.,
Raja Ka Sahaspur, Billari,District- Moradabad.
Name of the Proprietor/ Contactperson - DesignationContact No.
Shri V.N. Ojha,General Manager,Ph. NO-09012270066
Year of Commissioning. 1943
Sector Private5. Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
ENA/RS/Absolute Alcohol60 KLD
.
40 KLD40 KLD
6. Raw materials & their requirement Molasses-200 MTD7. Operational status OperatingB: Water Pollution and its Control:
Water Supply Source
Water Consumption (KLD)
Tube well
Industrial 1050 KLD
Domestic 12 KLD
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)I=. Industrial> Domestic
10 KL/kl oppr at 40 KLD
400 KLD10 KLD
5. Waste Water treatment capacity(KLD))%. Industrialâ Domestic
750 KLD
rtgrba.cpcbggmail.coin Distillery Format modified considering NGT directions
2
Details of ETP> ETP Description with flow
diagram
Details of Reverse Osmosis plant,if any
> Details of Multi Effect Evaporator,if any
Bio digester 4 Settling pit- RO-ConcentratedEffluent used in Bio composition
Capacity of R 0 Plant-750 KLD
Not installed
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
RO permeate after degasification used incooling tower and Agriculture
About 10 KLDMode of disposal of treated effluent(Details)
On land (other than spent wash)
Sample distributed into no. of parts(2/3)
3
Sludge disposal mode ---
Effluent collection locations &
analysis results (if collected)
Rs!,
Zia
LocationsENQA2s27)
ParameterspH son
(mg/1)COD(mg/1)
TSS(mg/1)
RaOtzeretmeal.‘ $' 21 22 y 3 $„D L.
"lees" 1 1 7. 9 ict 47 90
(I) Information regarding Bio-compostingActive area for bio compost
preparation (m2)
7.5 Acre
Area for press mud storage (m 2 ) 2.0 Acre
Area for bio compost storage (m 2 ) 2.5 Acre
Spent wash storage capacity 22500 KL
Availability of pressmud Sugar Mills
Quantity of compost prepared
(Monthly statement of last year) 5400 MT
Quantity of pressmen procured
(Monthly statement) 17500 MT
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
30, L-90 M, H-1.8 M, W-3 M.
Distance between two windows 2 M.
Quantity of Effluent being used for
composting ( m3/day)
190-200 M3/day
Quantity of press mud being used 3500-4200 MT
[email protected] Distillery Format modified considering NGT directions
3
for one cycle • •
Maturity time in days for one cycle 55-60 days
Arrangement for rainy season No such arrangement for covered composting
observed however, Lining, catch pits and patch
drains were present.
13. Quality of ground water in the area
and depth of ground water table
No measuring device
(II) Information regarding Ferti-irrigationDetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)Command area for irrigation(available land area)
Not Required .
System for dilution of treatedeffluent required for ferti-irrigation
Not Required
System of transportation of treatedeffluent upto field.Formal agreements with farmers forusing treated effluentStorage facility available for treatedeffluent during low demand periodQuality of effluent being used forferti-irrigationGround water monitoring network (Available /Not available)
C: Air Pollution and its ControlSources of Air Pollution 10 TPH> Type of Fuel used with
consumptionPet coke - 4.0 MTDBio gas - 13000 m3/day
> Stack details 33 Meters (Inner Dia 1.8 Meter)
> APCS details Multi cyclone Dust Collector
5. Samples collections points(if collected)
PM (mg/Nm3):
Result Awaited
[email protected] Distillery Format modified considering NGT directions
4
Photographs depicting status of the industry:
Pic 2: RO
Pic 3: RO permeate after degasifier Pic 3: Compost Yard
I3.1.
ngrba.cpcbaxmaii.corn Distillery Format modified considering NGT directions
Pic 6: Multi cyclone
Pic: 5 Chimney
E. Route of effluent to reach river Ganga/Yamuna
Sahaspura Drains--Aril Rive-) Ramganga River
5
2
Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi
"kA6e1r1‘44
Shri Vijay, AEEMoradabad, UPPCBShri U C Shukla, ASO,Moradabad, UPPCBShri A K Vishwakarma, SA,Moradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB DelhiShri D C Mishra, Monitoring Asst.RO Moradabad, UPPCB
Date of reportSubmission
th9 September, 2014
ngrba.cocbggmail.com Distillery Format modified considering NGT directions
IBS4.414 Ws/ (.1/:,
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 04-09-2014
A: General InformationName of the unit and address M/s Ajudhya Sugar Mills,
Raja ka sahaspur, Bilari,Distt-Moradabad (U.P.)
Name of the Proprietor/ Contactperson - DesignationContact No,
Shri Sachendra Singh,D.G.M. ProductionMob. No.-08392912302
Year of Commissioning. 1940 New group operating since 2006
Sector Private5. Production details.
ProductsInstalled Prod. CapOperating capacity
Sugar300 MTD
6. Cane crushing capacity 3000 TCD
Cane crushed last year 224269.531 MT
Molasses generation(2013-14) 10272.8 MT
Press Mud generation (2013-14) 8881.06 MT
Operational status Non operational due to off seasonB: Water Pollution and its Control:
Water Supply Source(s)
Water Consumption (KLD)
1. Tube well
Industrial 1900 KLD
Domestic 62 KLD
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)> Industrial> Domestic
1070 KLD50 KLD
5. Waste Water treatment capacity(KLD)> Industrial> Domestic
Capacity-650 KLD
[email protected] Sugar Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow
diagram
> Details of Reverse Osmosisplant, if anyDetail's of Multi EffectEvaporator, if any
Bar Screen- Oil and Grease
Trap- Equalization Tank - Primary Settling
Tank- Aeration Tank - Secondary Settling
Tank - Carbon sand filter- Sludge Drying
Beds.
Waste water discharged (aftertreatment)(KLD)
IndustrialDomestic
•
1070 KLD50 KLD
Mode of disposal of treatedeffluent (Details)
On land (Ferti Irrigation)
Sample distributed into no. ofparts (2/3)
N/A
Sludge disposal mode On land as manure
Effluent collection locations &
analysis results (if collected)Locations Parameters
pH SOD(mg/0
COD(mg/0
TSS(mg/0
Outlet
Others
(I) Information regarding Ferti-irrigationUnder ConstructionDetails of treatment effluent
before Ferti-irrigation
Command area for irrigation
(available land area)
22 Acres own (Nearby farmers also)
System for dilution of treated
effluent required for ferti-irrigation
Not Required
System of transportation of
treated effluent upto field.
Flexible pipe line
Formal agreements with farmers
for using treated effluent
Consent by farmers
Storage facility available for
treated effluent during low
demand period
As (1)
Quality of effluent being used forferti-irrigation
Not available
Ground water monitoring network Not available
[email protected] Sugar Format modified considering NGT directions
01)
3
C: Air Pollution and its ControlSources of Air Pollution Boiler of 26 TPH and 32 TPH> Type of Fuel used with
consum stionBagasse- 312 MTD with 26 TPH BoilerBasasse- 360 MTD with 32 TPH Boiler
â Stack details with 26 TPH Boiler - Height 60 M, I.D. 2.5 mwith 32 TPH Boiler- Hei g ht 40 M I.D.3.0 m
â APCS'details 1. Cyclone Type Dust Collector Separatelywith both boilers.Unit under Maintenance
5. Samples collections pointsif collected
PM (mg/Nm3):
Photographs depicting status of the industry
. .
Pic 1: Entry Pic 2: ETP (at least 1)
E. Route of effluent to reach river Ganga/Yamuna
Sahas•ura Nala - Aril River - Ramsan•a - Gan•a
1 Name of officialsinspecting
Name & Designations Signature
Shri M K Biswas, Sc 'C'CPCB Delhi "bt-1. 'Shri Vijay, AEEMoradabad, UPPCBShri P P Singh, JEERO Moradabad, UPPCBShri Ananda Kumar Ngangom, JRFCPCB Delhi
2 Date of reportSubmission
9 th9 September, 2014
Kati
[email protected] Sugar Format modified considering NGT directions
Joint Inspection ReportSugar & Distillery Industries
Muzaffarnagar (U.P)
Hon'ble Tribunal directed CPCB & UPPCB to carry out the Joint Inspection of the Sugar &Distillery industrial units operating and discharging the effluents in Rivers Ganga and Yumuna.In this view, a team of CPCB & UPPCB comprises of following officials visited the Sugar &Distillery industrial units in Muzaffarnagar area:
Officials from CPCB, Delhi Official/s from UPPCBSh. Suneel Dave, Sc. `D' & I/c NGRBA Cell Sh. Vivek Rai , 11,0 .Sh. Azad Singh, RA-I Sh. Yogender, Semuyt-orii---
The following industries were inspected by the above team during 1 5 September, 2014 to 2nd
September, 2014:
Sr. No. Name & Address of Industrial Unit, visited Joint Inspection Report
M/s D.S.M Sugar, Mansurpur, Meerut RoadMuzaffarnagar (U,P).
Annexure-I
M/s Sir Shadi Lal Distillery & Chemical Works,Mansurpur, Muzaffarnagar (U.P).
Annexure-Il
M/s Triveni Enggineering & Industries Ltd (Sugar unit),Khatauli, Muzaffarnagar (U.P).
Annexure-III
M/s Tikaula Sugar Mills Lts; Tikaula, Ramray,Muzaffarnagar (U.P).
Annexure-IV
M/s Tikaula Distillery, Tikaula, Muzaffarngar (U.P). Annexure-V
M/s Triveni Engg. & Industries Ltd., Bilaspur, Jolly Road,Muzaffarnagar (U.P).
Annexure-VI
M/s Bajaj Hindustan Ltd., Bhaisana, Muzaffarrnagar(U.P). ______
Annexure-VII
M/s Upper Doab Sugar Mill, Shamli, Muzaffarnagar (U.P) Annexure-VIII
M/s Shamli Distilleries & Chemical Works, Shamli,Muzaffarnagar (U.P).
Annexure-IX
M/s Unn Sugar Complex, Unn, Shamli, Muzaffarnagar(U.P).
Annexure-X
II. M/s Bajaj Hindustan Ltd.,Thanabhawan, Shamli,Muzaffarnagar (U.P).
Annexure-XI
Observations:
All the Industrial plants were found not in operation during inspection and hence no
production.
This implies that the Effluent Treatment Plants were also not in operation.
0410‘11(1°11-\n v(Su j Dafe)
Sc. `D' & 1/c NGRBA CellCPCB, Delhi
k
RtAtt-?
(Vivek Rai)Regional Officer
UPPCB, Muzaffarnagar
193
CO)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General InformationName of the unit and address M/s Bajaj Hindustan Ltd., Thanabhawan
Shamli, Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact No.
Sh. Sanjay T ipathi (V.P)
Year of Commissioning. 2005Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar10000 TCD-
6. Cane crushing capacity 10000 TCD
Cane crushed last year 850897.192 Tonns
Molasses generation 45276.800 Tonns
Press Mud generation 37269.297 Tonns
Operational status Closed by direction.
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tube Well
Industrial 3280Domestic 70
Water Meter to show consumption AvailableFlow measuring device installed at outletof ETP
V notch (Flow measurementcalibration and manual means).
through
Waste Water generation (KLD) (beforetreatment)â Industrialâ Domestic
1000 (approx.)50
5. Waste Water treatment capacity (KLD)â Industrialâ Domestic
100050
ngrba.cpcb@gmaitcom Sugar Format modified considering NGT directions
I 9
2
Details of ETPâ ETP Description with flow diagram
â Details of Reverse Osmosis plant, ifany
â Details of Multi Effect Evaporator, ifany
Oil & Grease trap --0 Chemical mixing TankPrimary
SecondarySludge drying
TankAeration
--0 EqualisationClarifier-0Clarifier—► ACF/Sandbeds.-
--0Tank--►filter &
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1000 (approx)50
Mode of disposal of treated effluent(Details)
On land (Within factory premises),Howeveino assessment of same due to non-operatiorof unit.
Sample distributed into no. of parts (2/3) Sample not collected as unit was not itoperation.
Sludge disposal mode On Horticulture land as manure.Effluent collection locations & analysisresults (if collected)
(No Sample)
Locations ParameterspH BOD
Ong/0CODOng/0
TSS(mg/r,-Outlet - - -
Others -(I) Information regarding Ferti-irrigation
Details of treatment effluent before Ferti-
irrigation
Activated sludge Treatment followed by
sludge separation.
Command area for irrigation (available
land area) Factory premises
System for dilution of treated effluent
required for ferti-irrigation No details provided.
System of transportation of treated
effluent upto field. Nill
Formal agreements with farmers for
using treated effluent No record provided.
Storage facility available for treated
effluent during low demand period No storage provided.
Quality of effluent being used for ferti-irrigation
After secondary Treatment
Ground water monitoring network Available
ngrba.cpcb@gmaiLcorn Sugar Format modified considering NGT directions
C: Air Pollution and its ControlSources of Air Pollution Boilers> Type of Fuel used with consumption
Bagasses> Stack details Stack Height > 30 mtrs.> APCS details Wet Scrubber
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm :
___
Photographs indicating locations: Photographs could not be taken due to out o.
battery-power of smart phone.
3.2" x3.2"
Pic 1: Entry
Pic 2: ETP (at least 1)
Pic 4: Discharge points
Pic: 3 Chimney (All visible)
3
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchmentEffluent (Raw/Treated) from outlet drain of unit
River Yamuna via seasonal drain.
► Discharge to
1 Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCB$70i&°'\\
(-ono/
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. ,‘,04
oti iiteSh. Yogender,UPPCB, Muzaffarnagar. \`--\
Sh. Azad Singh, RA-1, CPCB /5--- /c7
2 Date of reportSubmission Oc6,"\ c\i‘°(
[email protected] Sugar Format modified considering NGT directions
nn•nnnn•••••nn•nn
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General InformationName of the unit and address M/s Unn Sugar Complex, Unn, Shamli
Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact No.
Sh. Anil Gupta (G.M; Engg.)0975921563 5
Year of Commissioning. 1996Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar4200 TCD4000-4200 TCD
6. Cane crushing capacity 4200 TCD
Cane crushed last year 517634.970 Tonns
Molasses generation 27339.500 Tonns
Press Mud generation 25208.823 Tonns
Operational status Non Operational (Seasonal industry)
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tube Well
Industrial 2000Domestic 231
Water Meter to show consumption AvailableFlow measuring device installed at outletof ETP
Available-V notch. Flow measurement bycalibration and manual means.
Waste Water generation (KLD) (beforetreatment)â Industrialâ Domestic
-
1000 (approx.)170
5. Waste Water treatment capacity (KLD)â Industrialâ Domestic
1200170
[email protected] Sugar Formal modified considering NGT directions
► 922
Details of ETPâ ETP Description with flow diagram
â Details of Reverse Osmosis plant, ifany
â Details of Multi Effect Evaporator, ifany
Screens--► Oil & Grease Limetrap ---nTank—* Primary Clarifier ► AerationTank—* Secondary Clarifier—+ Lagoon &Sludge drying beds.
_
-
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1000 (approx)Nill
Mode of disposal of treated effluent(Details)
On land. However no assessment of samedue to non-operation of unit.
Sample distributed into no. of parts (2/3) Sample not collected as unit was not itoperation.
Sludge disposal mode On Agriculture land as manure.Effluent collection locations & analysisresults (if collected)
(No Sampe)
Locations ParameterspH SOD
Ong/0CODOng/0
TSS(mg/IJ
Outlet - - - -Others - - - -
(I) Information regarding Ferti-irrigationDetails of treatment effluent before Ferti-
irrigation
Aerobic Treatment followed by secondary
clarifier & lagooning.
Command area for irrigation (available
land area) 23 Hectare approx (Own farm)
System for dilution of treated effluent
required for ferti-irrigation Nill
System of transportation of treated
effluent upto field. Direct (via channel) as well as through Tankers
Formal agreements with farmers for
using treated effluent No record provided/
Storage facility available for treated
effluent during low demand period Lagoon
Quality of effluent being used for ferti-irrigation
After Secondary treatment
Ground water monitoring network Available
C: Air Pollution and its Control
[email protected] Sugar Format modified considering NGT directions
3
Sources of Air Pollution Boilersâ Type of Fuel used with consumption
Bagasses 900 TPD (approx.)
> Stack details Stack Height >30 mtrs.
> APCS details
5. Samples collections points(if collected)
(No sample)
PM (mg/Nm3):
Photographs indicating locations: Photographs could not be saved due to low battery.
3.2" x3.2"
Pic 1: Entry
Pic 2: ETP (at least 1)
Pic: 3 Chimney (All visible)
Pic 4: Discharge points
ngrba.cpcbQgmaiLcom Sugar Format modified considering NGT directions
2,0 5
4
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment Effluent (Raw/Treated) from outlet drain of unit
River Yamuna via seasonal drain.
► Discharge to
1 Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCBI ,
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. Vi i.va'
al,1104,Sh. Yogender,UPPCB, Muzaffarnagar. 40-
04A`M
4-- /' '-------Sh. Azad Singh, RA-1, CPCB
(7
2 Date of reportSubmission
(41ko`Pft \
[email protected] Sugar Format modified considering NGT directions
sirNIP/
00)CDCENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: General InformationName of the unit and address M/s Upper Doab Sugar Mill, Shamli, Distt-
Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact No.
Sh. A.M. Garg (A.G.M)09412212082
Year of Commissioning. 1933Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar600 Tonns/day-
6. Cane crushing capacity 6250 Tonn/d y
Cane crushed last year 879203.500 Tonns
Molasses generation 43676.100 Tonns (During last year)
Press Mud generation 37102.400 Tonns (During last year)
Operational status Closed by Owner (due to off-season)
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tube Well
Industrial 2900 (approx.)Domestic 500
Water Meter to show consumption AvailableFlow measuring device installed at outletof ETP
Not available
Waste Water generation (KLD) (beforetreatment)â Industrialâ Domestic
1500 (approx.)350
5. Waste Water treatment capacity (KLD))=. Industrialâ Domestic
1600 (approx.)
nrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETP> ETP Description with flow diagram
> Details of Reverse Osmosis plant, ifany
> Details of Multi Effect Evaporator, ifany
Roori filter—, Oil & Grease trap Lime--►Tank—, Aerobic Lagoon —, Clarifier—♦Sludge drying beds._
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
1500 (approx).
Mode of disposal of treated effluent(Details)
On land. However no assessment of samedue to non-operation of unit.
Sample distributed into no. of parts (2/3) Sample not collected as unit was not inoperation.
Sludge disposal mode On Agriculture/Horticulture land as manure.Effluent collection locations & analysisresults (if collected)
(No Sample)
Locations ParameterspH BOD
(mg/I)-
COD(mg/I)-
TSS(mg/I) -Outlet -
Others - - - -(I) Information regarding Ferti-irrigation
Details of treatment effluent before Ferti-
irrigation
Aerobic lagooning followed by sludge
separation.
Command area for irrigation (available
land area) 20 acre app
System for dilution of treated effluent
required for ferti-irrigation Not provided.
System of transportation of treated
effluent upto field.
,..
Not provided.
Formal agreements with farmers for
using treated effluent N/A
Storage facility available for treated
effluent during low demand period Storage Tank provided
Quality of effluent being used for ferti-irrigation
After Secondary treatment
Ground water monitoring network AvailableC: Air Pollution and its Control
Sources of Air Pollution Boilers 4 Nos> Type of Fuel used with consumption
[email protected] Sugar Format modified considering NGT directions
3
Bagasses approx. 1500 TPD
Stack Height> 30 mtrs.> Stack details> APCS details Wet Scrubber
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm3):
Photographs indicating locations:
3.2" x3.2"
.,.
11110 . o
*Iimmoses4 NS i
.. ..0,t
i .11" tiA •
r ,,i fill00
III'
Pic 1: Entry
4,
_
,,
. I
L.:—
1 --ii
r
'
. I
I
Pic 2: ETP (at least 1)
,
•
.SL
.-
i 4..6
1
,,
[email protected] Sugar Format modified considering NGT directions
*Discharge to River Yamuna via
Effluent (Raw/Treated) from outlet drain of unit
line *Municipal main sewer/Nalla
seasonal drain.
► Storm-line/ Sewer
4
Pic: 3 Chimney (All visible)
.
' , I
i "IA, 7 •
4...
10" . fl?,*piPic 4: Discharge points
E Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
1 Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc `D', CPCBitcli
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar.
11,41- PIo eid i(//1
Sh. Yogender,UPPCB, Muzaffarnagar.
-47--%-oq,\11H
Sh. Azad Singh, RA-1, CPCB /7C7 P----s" ,
2 Date of reportSubmission
8/Pcf/e1^914f
[email protected] Sugar Format modified considering NGT directions
(011)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
Date of Inspection: 02-09-2014
A: tienerai inrormatliniName of the unit and address M/s Bajaj Hindustan Ltd., Bhaisana,
Muzaffarrnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact No.
Sh. R.S.Choudhary (Vice President & unithead)
Year of Commissioning. 2005Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar10000 TCD-
6. Cane crushing capacity 10000 TCD
Cane crushed last year 1084824.320 Tonns
Molasses generation 58044.200 Tonns
Press Mud generation 47406.822 Tonns
Operational status Closed by direction.
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tube Well
Industrial 3460Domestic 70
Water Meter to show consumption AvailableFlow measuring device installed at outletof ETP
V notch (Flow measurement throughcalibration and manual means)
Waste Water generation (KLD) (beforetreatment)> Industrial > Domestic
100050
5. Waste Water treatment capacity (KLD)IndustrialDomestic
1000 (approx.)50 (Septic Tank)
nrg±gzpcb@gmaiLcom Sugar Format modified considering NGT directions
06
2
Details of ETPâ ETP Description with flow diagram
â Details of Reverse Osmosis plant, ifany
â Details of Multi Effect Evaporator, ifany
Oil & Grease trap Chemical---n mixing lank--• Equalisation Tank —,. PrimaryClarifier—* Aeration Tank—, SecondaryClarifier—► ACF/Sand filter & Sludge drying
_beds.
-Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1000 (approx)50
Mode of disposal of treated effluent(Details)
On land (Within factory premises). Howeverno assessment of same due to non-operationof unit.
Sample distributed into no. of parts (2/3) Sample not collected as unit was not inoperation.
Sludge disposal mode On Horticulture land as manure.Effluent collection locations & analysisresults (if collected)
(No Sample)
Locations ParameterspH BOD
Ong/0CODOng/0-
TSSOng/0-Outlet - -
Others - - - -(I) Information regarding Ferti-irrigation
Details of treatment effluent before Ferti-
irrigation
Activated sludge Treatment followed by
sludge separation.
Command area for irrigation (available
land area) Factory premises
System for dilution of treated effluent
required for ferti-irrigation No details provided.
System of transportation of treated
effluent upto field. Nill
Formal agreements with farmers'for
using treated effluent No record provided.
Storage facility available for treated
effluent during low demand period No storage provided.
Quality of effluent being used for ferti-irrigation
After secondary Treatment
Ground water monitoring network Available
ngrbacpcb@gmaiLcom Sugar Format modified considering NGT directions
C144
C: Air Pollution and its ControlSources of Air Pollution Boilers> Type of Fuel used with consumption
BagassesStack Height >30 meters.â Stack details
> APCS details Wet Scrubber
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm :
___
Photographs indicating locations:
3.2" x3.2"
' 9,
‘ v
°
Pic 1: Entry
1
4
0, , .
'''' 1 1PPini
' t 4Ft t,
''. 44 '
.
1
--,
.
Pic 2: ETP (at least 1)
' '
1
,
101
t 11.
.
[email protected] Sugar Format modified considering NGT directions
► Discharge to
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchmentEffluent (Raw/Treated) from outlet drain of unit
River Yamuna via seasonal drain.
Pic: 3 Chimney (All visible)
4
Pic 4: Discharge points
Name of officialsinspecting
Name & Designations
-Signature
Sh. Suneel Dave, Sc 'D', CPCBk,octP
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. (LI,
d di, ‘,1Sh. Yogender,UPPCB, Muzaffarnagar.
-4:7---0419 \ kl
Sh. Azad Singh, RA-1, CPCB
c4- of / 9
2 Date of report Submission 0 9A
°6\1 1,0'
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2CO3„
Nat"CITCO31
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 01-09-2014
A: General InformationName of the unit and address M/s Tikaula Sugar Mills Lts; Tikaula, Ramray
Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact No.
Sh. R.K Jain (Occupier)
Year of Commissioning. 1998-1999Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar700 MT700 MT
6. Cane crushing capacity 7000 Tonn/day
Cane crushed last year 651342.171 Tonns
Molasses generation 30850.00 Tonns
Press Mud generation 28791.9 Tonns
Operational status Closed by Own ( due to off- season)
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. 2 Nos. Tube WellIndustrial 3600Domestic 200
Water Meter to show consumption Not availableFlow measuring device installed at outletof ETP
V Notch available (Flow recording throughcalibration & manual measurement).
Waste Water generation (KLD) (beforetreatment)) Industrial) Domestic
120040
5. Waste Water treatment capacity (KLD)) Industrial
Domestic1200
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETPETP Description with flow diagram
D Details of Reverse Osmosis plant, ifany
D Details of Multi Effect Evaporator, ifany
Oil & Grease trap Primary ClarifierClarifier--*
---•—+Aeration Tank —+ SecondarySludge drying beds._
Waste water discharged (aftertreatment)(KLD)
IndustrialDomestic
1200
-Mode of disposal of treated effluent(Details)
On land. However no assessment of samEdue to non-operation of unit.
Sample distributed into no. of parts (2/3) Sample not collected as unit was not itoperation.
Sludge disposal mode Bio-composting.
Effluent collection locations & analysisresults (if collected)
( No Sample)
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet -Others -
(I) Information regarding Ferti-irrigationDetails of treatment effluent before Ferti-
irrigation
Aerobic treatment followed by sludgE
separation.
Command area for irrigation (available
land area) Nearby agriculture land
System for dilution of treated effluent
required for ferti-irrigation Not available
System of transportation of treated
effluent upto field. Through tankers.
Formal agreements with farmers for
using treated effluent Record not provided.
Storage facility available for treated
effluent during low demand period Lagoons in ETP of Tikaula distillery.
Quality of effluent being used for ferti-irrigation
After secondary Treatment
Ground water monitoring network Available
C: Air Pollution and its ControlSources of Air Pollution Boilers 3 Nos; (Total capacity 145 Tonns)D Type of Fuel used with consumption
Bagasses
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
3
â Stack details Stack Height >30 mtrs.
â APCS details Wet scrubber
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm :
Photographs indicating locations:
3.2" x3.2"
Pic 1: Entry
yJ
n i
. •
vit
Pic 2: ETP (at least 1)
[email protected] Sugar Format modified considering NGT directions
Pic 4: Discharge pointsPic: 3 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Effluent (Raw/Treated) from outlet drain of unit
River Ganga via tributary/seasonal drain.
via Surface run-off from catchment -• Discharge to
4
Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCB , fA\thCb(
v,;41.((,4--i-
0GO \c1 \\''
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar.Sh. Yogender,UPPCB, Muzaffarnagar.Sh. Azad Singh, RA-1, CPCB c /t,,—/'_--
2 Date ofSubmission
report ,
[email protected] Sugar Format modified considering NGT directions
711)
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 01-09-2014
•A: benerai inrormationName of the unit and address M/s Triveni Enggineering & Industries Ltc
(Sugar unit), Khatauli, Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact No.
Sh. Niranjan Singh (AGM;legal)/Sh. Deep Malik (Sr. Manager; Process)09897055900/09634105999
Year of Commissioning. 1933Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Refined Sugar1600 TPD
,
6. Cane crushing capacity 16000 Tonn/ ay
Cane crushed last year 1264959.556 Tonns
Molasses generation 62532.80 Tonns
Press Mud generation 62615.495 Tonns
Operational status Closed by Own (due to off-season)
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. Tube Well
Industrial 5500Domestic 1000
Water Meter to show consumption AvailableFlow measuring device installed at outletof ETP
V Notch; flow measurement throughcalibration and manual means.
Waste Water generation (KLD) (beforetreatment)> Industrial> Domestic
1800 (approx.)600
5. Waste Water treatment capacity (KLD)IndustrialDomestic
1650600
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETP> ETP Description with flow diagram
â Details of Reverse Osmosis plant, ifany
> Details of Multi Effect Evaporator, ifany
Oil & Grease —+trap —, Anaerobic PondAeration Tank --* Clarifier-- , Lagoon &Sludge drying beds._ r =7p ti., 1,,„/,), 6 („(Q.kr,
41, lAck.„,,, iko-te, Ca a. CZ cg-.:1
_0,,a( '
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1650.600
Mode of disposal of treated effluent(Details)
On land. However no assessment of samedue to non-operation of unit.
Sample distributed into no. of parts (2/3) Sample not collected as unit was not inoperation.
Sludge disposal mode As manure on land for agriculture.11. Effluent collection locations & analysis
results (if collected)
(No Sample)
Locations ParameterspH BOD
(mg/I)COD(mg/I)
TSS(mg/I)
Outlet - - - -Others - - - -
(I) Information regarding Ferti-irrigationDetails of treatment effluent before Ferti-
irrigation
Anaerobic-Aerobic treatment followed by sludge
separation and lagooning.
Command area for irrigation (available
land area) Nearby agriculture land ( approx. 34 hectare)
System for dilution of treated effluent
required for ferti-irrigation Mixing with ground water.
System of transportation of treated
effluent upto field. Through Hume Pipe
Formal agreements with farmers for
using treated effluent No record provided.
Storage facility available for treated
effluent during low demand period Lagoons
Quality of effluent being used for ferti-irrigation
After secondary Treatment
Ground water monitoring network Available
C: Air Pollution and its ControlSources of Air Pollution Boilers 3 Nos; (Total capacity 145 Tonns)> Type of Fuel used with consumption
Bagasses
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
3
> Stack details Stack Height >30 mtrs,> APCS details
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm :
Photographs indicating locations:
3.2" x3.2"
..
,
,
Pic 1: Entry
_,...„-.....----_---,,
,
. ,,,
,, .
,_
...,
—
Pic 2: ETP (at least 1)
...,
4,1 .,-,,r------ --,-
_ _ - - - ' • we: F-: z , -.,.....
,
,
nt_gLbs•[email protected] Sugar Format modified considering NGT directions
Pic: 3 Chimney (All visible)
► Discharge to River Ganga via
Effluent (Raw/Treated) from outlet drain of unit
line ► Municipal main sewer/Nalla
tributary/seasonal drain.
Pic 4: Discharge points
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass► Storm-line/ Sewer
Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCBIlly, tol
,,,,,,A
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. ‘660.1tcl
ocblc\\''1------—Sh. Yogender,
UPPCB, Muzaffarnagar.Sh. Azad' Singh, RA-1, CPCB
d 7
. -
2 Date ofSubmission
report0`316q1(1-811-t
[email protected] Sugar Format modified con ering NGT directions
1)-ikeTW
CD&CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Sugar
Date of Inspection: 01-09-2014
A: General InformationName of the unit and address M/s D.S.M Sugar, Mansurpur, Meerut Road
Muzaffarnagar (U.P).
Name of the Proprietor/ Contact person -DesignationContact Nb.
Sh. Sanjay Sharma (V.P)/Sh. Sarad Raz Khan (Dy Mgr, Q.C)0171717833
Year of Commissioning. 1933Sector Private
5. Production details.ProductsInstalled Prod. CapOperating capacity
Sugar7000 TCD-
6. Cane crushing capacity 7000 Tonn/d y
Cane crushed last year 848700 Tonns
Molasses generation 42100 Tonns (During last year)
Press Mud generation 29700 Tonns (During last year)
Operational status Closed by Own ( due to off season)
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. 3 Nos. Tube Well
Industrial 2500 (approx.)Domestic 100
Water Meter to show consumption Not availableFlow measuring device installed at outletof ETP
Not available
Waste Water generation (KLD) (beforetreatment)) Industrialâ Domestic
1500 (approx.)100
5. Waste Water treatment capacity (KLD)â Industrial
Domestic1500 (approx.)-
ngrba.cpcb@gmaiLcom Sugar Format modified considering NGT directions
2
Details of ETPETP Description with flow diagram
â Details of Reverse Osmosis plant, ifany
> Details of Multi Effect Evaporator, i fany
Oil & Grease trapEqualization Tank---►Secondary Clarifier_
-
Primary ClarifierAeration Tank—*
--n --*
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
1500 (approx.)-
Mode of disposal of treated effluent(Details)
In Surface Water (through nalla/drain).
Sample distributed into no. of parts (2/3) Sample not collected as unit was not inoperation.
Sludge disposal mode On Agriculture land as manure.Effluent collection locations & analysisresults (if collected)
(No Sample)
Locations ParameterspH BOD
(mg/I)COD(mg/l)-
TSS(mg/I) -Outlet - -
Others -
(I) Information regarding Ferti-irrigation - Not practicedDetails of treatment effluent before Ferti-
irrigation
-
Command area for irrigation (available
land area) -
System for dilution of treated effluent
required for ferti-irrigation -
System of transportation of treated
effluent upto field. -
Formal agreements with farmers for
using treated effluent -
Storage facility available for treated
effluent during low demand period_
Quality of effluent being used for ferti-irrigation
-
Ground water monitoring network -
C: Air Pollution and its ControlSources of Air Pollution Boilers2 Nos;capacity 90Tonns & 100 Tonns)> Type of Fuel used with consumption
Bagasses3. > Stack details Stack Height >30 mtrs.
[email protected] Sugar Format modified considering NO' directions
3
4. > APCS details Electro-static precipitator
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm3):
-
Photographs indicating locations:
3.2" x3.2"
:... , .•
r
'r \ v .„ \\
Pic 1: Entry
%,.
/'
,.
Pic
f
,-.
'I
2: ETP (at least 1)
.. ;
_ J_,r , - 41 4 ' n WM-
- n I
f )— t- -r.S1 I 1---
fI / I I, 1
- .v
Pic: 3 Chimney (All visible)
-
I
Pic 4: Discharge points
,
.
0 t '
,
.
.
• .
••
..,,
..hi--
n
[email protected] Sugar Format modified considering NGT directions
4
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Effluent (Raw/Treated) from outlet drain of unit
lo• Municipal main sewer/Nalla
tributary/seasonal drain.
r Nearb Nalla
*Discharge to River Ganga via
Name of officialsinspecting
Name & Designations Signature
Sh. SuneelSuneel Dave, Sc 'D', CPCBadik 14A
Sh. Vivek Roy, R,0UPPCB, Muzaffarnagar. li cVoi
Sh. Yogender,UPPCB, Muzaffarnagar. 4ct---V\\'''\Sh. Azad Singh, RA-1, CPCB /,
f----`` /
2 Date of reportSubmission olo 61 rglii
[email protected] Sugar Format modified considering NGT directions
vv./CO)
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery
Date of Inspection:01/09/2014
A: General InformationName of the unit and address M/s Sir Shadi Lal Distillery & Chemical Works,
Mansurpur, Muzaffarnagar.
Name of the Proprietor/ Contactperson - DesignationContact No.
Sh. S.K. Gupta (Associate V.P)/Sh. Ompal Singh (G.M Prouction)01396-252249
Year of Commissioning. 1961
Sector Private5. Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Rectified Sprit82 KLD
-
6. Raw materials & their requirement Molasses; 350 MT/day
7. Operational status Closed by own.
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube well
._,Industrial 8200 KLD
Domestic 5 KLD
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)
Industrial> Domestic
1148 KLD
5 KLD .
5.
IWaste Water treatment capacity(KLD)
Industrial > Domestic
1225 KLD (Ana. digestion & Bio composting)5 KLD (Soak Pit)
[email protected] Distillery Format modified considering NGT directions
2
Waste Water treatment capacity(KLD)
Industrial> Domestic
1225 KLD (Ana. digestion & Bio composting)5 KLD (Soak Pit)Primary Sedimentation Tank—. Anaerobicdigester coupled with gas holder—, R.0
Li LiLagoon & composting
R.0 of capacity 540 KLD has been provided.
No MEE has been provided.
Details of ETPâ ETP Description with flow diagram
> Details of Reverse Osmosis plant,if any
â Details of Multi Effect Evaporator,if any
Waste water discharged (aftertreatment)(KLD)
IndustrialDomestic
Zero-liquid discharge as UPPCB has stipulatedconsent condition of Zero-liquid discharge.However no assessment of same due to non-operation of unit,On land/ Surface water: N/A.Bio-composting leading to Zero liquiddischarge. However no assessment of samedue to non-operation of unit.
Mode of disposal of treated effluent(Details)
Sample distributed into no. of parts(2/3)
Samples not collected as the unit was not inoperation. Bio-compostingSludge disposal mode
11. Effluent collection locations &
analysis results (if collected)
(No Sample)
Locations ParameterspH BOD
(mg/I)COD(mg/I)-
TSS(mg/I)-Outlet -
Others - - - -
(I) Information regarding Bio-compostingActive area for bio compost
preparation (m2) 59880.8
Area for press mud storage (m 2 ) 16187.2
Area for bio compost storage (m 2 ) 6474.912
Spent wash storage capacity 20,275 cum
Availability of pressmud 9301 MT approx
Quantity of compost prepared
(Monthly statement of last year)
1133 MT/month
Quantity of pressmen procured
(Monthly statement)
7121.69 MT/month approx
Details of wind roses (Number, Approx 20 No per cycle and of dimension
ngrba.cpcbAgtnail.corn Distillery Format modified considering NGT directions
3
length, height, width of stacking,
space between two wind rose)
120mx3mx1.25m at a spacing of 2-3m.
Approx 10 cycle per annum.
Quantity of Effluent being used for
composting ( m3/day)
550 KLD approx
Quantity of press mud being used for
one cyCle
Approx 7500MT
Maturity time in days for one cyCle 60 days
Arrangement for rainy season Effluent storage lagoons provided.
13. Quality of ground water in the area
and depth of ground water table
-
(II) Information regarding Ferti-irrigation N/ADetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)
-
Command area for irrigation (available land area)
-
System for dilution of treatedeffluent required for ferti-irrigation
-
System of transportation of treated effluent upto field.
-
Formal agreements with farmers for using treated effluent
--
Storage facility available for treatedeffluent during low demand period
-
Quality of effluent being used for ferti-irrigation
-
Ground water monitoring network -C: Air Pollution and its Control
Sources of Air Pollution Boiler> Type of Fuel used with
consumptionBio-gas, Rice Husk
> Stack details Stack height > 30 mtrs.
> APCS details Dust collectors
5. Samples collections points(if collected)
PM (mg/Nm :
[email protected] Distillery Format modified considering NGT directions
4
(No Sample)
Photographs indicating locations:
Entry of Bottling plant
3.2" x3.2"
Pic : Entry of unitPic : ETP (at least 1)
[email protected] Distillery Format modified considering NGT directions
S
•
n
6 k 4 4 '
04 1 1 4 11
i '
/
2," ,.,.. 1
.,..- (• ,....,-
.....v..2.,-..., -,..n .7.
"4 ''' 1*,.._
. ;1.1,1 1 II1,0'"°
" •
Pic : Compost Yard Pic : RO
. , , .
-434
1 ''
l'' t1
4. . n
t- 4 ..,
1 i
ill a-46
. qi.• ''' ''
li, ‘(,..)&,,t
- •
o
A
:f ,
...g f :Pi ,7`
Pic: Chimney (All visible) Pic : Discharge points
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
Effluent (Raw/Treated) ► Municipal mainfrom outlet drain of unit
via tributary/seasonal drain.sewer/Nalla ► Discharge to River Ganga
[email protected] Distillery Format modified considering NGT directions
C"vt (6 5444.61-./- bi‘c+f
) MksName of officialsinspecting
r
Name & DesignationsV ' 1_1_,_
Signature
Sh. Suneel Dave, Sc 'D', CPCB11, ok1
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. b,
6?)1,6 0 'Sh. Yogender,UPPCB, Muzaffarnagar. -A--\—0% \9 )NSh. Azad Singh, RA-1, CPCB
2 Date ofSubmission
report0`0°11v*
[email protected] Distillery Format modified considering NGT directions
Nr"araiVW
COO)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Distillery
Date of Inspection:01/09/2014
A: General InformationName of the unit and address M/s Tikaula Distillery, Tikaula, Muzaffarnagar.
Name of the Proprietor/ Contactperson - DesignationContact No.
Sh. 0.P Sharma (V.P)/Sh. G.K.Gupta (G.M)01396-246508/2465282003Year of Commissioning.
Sector Private
5. Production details.ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
.Rectified Sprit, Special Denatured Sprit
30 KLD
30 KLD-
6. Raw materials & their requirement Molasses; 1100-1200 MT/day (Approx.)
7. Operational status Closed by own/Non-operational.
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube well
Industrial 612 KLD
Domestic Nill
Water Meter to show consumption Not available
Flow measuring device installed atoutlet of ETP
Not available
Waste Water generation (KLD)(before treatment)> Industrial
Domestic300 KLDNill
5. Waste Water treatment capacity(KLD)> Industrial> Domestic Nill
300 KLD (Ana. digestion & Bio composting)
[email protected] Distillery Format modified considering NGT directions
2
Details of ETP> ETP Description with flow diagram
> Details of Reverse Osmosis plant,if any
â , Details of Multi Effect Evaporator,if any
Primary Sedimentation TankAnaerobic digester coupled
- Ai ° (./1"` 0r— 'Ll
- iNi d ir7" )--- • U.
► Buffer Tank---*holder
Li& compost yardLagoon
with gas
Waste water discharged (aftertreatment)(KLD)
IndustrialDomestic j
Zero-liquid discharge as UPPCB has stipulatedconsent condition of Zero-liquid discharge.However no assessment of same due to non-operation of unit. On land/ Surface water: N/A.Bio-composting leading to Zero liquid discharge.However no assessment of same due to non-operation of unit.Samples not collected as the unit was not in
operation.
Mode of disposal of treated effluent(Details)
Sample distributed into no. of parts(2/3)Sludge disposal mode Bio-composting
Effluent collection locations &
analysis results (if collected)
(No Sample)
Locations ParameterspH BOD
m•/1-
COD/II
-
TSS(ing/1) -Outlet -
Others - - -
(I) Information regarding Bio-compostingActive area for bio compost
preparation (m2) 36000
Area for press mud storage (m ) 25600
Area for bio compost storage ( m 2 ) 2100
Spent wash storage capacity 28987.5 KL
Availability of pressmud 10780 MT approx
Quantity of compost prepared
(Monthly statement of last year)
6916 MT
•
Quantity of pressmen procured
(Monthly statement)
28792 MT approx
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
40 Wind roses (120mx3mx1.25m) @ 2m c/c
[email protected] Distiller)) Format modified considering NGT directions
3
Quantity of Effluent being used for
composting ( m 3/day) :
250-300 KLD approx
Quantity of press mud being used for
one cycle
Approx 2750MT
Maturity time in days for one cycle 45-60 days
Arrangement for rainy season Lagoons are available.
13. Quality of ground water in the area
and depth of ground water table
-
Information regarding Ferti-irrigation N/ADetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)
-
Command area for irrigation (available land area)
-
System for dilution of treated effluent required for ferti-irrigation
-
System of transportation of treated effluent upto field.
-
Formal agreements with farmers for using treated effluent
-
Storage facility available for treated effluent during low demand period
-
Quality of effluent being used forferti-irrigationGround water monitoring network - j
Ai r Pollution and its ControlSources of Air Pollution Boiler ( 12 T.P.H)
Bio-gas, Bagassesâ Type of Fuel used withconsumption
> Stack details Stack of height 30 m s
> APCS details Multi-cyclone..
5. Samples collections points(if collected)
(No. Sample)
PM (mg/Nm :
[email protected] Distillery Format modified considering NGT directions
Pic 1: Entry of unit Pic 2: ETP (at least 1)
Pic 3: Compost Yard
Pic 4: RO & MEE
4
Photographs indicating locations:
3.2" x3.2"
[email protected] Distillery Format modified considering NGT directions
Pic 6: Discharge pointsPic: 5 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
Effluent (Raw/Treated) from outlet drain of unit
River Ganga via tributary/seasonal drain.
► Discharge to
5
1 Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCB\
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar.
1, „kid q6. itJ,
Sh. Yogender,UPPCB, Muzaffarnagar.
—i,_.\-0S\e*1\`-\
Sh. Azad Singh, RA-L, CPCB / /i-4-----"is ,91/1
2 Date ofSubmission
report O oh
[email protected] Distillery Format modifie nsidering NGT directions
fa"Ir
ccO)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Distillery
Date of Inspection:01/09/2014
Ils VGIIGI PI ailiva ...".1.....
Name of the unit and address M/s Triveni Engg. & Industries Ltd (Alco-chemicalcomplex), Bilaspur, Jolly road, Muzaffarnagar.
Name of the Proprietor/ Contactperson - DesignationContact No.
Sh. R. Kandpal (G.M)07895900632
Year of Commissioning. 2007
Sector Private5. Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
ENA, Absolute alcohol & Rectified Sprit
160 KLD
160 KLD
6. Raw materials & their requirement Molasses; 720 Tonns/day (approx.)
7. Operational status Closed by own/Non-operational.
B: Water Pollution and its Control:Water Supply Source
Water Consumption (KLD)
Tube well
Industrial 2620
Domestic 16
Water Meter to show consumption Available
Flow measuring device installed atoutlet of ETP
Available
Waste Water generation (KLD)(before treatment)
IndustrialDomestic
160012
5. Waste Water treatment capacity(KLD)> Industrial
Domestic
160012
[email protected] Distillery Format modified considering NGT directions
2
Details of ETPâ ETP Description with flow diagram
> Details of Reverse Osmosis plant,if anyDetails of Multi Effect Evaporator,if any
Primary Sedimentation Tank/Collection tank -----+Anaerobic digester coupled with gas holder--+ R.0
Li
Lagoon & compost yardR.0 of capacity1600 [LLD has been provided.
No MEE has provided.
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
Zero-liquid discharge as UPPCBconsent condition of Zero-liquidHowever no assessment ofoperation of unit.
has stipulateddischarge.
same due to non-
-J
liquid discharge.due to non-
Mode of disposal of treated effluent(Details)
On land/ Surface water: N/A.Bio-composting leading to ZeroHowever no assessment of sameoperation of unit.
Sample distributed into no. of parts(2/3)
Samples not collected as the unit was not inoseration.
Sludge disposal mode Bio-composting
, Effluent collection locations &
analysis results (if collected)
(No Sample)
Locations ParameterspH BOD
( m9/ I ) COD
011 9_/ 1/-
TSS
ITO/
- IOutlet
Others - - -
(I) Information regarding Bio-compostingActive area for bio compost
preparation (m2) 80936.5
Area for press mud storage (m 2 ) 20234.12
Area for bio compost storage (m 2 ) 26709
Spent wash storage capacity 48000 KL
Availability of pressmud 100000 MT (from own sugar unit).
Quantity of compost prepared
(Monthly statement of last year)
20460 MT
Quantity of pressmen procured
(Monthly statement)
66500 MT (approx.)
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
85 Nos of Wind " roses of dimension
100mx3mx1.5m at a distance of 2m c/c
[email protected] Distillery Format modified considering NGT directions
Quantity of Effluent being used for
composting ( m 3/day) :
800 KLD (approx.)
Quantity of press mud being used
for one cycle
15000-16000 MT (Approx.)
Maturity time in days for one cycle 60 days (approx.)
Arrangement for rainy season Lagoons are available.
13. Quality of ground water in the area
and depth of ground water table
-
(II) Information regarding Ferti-irrigation N/ADetails of treatment of spent wash (details of bio methanisation,primary and secondary treatment)
-
Command area for irrigation (available land area)
-
System for dilution of treatedeffluent required for ferti-irrigation
-
System of transportation of treatedeffluent upto field.
-
Formal agreements with farmers forusing treated effluent
-
Storage facility available for treatedeffluent during low demand period
-
Quality of effluent being used forferti-irrigation
-
Ground water monitoring network -C: Air Pollution and its Control
Sources of Air Pollution Boiler> Type of Fuel used with
consumptionBio-gas, Bagasses
> Stack details Stack of height >30 mts
> APCS details Wet Scrubber
5. Samples collections points(if collected)
(No. Sample)
PM (mg/Nm3):
ngrbacpcbggmail.com Distillery Format modified considering NGT directions
Photographs indicating locations:
Pic 1: Entry of unit Pic 2: ETP (at least 1)
[email protected] Distillery Format modified considering NGT directions
Pic 6: Discharge pointsPic: 5 Chimney (All visible)
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Via Surface run-off from catchment
Effluent (Raw/Treated) from outlet drain of unit
River Ganga via tributary/seasonal drain.
Discharge to
5
1 Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCB , q,oIA0011
Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. 6 dt(l t-l -Sh. Yogender,UPPCB, Muzaffarnagar.
.021-1, A-V 0 cbv.n \ \1
7 C.--Sh. Azad Singh, RA-1, CPCB
2 Date of reportSubmission citekrA111-
[email protected] Distillery Format modified considering N91 directions
vrr
CDT{I)MCENTRAL POLLUTION CONTROL BOARD
NGRBA Cell
Joint inspection Re port: Distillery
Date of Inspection:02/09/2014
A: General InformationName of the unit and address
person - DesignationContact No.
M/s Shamli Distilleries & Chemical Works, Shamli,Muzaffarnagar (U.P).
Name of the Proprietor/ ContactSh. S.P Singh (V.P)09411276220
3. Year of Commissioning. 1945
Sector Production details.
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prod. Cap.
Private
Rectified Sprit7364 KL/Annum7364 KL/Annum-
Raw materials & their requirement Molasses; 30765.2 Tonns/Annum
B: Water
Operational status
Pollution and its Control:
Closed by own/Non-operational.
Water Supply Source
Water Consumption (KLD)
Water Meter to showconsumption
Tube wellICI
--IIndustrial 950 KLD.
Domestic -
Available
Flow measuring device installedat outlet of ETP
Not available
Waste Water generation (KLD)(before treatment)â Industrialâ Domestic
300 KLD (approx.)-
ngrba.cpcb • ,gmail.corn Distillery Format modified considering NGT directions
2
Waste Water treatment capacity(KLD)â Industrialâ Domestic
300 KLD-
Details of ETPâ ETP Description with flow
diagram
â Details of Reverse Osmosisplant, if any
â Details of Multi EffectEvaporator, if any
Anaerobic digester coupled with gas holder ----" SettlingTank/Lagoon--+ Compost Yard.
(1.)-Dias+ R.0 Plant has been provided. , rg 0 Pe----/X4-44---r
6wect.-1 4, 4A,No MEE has been provided. b...k.-6-i
Waste water discharged (aftertreatment)(KLD)â IndustrialDomestic
Zero-liquid discharge as UPPCB has stipulatedconsent condition of Zero-liquid discharge. Howeverno assessment of same due to non-operation of,unit.
Mode of disposal of treatedeffluent (Details)
On land/ Surface water: N/A.Bio-composting leading to Zero liquid discharge.However no assessment of same due to non-operation of unit.
Sample distributed into no. ofparts (2/3)
Samples not collected as the unit was not inoperation.
Sludge disposal mode Bio-composting. Compost yard is located at adistance of more than 12 km from the unit &
the effluent of the distillery is taken to thecom . ost and b tankers.
11. Effluent collection locations &
analysis results (if collected)
(No Sample)
Locations ParameterspH B 0 D
( TVA-
COD
C.nri_9 /0-
-
l
TSS
0191 ID_ _A
-
-
Outlet -
Others - -
(I) Information regardin . Bio-com I ostin
preparation (m2)
Active area for bio compost10 acre (Approx.)
Area for press mud storage (m 2 ) 1.0 acre (Approx.)
Area for bio compost storage (m 2 ) 1.0 acre (Approx.)
Spent wash storage capacity Approx. 20 days
Availability of pressmud From own sugar mil!
Quantity of compost prepared
(Monthly statement of last year)
5500 MT/Annum (Approx.)
7. Quantity of pressmen procured
(Monthly statement)
16491.105 Tonns during last financial year.
[email protected] Distillery Format modified considering NGT directions
Details of wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Wind roses 20-25 No./ cycle & 100mx1.5mx3m
in dimension at spacing of 2-3 meters.
Quantity of Effluent being used for
composting ( m3/day)
130-170 KLD approx
Quantity of press mud being used
for one cycle
Approx 3500-4000 MT
Maturity time in days for one cycle 60 days
Arrangement for rainy season
Quality of ground water in the
area and depth of ground water
table
Storage not provided.
-
(II) Information regarding Ferti-irri • ation N/ADetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)
-
Command area for irrigation(available land area)
-
System for dilution of treatedeffluent required for ferti-irrigation
-
System of transportation oftreated effluent upto field.
-
Formal agreements with farmersfor using treated effluent
-
Storage facility available fortreated effluent during lowdemand period
-
Quality of effluent being used forferti-irrigation
-
Ground water monitoring network -
C: Air Pollution and its ControlSources of Air Pollution Boiler)=. Type of Fuel used with
consumptionBio-gas approx. 14400 cum/dayBagasse approx. 40 MT/Day
â Stack details Stack height >30 mtrs.
â APCS details Twin cyclone
[email protected] Distillery Format modified considering NGT directions
Pic 2: ETP (at least 1)Pic 1: Entry of unit
Pic 3: Compost Yard
[email protected] Distillery Format modified considering NGT directions
4
Photographs indicating locations:
3.2" x3.2"
5. Samples collections points(if collected)
(No Sample)
PM (mg/Nm3):
Pic: 5 Chimney (All visible) Pic 6: Discharge points
► Discharge to River Yamuna via
Effluent (Raw/Treated) from outlet drain of unit
line ► Municipal main sewer/Nalla
seasonal drain.
5
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
Surface run-off/Intentional bypass
1 Name of officialsinspecting
Name & Designations Signature
Sh. Suneel Dave, Sc 'D', CPCB01t710111'°\1'/
o'3Sh. Vivek Roy, R.0UPPCB, Muzaffarnagar. Lii
SOL('Sh. Yogender,UPPCB, Muzaffarnagar. ec, \;\\-\Sh. Azad Singh, RA-1, CPCB / / cam_
c? f,-------
2 Date of reportSubmission ,. 0('
[email protected] Distillery Format modified considering IVGT directions
tk%
► Storm-line/ Sewer
Joint Inspection Report
Sugar & Distillery Industries
Saharanpur Distt. U.P
Hon'ble Tribunal directed CPCB & UPPCB to carry out the Joint Inspection of the Sugar and Distilleries
Industries operating and discharging the effluent in Rivers Ganga and Yarnuna..
In this view; team of CPCB & UPPCB comprises of following officials visited the Sugar & DistilleryIndustries in Saharanpur areas:
Team from CPCB, Delhi Team from UPPCB
Sh. Sharandeep Singh , Scientist 'C' Sh. Rajiv, Regional Officer, Saharanpur Distt
Dr. Ishaq Ahmad ,RA-I Sh. A.K Mishra , SA, Saharanpur
The following Industries were inspected by the above team between 2" d September, 2014 & 3 rd September,2014
S.No Units Visited Industrial Detail
I M/s Kissan Cooperative Sugar Factory Ltd, Sarsawa Annexure -I
2 M/s Pilakhni Distillery & Chemical Works , Pilakhni ,Saharanpur Annexure -II
3 M/s U.P Cooperative Sugar Factory Federation, Nanautaa Distillery Unit, Nanautaa Annexure —III
4 M/sThe Kisan Sahkari Chini Mill,Nanauta, Saharanpur Annexure —IV
5 M/s Triveni Engg & Industries Ltd (Sugar Unit) —Deoband, Distt Saharanpur Annexure —V
6 M/s Bajaj Hindusthan Ltd.Unit Gangnauli (Distillery Unit) ,Saharanpur Annexure —VIA
7 M/s Bajaj Hindusthan Ltd.Unit Gangnauli (Sugar Unit ) ,Saharanpur Annexure —VIB .
Overall Observations:
All the Plants were found closed during inspection
There was no production process going on during the period of inspection.
3. In all the above industries Effluent Treatment Plant. were not operational
(Sharandeep Singh)
Scientist "C"CPCB, Delhi
(Raji )Regional Officer
Saharanpur, (UPPCB)
I-A)Nqucktl-e_ -4016-01;6
cutCENTRAL POLLUTION CONTR.OL
NGREA Ca.kmection Re cg_Lit3u ar
Date of Inspection: rq91!1-1'
1. Name of the unit and address j<i'lori LI.c7c,-,'P k_0,. 1-i'vk_f 4S 1A-54-Ci .,r. c_IT, rk„)1 4c1 „C c-4 g ci ,41>°-, ,i '-' 1
n
1 ) , p(e',,,:c2t-irvi. c 1,1 3) friA. - : ,,,,_1 ,
2. Name of the Proprietor/ Contact 1n
Contact No.Person-Designation . 1
,,,,, t!..... , ,:.,...y.,' .,....„,r4..----;,:-._1--'...'•,:, ! 4 .0 r".-; ,
COK_Ick c).- o - 0 ( 3 i -- ,-7 ll (1 R33— 1Year of Commissioning. Sector I oo rative/Pc/Pri(die -1
Netqc k,ip?..g .1,4e hoi C 41.L. IOC: C)' if- e. i--
.:-... 2_ SC, 7 CI)
5. Production details.e Products
Installed Prod. Cap '0 Operating capacity
Cane crushing capacity '7 ',..- 0 ' I ' LI i / 7 C,cl i-Tie r ivz, ( -it t;') -Cr-C''.....-
Cane crushed last year 19929 f f'.Y4-- Olt-, "PtC.,Itis..t,i, ec-up,-) 20, 3 r- )‘.,.
Molasses generation4ro-e_kf NI A Ye-44 tkv °- I ..- 7 ; 74
cc - ifiki t- i‘r-C3 1
Press Mud generation081,106-6W(
.
eEr t)6.-f ttl /v. as 04-..,2c 1-..1. _10. Operational status •
-1, Operating
Non operational due raily seasonClosed by direction
4. Closed by own
B: Water Pollution and its Control:1 ; ItA1.---• — r-. _ __I. .- _ „..uppi y ource (s:
IAWater Consumption (KLD)b 4 ri 115 cx_tskf i. ar.._ Domestic /4-PP0 19' c[1.,A
1 : 'Weer 'O e t.Prto cthOW Car: Star rfCi r; '=1 A,--,qabt- N
3. Flow measuring device instaHeaat Available Not available: NtnkthOutlet of ETP
Ligrbacpcb(et;amai on SUM' Forma! modified considerin NGT directions
A: General Inform i
1, Ot.O
Industrial
It
4. Waste Water generation (KLD) et h ;.; i /491 (bef or e treatrnent) t ,f.4) 01-, , 1,1 < f :,._ L'il! ) Indu.striai c
tP
4 i t
S° 1> Domestic 1
11
,' 5—. 1-Vaste --.17ate—r treatment capacity
i
6.
flow Y
j
f
1 • r" r t- •
Details of Reverse Osmosi.sHplant, if any
L;.<'.. Details of MultiEvaporator, if any
1 7, Waste water dischargedtreatment)(KLD)
IndustrialDomestic
8. Mode of disposal of treated---(Details)
analysis results (if collected)Effluent collection locations
•
1^ -Outlet
Others
TI.Information regardi rrigation _1 Details of treatment effluent beforeFerti-irrigation
2. Command area for irrigation(available land area)
System for dilution of treated
effluent required for ferti-irrigationf 4. System of transportation of treated
effluent upto field,'armal ag reements witri farmersfor using treated effluent
lgt-ligszagSugar Format modified considering NGT directions
(KLD)Industrial
Details of ETP> ETP Descriparr--with
diagram
7r., 1\,) :2)/ 6411 kit
Effect
Sample distributed into no, ofparts 2)Sludge disposal mode
�0:4 C4 e (if ,
effluent On land/ Surface water7111</re-f.,0,h , fi .47)
(after
ti 04 c?S,
& Locations
7144'h 04 -Z`-'c
ParameterspH BOO 7 COD r-TSS
jrngf I) ! { 91 9,10_ 0-91/2)
1Photographs indicating locations:
3.2" x3.2"
nzrbo.cwobasmaii.con7 :S'ugar ormat ndfied considering :V07 &rec.! ions
k(V
C: Air Pollution and its ControlSources of Air Pollution
Type ofconsumption
Fuel used witTj
> Stack details
APCS details
5. Samples collections points(if collected)
PM (mg/Nm3):
-1Aoitc.. C
.•-i;; L •
Ili 6)-o ek
tTeTR(7)-(..01tp.,,L1.
, g.1 It2-7-Storage facility availanIP for
U- .eated effluent di u ri n g low demand
period
L.Q 1,0 c- f!..42& •
cu..c. •
Quality of effluent being used forferti-irrigationGround water monitorin g network (Available /Not available)
[email protected] Sugar Format modified eonsiderMg T directions
Date of reportSubmission
1 Name of officials Name DetSignationsinspecting
4
Pic 1: Entry ,Pic ETP (at least 1)
Pic: 3 Chimney__(All Pic 4: Discharge points
E, Route of effluent to reach river CangaiYarnuna(Please indicate starting from the outlet drain of the unit)
Picture of MjS Kissan Co-operative Sugar Mills Ltd. Sarsawa
Equalization tank
, P;akketAA.A'
A: General InformationName of the unit and address
3C,-014-LPD
Operating HoNon .
operational due ratny season ‘ite...6iClosed by direction N L.)Closed by own
Pet t4...owt16 1.Sbi MT ckia_tr_
1,3c-A
[Water Pollution and its. Control:
1 Water Supply Source
Water Consumption (KLD)
2. Water Nileter to show consumption
ProductsInstalled Prod. Cap.Consented Prod. CapRestricted Prai. Capes
Raw it & their requirement
rational status
aceDCENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint in e Lion Re port: Di tiller
Date'ofilnSpection: 0 2--
Name ofthe Proprietor/ Contactperson - DesignationContact No.
-1.7e7ar of Cornmissionin
C—oope—rativeja_Po—i—lciP"rivrtel.7_?1_ArjoiA71117:1-! 5. Production details.
Flow measuring device installed atoutlet of ETPWaste Water generation (KL,D)(before treatment)
Industrial to L. v_t_i) DDomestic
tti
Available Not •available
Available/ Not available se_tt ALA.
Li 3 2- L. P-13
Waste Water treatment capacity(KLD)
Industrial 101- 14.1 P,D
olyiestic 141, 9D -4-'n 13-tri o -444'&4. cp ca *m44,1 c2r,v, Divitiery la/ modified convdern T dire
6,
2
Details of ETPETP De.scription with flow-diagram C GLZ,
r
Details ofplant, if any
Reverse Osmosis 3c.,6
>Details of Multi effectEvaporator, if any
Waste water discharged (aftertreatment)(KLD)
IndustrialDomestic Mode of disposal of treated effluent(Details)
Sample distributed into no. : of iNst„../r . 4 IbAtAztSludge disposal mode
Effluent collection locations Locatonsi —r-- - -analysis results (if cciilected)(PAct&J ilse14-41 Ari:Att. 6a ..019 / )et
Pvuturpreparation (ma)
I--Area for press mud storage {m ) 0.“ Pt,u).41
rpsi4,; Spent wash storage capacity
Availability of pressmTudr
Quantity of compost prepared
(Monthly statement of last year)
; Quantity of pressmen procured my\ Le_ fr-La,„1- -
(Monthly statement)
Derails retails o wind roses (Number,
length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used far
composting ( rn3/clay)
7,
8, n land/. Surface water
parts L213)
"44 C41:1_Parameters
pK 1 ODD COD TSS
—13, 9A..tigAAtta8.- JAAAdvixffrou_ Others
(1) information revrdin.Bio-composting1. Active area for ho cornpo-i-t-r
2,
Area for bio compost storage (m2'
t11,6Lt ov5
190. e v,‘T (
tkLv bL J
'4140A , 7,34 w1/41-1,--T •/e,,,vvs.f.Y. . Z3.0r
I , s-4r - 0,
Yvl
r.tdi
Vibe? iiy7, n22,= ail corn Oisrillery Ih rICICiffied C5715 1"d: ilr NO.dirctions
2fr,
3
10, emntity—of7press rriud—'7--beind us"--edRILL_for on'e cycle
Maturity time in days for one cycle
Arrangement for r t..iirry season13. Quality of ground water in the area
and depth of ground water table
(U) Information repAnafertl-irrig1. Details of treatment of spent wash(details of hio methanisation,primary' and secondary treatment)
7—ConTrnTniTat'—ea forirrIgation(avallable land area)
System for dilution of treatedeffluent required for fenti-irrfgationSystenTc7F trans portation of treatedeffluent upto field,
5, Formal a g reements with farmersfor using treated effluentStorage facility available for
treated effluent during low demand i ,/l ,
periodiy
-.1 1 Quality of effluent being used for-1fat-irrigation
8, Ground water monitenng network i (Available /Not available)
, ..,_c; A r Pollqtion and its Control.I, ,, _ .. Sources of Air Polluti.on ,_____ Aft .tt..rx, e.O.pti4A, 9i,u fl ihyli 2,0 r-vrt t,,,, ,2.Type of Fuel used with l a:consumption WI° --(04.43* + gArAt-
(I
•1 *S-vvOtr 41Ak L r
3, Stack details
thve44-4. 76,47-crts,,,,t— 64,44 +-1)c_zoaA,4,4
P1/41,,,Arti'4 .14W akt-9,al
a tion
4.' APCS details 1.YY) tJL-tdSt
. Samples COneCtians points PM ,ing/Nlm(if collected)
pterbarpzi:111,3 ?!?.: Ir. Cotn, nksaen, Formw cmidering NGT dIrf arms.
Plc RO & MEEPic 3: Compost Yard
hotographs indicating locations:
3,2" x32"
Pic 2: ETP (at least 1)Pic I: Entry of unit
4
2119,cpcb(iSivrod cot Dtsaery Forrrat wodyiedvotisiderfpg NOT efirvertions
Picture of M/S Pilakhni Distillary & Chemical Works, Pilakhni, Saharanpur
Bio-digester (Methanation Plant) Gas Holder Under Construction
r, )
El: Water Pollution and its Control: 1, i Water Supply Source
2. Water Meter to show consumption
Water Consumption (KLD)
7-c,b0 ufta
Industrial 0800 kA
Domestic 'CT 15ti_
Available / Not avble
,
R)1INIC III.
" 1.1
! • •
! I ,
I!
Nu/ 1 f,---
CO)CENTRAL POLLUTION CONTROL BOARD
NGRBA CellJoint inspection Report: Distillery
Date of Inspection:
Li , P. 69oioer 47r/e4
li's Ial coci Unfl 1 ' Alfil (4; r)rla.a.,,: I ,''' 1 j ,,
,retikwyet,,,,I4tw . !II 1f
cA , .13 c tut), iik 1 t.), ;,) e, ref Oct.'11,, ' 1
Jill Cl C. rAtitY hleA ' 14..j (ria/t..o 4/ P' -b/3(
titmo It it 8 L ..,00rlir Cozoli-gij
H 3, Year of Commissioning.
SectorProduction details.
ProductsInstalled Prod. Cap, 36 ki /31*4-L/Consented Prod. CapRestricted Prod. Cap:.
6. Raw materials & their requirement
Al General Information Name of the unit and address
Name of the Proprietor/ Contactperson - DesignationContact No.
Cede./;:a-Alwv,
lcIeC-8kperative/Public/Private
PCC Alp cl Skin 4-
7. Operational status 1. OperatingNon operational due rainy season • ,Closed by direction •.; .;Closed by own '1 '
! i
3. Flow measuring device installed atoutlet of ETPWaste Water generation (KLD)(before treatment)
IndustrialI. ?
5, Waste Water treatment capacity(KLD)
Industrial`i-Domestic
Available / Not available
14S tt-1 ,
Itik) K).1Pc,"-1-
. 1 ,
,1
juria&Qt-q_ Distillery Format modified considering NGT directions
Det---fifis of ESPI> ETP Description with flow
diagram
> DetailS of Reverse Osmosisplant, if any
> Details of Multi EffectEvaporator, if any
Waste water discharged (afterI treatment)(KLD)
> IndustrialDomestic
. Mbde of disposal of treated effluenti (Details)
On land/ Surface water
1
r—)11. Effluent colilecton iodatiOnt:
Ianalysis results (If collected)
I
LinInformati on re ardlikt'll310'mr • ostin
11. i are a for bio compost1-Tai1 1
1 preparation (102)
,_.___r press mud
2 'I Area for storage (m )
'
. 1 Area for bio compost storage (m )
Spent wash storage capacity
Availability of pressmud
6. Quantity of compost prepared
(Monthly statement of last year)
Quantity of pressmen procured
(Monthl y statement)
f wind (Number,B. Deta)16 o win rosesI
1 length, height, width of stacking,
space between two wind rose)
Quantity of Effluent being used for
composting ( m3/day)
Sample distributed into no.arts 2 3
0. Sludge•disposa l mode
"7 • (UK ---
6 , 30 acre
o o ok(fe ,1 ,
goof 62.01.111)
n
,
.q111.(4)
Cel Jed, /pal
tadgafiattnktla Distillery forMat orohfted eonstdFrtng NGT directions
g)?
'0, I Quantity of press mud being used 14 ti 620 © /11 Tfor one cycle
11, Maturity time in days for one cycle
12. Arrangement for rainy seasonp ctucili.mi r rs '11)0/0114-e4 ,'
13, Quality of ground water in the area•
and depth of ground water table T
1 1,1TT
:
II. Information regarding . Ferti-irrigiation 0(1 , A . IIIDetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)
l ' Ti
Command area for irrigation(available land area)System for dilution of treatedeffluent required for ferti-irrigation
4. System of transportation of treatedeffluent upto field.
S. Formal agreements with farmersfor using treated effluent
' T
, ,A-T-1-,------i----6, Storage facility available for
treated effluent during low demandperiod
,
i
di-1
,II
7. Quality of effluent being used forferti-irrigation i
S. Ground water monitoring network (Available /Not available)C: Air Pollution and its Control
1Sources of Air Pollution f to roh ,ea-TO:err.
._„I
•A. Type of Fuel used withConsumption
A 4 Occ At444--
/
',, Stack details le' 0 ivvM. i. ose-p- rritdhi t am( ,
4._ -';.. APCS details 1' ni,1.14 1 cyan) . e , oUl ArS .
l
5., Samples collections points(if collected)
PM (mg/Nrri . 1T
iffbigmdil. ! pm Distillery Forme]; modified c'onsie ring Nor directions
‘54,6e„AmPial4 p uvAt- cL/)
''s\ott
Bio-composting Yard Showing Compost
Picture of M/S U.P. Cooperative Sugar Factory Nanauta,SaharanPur
Side View of the Bio-composting Yard Another Side View of the Bio-compostin g Yard
Showing over flow of the spent wash to nearby drain meeting river Trishini
Bio-composting Yard
r '
Sugar Format modified considering NGT threat 011,3
11-CL4'
rcEI NTRAL POLLUTION CONTROL BOARD
NGRBA CeH
Jjfltj sectonReport: Sugar
Date of Inspection: _12_19, \ I
A: •1.
,L.
....,..,.
--- -
5.
ET,
Name of the unit and address
,
V.,Q4)V S q f-1 V_A-1?-1 ffl-rlivi 11 7 ILL [:-
N )1100 TA , ,g (I I/ A 12 An) P v
n I S14- J S-4 PO'9 S-c4 5 S----
Name of the Proprietor/ c ontactperson - DesignationContact No._
c A.CutAziyL0t--, ,______
(
Year of Commissioning,-- (q7q - n cls(=,Sector - -- Cooperative/P-PateProduction details,
. Products0 Installed Prod. Cap
Operating capacity
q (-t- 9 cu_
5-nst-' -1-4.. c.c.t, et -- l,rDcuLd--
Cane crushing capacity ,ix. 0144) --gly0 T /D-G
7.
_....._........
Cane crushed last year
___ _
--.) E°-2- -,
10.
Molasses generation ti,:=3q cc, 7b,-;
Press Mud generation 0 i .22 ecak.-tcm_A ' 2). e--.1, (Tv,- (62.(3,-... ,
Operational status
t21. OperatingNon operational due rainy seasonClosed by direction
4. Closed by own,,.B: Water Pollution and its Controi: —
Water Supply Source(s)
Water Consumption (KLD)
1. TiL wX"-
Industrial 9 5,5-- M3 ici-cpDomestic
5O'v n i'ater Meter to show consumotion Avajat-ie; Not available
3. Flow measuring device installed atoutlet of ETP
Available / Not av-allable v iv t_0,_,,_/
2
4.
Waste Water generation (KLD)(before treatment)
Industrial> Domestic
'Rt.20 1.\'\3/1d I
Waste Water treatment capacity(KLD)> Industrial> Domestic
1.,{00 M3iCioj
Details of ETP'-> ETP Description with flow
diagram
Y Details of Reverse Osmosisplant, if anyDetails of Multi EffectEvaporator any
e ,A tfati----L.
—, ' !k,,.\ _ eryact.L.---Ctl)-
Waste water discharged (aftertreatment)(KLD)> IndustrialDomestic
S. Mode of disposal of treated effluent(Details)
On land/ Surface water
_ _partsSample distributed into no. of
(2/3)_ ,--- 3Sludge disposal mode 1)},..ark co) -)v.c..i."-iirw
11. Effluent collection locations &analysis results (if collected)
Locations ParameterspK GOD
(11 9/ 1 )
2
COD(,jr1 9/ 1 )
'-.-0-1 D
TSS_PIN/ILI
'.(alOutlet 730
Others_
_(A) Information reardin Ferti-irrigation Details of treatment effluent before
Ferti-irrigation------ _iCommand area for irrigation
(available land area)
System for dilution of treated
effluent required for ferti-irrigation —
System of transportation of treated
effluent upto field. -17j1--k. oi(Agawt-
5. Formal agreements with farmers
for using treated effluent
--------
(---
ngzha.cpcb&mail.com -Sugar Format modified considering NOT directions
3
?1,t_ [email protected] Sugar Format modified considering NGT directions
3.2" x3.2"
Storage facility available for
treated effluent during low demandperiod
NtL
Quality of effluent being used forferti-irrigation
8. Ground water monitoring network (A y a).1-eire—/Not available)Air Pa (Aeon avid ts Control
Sources of Air Pollution> Type of Fuel used with
const4mption &easr,,c
1-----;7.S.tack details
4. > APCS details
Samples collections points(if collected)
Photographs i nelftating Vocations:
W'20 1116(_
\A1i-Qt
PM (mg/Nrrr3):
2 117s 99-7
Pic 2: ETP (at least 1)Pic 1: Entry
Pic 4: Discharge pointsPic: 3 Chimney (All visible)
4
ra Route of effluent to reach river Gariga/Yarnuaa(Piease indicate sta3rting from the out drain of the. unit)
Lat,,i- to a)
1 Name of officialsinspecting
Name & Designations- Signature ------------,
I\( (0
;„__,........ 1
— —
.itkOlkAta,t.l. CA:A, L
---
: - .-t-k , ‘A--- IL, ik%tf -Gvy6, 14nn,i1.4.„....1,
, - - .----2I_
Date ofSubmission .
report1_______ _
[email protected] Sugar Format' modified considering NGT directions
Clarifier Stack
Entry of Unit Aeration Tank
Picture of WS Kisan Shakari Chini Mills Nanauta
(Jp
R'11VQ (1.-riLQA _
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Sugar
Date of Inspection: 02 -09 - zol A: General Information
Name of the unit and address
—rg(vEAl I g_A/44 c/— -7-X10. Z--77-),
SU4/4"Z uAirr- 1)6/1 L),)'4A/S /p.m 02,4-4 PC/R - u. '
.24_•s c - If
Name of the Proprietor/ Contactperson -- DesignationContact No.
Di , 1) gs_N 4 NA--TH fki 1 sH24( iff e..._' pizas ),D6A1 T )
of33b -2-2-2-I gr, 22.2.49-, 222$66I 9 %a
Cooperative/Public/Private ___
Year of Commissioning.4. Sector5, Production details.
ProductsInstalled Prod. CapOperating capacity
.,C 04 42,1400o7'e-C.
9 voo '7-CA
Cane crushing capacity/ 14 boo -ref)
Cane crushed last yearSotio 7-22- 6s- alqr
Molasses generation (./ 2-9s tir azrt_s
Press Mud generationli S 7-2 2 . 9/ WI-3
10. Operational status
1. Operating
t.--2. Non operational due rainy season CoClosed by directionClosed by own
B: Water Pollution and its Control:Water Supply Source(s)
Water Consumption (KLD)
1. 020 c)^ I D 14er-ER
Industrial A.pizit_ 20/ if c6ALcum,or/o^/
Domestic kf_P0127" Zr ./47771(....fie4,0
Water Meter to show consumption Available / Not available A vq- 1t,_
3. Flow measuring device installed at outlet of ETP
Available / Not available 1/_ iveyrce
[email protected] Sugar Format modified considering NGT directions
1. Waste Water generation (KLD)(before treatment) 1 -.:2 . e) o k, L. ()
industrial I
D. Waste Water treatment capacity I(KW) 2..e-c- '7 2- K L-10,Industrial
1 . I Domestic li.
e __•_____i 6. Details of ETP
4.-
‘.,:. ETP Description with flow V-.!--.0A/ D I9 . ; 1M- 1\1 /1-77)€.4cfcL)diagr,,.:1li)
Dct,a;1 5of Osniosplant, if: anyE)etails of Multi EffectEvaporator, if any
Waste water discharged (aftertreatment)(KI_D)
industrialDomesticMode of disposal of treated effluent On land/ Surface water(Details)
Sample distributed into no. of
,., parts (,2/31 ,
. .Sludge disnosal mode i i..u,..)e„cl. f) 10
2.A e,/ L.7.', 6 L.).....
11 Effluent collection locations Locations Parametersanalysis rcsults (if collected) PH BOP TC. OD TSS
019J1)_ j_019 ;111 L(rn911)ic' tz.‘
A cc Outlet
ty. 2JRe.Pn gfr O,C 2-0/ Others
— ...(1) Information regarding Ferti-irrigation
1. f Details of treatment effluent: before
Ferti-irrigation . . .
7. Command area for imoation
(available land area)
3. System for dilution of treated
effluent required for ferti-irrigation
n 4, System of transportation of treated'/-f' R. 0 c) 1:, f-I • 1)12 A:WS
. • •effluent ..ipt.o field. 1. . • • •
.1 .. . . ._._________
.. _5. Ii Formal agreements lith farmers . . .. ., . .
. .
. ., for usin g treated effluerlt
. .I; (.11) cbPS:ma n.7. ,-, , T‘r, • ?nod? ti 6)1 ;de qr.; c; icon
•• . • • .. , . •.
,
\aQ Kv..,
b. (S.)torage facility available for
' 'created effluent during low demand i Y67---
neriod,-- - • - - _ _.__ _ ____
7 Quality of effluent 'being l iscil for`erti-irrigation ,
water monillOting petworl< I (AYailoble /Hot avail-:ible) 4
C : Aft Pollution and its Control 1
I,_1„_____1_;.:;01,1rCeS of Air Pollution _ _ l (1) 6...) _OD_ _62) . _c>.---..) ,-!, 1 !.. — -,, . Type of Fuel usedwith 2--c)r"i.i.:77-P'f. (Jcvilf 'II )'<17.-‘)W
m.' consuptlon, (.....) . -Ci:P:-.I.")--------- -- --------s-i-------6-2;)------6)
1 ! ..). ! , St a ck details (df_141-r;r- IN' A77:,Z,) yo."D t-)S1 \.. so IS- '?, 0 S z-tr,).D
4. 1 ly, APCS details l 1. (4grI ,
i,,, g:,--r
kJ 7-
. C. 1Z.(1) A. E 12_ I!1 !• • ______ ...
Samples collecticins points I PM (ft,gi .\] II .,'; Yi 4 !!. ,(if collected) . l
I -Ca J, / PL. /.' c___0 LI-L" (--7-5_1) ()),!) I (i .);?. )
Photographs indicating locations:
3.2" x3.2".;)\ •
Lt
cti
\ ,, \ i, ( R. v, s(1,
L
,
)
' I (1'--1' D 7 6, l'-/ ( 1\4 '14, ),. , ...,_\ 1 -T.); /, ,_ 1).e:e", )-ka '.-',,i'Y • • ••
2,
..,
I.I.El1:1,(pckajgniail,com Sugar Formal P713diliM (70 . 1.5idering NGT
Pic 4: Discharge pointsPic: 3 Chimney (All visible)
Pic 1: Entry Pic 2: ETP (at least 1)
E. Route of effluent to reach river Ganga/Yamuna(Please indicate starting from the outlet drain of the unit)
4 26)
1 Nate of officialsinspecting
Name & Designations Signature
L\kiV ,, -()
.1(), L:;-(NJAA..otAAcVeln ---*--)."-ct,'`4>--1(1---
1, \ A • tt Qi-i. 1,
2 Date of reportSubmission
[email protected] Sugar Format modified considering NGT directions
Picture of M/S Triveni Engg & Industries Ltd. Sugar Unit Deoband Saharanpur
In let Drain
.„„
t
rtrl nnn
Clarifier Aeration
...n..mnow.•n•••••
41,(01[b
CENTRAL POLLUTION CONTROL BOARDNGRBA Cell
Joint inspection Report: Distillery.
Date of Inspection:
General InformationName of the unit and address
2. Name of the Proprietor/ Contactperson - DesignationContact No.
Y
<. ...I 3.
1 4.
Year of Commissioning,
Sector Cooperative/Public/PriYate
v.",,-_,,
• Restricted Prod, Cap,
r5, Production details.• Products* Installed Prod. Cap.* Consented Prod. Cap
-1 Raw materials 81 their requirement1
f + Operational status
1
1, OperatingNon operational due rainy seasonClosed by direction
4. Closed by own
B: Water Pollution and its Control:I, Water Supply Source
Water Consumption (KLD)
,Industrial
Domestic
2. Water Meter to show consumption Available / Not available
, 3. Flow measuring device installed atoutlet of ETP
Available / Not available "-
Waste Water generation (KLD)(before treatment)'-x- Industrial> Domestic
' "'n i,e;, , „ - ,
Waste Water treatment capacity(KLD)> Industrial
Domestic
pjgrba.cpcbagrnail.com Distillery Format modified considering NGT directions
-
=
2
Details of ETPETP Description with flow ., •
diagram
Details of Reverse Osmosisplant, if any
>. Details of Multi EffectEvaporator, if any , .•
treatment)(KLD)Waste water discharged (after
Industrial
8.•Dornestic
Mode of disposa of treated effluent On land/ Surface water(Details)
. ,•
9. Sample distributed into no. ofparts (2/3)
10. Sludge disposal mode•
11, Effluent collection locations &analysis results (if collected)
Locations ParametersP HBOO COD TSS
OutletLrn91 1 )_ ( m9/i) ( m9/ 1 ) 1
1
Others
Information regardin9 Bio-compostin9Active area for bin compost preparation (rn2)
Area for press mud storage (m2)3, Area for bio compost storage (m2)
I, 4, Spent wash storage capacity5. Availability of pressmud
: -4-6, Quantity of compost prepared
(Monthly statement of last year)7. Quantity of pressmen procured
(Monthly statement)S. Details of wind roses (Number;
length, height, width of stacking,
space between two wind rose)
9. Quantity of Effluent being used for
composting ( m3/day)
W'bo. Pcbgt-kiwI C0171 FOrMat PrICdified considering NGT direct ion
39-
10,1
Quantity of press mud being used
for one cycle
. .. . ,
.. ,
4 i
1 11. Maturity time in days for one cycle :,:-- . '-. .:,,
Arrangement for rainy season
Quality of ground water in the area
and depth of ground water table
to, ,! , :.7,1 "-; i, i ' 1 1:.' c:,7:.)1'
(II) Information regarding Ferti-irrigationDetails of treatment of spent wash(details of bio methanisation,primary and secondary treatment)
• ,.,
Command area for irrigation(available land area)
_
System for dilution of treatedeffluent required for ferti-irrigation . qSystem of transportation of treatedeffluent upto field.Formal agreements with farmersfor using treated effluentStorage facility available fortreated effluent during low demandperiod
i 7. Quality of effluent being used forferti-irrigation
8. Ground water monitoring network (Available /Not available)C: Air Pollution and its Control
Eit Cc7r:Sources of Air Pollution P...,6 i (..Q .k, .i4,04.1.‹.. r,',.- 17-1..A> Type of Fuel used with
consumptioncl..) ,,,,i ek c... ,3 ,4•-• co:, ,-,:.1, ca,,, ,,, VI, k,
‘:> Stack details 1,'..„ C.. Y :_k\ •:"I '-. i ''-', t 1,,,
>- APCS details 1 ' t-, 1 ,1:;.ff .
4.
5. Samples collections points(if collected)
PM (mg/Nm3):
[email protected] Distille ry Format modified cOnNidering NGT directions
4
Pic 1: Entry Pic 2: ETP (at least 1)—.
,
\CV(6
Pic: 3 Chimney (All visible
,rekevA,ce..._
•.
Pic 4: Discharge points
E. Route of effluent to reach river Gangariamuna(Please indicate starting from the outlet drain of the unit)
11) 1,t-- Li 34 ()j.,..,,,1
71---
_
Name of officialsinspecting
Name & Designations signature
I< 1. ko , i ‘ii'v
, 0,-vxmo,,,,tn. ctcap
%11-,. A k. M nch Ira ,
.2 Date of
Submissionreport
nr_s_temaiLom Sugar Format modified considering NGT directions
Top view of Buffer Tank
Picture of WS Bajaj Hindusthan Ltd. Unit Gangnoli, Saharanpur (Distillery)
Lagoon Bio- methanation Plant Gas Holder
^17.,rie
,i .1
40 ,-; t l a, lript'.10 . 11tli LM 1 ,.i.
\
\ \ )," 1
ol.,... —it 's
\ .
\ \,, A \
t....--....,
( z';'), L--..--i \ n '-' \
211 i I t 1:qtgl?.'4,!txtl " r
Flow Diagram Stack
V\
N'EtVWO'
',',71-r'f7;t.N., POLLUTION CONTROL ROARU
NiGRBA Ceg
joint jr-Auction Report : ,Sups
1-ANA,\l" kO\
Date of Inspection:
•fm!Gesterii.7,1 Informationthe unit and address
I "'
, ...... Name of fl !a Prop! i eLo!!! ,/ Contact ' - :. i:..,-:
person - DesignationContact No.
. ._ _...- ....--
! .3, Year of Commissioning. : .., • . ,•. :,.. ,.. - __
' 4. Sector
-.. Cooperative/Public/Private
•- J. Production rjetai!c.ProductsIn ctall e= d Prod, CanOperating capacitY
Cane crushing capacity
7. Cane crushed lastyc.,ar
B. Molasses generation
Press Nod OPFiral7i(T
.10 'ra3onei stfi.!sapEra:i..0nai due-
P. Closed by kection
' • •••. 4. Closed by own !!!•-•!.•-:• •-• • -
LI 6: Water Pollution and its Control:
Water Supply Source(s)!i
i
Water Consumption (KL.D),1 Industriali
1•
. 1 DornestiC
:• •
outlet o f "7"-r";
ilgrba.cpaibpnail, ...con Riga? . For-;at moji /fed c:ons:idehn ,z NGT
a 4
L,,\!:.--3c.t.e ),P,.':-,,J,c- ,,-,,,,,--,c..,„;,,,--,: 1..--.0_,)) :,.. . befor.-. -..!-2&,-,',-.,•,- n ,..-4,:;
ipoi-ne_,sijc. 5 Waste Water treatment capacity, 1 (LD)
l •,? IndustrialDomestic
eta I :..--, o f ET P;, ---, !c:1-----i1:,,Pqr.iTr.),escH,rql-_),,. ',/,‘,iti-, fi cyoi , • - - - ' . •
. . .
, • , •
jetc,;!s of oevero Osniosis, • -
Details of l vluiti Effect
1 c.-vaporator, if any
Waste water discharged (after "treatment)(KLD) '-
industrial1 ,
, ,, p • .,. , „,', , --; ,L '
Domestic I— ,
S. i Mode of disposal of treated effluent On land; Surface water '.... '.....
;Details)
'-_--Srnple distibute ,.t ,.ito nc,. of I,
is (2/3) i
1C. 1 Sludge d!s posal mode
11 11, 1 Effluent collection locations & 1 LOCatiO
..,_Pametersar11S
analysis results (if collected) laK ; BOO 1COD' TSS1
____
0 utiei 1 , i •.
;1 Others
1.1 Information mni Fteri.-krigation
.. _... 1. i Details of treatmerq efflu&,:. before l ', ' '''• ....' . ,' ...,. . .." '
.-en.-.I-irrici.,,,Lic_),c;
, ,2 • CommandPmman d a rP a for irrigation. i
i I
i 1 (available land area).
1 3. System for dilution of treated
effluent required for ferti-irrigation
4. .1 system of transportation of treated
effluent kipto flekd,
. -
_ • , • 0 '.. ., 7 : -:. --3c.ii,,,,,,e;',,...ii...'.:::._ l.
i ",•:.•,;: ;..,.3h).,••,.... •-......-.ai..e,..i ,e',.'ili...,,..;?,,,-0.-. ,
olant : •.,f•
!Igli)::-L(pc )). (.71) .37 7a i. 1 . ( 77i .2gc.' Forma,' motial nsidcrtHg 3G1 dircction
;*-
;IA6
_
treated effluent duriri,rj iow demand
period
I Quality of effluent being u.sed for [ ,i,'. . , , Hiii. ;;. I;",, l-,-).,,..,-..';'4, [ i ',.'; -.,' • . ,
fertiirrigation v--...c.. .;,.. ..i.in . [,-...',,, ,..,..[,-....ii . ,
, ..
. Ground water monitorinone.twork [ (Available /Not available).: ,
Air PoHntion and its C9ntroll
I 1, I Sources of Air Pollutlx', 1 -----.-----.---
z; i :=-> (ype. o f Fuel used viitti
consumption
II i
3. l I i---- Stack details
1 ..._ ..i. ;
I 4., 1 -‘,.- APCS details . _ ..
, I,1 .:)
I l 4.1 ;
,.
5. I Samples collections p oints i PM ,mq„[Niii ii,
(if is:cilected)
Photographs indicating locations:
3.2" x3.2'
bamail.con2 Sugar Forma n: 1nock:fied considerilig I‘/G7' diio S'
/41
(7.e
&St I Pic 1: Entry
! Pbc 4 Discharge pointsPic: 3 Chimney; .(All visible)
Route of e,ffimeh lt to reach t;lver CiangalYagrizim:(Neese indicate staicrting from th utiet drJr of the ti;nit'..;
(V) C.a--C)
_-.
1 1 Name of officials Name & Designationsinspecting
1 ,,
Ze. V-- 7
--. _---- _—_----
I1
- 1,-- i Date oi- repor'c
L i ..:;,ubmissioii i _ _
Sug:r Form coilsidei-in,c,.:
Block Diagram Aeration Tank
.4., 0 (AM t NOW'?! imp 100410i ITmoR ETP 4
Fr:141
Picture of M/S Bajaj Hindusthan Ltd. Unit Gangnoli, Saharanpur (Sugar)
..Vra-4,;177A,
Clarifier