Transcript of Slides from Mike Sullivan’s Presentation at the 2E34 Meeting.
New Q1/Q2 Bellows RF Seal
• 3/6 - New RF Seal Plate submitted to MFD
• 3/3 - Prototype RF Seal made using existing SPEAR3 RF seal die and another existing die.
Picture of bellows before installation in 2002
This picture is a miracle!! The correct bellows section in the correct orientation!!!Thank you Scott!!
Tentative Conclusion
• The design flaw in the RF seal made a weak point in the system – it allowed voltage to develop between the RF seal and the Cu under the tiles
• When the beam currents got high enough some form of an arc damaged this tile – the tile is made of SiC 40% and AlN 60%
• The damaged tile could not hold off as much voltage as before and hence the maximum beam currents were limited
There are many more pictures in the following location:V driveThen AD folderThen PEP-II Upgrade folderThen photoGallery folderThen Q1Q2 RF seal damaged folder