Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH...

19
INSIGHT AND OVERVIEW Slide Show 5: Create a New Project (System Configuration)

Transcript of Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH...

Page 1: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

INSIGHT

AND

OVERVIEW

Slide Show 5:

Create a New Project

(System Configuration)

Page 2: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Start up a new project

Create the new

configuration

[System Configuration]

Set up server(s) and

operator stations

[System Configuration]

Design symbols

[Symbol Editor/

External program]

Set up the

PLC drivers

[System Configuration]

Create background

drawings

[External program]

Prepare data list

of process

components

Page 3: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Design the project

Create areas

and diagrams

Create templates

(Global area) Create objects and

place them

on diagrams

Create

predefined graphsInstall and test the

configuration

[Chelm / Supervise]

Design

the reports

Commission the project

[Supervise]

Page 4: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

System Configuration module

Module used to:

• Create a new IGSS project

• Set up the individual IGSS stations

• Set up and configure PLC drivers

• Configure SQL servers, etc.

Page 5: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Inside the module

The last configuration or

project worked on

Creating a new project

1. From scratch

2. With the Wizard

Page 6: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

System Configuration Wizard

Give it a

name

Give it a

(storage)

location

Page 7: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Create all IGSS stations on one PC

All IGSS station types can be

created centrally on one PC -

usually the PC to be used as the

IGSS server.

Notice the green screen

next to the station name,

IGSS Server, which

indicates the station type to

be used on this PC.

Notice the number of tabs

visible to the right. On

these, the global

parameters for the system

are selected.

Page 8: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Operator station tabs

Notice the green screen

next to the station

name, OP_1, which

indicates the station

type to be used on this

PC.

Notice the different

tabs now visible

compared to the server

on the previous slide.

The IP address of the

IGSS server must

always be filled in on

an operator station.

Page 9: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Messages to operator station

On operator station, clicking the

starter brings up

the dialog box on the left.

If the IGSS configuration or

application on the server is

different from the one on the

operator station (also if it’s the

first time the operator station

is started) the dialog box on

the left appears. (Notice the

IP address at the top.)

Page 10: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Internal Simulation driver OPC (OLE for Process Control) Client-Side Driver

ABB Procontic T200, Hitachi H Series & Sprecher+Schue Phoenix Fernwirk protocol driver

ABB RCOM Extended Protocol Driver P-NET Fieldbus

AEG Modicon Modbus & Milltronics Enviroranger ERS 500 Sabroe&Soeby COMSAB II

AI800 AlarmNet Driver Saia S-Bus

Alfa Laval SattBus SAIA-P8

Allen Bradley RS-linx SattControl Comli 31

B&K 1301 IEEE 488 Interface Driver Siemens L2-FMS

BOSCH BÜEP19 / BÜEP19E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7

Brodersen System 2000 interface driver Siemens S7 HMI Adapter (S7 protocol)

CMM 7000 Siemens S7 Netlink driver

Data file driver Siemens S7 PCA adapter interface driver

Data file interface driver Siemens S7 PPI adapter interface driver

DDE Supermax Siemens S7 TeleService interface

Dupline Modem Interface D 9091 Siemens S7 using SICOS protocol and S7 functions

FPC Link Siemens Simatic / TI500 Series & Texas Instruments 500 Series

FT2000 (AlarmNet driver) Siemens Simatic S5 AS511

Gascromatograph file interface driver Siemens Sinec H1 (SICOS protocol)

Generic TCP/IP Driver Siemens Sinec L2 (FDL protocol)

IDEC Izumi FA-Series Siemens Sinec L2 (SICOS protocol)

KOYO DirectNet Driver SQUARE-D Multidrop COM port protocol driver

Mitsubishi Melsec-A (Serial RS232) Square-D SY/MAX SY/LINK

Mitsubishi Melsec-A (TCP/IP) Stella Primary Net Driver

MJK Data Transmitter 795 Stella Secondary Net Driver

MODBUS/TCP Driver TCP/IP driver for MJK Equipment with GPRS interface

NewLog Data Logger Driver Telemechanique Xway (Uni-Telway, Fipway and Ethway)

ODBC Interface Driver Teletronic Telelog

Omron FinsGateway Driver TP 5-Tone Radio Driver

Omron SysMac Link Driver VIPA TCP/IP driver

Omron Sysmac Way Ørum & Jensen PS4

Drivers and interfaces

Many different drivers (80+)

7T develops optimized driversfor IGSS

OPC fully supported byclient-side driver

Page 11: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Drivers

• Select Communication Driver dialog box shows all available drivers

• Specifications of available drivers for IGSS(see PLC Drivers Available on www.7t.dk)

• IGSS provides an OPC Client to connect to OPC Serversoftware

Interface

Driver

Node

Subnode

Page 12: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Interfaces

• a serial connection (COM port, modem or radio link connection)

• an interface card (proprietary or standard network card)

Interface

Driver

Node

Subnode

The interface can be:

Page 13: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Nodes (PLCs)

• Unique node number is selected (IGSS node = PLC number)

• Certain PLC types support subnodes(The gateway PLC becomes a “manager node”)

• In Definition: Drivers and node numbers appear on the ”Edit Mapping” tab of an object.

InterfaceDriver

Node

Subnode

Page 14: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Subnodes

• IGSS only communicates with the manager node, not with the subnode

• Manager node routes the messages to the subnode

• Manager node must have mailbox enabled, which is configured on the Advanced tab.

Interface

Driver

Node

Subnode

Page 15: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Suspend function (offline)

Suspend driver

Suspend interface

Suspend node

Right-click the driver, interface or

node in the tree view to select the

Suspend function

Page 16: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Suspending nodes online

Change set point to 1 to suspend node.Look for detailed information in the

System Configuration help file

Page 17: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Communication monitoring

Driver status– Right-click the Starter bar,

choose ”Detailed status” in the drop-down menu to view the status of the configuration’s PLC drivers.

Driver objectMonitors the communication at driver level

Node status objectMonitors the communication at node level

Remote connection status objectMonitors a remote connection

Dialup objectManually connect to, fetch historical data and disconnect from remote connection

Dialsuspend object”Dialup object” plus suspend and resume remote connection

Online suspend node objectUsed to suspend a node during supervision

Communication objects

Page 18: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Driver test and troubleshooting –T7T in the Utilities folder

T7T Driver Test programMonitors the communication betweenIGSS and the driver(s).Data can be viewed or data can be sent to the PLC (Send Packet).Data can be filtered by driver ID, node, data group, word, etc.

Log fileScan file with all data packets going between IGSS and the driver can be written.The log file – T7T.scn - will use the filter applied.The configuration scan file -<MyConfig>.scn –cannot be filtered.

Page 19: Slide Show 5: Create a New Project (System Configuration) - Creatin… ·  · 2010-04-22BOSCH BÜEP 19 / BÜEP 19 E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7 ... Siemens

Quick instructor demo

Please look and listen while the instructor quickly

goes through the creation procedure in

System Configuration.

Do Exercise 2 in the Exercises booklet

after the instructor demo