SLAC MMF PROJECT

20
1 SLAC MMF PROJECT SLAC MMF PROJECT MECHANICAL SYSTEM DESCRIPTION October 14, 2004 SLAC MMF Mechanical System Ben Entezam [email protected]

description

SLAC MMF PROJECT. MECHANICAL SYSTEM DESCRIPTION. October 14, 2004. Ben Entezam. SLAC MMF Mechanical System. [email protected]. SAFETY?. SLAC FLOOR LAYOUT W/ DESIGN TEMP. PARAMETERS. MMF ±0.1°C. CMM ±1.0°C. STORAGE ± 2.5°C. MECHANICAL ROOM UNIT LAYOUT. AHU-3. AHU-2. AHU-1. - PowerPoint PPT Presentation

Transcript of SLAC MMF PROJECT

Page 1: SLAC MMF PROJECT

1

SLAC MMF PROJECTSLAC MMF PROJECT

MECHANICAL SYSTEM DESCRIPTION

October 14, 2004

SLAC MMF Mechanical System

Ben Entezam

[email protected]

Page 2: SLAC MMF PROJECT

2

SAFETY?SAFETY?

Page 3: SLAC MMF PROJECT

3

MMF ±0.1°C

STORAGE

± 2.5°C

SLAC FLOOR LAYOUT W/ DESIGN TEMP. PARAMETERSSLAC FLOOR LAYOUT W/ DESIGN TEMP. PARAMETERS

CMM

±1.0°C

Page 4: SLAC MMF PROJECT

4

MECHANICAL ROOM UNIT LAYOUT

AHU-1MAU-1

AHU-3AHU-2

AHU-1 AND MAU-1 SERVING MMF

AHU-2 SERVING CMM

AHU-3 SERVING LOAD DOCK

Page 5: SLAC MMF PROJECT

5

ITEM NO.ITEM NO.

1

2

3

4

5

6A

6B

7

8A

8B

9

10

11

12

13

HEAT SOURCEHEAT SOURCE

POWER SUPPLY

MAGNET

ELECTRONICS RACK

COMPUTER

(2) TWO ELECTRONIC RACKS

LINEAR MOTOR

X-Y STAGES

(2) TWO ELECTRONIC RACKS

LINEAR MOTOR

X-Y STAGES

COMPUTER

COMPUTER

PRINTER

ELECTRONIC RACK

COMPUTER

(3) THREE PEOPLE

TOTALTOTAL

COOLING LOADS (BTU/HR)COOLING LOADS (BTU/HR)

LCW WATER

LCW WATER

5,115

1,705

10,230

3,410

3,410

10,230

1,783

3,410

1,705

1,705

1,705

5,115

1,705

1,023

= 52,251= 52,251

1313

1010

7777

99

5555

6A/6B6A/6B

11 22 33 44

1212

1111

8A/8B8A/8B

MMF HEAT SOURCE MMF HEAT SOURCE LOCATIONLOCATION

Page 6: SLAC MMF PROJECT

6

MAKE-UP AIR UNIT (MAU-1)

PREHEATING COIL

FILTER SECTION 65%

SUPPLY FAN

COOLING COIL

HEATING COIL

HUMIDIFIER

OUTSIDE OUTSIDE AIRAIR

SUPPLY SUPPLY AIRAIR

TO AHU-1TO AHU-1

FILTER SECTIONFILTER SECTION 30%

Page 7: SLAC MMF PROJECT

7

MAKE-UP AIR UNIT (MAU-1)

OUTSIDE AIROUTSIDE AIR

2626°F WINTER°F WINTER

95°F SUMMER95°F SUMMER

2,000 CFM 2,000 CFM

SUPPLY AIRSUPPLY AIR

7070°F°F

2,000 CFM2,000 CFM

QQ11= 1.08 * CFM * = 1.08 * CFM * ΔTΔT

Q1 = SENSIBLE HEAT (BTU/HR)

CFM = CUBIC FEET PER MINUTE

ΔT = TEMPERATURE DIFFERENCE (°F)

PREHEATING COIL (PREHEAT)

= 1.08 * 2,000 * 10 = 21,600 BTU/HR

HEATING COIL = 1.08 * 2,000 * 36 = 77,760 BTU/HRCOOLING COIL (Q1) = 1.08 * 2,000 * 32 = 69,120 BTU/HR (7 DEGREE MOTOR LOAD)COOLING COIL (Q2) (DEHUMIDIFICATION)

= 0.68 * 2,000 * 12 = 16,320 BTU/HR (ΔG = 12)

TOTAL COOLING = 69,120 + 16,320 = 85,440 BTU/HR = APPROX. 7½ TONS COOLING

HUMIDIFICATION = 69 LBS/HR

HOT WATER GPM = 9.9 GPM ~ 10 GPM

CHILLED WATER GPM

= 17 GPM85,4405,000

CFM*60*ΔG13.5*7,000

2,000*60*5413.5*7,000

=

=

=

99,36010,000

=

QQ22= 0.68 * CFM * = 0.68 * CFM * ΔGΔG

Q2 = LATENT HEAT (BTU/HR)

CFM = CUBIC FEET PER MINUTE

ΔG = GRAIN/LB DIFFERENCE (°F)

Page 8: SLAC MMF PROJECT

8

Page 9: SLAC MMF PROJECT

9

Page 10: SLAC MMF PROJECT

10

MAKE-UP MAKE-UP AIRAIR

7070°F°F

AIR HANDLING UNIT (AHU-1)

FILTER SECTION

TEMPERED HOT WATER COIL

TEMPERED CHILLED WATER COIL

SUPPLY FAN

RETURN AIRRETURN AIR

SUPPLY SUPPLY AIRAIR

69.8569.85°F°F

Page 11: SLAC MMF PROJECT

11

AIR HANDLING UNIT (AHU-1)

MAKE-UP MAKE-UP AIR AIR 7070°F °F 55%RH55%RH

2,000 CFM2,000 CFM

RETURN AIR 73RETURN AIR 73°F °F 22,000 CFM22,000 CFM

SUPPLY AIR SUPPLY AIR 69.8269.82°F°F

24,000 CFM24,000 CFM

AIR FLOW CALCULATION

(INTERIOR LOADS)

LIGHTING = 3,410 BTU/HR

PEOPLE = 454 BTU/HR

ROOF = 675 BTU/HR

TOTAL = 4,539 BTU/HR

CFM =4,539

1.08*0.18= 23,348 CFM ~ 24,000 CFM

SURROUNDING AREA EQUIPMENT LOADS

EQUIPMENT = 52,251 BTU/HR

LIGHTING = 8,000 BTU/HR

ROOF = 1,000 BTU/HR

TOTAL = 61,251 BTU/HR

SURROUNDING AREA TEMPERATURE RISE

ΔT =61,251

1.08*0.7*24,000= 3°F

Page 12: SLAC MMF PROJECT

12

AIR HANDLING UNIT (AHU-1) CONT.

MAKE-UP MAKE-UP AIR AIR 7070°F °F 55%RH 55%RH

2,000 CFM2,000 CFM

RETURN AIR 73RETURN AIR 73°F °F 22,000 CFM22,000 CFM

SUPPLY AIR SUPPLY AIR 69.8269.82°F°F

24,000 CFM24,000 CFM

COOLING LOADS

EQUIPMENT = 52,251 BTU/HR

LIGHTING = 8,000 BTU/HR

ROOF = 1,000 BTU/HR (0.033 * 25.1224 = 1,000 BTU/HR)

FAN HEAT = 24,000 * 1.08 * 2.45 = 63,504 BTU/HR (20 HP)

TOTAL = 124,755 BTU/HR / 12,000 = 10.4 TONS (TCW COIL)

GPM =BTU/HR

500 * ΔT= 83 GPMΔT = 3°C =

124,755

1,500

REHEAT COIL = 24,000*1.08*3 = 77,760 BTU/HR (THW COIL)

ΔT=20°F = 7.7 GPM =GPM 77,760500*20

ΔT=4°F = 38 GPM =GPM

HEATING LOADS

77,760500*4

Page 13: SLAC MMF PROJECT

13

Page 14: SLAC MMF PROJECT

14

MMF FLOOR LAYOUT (DIFFUSERS)

Page 15: SLAC MMF PROJECT

15

BOILER 300,000 BTU/HR

CHILLER 45 TON

HOT WATER PUMPS

CHILLEDWATER PUMPS

HEAT EXCHANGER

HEAT EXCHANGER

TEMPERED HOT

WATER PUMPS

TEMPERED CHILLED WATER PUMPS

MAU-1

AHU-1

MMF FLOW DIAGRAM MMF FLOW DIAGRAM

Page 16: SLAC MMF PROJECT

16

Page 17: SLAC MMF PROJECT

17

Page 18: SLAC MMF PROJECT

18

AIR HANDLING UNIT (AHU-2)

SUPPLY SUPPLY AIRAIR

OUTSIDE OUTSIDE AIRAIR

FILTER SECTION 30%

FILTER SECTION 65%

SUPPLY FAN

COOLING COIL

HEATING COIL

HUMIDIFIER

RETURN AIRRETURN AIR

VAV-1VAV-1

VAV-2VAV-2

VAV-3VAV-3

VAV-4VAV-4

Page 19: SLAC MMF PROJECT

19

AIR HANDLING UNIT (AHU-3)

OUTSIDE OUTSIDE AIRAIR

SUPPLY SUPPLY AIRAIR

FILTER SECTION 30%

FILTER SECTION 65%

COOLING COIL

HEATING COIL

SUPPLY FAN

FILTER SECTION

RETURN AIRRETURN AIR

Page 20: SLAC MMF PROJECT

20

CHILLER 45 TON

BOILER 300,000 BTUHR

AHU-2AHU-3

MAU-1 AHU-1

HEAT EXCHANGER

HEAT EXCHANGER

TEMPERED CHILLED WATER PUMPS

TEMPERED HOT WATER PUMPS

HOT WATER PUMPS

CHILLED WATER PUMPS

FLOW DIAGRAM