ZXA10 C220 xPON Optical Access Convergence Equipment Cabinet Installation Guide Version 1.2.1 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 Fax: (86) 755 26770801 URL: http://ensupport.zte.com.cn E-mail: [email protected]

description

ZXA10 C220

Transcript of SJ-20100823134814-004-ZXA10+C220+(V1.2.1)+xPON+Optical+Access+Convergence+Equipment+Cabinet+Installation+Guide_299730...

  • ZXA10 C220xPON Optical Access Convergence

    EquipmentCabinet Installation Guide

    Version 1.2.1

    ZTE CORPORATIONZTE Plaza, Keji Road South,Hi-Tech Industrial Park,Nanshan District, Shenzhen,P. R. China518057Tel: (86) 755 26771900Fax: (86) 755 26770801URL: http://ensupport.zte.com.cnE-mail: [email protected]

  • LEGAL INFORMATION

    Copyright 2006 ZTE CORPORATION.

    The contents of this document are protected by copyright laws and international treaties. Any reproduction or distribution ofthis document or any portion of this document, in any form by any means, without the prior written consent of ZTE CORPO-RATION is prohibited. Additionally, the contents of this document are protected by contractual confidentiality obligations.

    All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE CORPORATIONor of their respective owners.

    This document is provided as is, and all express, implied, or statutory warranties, representations or conditions are dis-claimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose, title or non-in-fringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the use of or reliance on theinformation contained herein.

    ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications covering the subjectmatter of this document. Except as expressly provided in any written license between ZTE CORPORATION and its licensee,the user of this document shall not acquire any license to the subject matter herein.

    ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.

    Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.

    The ultimate right to interpret this product resides in ZTE CORPORATION.

    Revision History

    Revision No. Revision Date Revision Reason

    R1.0 2010-10-30 First Edition

    Serial Number: SJ-20100823134814-004

  • Contents

    About This Manual..............................................i

    Declaration of RoHS Compliance ........................i

    Overview...........................................................1Device Introduction ........................................................ 1

    Device Features ............................................................. 3

    External Interfaces ......................................................... 4

    Device Configuration....................................................... 5

    Cabinet Configuration.................................................. 5

    Shelf Configuration ..................................................... 8

    Fan Tray Configuration ................................................ 9

    Card List ..................................................................14

    Equipment Components..................................................15

    Standard Compliance .....................................................16

    Technical Specifications ..................................................18

    Dimensions and Weight ..............................................18

    Environment Requirements .........................................18

    Power Supply and Grounding Requirements ..................20

    Performance Specifications .............................................20

    Installation Preparation ..................................23Engineering Documents Preparation .................................23

    Tools and Meters Preparation ..........................................23

    Installation Environment Check .......................................24

    Construction Check....................................................25

    Equipment Room Construction Check...................25

    Equipment Room Indoor Environment Check .........25

    Power Supply Check...................................................26

    Grounding Cable Check ..............................................26

    Safety Check ............................................................27

    Other Supporting Facilities Check.................................27

    Equipment Room Layout.................................................28

    Equipment Plane Layout .............................................28

  • Equipment Room Cabling............................................29

    Equipment Unpacking ....................................................30

    Unpacking Preparation ...............................................30

    Unpacking Flow .........................................................31

    Unpacking the Cabinet.......................................32

    Unpacking the Shelf ..........................................35

    Unpacking Cards...............................................36

    Unpacking Accessories.......................................37

    Unpacking Cables..............................................37

    Signature for Approval.......................................37

    Cabinet Installation.........................................39Cabinet Installation Flow ................................................39

    Cabinet Installation........................................................40

    Base Installation Mode ...............................................40

    Base Structure..................................................41

    Base Installation Flowchart.................................42

    Base Positioning................................................43

    Base Installation ...............................................47

    Cabinet Fixing ..................................................50

    Insulation Test..................................................52

    Leg Installation Mode .................................................53

    Leg and Pressure Plate Assembly ........................53

    Leg Installation Flowchart ..................................54

    Pressure Plate Assembly Positioning ....................55

    Expansion Bolt Installation .................................59

    Cabinet Fixing ..................................................60

    Insulation Test..................................................61

    Connection Between Cabinets .....................................61

    Cabinet Connection in Base Installation

    Mode....................................................62

    Cabinet Connection in Leg Installation Mode .........65

    Connecting Adjacent Cabinets.............................69

    Top Panel and Top-Side Panel Installation......................71

    Decorative Panel Installation ...........................................74

    Shelf Installation ...........................................................75

    Card Installation............................................................76

    Fan Tray Installation ......................................................77

    Power Supply Installation ...............................79Power Cable and Grounding Cable Introduction..................79

  • Power Cable and Grounding Cable Installation

    Flowchart .............................................................79

    Power Input Cables and Protection Grounding Cables .........80

    PDU.........................................................................81

    PDU Power Cable and Protection Grounding Cable

    Installation .......................................................82

    Power and Grounding Protection Cables

    Preparation.......................................................82

    Power Cable and Grounding Cable Installation ...............85

    Installation Check......................................................86

    Fan Tray Power System ..................................................87

    PDCC Distribution Box................................................87

    PDCC Power Cable Installation.....................................88

    Installation Check......................................................88

    3-Core Power Cable ...................................................89

    Cable Connection.............................................91Overall Cabinet Cabling ..................................................91

    Cabling Principles ..........................................................93

    Cabling Requirements ................................................93

    Cable Binding Requirements........................................94

    Maintenance Cables .......................................................96

    Local Serial Port Cable................................................96

    Network Cable ..........................................................97

    75-ohm Unbalanced Cable ..........................................98

    Optical Fiber Layout ..................................................... 101

    Installation Check .........................................103Overall Inspection........................................................ 103

    Cabinet Inspection................................................... 103

    Cabling Inspection ................................................... 103

    Power Supply Inspection............................................... 104

    Power-ON/OFF Inspection............................................. 104

    Inspection Before Power-ON...................................... 105

    Power-ON Process ................................................... 105

    Power-OFF Process .................................................. 106

    Cabinet Maintenance .....................................107Cabinet Front/Back Door Assembling/Disassembling ......... 107

    Assembling Cabinet Front/Back Door.......................... 107

    Disassembling Cabinet Front/Back Door...................... 108

    Dust-Proof Net Disassembling and Cleaning .................... 109

    Power Module Routine Maintenance................................ 111

  • Indoor Cabinet Grounding System

    Connection ....................................................113Overview.................................................................... 113

    Indoor Cabinet Grounding System Connection ................. 113

    Grounding for Rack System in Central Equipment

    Room............................................................. 114

    Grounding for Rack System in Remote-End Equipment

    Room............................................................. 116

    Grounding Network Requirements ................117Grounding Requirements for Access Network................... 117

    Grounding Cable Requirements...................................... 118

    Grounding Connections Requirements ............................ 119

    Ground Resistance Requirements................................... 119

    Station and In-Station Rack Requirements ...................... 120

    Ingress and Egress Communication Office (Station) Cable

    Requirements...................................................... 120

    Lighting Proof Network .................................123Lightning Protection Requirements ................................. 123

    Lightning Protection Design........................................... 124

    Power Supply Lightning Protection Grounding in a

    Central Equipment Room ................................. 124

    Power Supply Lightning Protection Grounding in a

    Far-End Equipment Room ................................ 125

    Terminology ..................................................127Terminologies.............................................................. 127

    Figures ..........................................................129

    Tables ...........................................................133

    Index ............................................................135

    Glossary ........................................................137

  • About This Manual

    Purpose The ZXA10 C220 xPON Optical Access Convergence Equipment(ZXA10 C220 for short) is a full-service optical access platform.It supports the video, data, voice, TDM, and CATV services. TheZXA10 C220 can be connected with ONUs of medium or larger ca-pacity through various networking technologies.

    The ZXA10 C220 device consists of the main control and switchingcard, xPON subscriber cards, CES uplink card, and Ethernet uplinkcard. It provides large-capacity controllable multicast and highQoS control.

    This manual provides procedures and guidelines that support theinstallation of the ZXA10 C220 xPON Optical Access ConvergenceEquipment.

    IntendedAudience

    This document is intended for the installation and debugging en-gineers.

    Prerequisite Skilland Knowledge

    To use this document effectively, users should have a general un-derstanding of network technology. Familiarity with the followingis helpful:

    The ZXA10 C220 system and its various components

    Maintenance procedures

    Local operating procedures

    What Is in ThisManual

    This manual contains the following chapters:

    Chapter Summary

    Chapter 1, Overview Provides the device introduction,features, interfaces, configuration,components, standard compliance,technical specifications, andperformance specifications.

    Chapter 2, InstallationPreparation

    Describes the engineeringdocuments preparation, toolsand meters preparation, installationenvironment check, equipmentroom layout, and equipmentunpacking.

    Chapter 3, Cabinet Installation Describes the cabinet installationflow, cabinet installation, decorativepanel installation, shelf installation,card installation, and fan trayinstallation.

    Chapter 4, Power SupplyInstallation

    Describes the power cable andgrounding cable installation flow,cable details, and fan tray powersupply system.

    Confidential and Proprietary Information of ZTE CORPORATION i

  • ZXA10 C220 Cabinet Installation Guide

    Chapter Summary

    Chapter 5, Cable Connection Describes the overall cabling,cabling principles, maintenancecables, and optical fiber layout.

    Chapter 6, Installation Check Describes the overall inspection,power supply inspection, andpower-ON/OFF inspection.

    Chapter 7, Cabinet Maintenance Describes cabinet front/backdoor assembling/disassembling,dust-proof net disassembling andcleaning, and power module routinemaintenance.

    Appendix A, Indoor CabinetGrounding System Connection

    Describes the grounding for racksystem in central equipment roomand remote equipment room.

    Appendix B, Grounding NetworkRequirements

    Describes the groundingrequirements for the accessnetwork, grounding cablerequirements, groundingconnection requirements,grounding resistance requirements,ingress and egress communicationoffice (station) cable requirements.

    Appendix C, Lighting ProofNetwork

    Describes the lightning protectionrequirements and lighteningprotection design.

    Appendix D, Terminology Provides the technical terms for thismanual.

    RelatedDocumentation

    The following documentation is related to this manual:

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Documentation Guide

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Feature Description

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Product Description

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Hardware Description

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Configuration Manual (CLI)

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Configuration Manual (NetNumen)

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Maintenance Manual

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Alarm and Notification Message Reference

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Command Reference (Volume I)

    ii Confidential and Proprietary Information of ZTE CORPORATION

  • About This Manual

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Command Reference (Volume II)

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Command Reference (Volume III)

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Command Reference (Volume IV)

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Command Reference (Volume V)

    Conventions ZTE documents employ the following typographical conventions.

    Typeface Meaning

    Italics References to other Manuals and documents.

    Quotes Links on screens.

    Bold Menus, menu options, function names, input fields,radio button names, check boxes, drop-down lists,dialog box names, window names.

    CAPS Keys on the keyboard and buttons on screens andcompany name.

    Note: Provides additional information about a certaintopic.

    Checkpoint: Indicates that a particular step needs tobe checked before proceeding further.

    Tip: Indicates a suggestion or hint to make thingseasier or more productive for the reader.

    Mouse operation conventions are listed as follows:

    Typeface Meaning

    Click Refers to clicking the primary mouse button (usually theleft mouse button) once.

    Double-click

    Refers to quickly clicking the primary mouse button(usually the left mouse button) twice.

    Right-click Refers to clicking the secondary mouse button (usuallythe right mouse button) once.

    Confidential and Proprietary Information of ZTE CORPORATION iii

  • ZXA10 C220 Cabinet Installation Guide

    This page is intentionally blank.

    iv Confidential and Proprietary Information of ZTE CORPORATION

  • Declaration of RoHSCompliance

    To minimize the environmental impact and take more responsibil-ity to the earth we live, this document shall serve as formal decla-ration that the ZXA10 C220 manufactured by ZTE CORPORATIONis in compliance with the Directive 2002/95/EC of the EuropeanParliament - RoHS (Restriction of Hazardous Substances) with re-spect to the following substances:

    Lead (Pb)

    Mercury (Hg)

    Cadmium (Cd)

    Hexavalent Chromium (Cr (VI))

    PolyBrominated Biphenyls (PBBs)

    PolyBrominated Diphenyl Ethers (PBDEs)

    The ZXA10 C220 manufactured by ZTE CORPORATION meetsthe requirements of EU 2002/95/EC; however, some assembliesare customized to client specifications. Addition of specialized,customer-specified materials or processes which do not meet therequirements of EU 2002/95/EC may negate RoHS compliance of theassembly. To guarantee compliance of the assembly, the need forcompliant product must be communicated to ZTE CORPORATION inwritten form. This declaration is issued based on our current levelof knowledge. Since conditions of use are outside our control, ZTECORPORATION makes no warranties, express or implied, and assumesno liability in connection with the use of this information.

    Confidential and Proprietary Information of ZTE CORPORATION i

  • ZXA10 C220 Cabinet Installation Guide

    This page is intentionally blank.

    ii Confidential and Proprietary Information of ZTE CORPORATION

  • C h a p t e r 1

    Overview

    Table of ContentsDevice Introduction ............................................................ 1Device Features ................................................................. 3External Interfaces ............................................................. 4Device Configuration........................................................... 5Equipment Components .....................................................15Standard Compliance .........................................................16Technical Specifications ......................................................18Performance Specifications .................................................20

    Device IntroductionThe ZXA10 C220 is a full-service optical access platform, support-ing the video, data, voice, TDM, and CATV services. The ZXA10C220 uses the ZXA10 universal indoor cabinets 19D06H20 and19D06H22.

    Figure 1 shows the outline of the 19D06H20 cabinet.

    Confidential and Proprietary Information of ZTE CORPORATION 1

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 1 19D06H20 CABINET OUTLINE

    Figure 2 shows the outline of the 19D06H22 cabinet.

    2 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    FIGURE 2 19D06H22 CABINET OUTLINE

    Device FeaturesFeatures The 19D06H20 and 19D06H22 cabinets have the following fea-

    tures:

    Large capacity

    Easy installation

    Convenient cabling

    Complete monitoring functions

    High anti-interference capability

    Good ventilation

    Pleasant appearance

    Application The 19D06H20 and 19D06H22 cabinets are both indoor cabinetswith large capacity. They are intended for areas with high userdensity and proper cabinet installation conditions.

    Confidential and Proprietary Information of ZTE CORPORATION 3

  • ZXA10 C220 Cabinet Installation Guide

    External InterfacesNetwork

    InterfacesThe ZXA10 C220 provides various types of network interfaces tomeet the device uplink requirements.

    Supports the following interfaces:

    Four GE optical interfaces

    Two GE optical interfaces and two 10 Mbps/100 Mbps/1000Mbps electrical interfaces

    Four 10 Mbps/100 Mbps/1000 Mbps electrical interfaces

    One 10GE or two 10GE interfaces

    Supports up to eight GE, two 10GE, or four 10GE interfaces.

    Supports up to two STM-1 interfaces.

    Supports up to two 32 E1 interfaces.

    SubscriberInterfaces

    The ZXA10 C220 subscriber interfaces are EPON interfaces. Theyare used for network uplink. The ZXA10 C220 supports up to 20EPON interfaces or 12 10G EPON interfaces, and 1280 ONTs.

    ManagementInterfaces

    The ZXA10 C220 control and switching card provides various man-agement and maintenance interfaces to meet the local and remotemaintenance requirements. It provides the CLI and NMS mainte-nance modes.

    Maintenance serial port

    The maintenance serial port uses the RJ-45 connector, whichcan connect HyperTerminal to perform local serial port main-tenance. When the serial port is working, the bit rate is 9600bps.

    Remote maintenance network port

    The remote maintenance network port uses the RJ-45 connec-tor. It supports 10 Mbps/100 Mbps self-adaptation and canconnect HyperTerminal to load and debug programs. It canalso connect the remote NM work station to achieve the re-mote management on the device (out-of-band NM).

    In-band NM interface

    This interface is a GE optical interface and it connects the ser-vice network in the uplink direction and connects the NM workstation externally.

    Environment monitoring interface

    This interface is connected to the environment monitoringmodule through a special cable. It can collect the environmentinformation, such as temperature, humidity, power voltage,and smog, sent from the environment monitoring module. Inaddition, the system backplane provides the fan monitoringinterface for the convenience of system management andmaintenance.

    4 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    Device ConfigurationThis section includes the following topics:

    Cabinet Configuration

    Shelf Configuration

    Fan Tray Configuration

    Card Configuration

    Cabinet Configuration

    19D06H20 Cabinet Figure 3 shows the configuration of a 19D06H20 cabinet.

    Confidential and Proprietary Information of ZTE CORPORATION 5

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 3 19D06H20 CABINET CONFIGURATION

    19D06H22 Cabinet Figure 4 shows the configuration of a 19D06H22 cabinet.

    6 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    FIGURE 4 19D06H22 CABINET CONFIGURATION

    Confidential and Proprietary Information of ZTE CORPORATION 7

  • ZXA10 C220 Cabinet Installation Guide

    Note:

    To ensure ventilation, leave a minimum of 2U free space above thefan and under the ZXA10 C220 shelf of each unit.

    Shelf Configuration

    Shelf Structure The ZXA10 C220 shelf uses a 19-inch 6U (1U = 44.45 mm) plug-inbox.

    The shelf consists of the front and back beams, left and right sidepanels, and guide rails, as shown in Figure 5. Each shelf has 14slots, and the gap between slots is 25 mm.

    FIGURE 5 6U STANDARD SHELF STRUCTURE

    Shelf Configura-tion

    Figure 6 shows the typical configuration for the ZXA10 C220MB6UN backplane.

    8 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    FIGURE 6 ZXA10 C220 SHELF CONFIGURATION

    The shelf consists of the 6U service card area and 1.5U cablingarea.

    6U service card area

    The service card area is used to insert service cards and controland switching cards. It has 14 slots.

    Slot 7 and slot 8 are for control and switching cards, andthis area is 6U in height.

    The other 12 slots are for general line cards, including allthe service cards and uplink cards except the main controland switching cards and power cards. The line card slotsare 4.5U in height.

    1.5U cabling area

    This area lies under the line cards and avoids overlapping thecontrol and switching cards. It is 1.5U in height and used forcabling, including the network cable, optical fiber, and coaxialfiber. Cabling brackets are especially designed for trimmingcables connecting different cards.

    Fan Tray Configuration

    Overview The TFANP speed-adjustable fan group is installed in the front out-let cabinet of the ZXA10 C220. Figure 7 shows the fan panel.

    FIGURE 7 FAN PANEL

    Table 1 lists the interfaces on the fan panel.

    Confidential and Proprietary Information of ZTE CORPORATION 9

  • ZXA10 C220 Cabinet Installation Guide

    TABLE 1 INTERFACES ON THE FAN PANEL

    Interface Function

    -48 VRTN -48 V voltage input slot

    UPLINK Uplink interface

    LINK Cascading interface

    Fan PowerConnection

    The fan power supply uses the 3-core power cable, with one endconnecting the -48 V voltage input slot, and the other end con-necting any port of PDCC FAN1FAN5.

    Fan MonitoringConnection

    The fan can be monitored through the ZXA10 C220 or CSV. TheCSV can be configured as an accessory. Ignore it if the operatordoes not have any requirements for environment monitoring.

    The UPLINK interface of the fan is connected to the EDI interfaceon the ZXA10 C220 through ZXA10 C220 monitoring, as shown inFigure 8.

    10 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    FIGURE 8 C220 MONITORING

    Figure 9 shows the ZXA10 C220 monitoring cable connection.

    FIGURE 9 ZXA10 C220 MONITORING CABLE CONNECTION

    Confidential and Proprietary Information of ZTE CORPORATION 11

  • ZXA10 C220 Cabinet Installation Guide

    When the CSV is used to control the fan trays in the cabinet, the fantrays are cascaded. The uplink interface of the topmost fan trayis connected with the CSV 485-1 interface. The uplink interface ofthe lower-layer fan tray is connected with the link interface of theupper-layer fan.

    In cascading mode, the interface of the fan tray works in 485 in-terface mode. Handle the S1 and S2 bit switches on the fan tray.Set S1 to OFF. Select fan IDs for S2, 1 for low, 4 for high, ON forlevel 1, and OFF for level 0. When four shelves are cascaded, eachshelf should be configured with different fan IDs. Generally, theshelf IDs are 0000, 0001, 0010, and 0100 from bottom to top.

    Figure 10 shows CSV monitoring.

    12 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    FIGURE 10 CSV MONITORING

    Figure 11 shows the CSV monitoring cable connection.

    Confidential and Proprietary Information of ZTE CORPORATION 13

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 11 CSV MONITORING CABLE CONNECTION

    Card List

    The ZXA10 C220 cards include the main control and switchingcards, uplink cards, subscriber cards, backplanes, and powercards, as listed in Table 2.

    TABLE 2 ZXA10 C220 CARDS

    Type Name Description

    Main control andswitching cards

    GCSD Type D control andswitching card

    EIG 4-port optical (GE)Ethernet interface card

    EIGF 4-port optical (FE)Ethernet interface card

    EIGT Time transmissionEthernet interface card

    EIGMF Optical and electricalgigabit Ethernetinterface card

    EIT1F Single-port 10G opticalinterface card

    EIT2F 2-port 10G opticalinterface card

    CL1A Single-port STM-1optical interface circuitemulation card

    CE1B 32-port E1 unbalancedinterface circuitemulation card

    CE1BB 32-port E1 balancedinterface circuitemulation card

    Uplink cards

    CT1BB 32-port T1 balancedinterface circuitemulation card

    14 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    Type Name Description

    EPFC 4-port Type C EPONcentral office card

    EPFCB 4-port Type CB EPONcentral office card

    EPXS Asymmetric single-port10G EPON central officecard

    GPFAB 4-port Type AB GPONcentral office card

    GPFAC 4-port Type AC GPONcentral office card

    Subscriber cards

    GPFAE 4-port Type AE GPONcentral office card

    MB6UN 6U back power outletbackplane

    Backplanes

    MB6UF 6U front power outletbackplane

    PFR Back outlet power cardPower cards

    PFF Front outlet power card

    Equipment ComponentsPower Supply

    ModuleThe cabinet directly provides -48 V DC power, when the equipmentroom provides -48 V DC power.

    The system uses a detectable PERC power distributor, which isdual-channel -48 V input power distributor and supports simulta-neous input of dual-channel -48 V DC power voltage.

    Core Control andSwitching Module

    The CGSD card performs the ZXA10 C220 system control and ex-change functions, including data exchange, TDM switching, systemclock processing, system control software management, protocolprocessing software management, inter-card communication, andoverhead processing.

    The ZXA10 C220 device is configured with dual GCSD cards run-ning in active/standby mode. The standby GCSD card performshot-backup for the active GCSD card.

    Service AccessModule

    The ZXA10 C220 system provides various types of services,such as VoIP, IPTV, CATV, and broadband service, throughGPON/EPON/10G EPON or CES access.

    Ethernet UplinkModule

    The ZXA10 C220 system provides the EIG, EIGM, and EIT1F cardsfor uplink. The uplink interface types and count are determinedby the configured cards.

    Confidential and Proprietary Information of ZTE CORPORATION 15

  • ZXA10 C220 Cabinet Installation Guide

    Standard ComplianceTable 3 lists the technical standards that the ZXA10 C220 complieswith.

    TABLE 3 STANDARD COMPLIANCE

    Code Standard Name

    GB 3378-1982 Subscriber Line Signaling Systemfor Telephone Automatic SwitchingNetwork

    GB 3380-1982 Ringing and Tone for TelephoneAutomatic Switching Network

    GB 7611-1987 Parameters of Digital Interfacefor PCM Systems OverTelecommunication Network

    GB 6879-1995 Performance and Test Methodsof the 30 Channels Pulse CodeModulation Multiplex Equipmentat 2048 Kbps

    GB/T 13997-1992 Technical Requirement for OpticalLine Terminals at 2048 Kbps, 8448Kbps, 34368 Kbps, 139264 Kbps

    GB/T 14760-1993 Measurement Methods ofTransmission Performanceson Optical Fiber CableCommunication Systems

    GB/T 15542-1995 Technical Requirements ofDigital SPC Automatic TelephoneExchange

    GB 191-1990 Packaging - Pictorial Markings forHandling of Goods

    GB 3873-1983 General Specifications for ProductsPackaging of CommunicationEquipments

    GB2423-1989 Basic Environmental TestingProcedures for Electric andElectronic Products - General andGuidance

    GB/T4798-1990 Environmental Conditions Existingin the Application of Electric andElectronic Products

    YDN 020-1996 Technical Specifications for V5.1Interfaces between the DigitalLocal Exchange (LE) and AN

    YDN 021-1996 Technical Specifications for V5.2Interfaces between the DigitalLocal Exchange (LE) and AN

    16 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    Code Standard Name

    YDN 065-1997 General Technical Specificationsof Telephony Switching Equipmentby Ministry of Posts andTelecommunications

    YDN 107-1998 V5.2 Interface Conformance TestTechnical Specifications

    YDN 108-1998 V5.2 Interface Conformance TestTechnical Specifications

    ITU-T G0.964 Technical Specifications for V5.1Interfaces between the DigitalLocal Exchange (LE) and AN

    ITU-T G0.965 Technical Specifications for V5.2Interfaces between the DigitalLocal Exchange (LE) and AN

    ITU-T G0.703 Physical/Electrical Characteristicsof Hierarchical Digital Interfaces

    ITU-T G0.704 Synchronous Frame StructuresUsed at 1544, 6312, 2048, 8448and 44 736 Kbps HierarchicalLevels

    ITU-T G0.823 The Control of Jitter and Wanderwithin Digital Networks Which AreBased on the 2048 Kbps Hierarchy

    ITU-T G0.826 Error Performance Parametersand Objectives for International,Constant Bit Rate Digital Paths ator above the Primary Rate

    ITU-T G0.960 Access Digital Section for ISDNBasic Rate Access

    ITU-T G0.961 Digital Transmission System onMetallic Local Lines for ISDN BasicRate Access

    ITU-T G0.962 Access Digital Section for ISDNPrimary Rate at 2048 Kbps

    ITU-T I.430 Basic ISDN Access User-NetworkInterface - Layer 1 Specification

    ITU-T I.431 Primary Rate User-NetworkInterface - Layer 1 Specification

    ITU-T Q0.921 ISDN User-Network Interface -Data Link Layer Specification

    ITU-T Q0.931 ISDN User-Network InterfaceLayer 3 Specification for Basic CallControl

    Confidential and Proprietary Information of ZTE CORPORATION 17

  • ZXA10 C220 Cabinet Installation Guide

    Code Standard Name

    DGT AN On-site Trial of V5-interfaceTesting Methods

    DGT Technical Specifications for UserAN Equipment

    Technical SpecificationsThis section includes the following topics:

    Dimensions and Weight

    Environment Requirements

    Power Supply and Grounding Requirements

    Dimensions and Weight

    19D06H20 Cabinet Dimensions: 2000 mm 600 mm 600 mm (Height Width Depth)

    Weight

    Empty cabinet: 106 kg

    Full configuration: 250 kg

    19D06H22 Cabinet Dimensions: 2200 mm 600 mm 600 mm (Height Width Depth)

    Weight

    Empty cabinet: 128 kg

    Full configuration: 280 kg

    ZXA10 C220 Shelf Dimensions: 265.9 mm 482.6 mm 358.5 mm (Height Width Depth)

    Environment Requirements

    Temperature andHumidity

    Transportation and storage temperature: -40 to +70

    Working environment temperature: -5 to +45

    Working environment humidity: 5%95%

    18 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    Note:

    Either too low or too high environment temperature may lead toabnormal running of the equipment.

    Air-conditioner is required in the equipment room. It is forbiddento place the equipment in any damp site. In southern areas wherethe humidity is higher, damp-proof devices should be provided;while in northern areas where the humidity is lower, antistatic floorshould be provided.

    CleannessRequirements

    Cleanness concerns the dust and harmful gases in the air. Theequipment room should meet the following cleanness require-ments:

    There is no explosive, conductive, magnetic, or corrosive dust.

    The density of the dust with a diameter over 5 m should beno more than 3 104 particles/m3.

    There is no corrosive metal or insulation-destructive gas, suchas SO2 or NH3.

    The equipment room must be very clean, and the doors andwindows must be sealed.

    Illumination The equipment room should meet the following illumination re-quirements:

    The equipment room is free from being exposed to direct sun-light to avoid aging and deformity of the circuit cards and othercomponents.

    The average light is from 150 Lx to 200 Lx without flare. Gen-erally , the equipment room is lighted by fluorescence lampsembedded in the ceiling.

    The equipment room should be equipped with emergencylights.

    Air PressureRequirements

    Working: 70 kPa106 kPa

    Storage: 70 kPa106 kPa

    Air PollutionRequirements

    Do not expose the equipment in corrosive gas (such as sulfuretedhydrogen, sulfur dioxide, and ammonia oxide) and smoke (suchas oil solvent and smoke). Do not smoke in the equipment room.

    ElectromagneticInterference

    The field strength cannot exceed 140 dBV/m and the frequencyranges from 0.01 MHz to 110000 MHz.

    Fireproof The equipment room should meet the following fireproof require-ments:

    The paint and decorative materials in the equipment roomshould be fireproof.

    The through holes in the wall for cables should be filled withfire retardant materials.

    Extinguishers and automatic fire alarm system should be inplace wherever necessary.

    Confidential and Proprietary Information of ZTE CORPORATION 19

  • ZXA10 C220 Cabinet Installation Guide

    Power Supply and GroundingRequirements

    Power SupplyRequirements

    The power supply requirements are as follows:

    The equipment room is equipped with a 220 V AC power supply.2-core and 3-core sockets are available.

    The ZXA10 C220 uses -48 V DC power. The equipment roomshould be equipped with an AC/DC power transforming deviceto provide working power. The DC power voltage fluctuation isallowed to range from -57 V to -38 V.

    In order to ensure continuous working after the mains powerfailure, the corresponding measures should be taken, such asdiesel generator set and storage batteries.

    The noise level indices of DC power supply voltages shouldmeet the technical specifications of the former MPT.

    DC power supply must have over-voltage and over-current pro-tection and indications.

    GroundingRequirements

    The overall cabinet can use the joint grounding or a unified con-nection with the cabinet earth by connecting the working groundand the power ground on the power socket of the backplane, andthen connecting with the protection ground at the bottom of thebusbar.

    The grounding resistance should be less than 1 ohm.

    PowerConsumption

    Power consumption of a single shelf (in full configuration): 400 W

    Maximum power consumption for a cabinet with four shelves:1600 W

    Performance SpecificationsInterface

    SpecificationsTable 4 lists the interface specifications.

    TABLE 4 INTERFACE SPECIFICATIONS

    Interface Interface Specifications

    E1 interface ITU-T G.703, ITU-T G.704

    SDH network node interface ITU-T G.707 (2000)

    Optical interfaces for the SDHequipment and system

    ITU-T G.957 (1999.6) OpticalInterfaces of Synchronous DigitalHierarchy (SDH) Equipment andSystem

    Ethernet interface IEEE 802.3u, IEEE 802.3z, IEEE802.3i, IEEE 802.3x, IEEE Std802.3ab, IEEE 802.1Q

    20 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 1 Overview

    Interface Interface Specifications

    STM-1 ITU-T G.707 (SDH-frame),ITU-T G.958 (AutomaticLaser Shutdown), ITU-T G.783(RSOH+MSOH handling), ITU-TI.432.1

    ReliabilitySpecifications

    Cabinet lifetime: 15 years

    ZXA10 C220 MTBF: 50000 hours, lifetime: 20 years

    Confidential and Proprietary Information of ZTE CORPORATION 21

  • ZXA10 C220 Cabinet Installation Guide

    This page is intentionally blank.

    22 Confidential and Proprietary Information of ZTE CORPORATION

  • C h a p t e r 2

    Installation Preparation

    Table of ContentsEngineering Documents Preparation.....................................23Tools and Meters Preparation ..............................................23Installation Environment Check ...........................................24Equipment Room Layout.....................................................28Equipment Unpacking ........................................................30

    Engineering DocumentsPreparationThe following documents are related to the ZXA10 C220:

    Purchase contract (duplicate copy) and technical proposals.

    Engineering survey report, environment acceptance report,and installation acceptance report.

    Delivery attached documents:

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Product Information

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Hardware Description

    ZXA10 C220 (V1.2.1) xPON Optical Access Convergence Equip-ment Hardware Installation

    Tools and MetersPreparation

    General Tools andMeters

    General tools and meters for installation are as follows:

    Tape

    Screw driver (straight, cross)

    Tweezers

    Spanner

    Confidential and Proprietary Information of ZTE CORPORATION 23

  • ZXA10 C220 Cabinet Installation Guide

    Diagonal pliers

    Cable peeler

    Sharp-nose pliers

    Cable clamp

    Unpacking pliers

    Electric iron

    Percussion drill

    Extraction tool

    Digital multimeter

    Thermometer

    Programming card

    Eraser

    Optical power meter

    Antistatic wrist strap

    Insulated tape

    Resistance tester

    Band

    Torque spanner

    Special Tools andMeters

    Special tools and meters for installation are as follows:

    Laptop

    Optical connector and pigtail fiber

    Optical attenuator

    All the tools and meters must be calibrated in advance. The gen-eral tools and meters are usually provided by the customer. ZTEinstallation engineers usually bring the special tools and meterswith them.

    Installation EnvironmentCheckThis topic includes the following:

    Construction Check

    Power Supply Check

    Grounding Cable Check

    Safety Check

    Other Supporting Facilities Check

    24 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    Construction Check

    Before indoor cabinet installation, check the equipment room con-struction and indoor environment.

    Equipment Room Construction Check

    Check that the equipment room construction meets the followingrequirements:

    The civil work is complete and the indoor walls are dry.

    The equipment room is large enough for holding all cabinets.The door of the equipment room is greater than 2.2 m in heightand 1 m in width. The space at both the front and back of thedoor is more than 1 m. The room height is not less than 3 m.

    The load bearing capacity for the equipment floor is more than450 kg/m2. The bearing capacity for the non-equipment flooris at least 300 kg/m2.

    The equipment room can be installed with the antistatic activefloor. The floor is installed firmly with the horizontal inaccuracyper square meter less than 2 mm. The grounding and antistaticmeasures of the floor meets the requirements.

    Air conditioners are used to keep normal temperature and hu-midity.

    No drain pipe passes through the equipment room. The re-served hidden ducts and holes meet the cabling requirements.The hole size is 400 mm 400 mm. Ducts and troughs shouldbe damp-proof.

    Lighting wires and power cables are grounded and hidden.Dust-proof measures are taken to protect walls and roof.

    The anti-shock level reaches seven.

    The lightning-arrester or rod are mounted to avoid lightningstrike. All the metal pipes are grounded at the entrance of theequipment room.

    Equipment Room Indoor Environment Check

    Check that the equipment room indoor environment meets thefollowing requirements:

    Operating ambient temperature: -5 to +45

    Relative humidity: 10%90%

    The temperature and humidity are measured 2 m above thefloor and 0.4 m at the front of the equipment when the equip-ment is in operation.

    Cleanness

    Cleanness concerns the dust and harmful gases in the air. Theequipment should be installed in the equipment room wheremeets the following cleanness requirements:

    Confidential and Proprietary Information of ZTE CORPORATION 25

  • ZXA10 C220 Cabinet Installation Guide

    There is no explosive, conductive, magnetic, or corrosivedust.

    The density of the dust with a diameter over 5 m shouldbe no more than 3 104 particles/m3.

    There is no corrosive metal or insulation-destructive gas,such as SO2 or NH3.

    The equipment room should be always kept clean, withdoors and windows tightly sealed.

    Power Supply Check

    Check that the power supply meets the following requirements:

    The equipment room is equipped with 220 V AC power supplyand both two-pin and three-pin sockets are used.

    -48 V DC power is provided with the allowed fluctuation rangefrom -57 V DC to -38 V DC. The DC power supply providespower-OFF protection measures and the storage batteries areavailable for backup.

    The cabling routes, quantity, and cabling position of the DCpower cables is compliant with the general regulations oftelecommunication projects. The specifications of the lineconductors applied, the dielectric strength, and the fusecapacity meet the design requirements.

    The power cable employed is one-piece cable without anyjoints.

    The voltage fluctuation of the mains supply does not exceed20 V, with the frequency fluctuation no more than 5%, andthe distortion rate of the cable voltage less than 5%.

    The cabling of the power supply system is exact, tidy with goodinsulation, and reasonable layout.

    Note:

    If the system has the active/standby power supply, both the powercables should be connected in correct directions. Once the cable isconnected in a reverse direction, it may cause serious short circuit.

    The power cables should be clearly separated from the signal linesand subscriber lines. In the process of laying out the power cables,make sure that the feed cables and busbar meet the medium-termor long-term expansion demands.

    Grounding Cable Check

    Check that the grounding cables meet the following requirements:

    26 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    The cabinet has the protection grounding busbar. All the pro-tection grounding and working cables are connected to thegrounding busbar. Therefore, the protection grounding busbaris a hybrid busbar for both protection grounding and workinggrounding.

    The soil type has the greatest effect on the grounding resis-tance. In an area with poor soil condition, it is recommendedto add the resistance reducer (like acrylamide) around thegrounding stub.

    Temperature also affects the grounding resistance. In northernChina, it is recommended to embed stubs deep to reduce thetemperature effect. The grounding stub is made of galvanizedmaterial.

    Use electricity-conductive cables with cooper jacket to connectthe grounding stub and equipment. Their cross section areasis not less than 50 mm2 and the distance should be as shortas possible. If necessary, take corrosive-proof measures forgrounding connectors to lower the resistance.

    Safety Check

    Check that the equipment room meets the following safety re-quirements:

    The equipment room is equipped with fire extinguishers.

    The large equipment room is equipped with the automatic firecontrol system.

    Flammable or explosive materials are forbidden in the equip-ment room.

    Other Supporting Facilities Check

    Based on the contract configuration requirements, check:

    Whether the uplink optical interface or electrical interface isavailable.

    Whether the uplink devices are ready.

    Whether the power cables for external power supplies and cab-inets are ready.

    Whether the ODF, DDF, and MDF have been constructed.

    Whether the optical fibers are prepared and whether the opticalfiber connectors match.

    Confidential and Proprietary Information of ZTE CORPORATION 27

  • ZXA10 C220 Cabinet Installation Guide

    Equipment Room LayoutThis section includes the following topics:

    Equipment Plane Layout

    Equipment Room Cabling

    Equipment Plane Layout

    Equipment room area should be spacious enough for the equip-ment operation and maintenance.

    The space reserved for opening the front and rear door shouldbe larger than 1 m.

    The space between the cabinet side and the wall should not beless than 0.9 m.

    If there are operation buttons on the cabinet side, the spaceleft should be more than 1 m.

    The equipment should also have a passage with more than 1m wide.

    Figure 12 provides a device (with one cabinet) plane layout forreference.

    28 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    FIGURE 12 EQUIPMENT PLANE LAYOUT (TAKING 19D06H22 AS ANEXAMPLE)

    Equipment Room Cabling

    Generally, the cabling in the equipment should meet the followingrequirements:

    Power cables, grounding cables, signal cables, subscriber ca-bles, and optical fibers should be laid separately.

    The cables in the same direction should be bound together andnot crossed.

    Make the cables to bend a little at their roots and at turnings.Try not to straighten them to ensure that neither the roots northe plugs are given force.

    There are horizontal cabling racks between the layers of plug-inboxes of the cabinet. Meanwhile, there are vertical cablingtroughs at a side of the cabinet. Each cable connected at theback of each layer in the plug-in box should be laid out alongthe horizontal cabling rack, and then along the vertical cablingtroughs.

    All cables must be bound with cable ties in the following manner:

    The bound cables should be arranged tidily without any obviouscrossings and twists.

    Confidential and Proprietary Information of ZTE CORPORATION 29

  • ZXA10 C220 Cabinet Installation Guide

    Do not bind the cables too tightly or too loosely.

    The spacing between cable ties must be consistent and varywith the diameters of the bundle, usually three to four timesof it.

    Increase or reduce cable ties according to the bundle branches.

    The cables should be bound and fixed securely at ends, bends,and crosses.

    Extra parts of the cables should be cut off neatly, without leav-ing any sharp edges.

    Equipment UnpackingThis section includes the following topics:

    Unpacking Preparation

    Unpacking Flow

    Unpacking Preparation

    Before unpacking, ensure that the equipment room is qualified forequipment installation. Consider the following guidelines:

    The Equipment room building project is complete.

    The equipment room meets the requirements for installingTelecommunication equipments.

    The power supply is already available with adequate power andsufficient connecting terminals on the power distributor cabi-net. It is also equipped with necessary standby power system.

    The grounding connection is done according to the relativestandards, by connecting to the ground together, with agrounding resistance less than 1 ohm. The number of theconnecting terminals on the grounding copper busbar meetsthe equipment grounding demand.

    Prepare the following tools in advance: large and small Phillipsscrewdrivers, large flathead screwdrivers, diagonal pliers, ad-justable wrench, diagonal pliers, pliers, sharp nose pliers, in-sulation plastic tape, wallpaper cutter, electrical knife, mark-ing pen, sharp-nose tweezers, tape, dehydrated alcohol, dustproof paper, antistatic wrist strap, crowbar, and nail hammer.

    Inform the project supervisor and the relevant personnel fromthe equipment operator in advance to be sure of their availabil-ity upon unpacking. Make sure that there is enough personnelespecially for moving the cabinet.

    30 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    Unpacking Flow

    Figure 13 shows the unpacking flow.

    FIGURE 13 UNPACKING FLOW

    The ZXA10 C220 should be packed properly to avoid damage fromwater and vibration during transportation. Upon equipment arrivalat the installation site, handle it properly and protect it from ex-treme sunlight and rain.

    Confidential and Proprietary Information of ZTE CORPORATION 31

  • ZXA10 C220 Cabinet Installation Guide

    Unpacking the Cabinet

    Purpose Check whether the cabinet is in a good condition and whether thecabinet type is correct.

    Procedure To unpack and check the cabinet, perform the following steps:

    1. Count the total number of the goods.

    Before unpacking, it is necessary to count the number of thegoods according to the packing list attached to the packingboxes. It is recommended to keep a record of goods.

    2. Unpack the cabinet box.

    Be cautious while unpacking the cabinet. Protect the equip-ment coating and the circuit cards. Wear an antistatic wriststrap to touch and move the circuit cards and other metal com-ponents. When the equipment arrives at the destination with aconsiderably different temperature and humidity, do not openthe package until it stays for some time in order to avoid dam-age to the equipment.

    Unpack the box carefully and check the items one by one. Makesure that the goods are consistent with the order requirementsspecified by the contract, shipping list, and packing list. All thelists of equipment components and their technical documentsshould be put in the packing box.

    i. Open case 1. Check if the delivery attached documentsand the acceptance report are available. The installationpersonnel should read the technical documents, check ifany device is damaged, and then take down the results.

    ii. The cabinet is contained in a wooden case. Figure 14 showsthe case body. The cabinet is wrapped by an aluminum foilbag, and pads are used to protect the edges of the cabinet.The pads are fixed by adhesive tapes, as shown in Figure15. Therefore, abide by the following steps to open thecase.

    FIGURE 14 WOODEN BOX

    1. Cover2. Body

    32 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    FIGURE 15 CABINET PACKAGE IN THE BOX

    1. Cabinet2. Top Pad3. Top Pad

    4. Bottom Pad25. Bottom Pad1

    Perform the following steps to open the box.

    i. Before unpacking, place the case horizontally upwards. Usethe unpacking pliers or nail claw to remove iron corner-wrappers of the box and the nails in the cover. The un-packing sequence is: Detach the top cover > Remove thefront side plate > Remove the side plates (two sides) >Remove the back side plate > Remove the foam plates >Open the moisture-proof plastic film, as shown in Figure16.

    Confidential and Proprietary Information of ZTE CORPORATION 33

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 16 UNPACKING SEQUENCE

    1. Cover2. Side Front Panel3. Side Panel4. Side Rear Panel

    5. Polyfoam Card6. Bottom Frame7. Plastic Film

    Caution:

    Open the box carefully to avoid any damage to the cabinet.

    ii. Remove the packing material such as foam cushion andaluminum foil bag on cabinet. Hold the lower part of thewooden box and pull the cabinet slowly till it is upright.Then, drag the box out slowly until it stands steady.

    34 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    Note:

    At least five persons are needed since the cabinet is veryheavy.

    iii. Keys required for cabinet are packed in a plastic bag andhung on the handle of the cabinet front door. Use the keysto open the front, rear, and side doors, to check whetherthere are complete collection of plug-in units in the cabi-net. Check cabinet cleanness, scratches, or loosened partson the surface. Make sure that the cabinet interior is cleanwith reliable socket connection and clear markings. Be-cause the plug-in units are transported with the cabinet,their reinforcing mode, installation accessories, and relia-bility should be checked carefully. Close the cabinet dooron completing the cabinet inspection.

    Unpacking the Shelf

    Purpose Check whether the shelf is in good condition and its type ismatched.

    Procedure To unpack the shelf, perform the following steps:

    1. Place the packed unit on ground and keep its face upwards.Figure 17 shows the shelf packing box.

    FIGURE 17 6U SHELF PACKING BOX

    1. Cover 2. Body

    2. Use a nail hammer to remove nails and corner wrap sheets.3. Remove the top cover of the packing box.

    Confidential and Proprietary Information of ZTE CORPORATION 35

  • ZXA10 C220 Cabinet Installation Guide

    Unpacking Cards

    Purpose Check whether the cards are in good condition and their types arematched.

    Procedure Each card is packed with an antistatic bag (with desiccant inside).The packed card components are put in a box with foam plates inthe gaps.

    Figure 18 shows the packing box.

    FIGURE 18 CARD PACKING BOX

    1. Binding Strap2. Adhesive Tape

    3. Carton

    To unpack cards, perform the following steps:

    1. Wear an antistatic strap.2. Open the packing box, count the cards, and then take the cards

    out from the antistatic bags.3. Check whether the card types are the same as those on the

    packing box.

    Figure 19 shows the opened card box.

    36 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 2 Installation Preparation

    FIGURE 19 OPENED CARD PACKING BOX

    1. Card Cushion

    Unpacking Accessories

    To unpack accessories, perform the following steps:

    1. Open the plastic bag.2. Check the specifications and count of the accessories such as

    the cable ties, pigtail fibers, and fasteners.

    Unpacking Cables

    Cables are packed in a carton.

    Open the carton, and then check whether the cable types, length,and connectors meet the configuration requirements in the con-tract.

    Signature for Approval

    After unpacking, check the articles according to the configurationlist and packing list. Then, fill in the acceptance list and the ac-ceptance report. Both parties should sign them for confirmationand each party keeps a copy of them.

    If anything is found damaged, wrong, or missing during the un-packing inspection, contact the local ZTE office.

    Confidential and Proprietary Information of ZTE CORPORATION 37

  • ZXA10 C220 Cabinet Installation Guide

    This page is intentionally blank.

    38 Confidential and Proprietary Information of ZTE CORPORATION

  • C h a p t e r 3

    Cabinet Installation

    Table of ContentsCabinet Installation Flow ....................................................39Cabinet Installation............................................................40Decorative Panel Installation ...............................................74Shelf Installation ...............................................................75Card Installation................................................................76Fan Tray Installation ..........................................................77

    Cabinet Installation FlowBefore installing the cabinet, decide the position to place the cab-inet according to the Engineering Survey Report. In case of anychange, discuss with the customer.

    Then, decide whether to install the base according to the equip-ment room floor.

    If it is the antistatic floor, install the base, and then fix thecabinet on the base. This is the base installation mode.

    If it is the concrete floor, fix the cabinet directly on the con-crete floor with press plate assembly. This is the leg installa-tion mode.

    Figure 20 shows the cabinet installation flowchart.

    Confidential and Proprietary Information of ZTE CORPORATION 39

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 20 CABINET INSTALLATION FLOWCHART

    Cabinet InstallationThis section includes the following topics:

    Base Installation Mode

    Leg Installation Mode

    Connection Between Cabinets

    Top Panel and Top-Side Panel Installation

    Base Installation Mode

    This section describes how to install the cabinet in base mode. Itincludes the following topics:

    Base Structure

    Base Installation Flowchart

    Base Positioning

    Base Installation

    Cabinet Fixing

    Insulation Test

    40 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    Base Structure

    Types The cabinet can be installed on three types of height-adjustablebases: Type A, Type B, and Type C, as shown in Figure 21. Theholes of these three base types have the same positions and sizes,but their height adjustment ranges are different.

    FIGURE 21 THREE BASE TYPES

    1. Movable Support2. Fixed Support

    3. Height-locking Screw

    Installation Holes Figure 21 shows three installation holes at the top of each basetype with 518 mm spacing. Each base has one pair of installationholes at the bottom to fix the base on the foundation, as shown inFigure 22.

    FIGURE 22 BASE INSTALLATION HOLE

    Confidential and Proprietary Information of ZTE CORPORATION 41

  • ZXA10 C220 Cabinet Installation Guide

    HeightAdjustment

    The three types of the adjustable bases have different height ad-justment ranges. As shown in Figure 23, L is the height adjustmentrange of the adjustable base, which is the height from the installedcabinet bottom to the ground. The base height can be adjustedin steps of 25 mm, together with the cabinet feet adjustment, toachieve continuous adjustment at each height section.

    The height adjustment range L of each base type is as follows:

    Type A: 160 mm210 mm

    Type B: 210 mm310 mm

    Type C: 310 mm510 mm

    FIGURE 23 HEIGHT ADJUSTMENT RANGE OF THE ADJUSTABLE BASE

    1. Cabinet2. Pressure Plate Assembly

    3. Adjustable Installation Base4. Ground

    During the project survey, select the type of installation base ac-cording to the actual floor height. Each cabinet needs two instal-lation bases.

    Base Installation Flowchart

    Figure 24 shows the base installation flowchart.

    42 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 24 BASE INSTALLATION FLOWCHART

    Base Positioning

    Overview Base positioning is to fix the base on the floor in the equipmentroom. It consists of two steps: mark and drill.

    Mark According to the reference dimensions, cabinet dimensions, andthe base dimension position given in the engineering plane designdiagram, confirm the installation position of the cabinet, work outwhere to fix the cabinet by using a measuring tape, and then drawthem with a ink marker, as shown in Figure 25 and Figure 26.

    Confidential and Proprietary Information of ZTE CORPORATION 43

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 25 19D06H20 CABINET BASE POSITIONING

    1. Adjustable installation base2. Drilled hole 14 (M12 expansion

    bolt)3. Cabinet outline4. Front side of cabinet

    44 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 26 19D06H22 CABINET BASE POSITIONING

    1. Adjustable installation base2. Drilled hole 14 (M12 expansion

    bolt)

    3. Cabinet outline4. Front side of cabinet

    Figure 27 and Figure 28 shows the distances between the cabinetand the walls.

    Confidential and Proprietary Information of ZTE CORPORATION 45

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 27 19D06H20 CABINET POSITIONS IN EQUIPMENT ROOM

    1. Internal Wall2. Cabinet Edges3. Drilled Hole 14 (M12 Expansion

    Bolt)4. Front Side of Cabinet

    46 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 28 19D06H22 CABINET POSITIONS IN EQUIPMENT ROOM

    1. Internal Wall2. Cabinet Edges

    3. Drilled Hole 14 (M12 ExpansionBolt)

    4. Front Side of Cabinet

    Drill Whiling drilling holes, pay attention to the following points:

    Use a 14 drill bit to drill the holes at the positions where theexpansion bolt holes are marked.

    While drilling holes, keep the drill bit vertical to the ground andtightly hold the drilling machine.

    Keep the depth of holes equal to the length of expansion bushplus cone. Keep the depths of all holes equal.

    While drilling, use a blower to remove dust.

    If the floor is too hard and smooth to locate the drill bit, youcan cut a dent at the desired position with the sample drill firstto help locating the drill bit.

    Base Installation

    InstallingExpansion Bolts

    Before installation, use a cleaner to clean the inside and outsideof all the holes, and then measure the space between holes. Forholes with large deviation, it is necessary to reposition and re-drillthe holes.

    Confidential and Proprietary Information of ZTE CORPORATION 47

  • ZXA10 C220 Cabinet Installation Guide

    Take the gasket and nut out of the expansion bolt. Put the expan-sion rod and expansion bush vertically in the hole and hammer theexpansion bolt fully into the ground.

    The expansion bolt is M12 100, which is attached to the base.

    Installing theFixed Support

    Align the two holes on the bottom of one base in the vertical direc-tion to the expansion bolts, and then fix the base on the foundationfloor firmly, as shown in Figure 29.

    FIGURE 29 FIXED SUPPORT INSTALLATION

    1. Fixed support2. Expansion bolt M12100

    3. Gasket4. Ground

    Install the other base in the same way as mentioned above. Screwdown the expansion bolts and nuts, and then fix the fixed supportof the adjustable base on the floor firmly.

    The leveling washers are available in the 1 mm and 2 mm speci-fications. They are used to level the adjustable base, as shown inFigure 30.

    FIGURE 30 LEVELING WASHERS

    1. 1mm Gasket 2. 2 mm Gasket

    Installing theMovable Support

    After installing the fixed support on the ground, release the boltsconnecting the fixed support with the movable support. Adjustthe height of the movable support to meet the specified heightbetween the bottom of the cabinet and the ground.

    The height between two adjusting holes is 25 mm. Fix the boltsof the movable support and fixed support firmly after proper ad-justments. When tightening the movable support, first tighten thebolt at Mark A and then at Mark B and C to ensure a firm connec-tion between the movable and fixed supports, as shown in Figure31.

    48 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 31 MOVABLE SUPPORT INSTALLATION

    1. Movable support2. Height-locking screw M1230

    (with flat gasket and spring gas-ket)

    3. Fixed support4. Ground

    Three tightening bolts are used for Type A and Type B bases andfour tightening bolts are used for Type C base, as to increase thebase rigidity, as shown in Figure 32.

    FIGURE 32 TYPE C FIXATION

    1. Movable support2. Height-locking screw M1230

    (with flat gasket and spring gas-ket)

    3. Fixed support4. Ground

    Confidential and Proprietary Information of ZTE CORPORATION 49

  • ZXA10 C220 Cabinet Installation Guide

    InstalledAdjustable Base

    Figure 33 shows the installed adjustable base for a single cabinet.

    FIGURE 33 INSTALLED ADJUSTABLE BASE

    Cabinet Fixing

    CabinetInstallation

    After the adjustable base is installed, put the cabinet on the ad-justable base and adjust it to a proper position, as shown in Figure34.

    FIGURE 34 CABINET POSITIONING

    1. Cabinet2. Leg

    3. Adjustable installation base4. Ground

    Turn the four anchor bolts with an adjustable wrench to adjustthe height and verticality of the cabinet. Ensure that the distancebetween the bottom of the cabinet and the surface of the conduc-tive floor meet the requirements and the cabinet is vertical to theground. The fastening moment of force should be 45 N m.

    50 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    Note:

    The adjustable range of the anchor bolts on the cabinet is 0 mm25mm. It cannot exceed 30 mm. Otherwise, it may lower the cabinetstability.

    Cabinet Fixing After the adjustment mentioned above, lock the four anchors of thecabinet with four press plates, and then fix the four press plateson the adjustable cabinet base with four hex bolts, as shown inFigure 35.

    FIGURE 35 CABINET FIXING

    1. Cabinet2. Adjustable installation base3. Ground4. Bolt M12X40 (with flat gasket and

    spring gasket)

    5. Insulation washer6. Pressure plate7. Insulation base plate8. Leg

    Installed Cabinet Figure 36 shows the overall appearance of the cabinet installed onthe raised floor.

    Confidential and Proprietary Information of ZTE CORPORATION 51

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 36 INSTALLED CABINET

    Insulation Test

    The base has insulating coats that guarantee insulation against thefloor.

    Adjust the multimeter to the resistance range to measure the re-sistance between the anchor bolt of the cabinet and the expansionbolt that fixes the base.

    If the circuit is in open state, the insulation is qualified.

    Otherwise, the cabinet is not insulated. Then, check whetherthe insulating pad and plate are installed or the insulating ma-terial is ineffective.

    After performing the insulation processing, install the cabinetagain and redo the insulation test.

    52 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    Leg Installation Mode

    This section describes how to install the cabinet in leg mode. Itincludes the following topics:

    Leg and Pressure Plate Assembly

    Leg Installation Flowchart

    Pressure Plate Assembly Positioning

    Expansion Bolt Installation

    Cabinet Fixing

    Insulation Test

    Leg and Pressure Plate Assembly

    Leg Structure Figure 37 shows the cabinet leg structure.

    FIGURE 37 LEG STRUCTURE

    1. Expansion bolt M121002. Insulation washer3. Insulation base plate

    4. Cabinet5. Pressure plate6. Cabinet anchor

    Pressure PlateAssembly

    The pressure plate assembly consists of insulation washer, pres-sure plate, and insulation plate, as shown in Figure 38.

    Confidential and Proprietary Information of ZTE CORPORATION 53

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 38 PRESSURE PLATE ASSEMBLY OUTLINE

    1. Insulation washer2. Pressure plate

    3. Insulation base plate

    Leg Installation Flowchart

    In leg installation mode, the cabinet is fixed directly on the floorwith expansion bolts and pressure plate, and no base is required.Figure 39 shows the leg installation flowchart.

    54 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 39 LEG INSTALLATION FLOWCHART

    Pressure Plate Assembly Positioning

    Overview Pressure plate assembly positioning is to fix the pressure plateassembly on the floor in the equipment room. It consists of twosteps: mark and drill.

    Mark According to the reference dimensions, cabinet dimensions anddirection given in the engineering plane design diagram, confirmthe installation position of the cabinet, work out where to fix thecabinet pressure plate by using a measuring tape, and then drawthem with a ink marker, as shown in Figure 40 and Figure 41.

    Confidential and Proprietary Information of ZTE CORPORATION 55

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 40 CABINET INSTALLATION HOLE POSITION (19D06H20)

    1. Drilled hole 14 (with M12 expan-sion bolt)

    2. Cabinet outline3. Cabinet leg position4. Front side of cabinet

    56 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 41 CABINET INSTALLATION HOLE POSITION (19D06H22)

    1. Drilled hole 14 (with M12 expan-sion bolt)

    2. Cabinet edges3. Cabinet leg position

    Figure 40 and Figure 41 show the relative positions between thecabinet edge and hole positions. The double-dotted lines in thefigure are the cabinet outlines in a downward view.

    Figure 42 and Figure 43 show the distances between the cabinetand the walls.

    Confidential and Proprietary Information of ZTE CORPORATION 57

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 42 19D06H20 CABINET POSITIONS IN EQUIPMENT ROOM

    1. Internal wall2. Cabinet edges3. Drilled hole 14 (with M12 expan-

    sion bolt)4. Front side of cabinet

    58 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 43 19D06H22 CABINET POSITIONS IN EQUIPMENT ROOM

    1. Internal wall2. Cabinet edges

    3. Drilled hole 14 (with M12 expan-sion bolt)

    4. Front side of cabinet

    Drill Whiling drilling holes, pay attention to the following points:

    Use a 14 drill bit to drill the holes at the positions where theexpansion bolt holes are marked.

    While drilling holes, keep the drill bit vertical to the ground andtightly hold the drilling machine.

    Keep the depth of holes equal to the length of expansion bushplus cone. Keep the depths of all holes equal.

    While drilling, use a blower to remove dust.

    If the floor is too hard and smooth to locate the drill bit, youcan cut a dent at the desired position with the sample drill firstto help locating the drill bit.

    Expansion Bolt Installation

    Before installation, use a cleaner to clean the inside and outsideof all the holes, and then measure the space between holes. Forholes with large deviation, it is necessary to reposition and re-drillthe holes.

    Confidential and Proprietary Information of ZTE CORPORATION 59

  • ZXA10 C220 Cabinet Installation Guide

    Take the gasket and nut out of the expansion bolt. Put the expan-sion rod and expansion bush vertically in the hole and hammer theexpansion bolt fully into the ground.

    The expansion bolt is M12 100, which is attached to the cabinet.

    Cabinet Fixing

    Leveling Move the cabinet and place its four anchors at the positions markedfor them. Place a horizontal ruler on the top of the cabinets intwo perpendicular directions to check the horizontal level. If thecabinet is slanted, adjust the adjustable nuts of the four adjustablelegs of the cabinet to level the cabinet.

    Cabinet Fixing Lock the four pressure plates onto the four anchors of the cabinet,and install them completely, as shown in Figure 44. Screw downthe nuts of the expansion bolts to fix the cabinet firmly on the floor.The fastening moment of force should be 45 N m.

    FIGURE 44 CABINET FIXING

    1. Cabinet2. Pressure plate assembly3. Expansion bolt M12X1004. Ground

    5. Pressure plate6. Insulation washer7. Insulation base plate8. Leg

    Installed Cabinet Figure 45 shows the overall appearance of the cabinet installed onthe floor.

    60 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 45 INSTALLED CABINET

    Insulation Test

    Adjust the multimeter to the resistance range to measure the re-sistance between the anchor bolt of the cabinet and the expansionbolt that fixes the base.

    If the circuit is in open state, the insulation is qualified.

    Otherwise, the cabinet is not insulated. Then, check whetherthe insulating pad and plate are installed or the insulating ma-terial is ineffective.

    After performing the insulation processing, install the cabinetagain and redo the insulation test.

    Connection Between Cabinets

    This section includes the following topics:

    Cabinet Connection in Base Installation Mode

    Cabinet Connection in Leg Installation Mode

    Connecting Adjacent Cabinets

    Confidential and Proprietary Information of ZTE CORPORATION 61

  • ZXA10 C220 Cabinet Installation Guide

    Cabinet Connection in Base Installation Mode

    Positioning TwoCabinets

    To install two cabinets in parallel, position them according to thedimensions shown in Figure 46 and Figure 47.

    FIGURE 46 POSITIONING TWO CABINETS IN PARALLEL (19D06H20)

    1. Wall2. Cabinet edges3. Drilled hole 14 (with M12 expan-

    sion bolt)4. Cabinet front side

    62 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 47 POSITIONING TWO CABINETS IN PARALLEL (19D06H22)

    1. Wall2. Cabinet Edges

    3. Drilled Hole 14 (with M12 Expan-sion Bolt)

    4. Cabinet Edges

    PositioningMulti-Cabinets

    Figure 48 and Figure 49 show how to position multiple cabinets inthe equipment room.

    Confidential and Proprietary Information of ZTE CORPORATION 63

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 48 POSITIONING MULTI-CABINETS (19D06H20)

    1. Wall2. Cabinet edges3. Drilled hole 14 (with M12 expan-

    sion bolt)4. Cabinet front side

    64 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 49 POSITIONING MULTI-CABINETS (19D06H22)

    1. Wall2. Cabinet Edges

    3. Drilled Hole 14 (with M12 Expan-sion Bolt)

    4. Cabinet Edges

    Cabinet Connection in Leg Installation Mode

    Positioning TwoCabinets

    To install two cabinets in parallel, position them according to thedimensions shown in Figure 50 and Figure 51.

    Confidential and Proprietary Information of ZTE CORPORATION 65

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 50 POSITIONING TWO CABINETS IN PARALLEL (19D06H20)

    1. Wall2. Cabinet edges3. Drilled hole 14 (with M12 expan-

    sion bolt)4. Cabinet front side

    66 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 51 POSITIONING TWO CABINETS IN PARALLEL (19D06H22)

    1. Wall2. Cabinet edges

    3. Drilled hole 14 (with M12 expan-sion bolt)

    4. Cabinet front side

    PositioningMulti-Cabinets

    Figure 52 and Figure 53 show how to position multiple cabinets inthe equipment room.

    Confidential and Proprietary Information of ZTE CORPORATION 67

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 52 POSITIONING MULTI-CABINETS (19D06H20)

    1. Wall2. Cabinet edges3. Drilled hole 14 (with M12 expan-

    sion bolt)4. Cabinet front side

    68 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 53 POSITIONING MULTI-CABINETS (19D06H22)

    1. Wall2. Cabinet edges

    3. Drilled hole 14 (with M12 expan-sion bolt)

    4. Cabinet front side

    Connecting Adjacent Cabinets

    ConnectionRequirements

    The cabinet must be installed vertically. The connection shouldmeet the following requirements:

    The horizontal and vertical deviation should not exceed 3 mm.

    The main aisle between rows of cabinets must be alignedstraight with an error rate lower than 5 mm.

    The adjacent cabinets should be close against each other andthe entire row of cabinets should be on the same plane.

    Connection To connect adjacent cabinets in the same row, perform the follow-ing steps:

    1. Figure 54 shows adjacent cabinet connecting screw and curvedsteel plate. Disassemble the curved steel plate (on the racktop, used for connecting adjacent cabinets), as shown in Figure55.

    Confidential and Proprietary Information of ZTE CORPORATION 69

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 54 SCREW AND CURVED STEEL PLATE

    1. Tightening screw 2. Curved plate nut

    FIGURE 55 DISASSEMBLING CURVED STEEL PLATE

    2. Fix the curved steel plate with a tightening screw, as shown inFigure 56.

    FIGURE 56 FIXING CURVED STEEL PLATE

    3. Assemble the curved steel plates of the cabinets with bolts(M812), plain pad, spring pad, and M8 nuts, as shown inFigure 57.

    70 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 57 ADJACENT CABINETS CONNECTION

    1. Bolt (M812)2. Spring pad3. Plain pad

    4. Curved part5. M8 nut

    Top Panel and Top-Side PanelInstallation

    Install the top panel and the top-side panel according to customerrequirements. Before installing them, ensure that:

    The cabinet is fixed.

    All the cables are installed.

    Hardware check and power-ON debugging are complete.

    Installing the TopPanel

    A cabinet is required to be equipped with two top panels, includinga front top panel and a rear top panel. Connect them to the cabinettop with five M5 12 combination screws, as shown in Figure 58.

    Confidential and Proprietary Information of ZTE CORPORATION 71

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 58 INSTALLING THE TOP PANEL

    1. Combination screw M5 122. Cabinet

    3. Top panel

    InstallingTop-Side Panels

    To install the top-side panels, perform the following steps:

    1. Dismantle the angle bracket on the top of the cabinet.2. Fix the angle bracket along with the top-side panel on the top

    of the cabinet.3. Fasten the top-side panel with the top panel with three M5

    12 combination screws.4. Install the other top-side panels in the same way.

    Figure 59 shows how to install the top-side panels.

    72 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 59 INSTALLING TOP-SIDE PANELS

    1. Top-side panel2. Combination screws M5 123. Angle bracket

    4. Top panel5. Cabinet

    For a row of multiple cabinets, install all the top panels along withthe top-side panels at the two ends of the row.

    Figure 60 shows the multiple cabinets with top panels and top-sidepanels installed.

    Confidential and Proprietary Information of ZTE CORPORATION 73

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 60 MULTIPLE CABINETS WITH TOP PANELS AND TOP-SIDE PANELS

    Decorative Panel InstallationInstalling the

    Front and RearDecorative Panels

    Align the connection holes of both the front and the rear decorativepanels with the ones at the cabinet bottom lintels, and then fixthem tightly with screws, as shown in Figure 61.

    FIGURE 61 INSTALLING THE FRONT AND REAR DECORATIVE PANELS

    1. Screw2. Front decorative panel

    3. Rear decorative panel

    For multiple cabinets, install the cabinets one by one after fixingthe front and rear decorative panels of the first cabinet. Figure 62shows the installed front and rear decorative panels.

    74 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    FIGURE 62 INSTALLED FRONT AND REAR DECORATIVE PANEL

    Installing SideDecorative Panels

    Align the connection holes of the two side decorative panels withthe holes at the front and the rear decorative panels, and then fixthem tightly with screws, as shown in Figure 63.

    FIGURE 63 INSTALLING SIDE DECORATIVE PANELS

    1. Left decorative panel2. Screw

    3. Right decorative panel

    Figure 64 shows the installed side decorative plates for a singlecabinet.

    FIGURE 64 INSTALLED DECORATIVE PANEL

    For multiple cabinets in a single row, just install the side decorativepanels.

    Shelf InstallationThe shelf is packed together with the cabinet. Therefore, it is onlynecessary to check whether the screws of the fixed shelves aretight and whether the connection lines are loosened.

    Confidential and Proprietary Information of ZTE CORPORATION 75

  • ZXA10 C220 Cabinet Installation Guide

    In case of expansion, the shelf is packed separately and needs tobe installed.

    On the two sides of the cabinet front, there are two columns forinstallation positioning. In actual installation, place the shelf hor-izontally on its bracket and push it into the cabinet. Tighten theM5 14 screw with the floating nut on the column to ensure thefirmness of all the shelves. The shelf can be fixed by four panelscrews, and can be flexibly placed in the cabinet as required.

    Figure 65 shows the shelf installation.

    FIGURE 65 INSTALLING A SHELF

    1. Floating nut2. Combination screw3. Shelf

    4. Shelf tray5. Rack

    Card InstallationPreparation Before installing a circuit board, do as follows:

    Remove sundries from the cabinet and the frame.

    Take out the circuit card from the antistatic bag and removethe moisture-proof bag.

    Check whether the circuit card name is the same as that onthe packing list and whether the parts on the circuit card aredamaged or fall off.

    Card Installation Each shelf is installed with a floating grounding reed, so all thecards use the same grounding cable in the shelf.

    To install a card, perform the following steps:

    1. Insert the card according to the slot name on the upper andlower beams of each shelf.

    2. Press claspers on the card and push it in until it is latched,which means the card is in place.

    76 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 3 Cabinet Installation

    Caution:

    While installing a card, wear antistatic wrist straps.

    Dummy PanelInstallation

    Because of different configurations, the shelf in each cabinet mayhave idle slots. All the idle slots are decorated with standarddummy panels. The spring reed at the back of the dummy panelcan be used to adjust the tension.

    Fan Tray InstallationInstall an empty shelf onto the columns of the cabinet. Insertthe fan tray into the empty shelf with captive screws, as shown inFigure 66.

    FIGURE 66 INSTALLING FAN TRAY

    1. Cabinet column2. Panel screw3. Fan tray

    Confidential and Proprietary Information of ZTE CORPORATION 77

  • ZXA10 C220 Cabinet Installation Guide

    This page is intentionally blank.

    78 Confidential and Proprietary Information of ZTE CORPORATION

  • C h a p t e r 4

    Power SupplyInstallation

    Table of ContentsPower Cable and Grounding Cable Introduction......................79Power Cable and Grounding Cable Installation Flowchart .........79Power Input Cables and Protection Grounding Cables .............80Fan Tray Power System ......................................................87

    Power Cable and GroundingCable IntroductionPower cables can be classified into -48 V power input cable andinternal power cable of the cabinet. The grounding cable is theprotection grounding cable for the cabinet.

    Power Cable and GroundingCable Installation FlowchartFigure 67 shows the installation flowchart for power and groundingcables.

    Confidential and Proprietary Information of ZTE CORPORATION 79

  • ZXA10 C220 Cabinet Installation Guide

    FIGURE 67 INSTALLATION FLOWCHART

    Power Input Cables andProtection GroundingCablesThis section includes the following topics:

    PDU

    PDU Power Cable and Protection Grounding Cable Installation

    Power and Grounding Protection Cables Preparation

    Power Cable and Grounding Cable Installation

    Installation Check

    80 Confidential and Proprietary Information of ZTE CORPORATION

  • Chapter 4 Power Supply Installation

    PDU

    Dimensions The dimensions of the 19-inch PDU are 131 mm 482.6 mm 240 mm (Height Width Depth), as shown in Figure 68.

    FIGURE 68 19-INCH PDU

    1. Installation support2. Box bottom

    3. Cover

    Internal Structure Figure 69 shows the internal structure of the PDU.

    FIGURE 69 PDU INTERNAL STRUCTURE

    1. Connection terminal2. Centralize short connection part3. 50A single-polar