Six sigma overview
-
Upload
jeremy-jay-v-lim-css-bb-pmp -
Category
Business
-
view
280 -
download
1
description
Transcript of Six sigma overview
![Page 1: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/1.jpg)
Six Sigma
1
![Page 2: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/2.jpg)
2
![Page 3: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/3.jpg)
Why do Six Sigma?
3
![Page 4: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/4.jpg)
Why do Six Sigma?
Reduction of Cost due to Poor
Quality and Process Wastes
Reduction of OpEx
4
![Page 5: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/5.jpg)
Why do Six Sigma?
Increase in Customer
Satisfaction
Reduction of Complaints
5
![Page 6: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/6.jpg)
Why do Six Sigma?
Less fire-fighting
Improvement of
Operational Efficiency
Shorter Time to Market
6
![Page 7: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/7.jpg)
Why do Six Sigma?
Helps make business
more competitive and
sustainable
7
![Page 8: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/8.jpg)
Six Sigma Methodology Overview of the Technique
8
![Page 9: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/9.jpg)
9
What is Six Sigma?
![Page 10: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/10.jpg)
What is Six Sigma?
• Universal Measure of
Performance
• Methodology for problem-
solving, process improvement
and innovation
• Management System for
Continual Improvement and
Innovation
10
According to Motorola's Six Sigma University
![Page 11: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/11.jpg)
Six Sigma as a Measure
11
![Page 12: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/12.jpg)
Six Sigma as a Measure
12
![Page 13: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/13.jpg)
Six Sigma as a Measure
13
![Page 14: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/14.jpg)
Six Sigma as a Methodology
14
![Page 15: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/15.jpg)
Six Sigma as a Methodology
15
Impact of doing Six Sigma
![Page 16: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/16.jpg)
16
Six Sigma as a
Management System
![Page 17: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/17.jpg)
17
Six Sigma as a
Management System
Standardization,
KPI, BPM
Project
Management
Training &
Certification
Rewards &
Recognition
Management
Support
![Page 18: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/18.jpg)
Six Sigma Methodology Overview of How It's Done
18
![Page 19: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/19.jpg)
19
Note that this content is graded to Yellow Belt Level (" Just The Basics")
![Page 20: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/20.jpg)
Six Sigma as a Methodology
20
![Page 21: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/21.jpg)
RECOGNIZE
21
![Page 22: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/22.jpg)
22
![Page 23: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/23.jpg)
Remember,
At the end of Recognize Phase
One should be able to choose a
good project to work on based
on agreed criteria with top
management
23
![Page 24: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/24.jpg)
DEFINE
24
![Page 25: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/25.jpg)
25
![Page 26: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/26.jpg)
26
![Page 27: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/27.jpg)
27
![Page 28: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/28.jpg)
29
Project Charter for Define Phase
![Page 29: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/29.jpg)
Remember,
At the end of Define Phase
One should be able to state
what is the problem to be
solved, the goal to be reached
and the process to be
improved.
The charter is very important
since it sets the direction and
scope of the project.
30
![Page 30: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/30.jpg)
MEASURE
31
![Page 31: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/31.jpg)
32
![Page 32: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/32.jpg)
33
![Page 33: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/33.jpg)
34
![Page 34: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/34.jpg)
35
Performance Measure (Data)
Operational Definition
(Data Collection Plan)
![Page 35: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/35.jpg)
36
Check for Process Controllability Example of data collected using the Data Collection Plan
![Page 36: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/36.jpg)
37
Compute for Process Sigma Level
Using Excel,
Sigma Level = Normsinv(Yield%) + 1.5 This is one common formula if raw data is in Counts of Good and Bad
![Page 37: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/37.jpg)
Remember,
At the end of Measure Phase
One should be able to decide
GO or NO-GO on solving the
identified problem
If Go, go to Analyze Phase
If No-Go, move on to next
problem
38
![Page 38: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/38.jpg)
ANALYZE
39
![Page 39: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/39.jpg)
40
![Page 40: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/40.jpg)
41
![Page 41: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/41.jpg)
42
![Page 42: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/42.jpg)
43
![Page 43: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/43.jpg)
44
![Page 44: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/44.jpg)
45
![Page 45: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/45.jpg)
46
![Page 46: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/46.jpg)
47
![Page 47: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/47.jpg)
48
![Page 48: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/48.jpg)
Remember,
At the end of Analyze Phase
One should be able to find out
what is/are the Root Cause(s).
This will be the focus of
improvement because the
Root Cause has the biggest
contribution to the problem.
49
![Page 49: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/49.jpg)
IMPROVE
50
![Page 50: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/50.jpg)
51
![Page 51: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/51.jpg)
52
![Page 52: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/52.jpg)
53
![Page 53: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/53.jpg)
54
![Page 54: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/54.jpg)
Remember,
At the end of Improve Phase
One should be able to select
and apply the Best Solution
addressing the Root Cause(s).
This is based on the fact that
we were able to validate that
the Root Cause has the
biggest contribution to the
problem.
55
![Page 55: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/55.jpg)
CONTROL
56
![Page 56: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/56.jpg)
57
![Page 57: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/57.jpg)
58
![Page 58: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/58.jpg)
59
![Page 59: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/59.jpg)
60
![Page 60: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/60.jpg)
61
The worse way to manage a process is by giving only
verbal instructions!
![Page 61: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/61.jpg)
62
![Page 62: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/62.jpg)
63
![Page 63: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/63.jpg)
Remember,
At the end of Control Phase
One should be able to sustain
the improved results and
handover the improved
process to its owners.
This phase leads to the closure
of the project and don’t forget
to celebrate the achievement.
64
![Page 64: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/64.jpg)
65
People still love doing Six Sigma
Or adapting something similar
![Page 65: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/65.jpg)
66
"To Work Smarter Not Harder"
![Page 66: Six sigma overview](https://reader034.fdocuments.net/reader034/viewer/2022052522/5549b797b4c905bc6d8b4c8d/html5/thumbnails/66.jpg)
About Me
Mapua Graduate School of Engineering 67
Jeremy Jay V. Lim CSS-BB, PMP, MSEM, BPM
Currently working in a local bank as Six
Sigma Program Manager
15 years work experience
10 years in CI and PM, 5 years in Ops Mgt
Worked in MNCs – Mfg, BPO & Fin’l Svcs
Has done TPM, Six Sigma, RAD, BPM, BPR,
Lean, and PMO
Guest speaker in Six Sigma conferences
Authored BPM whitepapers
Passionate about Value-driven Change
and Innovation