Site Visit Report
The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not been reported, this should not be construed to mean that there is full compliance with that condition of the licence.
Instructions and actions arising from the visit shall be addressed, or where applicable noted, by the licensee in order to ensure compliance, to improve the environmental performance of the installation and to provide clarification on certain issues.
The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.
Licensee
Name of Installation Abbott Ireland (Cootehill)
Licensee Abbott Ireland
Licence Register No. P0687-02
CRO Number 902453
Site Address Dromore West, Cootehill, Cavan
Site Visit Reference No. SV10474
Report Detail
Issue Date 03/11/2017
Prepared By David Matthews
Site Visit Detail
Date Of Inspection 27/09/2017 Announced No
Time In 09:30 Time Out 17:00
Visited by on behalf of the EPA Exova Catalyst Ireland
Licensee Personnel and Role See report.
Photo Taken No Samples Taken Yes Video Taken No
Odour Assessment No
Site Visit Report - SV10474 - Abbott Ireland Page 1 of 54
Scope
This is a report on monitoring of emissions to atmosphere at this site. Please find the detailed technical report attached.
Media
Air.
Site Areas Inspected
See report.
Documents Inspected
See report.
Site Visit Report - SV10474 - Abbott Ireland Page 2 of 54
ISO/IEC 17025 Accredited Legal Entity, UKAS Accredited Testing Laboratory No. 4279Exova (UK) Ltd trading as Exova Catalyst & Exova Catalyst Ireland
Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL
EMISSIONS REPORTEPA AIR EMISSIONS COMPLIANCE MONITORING
Your Exova Catalyst Ireland Contact: Nick Kenny (+353 86 853 8247)
CootehillDromore WestAbbott Ireland
Co. Cavan
EPA Office of Environmental Enforcement
(Prepared on behalf of the EPA by Exova Catalyst - EPA Contract No. OEE-DS-14)-
-
Exova Catalyst Ireland, Unit D8 North City Business Park, North Road, Finglas, Dublin 11E: [email protected]
Industrial Emissions Licence: PO687-02
Stack Emissions Testing Report Commissioned by
Installation Name & Address
A1-4 Boiler A
DELETE & COVER ME
MM 10 1074MCERTS Level 2
Stack Reference
Signature of Report Approver
Version 1
Team Leader
Deputy Regional Manager
TE1 TE2 TE3 TE4MM 08 922
MCERTS Level 2
Patrick O'BrienReport Approved by
27th September 2017
Job Reference NumberPO687-02 -CAR17-01
Dates of the Monitoring Campaign
Report Written byJohn Glennon
18th October 2017Report Date
TE1 TE2 TE3 TE4
Version
Site Visit Report - SV10474 - Abbott Ireland Page 4 of 54
TITLE PAGE
CONTENTS
Summary of Sampling Deviations
EXECUTIVE SUMMARY
Monitoring Objectives
Monitoring Results
Monitoring Dates & Times
Process Details
Monitoring & Analytical Methods
Sampling Location
Plant Photos / Sample Points
APPENDIX 1 - Monitoring Personnel & List of Equipment
APPENDIX 2 - Raw Data, Sampling Equations & Charts
9
3
5
6
8
CONTENTS
4
2
7
The testing performed fully meets the technical requirements in Irish EPA Guidance Note, AG2.
Opinions and interpretations expressed herein are outside the scope of Exova Catalyst Ireland's ISO 17025 accreditation.
This test report shall not be reproduced, except in full, without the written approval of Exova Catalyst Ireland.
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 2 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 5 of 54
Overall Aim of the Monitoring Campaign
Special Requirements
Target Parameters
Exova Catalyst Ireland were commissioned by the EPA Office of Environmental Enforcement to carry out stack emissions testing at Abbott Ireland on the A1-4 Boiler A at Cootehill.
The aim of the monitoring campaign was to demonstrate compliance with a set of emission limit values (ELVs) as specified in the Site's Permit.
There were no special requirements.
Oxides of Nitrogen (as NO₂)
MONITORING OBJECTIVES
Executive Summary(Page 1 of 7)
Abbott Ireland, CootehillA1-4 Boiler A
27th September 2017
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 3 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 6 of 54
where MU = Measurement Uncertainty associated with the Result
Parameter
Oxides of Nitrogen (as NO₂) ¹ - -Oxygen Dry
Water Vapour Stack Gas TemperatureStack Gas Velocity
¹
- -NOTE: VOLUMETRIC FLOW RATE & VELOCITY DATA TAKEN FROM THE PRELIMINARY VELOCITY TRAVERSE.
¹ Reference Conditions (REF) are: 273K, 101.3kPa, dry gas, 3% oxygen.
Limit30598
-
Abbott Ireland, Cootehill
27th September 2017
+/-Units Result
Concentration
MULimit+/-
4.18
629
mg/m³ 66.42
Executive Summary
Mass Emission
MONITORING RESULTS
A1-4 Boiler A
Result LimitUnitsMU
0.21
% v/v
3.8m/s
0.8100.4
5.24 200 580.6 62.0
m³/hr 15493m³/hr
°C
(Page 2 of 7)
Volumetric Flow Rate (ACTUAL) 1114
% v/v18.0
8742
0.28g/hr
Volumetric Flow Rate (REF)
-
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 4 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 7 of 54
Parameter
R1 - -R1 -R1R1
All results are expressed at the respective reference conditions.
Date(s)Mass Emission
12:35 - 13:04% v/v 18.0 27/09/2017 30Water Vapour27/09/2017 10:46 - 10:56
Units
Abbott Ireland, Cootehill
MONITORING DATE(S) & TIMES
A1-4 Boiler A27th September 2017
30Oxides of Nitrogen (as NO₂)
(Page 3 of 7)Executive Summary
SamplingTimes mins
% v/v
Velocity & Volumetric Flow Rate
Units DurationConcentration Sampling
27/09/20174.1866.4
27/09/2017g/hr
12:35 - 13:04mg/m³
Oxygen580.6 12:35 - 13:04 30
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 5 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 8 of 54
Standard Operating Conditions
Abbott Ireland, Cootehill
Feedstock (if applicable)
Value
Process Status
A1-4 Boiler A27th September 2017
Abatement SystemAbatement System Running Status
Plume Appearance
N/A
Parameter
Capacity (of 100%) and Tonnes / HourContinuous or Batch Process
Natural GasN/A
Continuous
Gas Boiler
Natural Gas
Fuel
(Page 4 of 7)Executive Summary
PROCESS DETAILS
N/A
80% capacity
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 6 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 9 of 54
CAT-TP-21CATCAT Yes
Dry Zirconia Cell by Horiba PG-250CATOxygen
(with short name reference as appears in the table above)
Exova Catalyst (CAT)
0.41 mg/m³YesEN 14789 CAT-TP-21 Yes 0.1 %
SUMMARY OF SAMPLING DEVIATIONS
Yes 1.2 m/s
ISO 17025 Accreditation Number: 4279
Oxides of Nitrogen (as NO₂)Yes
Yes
Yes CATYes
ANALYSIS LABORATORIES
TechniqueProcedure Lab Lab
Velocity & Vol. Flow Rate
GravimetricWater Vapour
EN 16911-1 (MID) CAT-TP-41 CAT
Chemiluminescence by Horiba PG-250EN 14792CAT-TP-05 CAT-TP-05 0.1 % v/vYesEN 14790
Standard
Abbott Ireland, Cootehill
ISO
Executive Summary
Monitoring
ParameterProcedure
Technical MCERTS17025
TestingTesting
Analytical Analysis17025
Analysis
LOD(Average)
Analytical
A1-4 Boiler A
(Page 5 of 7)
Testing ISO
Analysis
MONITORING & ANALYTICAL METHODS
27th September 2017
Pitot Tube and Thermocouple
Parameter Deviation
All 1 There are no deviations associated with the sampling employed.
Run
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 7 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 10 of 54
Duct Characteristics Location of Sampling Platform
Platform Details
Number of Ports - 1
Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)
-
Sufficient working area to manipulate probe and operate the measuring instruments
Type1.20
Value
Executive Summary
cm
Yes
-
(Page 6 of 7)
Units
-
Permanent
Parameter
Yes
Horizontal
YesThere are no obstructions present which hamper insertion of sampling equipmentSafe Access Available
Width
Yes
-
m²m
Sample Port Size
Circular
Value General Platform Information
Permanent / Temporary PlatformInside / Outside
Platform has chains / self closing gates at top of laddersPlatform has vertical base boards (approx. 0.25m high)
YesYes
SUITABILITY OF SAMPLING LOCATION
Inside
Yes
10
Irish EPA Technical Guidance Note AG1 / EN 15259 Platform Requirements
Port Depth
m
1.13
Orientation of Duct
Easy Access Available
Depth
Area
2" BSP
Value
Sampling Location / Platform Improvement Recommendations
EN 15259 Homogeneity Test Requirements
Sampling Plane Validation Criteria (from EN 15259)
Where NM = Not Measured as no Isokinetic sampling was performed.
--
Yes
Pa
-
NM
-
-
-
--m/s
Maximum Angle of Swirl
> 5 Pa Yes
Units
-
NM0.00
-
NM
-
-
3.85
-
-Lowest Gas Velocity
m/s-
3.71-
-
Required
The sampling location meets all the requirements specified in Irish EPA Guidance Note AG1 and EN 15259, and therefore there are no improvement recommendations.
No Local Negative Flow
-
NM
Mean Velocity--
-
-
Yes
Traverse 1
m/s-
Criteria in EN 15259
-
There is no requirement to perform a EN 15259 Homogeneity Test on this Stack.
9.0
- Compliant
--3.80
1.04
°-
NM-
Easy Access Available
Highest Gas Velocity< 3 : 1Ratio of Above 0.00
-NM0.00
Yes
: 1 YesNM
0.00
--
Lowest Differential Pressure
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 8 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 11 of 54
(Page 7 of 7)
Executive Summary
SAMPLE POINTS
= isokinetic point not sampled atLine A
where = isokinetic point sampled at
= combustion gases sample point= non-isokinetic sample point
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 9 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 12 of 54
APPENDIX 1 - Stack Emissions Monitoring Personnel, List of Equipment & Methods and Technical Procedures Used
APPENDIX 2 - Summaries, Calculations, Raw Data and Charts
APPENDIX CONTENTS
APPENDICES
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 10 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 13 of 54
Stopwatch
-
CAT 9.19
CAT 3.97-
-
CAT 21S.42
SELECT FTIR
SELECT Horiba Model (2)
MM 10 1074 TE1 TE2 TE3 TE4Trainee Luke Cregan MCERTS Trainee MM17 1413 None
ABB AO2020-URAS26
Stack Thermocouple (2)
SELECT Servomex Model-
-
-
MCERTS Number
-
Eco Physics CLD 822Mh
Miscellaneous Items
CAT 12.66
-
Equipment I.D.
STACK EMISSIONS MONITORING PERSONNEL
APPENDIX 1
15m Heated Line (1)
CAT 17.24
-
Heated Probe (1)Bernath 3006 FID -
Mass Flow Controller (2) CAT 6.1
- 1m Heated Line (2)Heated Probe (2)
Equipment Type
Control Box DGM (2)
-
John Glennon MCERTS Level 2
CAT 4.491
-
Umbilical (2) Testo 350 XL
5m Heated Line (1)
Instrumental Analysers
1m Heated Line (3)
Control Box DGM (1)Equipment I.D.
CAT 6.21
CAT 25.35
-
JCT JCC P1 Cooler
CAT 13.27
Mass Flow Controller (1)
Stack Thermocouple (3)
Technical Endorsements
S-Pitot (1)
L-Pitot
Barometer
Digital Manometer (2)
Umbilical (1)Box Thermocouples (2)Box Thermocouples (1)
M&C PSS
- 20m Heated Line (1)20m Heated Line (2)
-
Stack Thermocouple (1)
Gasmet Sampling System-
Extractive Sampling
LIST OF EQUIPMENT
MCERTS Accreditation
-
-
CAT 14.65
-
-
Position
Team Leader
S-Pitot (2) -
-
-
-
-Equipment Type
CAT 20.71
Equipment Type
CAT 4.705
Mass View (1)
--
Mass View (2)
1m Heated Line (1)
Name
Site Balance
Digital Temperature Meter
Heated Probe (3) -
CAT 3.97
Oven Box (1)
-Oven Box (2)
-
Equipment I.D.Digital Manometer (1)Horiba PG-250
Bioaerosols Temperature Logger -Electronic Refrigerator -
-
Oxides of Nitrogen (as NO₂)Oxygen
CAT-TP-21Water Vapour
EN 14789
EN 14790
EN 16911-1 (MID) CAT-TP-41Velocity & Vol. Flow RateCAT-TP-21
CAT 17.24
Technical ProcedureStandard
Single Channel Heater Controller
Parameter
-SELECT Logger 2 -
Dual Channel Heater Controller
Tubes Kit Thermocouple -
20m Heated Line (2)-500g / 1Kg Check Weights CAT 17.24
Last Impinger Arm -Callipers
-
METHODS & TECHNICAL PROCEDURES USED
SELECT Logger 1Mass View (2)Site Balance
CAT 20.71Laboratory Balance
CAT-TP-05EN 14792
Tape Measure CAT 16.35-
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 11 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 14 of 54
General Stack Details
Stack Gas Composition & Molecular Weights
CO₂ (Estimated)
O₂
Moisture (H₂O)
Where: p = M / 22.41
m²
Stack Diameter / Depth, D
PRELIMINARY STACK SURVEY: CALCULATIONS
APPENDIX 2
Stack Area, A
0.1000
MassComponent
°C
Average Stack Static Pressure, Pstatic
-
9.5
Molar Conc
Value
1.20
102.1
Average Stack Gas Temperature, Ta
-0.072
Units
Pa
Fraction Density
Dry
0.14481
4.18 32.00
Conc
1.13
-
mStack Width, W
Stack Details (from Traverse)
Average Pitot Tube Calibration Coefficient, Cp
ppm kg/m³
Average Stack Gas Pressure
Conc Conc
MWet
r% v/v
18.0285.82
8.20
kg/m³
100.4
Average Barometric Pressure, Pb
m
0.8582 28.01
1.9635
-
Volume
kPakPa
0.84
-
-1.2498
44.01
-0.0418
18.021.0726370.36N₂
1.4277 0.05967-0.19635
0.1802
3.43
0.8037
10.00
p pi% v/v
Where: p = M / 22.41
pi = r x p
Calculation of Stack Gas Densities
Where: P STD = sum of component concentrations, kg/m³ (not including water vapour)
P STW = sum of all wet concentrations / 100 x density, kg/m³ (including water vapour)
P Actual = P STD x (TSTP / (PSTP)) x ((Pstatic + Pb) / Ta)
P ActualW (at each sampling point) = P STW x (Ts / Ps) x (Pa / Ta)
Calculation of Stack Gas Volumetric Flowrate, Q
Dry Density (STP), P STD
8742
kg/m³
m³/hrGas Volumetric Flowrate (Actual)
ResultGas Volumetric Flowrate (from Traverse)
18.02
kg/m³
m³/hr
Total Pressure
Average Wet Density (Actual), P ActualW
Units Actual
4.2
kg/m³
101.3
Result
3.0
m³/hr
REF ¹
Oxygen (Dry)
0.909
Dry Density (Actual), P Actual
m³/hrGas Volumetric Flowrate (STP, Dry)
Determinand
1.329
100.4102.0
Gas Volumetric Flowrate REF ¹
Temperature
%
Units
Gas Volumetric Flowrate (STP, Wet)
MoisturekPa%
°C
kg/m³ 1.234
Duct gas flow conditions
1141015493
0.979
Wet Density (STP), P STW
9354
-0.0
0.00
Units
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 12 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 15 of 54
Parameter Parameter
Date of Survey Initial Pitot Leak CheckTime of Survey Final Pitot Leak CheckAtmospheric Pressure Orientation of DuctAverage Stack Static Pressure Pitot Tube, Cp
Result of Pitot Stagnation Test Number of Lines AvailableAre Water Droplets Present? Number of Lines UsedDevice Used
0.909
27/09/2017
ValueUnits
0.84
S-Type Pitot with KIMO MP 200 (500Pa)
102.1
-
Wet Density
Pa
DepthPoint
100.3
Mean
0.30
100.53
100.4
3.83
3.71
-
Traverse
1-
-Swirl
No
Units
APPENDIX 2
kg/m³ -
Pass
PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID)
Pass
-
-
(1 of 1)
1
Value
∆P --
-72 -
--°-
Horizontal
Pass
m/sPa
0.909
m -°C-72.3
0.08
0.908
Velocity
STATIC (Units: Pa)
4
-0.909
9.02
1.12
100.1
100.50.909.6
10:46 - 10:56
Sampling Line A
kPa
-
-
-
-
-
-
0.9083.85 -9.7
1
-3.83
3.80
-
-
-
9.6
9.5 -
Temp
-
- - -- - -
-
-
-
-
-
-
--
-
-
-
-
- --
- -
-
-
-
-
--
-
--
-
-
-
- -
-
-
-
-
- --
----
-
-
---
-
- --
-
-
--
--------
-
---
--
--
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 13 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 16 of 54
3.426- 8.198
u(φO₂,d) 0.128
u(φCO₂,w) 0.267u(Tc) 1.905
1.063
PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID) - MEASUREMENT UNCERTAINTY(1 of 1)
APPENDIX 2
Standard uncertainty associated with the local velocities
u(Cf)
u(cal) 0.009
-
u(φCO₂,d) 0.306
- Static PressureStandard uncertainty associated with the density in the duct
Standard uncertainty associated with the stack temperature
-Pa
u(φH₂O) 0.919u(φO₂,w) 0.112
- φCO₂,w- Oxygen, dry- Carbon Dioxide, dry
u(fit) 0.036
Standard Uncertainty associated with the mean local dynamic pressures
- Calibration
u(M) 0.00010
0.214
- Drift- Lack of Fit
- Water Vapour- Oxygen, wet- Carbon Dioxide, wet
-
- Overall corrections to dynamic measurementsStandard uncertainty associated with the molar mass of the gas- φO₂,w
0.130
u(vi)
Ku(pc) 175.695 Pa
u(patm) 175.692u(pstat) 1.063
u(ρ) 0.00489
Standard Uncertainty on the coefficient of the Pitot Tube u(k) 0.005Pa
u(res) 0.00087u(∆pi)
- Resolution
-
Standard uncertainty associated with the absolute pressure in the duct- Atmospheric Pressure
u(drift) 0.083
Performance characteristics (Uncertainty Components) UnitsValueUncertainty
- u²(a)/a²- u²(qV,w)/q²V,w
-1114.2 m³/hr
- u²(qV,w)
Standard uncertainty associated with the local velocities
7.19
%
Pam/sStandard uncertainty associated with the mean velocity
0.00135- 323147- 568.5
Uc,rel(qV,w)
Standard uncertainty associated with the mean velocity (95% Confidence), relative
0.00053-
Uc(qV,w)
0.214u(v) 0.108
Uc(v)Standard uncertainty associated with the mean velocity (95% Confidence)Uc,rel(v) 5.59
0.213
u(vi)
m/s
- u(qV,w)Standard uncertainty associated with the volume flow rate (95% Confidence), relative %
Standard uncertainty associated with the volume flow rate (95% Confidence)
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 14 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 17 of 54
Sample Runs
General Sampling Information
Sample Runs
0.77
Concentration
MeanRun 1
±% v/v
A1-4 Boiler A
% v/v
Parameter
WATER VAPOUR: RESULTS SUMMARY
0.77
APPENDIX 2
Value
Parameter
Abbott Ireland, Cootehill
EN 14790
Uncertainty
Technical ProcedureStandard
Units
WATER VAPOUR: SAMPLING DETAILS
18.02
CAT-TP-05
18.02
Sample Runs
Where: MFC stands for Mass Flow Controller, MV stands for Mass View Flowmeter
18.02
Run 1
- MFC / MV
Sample Flow Rate0.1936
% v/v
1425.128.0Total Mass Of Water Vapour
Liquid Trap End MassLiquid Trap Start Mass
Sampling Device
0.1587
gg
Sampling Dates
5.12
12:35 - 13:04
Volume Sampled (STP, Wet)
g
1422.3
4178.8l/min
m³
4204.0
Sampling Times
Duration
Parameter
m³mins
-
30Volume Sampled (STP, Dry)
- 27/09/2017
Units
gCalculated Water Vapour
Silica Trap End Mass
gSilica Trap Start Mass
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 15 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 18 of 54
Sample Runs
Ambient Temperature Recorded?
Test Conditions
No
Yes
Units Run 1
Run 1
Units Run 1
-
Units
20.0
Water Droplets
Yes-
MU Acceptable % Yes
Less than 50% Faded %
Measurement Uncertainty
Silica Gel
l/min5.1
Measurement Uncertainty (MU) %
Run 1
Mean Sampling Rate
l/min 0.05
Are Water Droplets Present
Leak Test Results Units
Units Run 1
APPENDIX 2
WATER VAPOUR: QUALITY ASSURANCE
4.2
Leak Test Acceptable
-
%
Allowable Leak Rate
l/min
l/min
Pre-Sampling Leak Rate 0.05
0.10Yes
Post-Sampling Leak Rate
Allowable MU
Method Deviations
1
x
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Ambient Temperature Recorded?
There are no deviations associated with the sampling employed.
Nature of Deviation
Yes-
Run Number(x = deviation applies to the associated run)
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 16 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 19 of 54
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Sensitivity Coefficient
Vm
Measured Quantities
Run 1
Rw
Rb
L 0.10
Units
0.14
Measured Quantities
%
Units
Run 1
≤2%
uRw
uRb
0.10Rw
Symbol
Requirement of Standard
Uncertainty in Measurement Units
APPENDIX 2
Rb
0.0032
Run 1
0.36No RequirementNo Requirement
0.50
2.00
28.00
0.98
Run 1
Units
uVm
Symbol
≤2%
0.98
Run 1Standard uncertainty
L
%
g
%
m³
-
% v/vg
Uncertainty in Result
0.6428.00
Vm
0.64
m³
Symbol
WATER VAPOUR: MEASUREMENT UNCERTAINTY CALCULATIONS
ValueMeasured Quantities
113.50
0.1587
28.00
g
1.00
Uncertainty as a Percentage
%
28.00 g%
0.1587
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Combined uncertainty
Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty
Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty 4.2%
N/A
% v/v 0.77
Units Run 1
4.2
Parameter
% v/v
% v/v% v/v 0.064
Run 1
0.090
0.360
Uncertainty in ResultMeasured Quantities
Units
% v/v 0.102
0.77
% v/v 0.39
%%
% v/v
% v/v% v/v N/A
0.77
%
4.2
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 17 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 20 of 54
Sample Runs
- -
- -
- -
- -
- -
General Sampling Information
OXIDES OF NITROGEN (as NO₂): RESULTS SUMMARY
Value
APPENDIX 2
Run 1
EN 14792
0.1µm Glass Fibre
Uncertainty
Heated Head Filter UsedFiltration Type / Size
CAT-TP-21
g/hr 580.6
66.42
Uncertainty ±mg/m³
Concentration mg/m³
Abbott Ireland, Cootehill
Yes
A1-4 Boiler A
Parameter Units Mean
62.062.0±g/hr
Parameter
580.6
66.42
Stainless Steel
Mass Emission
5.24
Probe Material
180°C
Technical Procedure
Heated Line Temperature
5.24
Standard
NOTE: Dilution performed to achieve correct span value
FORMAT: Number Used / Number Required
FORMAT: Number Used / Number Required
Reference Conditions
Reference Conditions are: 273K, 101.3kPa, dry gas, 3% oxygen.
Span Gas Type Nitrogen Monoxide
13/07/2019
04/04/2017 - 96.2%
400.3
Number of Sampling Lines Used 1 / 1Number of Sampling Points Used
Span Gas Start Pressure (bar) 160Gas Cylinder Concentration (ppm)Span Gas Uncertainty (%)
Sample Point I.D.'s
1 / 1
2
A1
Span Gas Reference Number CYL 12.0092Span Gas Expiry Date
180°C
Zero Gas Type Nitrogen (5 Grade)
Heated Line TemperatureDate & Result of Last Converter Check
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 18 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 21 of 54
Graphical Trend of Data
APPENDIX 2
OXIDES OF NITROGEN (as NO₂): DATA TREND
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
12:3
5
12:3
6
12:3
7
12:3
8
12:3
9
12:4
0
12:4
1
12:4
2
12:4
3
12:4
4
12:4
5
12:4
6
12:4
7
12:4
8
12:4
9
12:5
0
12:5
1
12:5
2
12:5
3
12:5
4
12:5
5
12:5
6
12:5
7
12:5
8
12:5
9
13:0
0
13:0
1
13:0
2
13:0
3
13:0
4
Conc
entr
atio
n (m
g/m
³)
Oxides of Nitrogen (as NO₂) At Reference Conditions
- Run 1
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 19 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 22 of 54
Sampling Details
Quality Assurance
Zero Drift 0 0 0
Zero Drift 0 0 0
Zero Drift 0 0 0
Instrument Range
Zero Down Sampling Line (Pre) ppm
ppm
Average Temperature °C 1.3
Sampling Times - 12:35 - 13:04
Units
APPENDIX 2
OXIDES OF NITROGEN (as NO₂): SAMPLING DETAILS & QUALITY ASSURANCE
Parameter
100.0
Run 1
Zero Down Sampling Line (Post)Zero Down Sampling Line (Pre)
Span Gas Value ppm
Run 1
4.0< °C
ppm 0.80
ppm
- 27/09/2017Sampling Dates250
- YesTemperature Acceptable
ppm 0.50
Allowable Temperature
0.30
Zero Drift Units
CAL
3CA
L 1
CAL
2
ppm
Run 1
Zero Down Sampling Line (Post) ppm
Zero Down Sampling Line (Post)
ppm
Units
Zero Down Sampling Line (Pre)ppm
ppm
Conditioning Unit Temperature
Zero Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Method Deviations
1
x
- - -
- - -
- - -
°C
ppm5.00
Span Drift Acceptable - Yes
Span Down Sampling Line (Post)
ppm
Span Down Sampling Line (Pre) ppm
(x = deviation applies to the associated run)
There are no deviations associated with the sampling employed.
14
Allowable Zero Drift
Units Run 1
CAL
1
± ppm 5.00
Run Ambient Temperature Range
Span Down Sampling Line (Pre) ppm 99.70
ppm
ppm
-
Span Drift
Allowable Span Drift
Test Conditions
Units
CAL
3CA
L 2
Span Down Sampling Line (Post)
Span Down Sampling Line (Post) ppm 102.80ppm 3.10
ppm
Nature of Deviation
ppm
Yes
Span Down Sampling Line (Pre)
Run 1
± ppm
Zero Drift Acceptable
Run Number
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 20 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 23 of 54
0.40
% of full scale
0.60
Performance characteristics RUN 1
Range Used
Lower of [A] or [B]
Converter efficiency
Number of readings in measurement 30 -Repeatability at zero 0.40 % full scale
Ration NO / NO₂Measured concentrationTGN M2 Allowable MULimit value
Cal gas conc. 100.0 ppmConversion 2.05 ppm to mg/m³MCERTS Range [B] 125.0 mg/m³
seconds
%62.07
mg/m³250.0
UnitsResponse time 60
mg/m³ (REF)10.0
200.0
mg/m³
OXIDES OF NITROGEN (as NO₂): MEASUREMENT UNCERTAINTY CALCULATIONS
mg/m³ (STP, dry)5 %
125.0
ppmRange Used [A] 513.1
% full scaleDeviation from linearity 0.34
Span drift 0.00
% full scale/10V96.2 %
% range
Losses in the line (leak)
% full scale
Atmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence 0.18 % full scale/10K
% full scaleVolume or pressure flow dependence 0.40
Dependence on voltage
% of value0.30
mg/m³Cal gas conc. 205.2
Performance characteristics RUN 1
% of valueZero drift 0.50
Repeatability at span level
Combined interference
0.40
APPENDIX 2
Units
k =
Expanded uncertainty (no O₂) - at 95% Confidence 3.98
% at ELVResult of Compliance with Uncertainty Requirement in M2 N/A -
RUN 1
use rep at span
% of value
mg/m³ (REF)
mg/m³0.07
mg/m³
Uncertainty corrected to std conds. (O₂) 2.64
0.25 mg/m³Drift
10.0
mg/m³
UnitsExpanded uncertainty (with O₂) - at 95% Confidence 7.89
0.72
mg/m³Dependence on voltage
mg/m³
Result of Compliance with Uncertainty Requirement in M2
mg/m³
RUN 1
% of Value
Expanded uncertainty (with O₂) - at 95% Confidence
0.59
Losses in the line (leak)
UnitsStandard deviation of repeatability at zero
Expanded uncertainty (no O₂) - at 95% Confidence 1.24
% at ELV
Overall Allowable uncertainty (with O₂) - at 95% Confidence 12.1 % at ELV
0.07
RUN 1
2.47
Uncertainty of calibration gas
Units% of Value
mg/m³Standard deviation of repeatability at span level
UnitsMeasurement uncertainty Result 62.07
% at ELV
Overall Allowable uncertainty (no O₂) - at 95% Confidence
mg/m³
% of value% of value
0.30
mg/m³Combined uncertainty 1.26
mg/m³Atmospheric pressure dependence 0.11 mg/m³
mg/m³Lack of fit
Uncertainty of calibration gas 2.00
Performance characteristic RUN 1
0.03 mg/m³Combined interference (from MCERTS Certificate) 0.43
Requirement for SRM is that Uncertainty should be <10% of the value at the ELV, on a dry gas basis, or if O₂ correction is applied less than 10% + the uncertainty associated with the O₂ correction (using sqrt of sum squares to add uncertainty components). Ref EA TGN M2.
Ambient temperature dependence
mg/m³Converter efficiencyLosses in the line (leak) 0.11
COMPLIANT -
mg/m³
Volume or pressure flow dependence 0.00
Expanded uncertainty 1.96
Uncertainty of calibration gas blending 0.50
0.05
6.94
Uncertainty of calibration gas blending 1.40
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 21 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 24 of 54
Sample Runs
- -
- -
- -
General Sampling Information
Span Gas Type Synthetic Air (5 Grade)Span Gas Reference Number
Units Run 1
Value
Standard
Mean
180°C
Parameter
Heated Head Filter Used YesHeated Line Temperature
CYL 11.0268
EN 14789Technical Procedure CAT-TP-21
Probe Material Stainless Steel
Uncertainty ±% v/v 0.28 0.28
A1-4 Boiler AAbbott Ireland, Cootehill
Filtration Type / Size
Parameter
Span Gas Expiry Date 07/12/2021
OXYGEN: RESULTS SUMMARY
APPENDIX 2
Concentration % v/v 4.18 4.18
0.1µm Glass Fibre
NOTE: Dilution performed to achieve correct span value
FORMAT: Number Used / Number Required
FORMAT: Number Used / Number RequiredNumber of Sampling Points Used 1 / 1
Sample Point I.D.'s
Nitrogen (5 Grade)
A1
Span Gas Uncertainty (%) 2
Span Gas Expiry Date 07/12/2021Span Gas Start Pressure (bar) 80Gas Cylinder Concentration (% v/v) 20.49
Number of Sampling Lines Used 1 / 1
Zero Gas Type
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 22 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 25 of 54
Graphical Trend of Data
OXYGEN: DATA TREND
APPENDIX 2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
12:3
5
12:3
6
12:3
7
12:3
8
12:3
9
12:4
0
12:4
1
12:4
2
12:4
3
12:4
4
12:4
5
12:4
6
12:4
7
12:4
8
12:4
9
12:5
0
12:5
1
12:5
2
12:5
3
12:5
4
12:5
5
12:5
6
12:5
7
12:5
8
12:5
9
13:0
0
13:0
1
13:0
2
13:0
3
13:0
4
Conc
entr
atio
n (%
v/v
)
Oxygen Oxygen
- Run 1
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 23 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 26 of 54
Sampling Details
Quality Assurance
Zero Drift 0 0 0
Zero Drift 0 0 0
Zero Drift 0 0 0
Zero Down Sampling Line (Pre) % v/v
Span Gas Value
Sampling Times
Average Temperature
Zero Down Sampling Line (Post)
% v/v
Allowable Temperature < °C
0.06Zero Down Sampling Line (Post) % v/v 0.09
12:35 - 13:04
Parameter Units Run 1
Instrument Range
CAL
3
4.0
0.03
Zero Down Sampling Line (Pre) % v/v
CAL
1 Zero Down Sampling Line (Pre) % v/v
% v/v
Zero Down Sampling Line (Post)
% v/v
Units Run 1
% v/v
Sampling Dates - 27/09/2017-
Conditioning Unit Temperature Units Run 1
°C
% v/v 5.00
APPENDIX 2
OXYGEN: SAMPLING DETAILS & QUALITY ASSURANCE
1.3
Temperature Acceptable - Yes
CAL
2
% v/v
% v/v 25
Zero Drift
Zero Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Method Deviations
1
x
- - -
- - -
- - -
Span Drift Acceptable - Yes
% v/v
% v/v
Zero Drift Acceptable
Run 1
Run 1
Run Ambient Temperature Range °C 14
Span Down Sampling Line (Post) % v/v
Allowable Span Drift ± % v/v 0.25
CAL
3
% v/v
Yes
Run Number
(x = deviation applies to the associated run)
There are no deviations associated with the sampling employed.
% v/v
CAL
3
-
Nature of Deviation
Span Drift Units
Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post) % v/v
5.02
Test Conditions Units
% v/v -0.13
Allowable Zero Drift ± % v/v
% v/v4.89
Span Down Sampling Line (Pre)
0.25
CAL
2 Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post)
CAL
1
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 24 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 27 of 54
% rangeDependence on voltage 0.02 % full scale/10VLosses in the line (leak) 0.00
-0.07 % full scale/10KAtmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence
Volume or pressure flow dependence 0.20 % of full scale
Standard deviation of repeatability at zero use rep at span %volStandard deviation of repeatability at span level 0.01 %volLack of fit 0.01 %volDrift 0.07
% of valueUncertainty of calibration gas 2.00
Combined interference 0.56
%vol
Performance characteristics RUN 1 UnitsResponse time 60 seconds
N/A
-Repeatability at zero 0.04
%vol6.0 %
%volVolume or pressure flow dependence 0.00 %vol
0.00 % full scale
4.18 %volRange Used 25.0 %volCal gas conc. 20.5
% of value
Performance characteristic RUN 1 Units
0.05 % of valueZero drift 0.60
Number of readings in measurement 30
RUN 1 Units
Measured concentrationTGN M2 Allowable MULimit value
Span drift
Performance characteristics
% full scaleRepeatability at span level 0.04 % full scaleDeviation from linearity
% full scale
APPENDIX 2
OXYGEN: MEASUREMENT UNCERTAINTY CALCULATIONS
k =
Units
0.02Ambient temperature dependence -0.01 %vol
UnitsMeasurement uncertainty Result 4.18 %volCombined uncertainty 0.15 %vol
Result of Compliance with Uncertainty Requirement in M2Expanded uncertainty (no O₂) - at 95% Confidence 6.81 % of Value
Expanded uncertainty 1.96 0.28 %vol
RUN 1
%volLosses in the line (leak) 0.00
Volume or pressure flow dependence 0.00 %volAtmospheric pressure dependence %vol
COMPLIANT -
Requirement for SRM is that Uncertainty should be 0.5%vol absolute or 6% relative whichever is the lower, on a dry gas basis. Ref EA TGN M2.
Combined interference (from MCERTS Certificate) 0.08 %volDependence on voltage 0.00
%volUncertainty of calibration gas 0.05 %vol
RUN 1
Abbott IrelandCootehillA1-4 Boiler A
CAT-RT (Version BR)Page 25 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 28 of 54
ISO/IEC 17025 Accredited Legal Entity, UKAS Accredited Testing Laboratory No. 4279Exova (UK) Ltd trading as Exova Catalyst & Exova Catalyst Ireland
Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL
EMISSIONS REPORTEPA AIR EMISSIONS COMPLIANCE MONITORING
Your Exova Catalyst Ireland Contact: Nick Kenny (+353 86 853 8247)
CootehillDromore WestAbbott Ireland
Co. Cavan
EPA Office of Environmental Enforcement
(Prepared on behalf of the EPA by Exova Catalyst - EPA Contract No. OEE-DS-14)-
-
Exova Catalyst Ireland, Unit D8 North City Business Park, North Road, Finglas, Dublin 11E: [email protected]
Industrial Emissions Licence: PO687-02
Stack Emissions Testing Report Commissioned by
Installation Name & Address
A1-4 Boiler B
DELETE & COVER ME
MM 10 1074MCERTS Level 2
Stack Reference
Signature of Report Approver
Version 1
Team Leader
Deputy Regional Manager
TE1 TE2 TE3 TE4MM 08 922
MCERTS Level 2
Patrick O'BrienReport Approved by
27th September 2017
Job Reference NumberPO687-02 -CAR17-01
Dates of the Monitoring Campaign
Report Written byJohn Glennon
12th October 2017Report Date
TE1 TE2 TE3 TE4
Version
Site Visit Report - SV10474 - Abbott Ireland Page 29 of 54
TITLE PAGE
CONTENTS
Summary of Sampling Deviations
EXECUTIVE SUMMARY
Monitoring Objectives
Monitoring Results
Monitoring Dates & Times
Process Details
Monitoring & Analytical Methods
Sampling Location
Plant Photos / Sample Points
APPENDIX 1 - Monitoring Personnel & List of Equipment
APPENDIX 2 - Raw Data, Sampling Equations & Charts
9
3
5
6
8
CONTENTS
4
2
7
The testing performed fully meets the technical requirements in Irish EPA Guidance Note, AG2.
Opinions and interpretations expressed herein are outside the scope of Exova Catalyst Ireland's ISO 17025 accreditation.
This test report shall not be reproduced, except in full, without the written approval of Exova Catalyst Ireland.
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 2 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 30 of 54
Overall Aim of the Monitoring Campaign
Special Requirements
Target Parameters
Exova Catalyst Ireland were commissioned by the EPA Office of Environmental Enforcement to carry out stack emissions testing at Abbott Ireland on the A1-4 Boiler B at Cootehill.
The aim of the monitoring campaign was to demonstrate compliance with a set of emission limit values (ELVs) as specified in the Site's Permit.
There were no special requirements.
Oxides of Nitrogen (as NO₂)
MONITORING OBJECTIVES
Executive Summary(Page 1 of 7)
Abbott Ireland, CootehillA1-4 Boiler B
27th September 2017
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 3 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 31 of 54
where MU = Measurement Uncertainty associated with the Result
Parameter
Oxides of Nitrogen (as NO₂) ¹ - -Oxygen Dry
Water Vapour Stack Gas TemperatureStack Gas Velocity
¹
- -NOTE: VOLUMETRIC FLOW RATE & VELOCITY DATA TAKEN FROM THE PRELIMINARY VELOCITY TRAVERSE.
¹ Reference Conditions (REF) are: 273K, 101.3kPa, dry gas, 3% oxygen.
Limit30598
-
Abbott Ireland, Cootehill
27th September 2017
+/-Units Result
Concentration
MULimit+/-
2.77
719
mg/m³ 67.9
Executive Summary
Mass Emission
MONITORING RESULTS
A1-4 Boiler B
Result LimitUnitsMU
0.24
% v/v
3.3m/s
0.7100.2
7.24 200 573.8 78.3
m³/hr 13504m³/hr
°C
(Page 2 of 7)
Volumetric Flow Rate (ACTUAL) 1149
% v/v16.2
8448
0.28g/hr
Volumetric Flow Rate (REF)
-
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 4 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 32 of 54
Parameter
R1 - -R1 -R1R1
All results are expressed at the respective reference conditions.
Date(s)Mass Emission
13:12 - 13:41% v/v 16.2 27/09/2017 30Water Vapour27/09/2017 11:30 - 11:40
Units
Abbott Ireland, Cootehill
MONITORING DATE(S) & TIMES
A1-4 Boiler B27th September 2017
30Oxides of Nitrogen (as NO₂)
(Page 3 of 7)Executive Summary
SamplingTimes mins
% v/v
Velocity & Volumetric Flow Rate
Units DurationConcentration Sampling
27/09/20172.7767.9
27/09/2017g/hr
13:12 - 13:41mg/m³
Oxygen573.8 13:12 - 13:41 30
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 5 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 33 of 54
Standard Operating Conditions
Abbott Ireland, Cootehill
Feedstock (if applicable)
Value
Process Status
A1-4 Boiler B27th September 2017
Abatement SystemAbatement System Running Status
Plume Appearance
N/A
Parameter
Capacity (of 100%) and Tonnes / HourContinuous or Batch Process
Natural GasN/A
Continuous
Gas Boiler
Natural Gas
Fuel
(Page 4 of 7)Executive Summary
PROCESS DETAILS
N/A
80% of capacity
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 6 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 34 of 54
CAT-TP-21CATCAT Yes
Dry Zirconia Cell by Horiba PG-250CATOxygen
(with short name reference as appears in the table above)
Exova Catalyst (CAT)
0.41 mg/m³YesEN 14789 CAT-TP-21 Yes 0.1 %
SUMMARY OF SAMPLING DEVIATIONS
Yes 1.2 m/s
ISO 17025 Accreditation Number: 4279
Oxides of Nitrogen (as NO₂)Yes
Yes
Yes CATYes
ANALYSIS LABORATORIES
TechniqueProcedure Lab Lab
Velocity & Vol. Flow Rate
GravimetricWater Vapour
EN 16911-1 (MID) CAT-TP-41 CAT
Chemiluminescence by Horiba PG-250EN 14792CAT-TP-05 CAT-TP-05 0.1 % v/vYesEN 14790
Standard
Abbott Ireland, Cootehill
ISO
Executive Summary
Monitoring
ParameterProcedure
Technical MCERTS17025
TestingTesting
Analytical Analysis17025
Analysis
LOD(Average)
Analytical
A1-4 Boiler B
(Page 5 of 7)
Testing ISO
Analysis
MONITORING & ANALYTICAL METHODS
27th September 2017
Pitot Tube and Thermocouple
Parameter Deviation
All 1 There are no deviations associated with the sampling employed.
Run
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 7 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 35 of 54
Duct Characteristics Location of Sampling Platform
Platform Details
Number of Ports - 1
Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)
-
Sufficient working area to manipulate probe and operate the measuring instruments
Type1.20
Value
Executive Summary
cm
Yes
-
(Page 6 of 7)
Units
-
Permanent
Parameter
Yes
Horizontal
YesThere are no obstructions present which hamper insertion of sampling equipmentSafe Access Available
Width
Yes
-
m²m
Sample Port Size
Circular
Value General Platform Information
Permanent / Temporary PlatformInside / Outside
Platform has chains / self closing gates at top of laddersPlatform has vertical base boards (approx. 0.25m high)
YesYes
SUITABILITY OF SAMPLING LOCATION
Inside
Yes
100
Irish EPA Technical Guidance Note AG1 / EN 15259 Platform Requirements
Port Depth
m
1.13
Orientation of Duct
Easy Access Available
Depth
Area
2" BSP
Value
Sampling Location / Platform Improvement Recommendations
EN 15259 Homogeneity Test Requirements
Sampling Plane Validation Criteria (from EN 15259)
Where NM = Not Measured as no Isokinetic sampling was performed.
--
Yes
Pa
-
NM
-
-
-
--m/s
Maximum Angle of Swirl
> 5 Pa Yes
Units
-
NM0.00
-
NM
-
-
3.46
-
-Lowest Gas Velocity
m/s-
3.21-
-
Required
The sampling location meets all the requirements specified in Irish EPA Guidance Note AG1 and EN 15259, and therefore there are no improvement recommendations.
No Local Negative Flow
-
NM
Mean Velocity--
-
-
Yes
Traverse 1
m/s-
Criteria in EN 15259
-
There is no requirement to perform a EN 15259 Homogeneity Test on this Stack.
6.8
- Compliant
--3.32
1.08
°-
NM-
Easy Access Available
Highest Gas Velocity< 3 : 1Ratio of Above 0.00
-NM0.00
Yes
: 1 YesNM
0.00
--
Lowest Differential Pressure
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 8 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 36 of 54
(Page 7 of 7)
Executive Summary
SAMPLE POINTS
= isokinetic point not sampled atLine A
where = isokinetic point sampled at
= combustion gases sample point= non-isokinetic sample point
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 9 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 37 of 54
APPENDIX 1 - Stack Emissions Monitoring Personnel, List of Equipment & Methods and Technical Procedures Used
APPENDIX 2 - Summaries, Calculations, Raw Data and Charts
APPENDIX CONTENTS
APPENDICES
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 10 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 38 of 54
Stopwatch
-
CAT 9.19
CAT 3.97-
-
CAT 21S.42
SELECT FTIR
SELECT Horiba Model (2)
MM 10 1074 TE1 TE2 TE3 TE4Trainee Luke Cregan MCERTS Trainee MM17 1413 None
ABB AO2020-URAS26
Stack Thermocouple (2)
SELECT Servomex Model-
-
-
MCERTS Number
-
Eco Physics CLD 822Mh
Miscellaneous Items
CAT 12.66
-
Equipment I.D.
STACK EMISSIONS MONITORING PERSONNEL
APPENDIX 1
15m Heated Line (1)
CAT 17.24
-
Heated Probe (1)Bernath 3006 FID -
Mass Flow Controller (2) CAT 6.1
- 1m Heated Line (2)Heated Probe (2)
Equipment Type
Control Box DGM (2)
-
John Glennon MCERTS Level 2
CAT 4.491
-
Umbilical (2) Testo 350 XL
5m Heated Line (1)
Instrumental Analysers
1m Heated Line (3)
Control Box DGM (1)Equipment I.D.
CAT 6.21
CAT 25.35
-
JCT JCC P1 Cooler
CAT 13.27
Mass Flow Controller (1)
Stack Thermocouple (3)
Technical Endorsements
S-Pitot (1)
L-Pitot
Barometer
Digital Manometer (2)
Umbilical (1)Box Thermocouples (2)Box Thermocouples (1)
M&C PSS
- 20m Heated Line (1)20m Heated Line (2)
-
Stack Thermocouple (1)
Gasmet Sampling System-
Extractive Sampling
LIST OF EQUIPMENT
MCERTS Accreditation
-
-
CAT 14.65
-
-
Position
Team Leader
S-Pitot (2) -
-
-
-
-Equipment Type
CAT 20.71
Equipment Type
CAT 4.705
Mass View (1)
--
Mass View (2)
1m Heated Line (1)
Name
Site Balance
Digital Temperature Meter
Heated Probe (3) -
CAT 3.97
Oven Box (1)
-Oven Box (2)
-
Equipment I.D.Digital Manometer (1)Horiba PG-250
Bioaerosols Temperature Logger -Electronic Refrigerator -
-
Oxides of Nitrogen (as NO₂)Oxygen
CAT-TP-21Water Vapour
EN 14789
EN 14790
EN 16911-1 (MID) CAT-TP-41Velocity & Vol. Flow RateCAT-TP-21
CAT 17.24
Technical ProcedureStandard
Single Channel Heater Controller
Parameter
-SELECT Logger 2 -
Dual Channel Heater Controller
Tubes Kit Thermocouple -
20m Heated Line (2)-500g / 1Kg Check Weights CAT 17.24
Last Impinger Arm -Callipers
-
METHODS & TECHNICAL PROCEDURES USED
SELECT Logger 1Mass View (2)Site Balance
CAT 20.71Laboratory Balance
CAT-TP-05EN 14792
Tape Measure CAT 16.35-
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 11 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 39 of 54
General Stack Details
Stack Gas Composition & Molecular Weights
CO₂ (Estimated)
O₂
Moisture (H₂O)
Where: p = M / 22.41
m²
Stack Diameter / Depth, D
PRELIMINARY STACK SURVEY: CALCULATIONS
APPENDIX 2
Stack Area, A
0.1000
MassComponent
°C
Average Stack Static Pressure, Pstatic
-
7.3
Molar Conc
Value
1.20
102.1
Average Stack Gas Temperature, Ta
-0.069
Units
Pa
Fraction Density
Dry
0.13007
2.77 32.00
Conc
1.13
-
mStack Width, W
Stack Details (from Traverse)
Average Pitot Tube Calibration Coefficient, Cp
ppm kg/m³
Average Stack Gas Pressure
Conc Conc
MWet
r% v/v
16.1887.23
8.38
kg/m³
100.2
Average Barometric Pressure, Pb
m
0.8723 28.01
1.9635
-
Volume
kPakPa
0.84
-
-1.2498
44.01
-0.0277
18.021.0903073.12N₂
1.4277 0.03948-0.19635
0.1618
2.32
0.8037
10.00
p pi% v/v
Where: p = M / 22.41
pi = r x p
Calculation of Stack Gas Densities
Where: P STD = sum of component concentrations, kg/m³ (not including water vapour)
P STW = sum of all wet concentrations / 100 x density, kg/m³ (including water vapour)
P Actual = P STD x (TSTP / (PSTP)) x ((Pstatic + Pb) / Ta)
P ActualW (at each sampling point) = P STW x (Ts / Ps) x (Pa / Ta)
Calculation of Stack Gas Volumetric Flowrate, Q
Dry Density (STP), P STD
8448
kg/m³
m³/hrGas Volumetric Flowrate (Actual)
ResultGas Volumetric Flowrate (from Traverse)
16.18
kg/m³
m³/hr
Total Pressure
Average Wet Density (Actual), P ActualW
Units Actual
2.8
kg/m³
101.3
Result
3.0
m³/hr
REF ¹
Oxygen (Dry)
0.915
Dry Density (Actual), P Actual
m³/hrGas Volumetric Flowrate (STP, Dry)
Determinand
1.326
100.2102.0
Gas Volumetric Flowrate REF ¹
Temperature
%
Units
Gas Volumetric Flowrate (STP, Wet)
MoisturekPa%
°C
kg/m³ 1.242
Duct gas flow conditions
994913504
0.977
Wet Density (STP), P STW
8339
-0.0
0.00
Units
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 12 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 40 of 54
Parameter Parameter
Date of Survey Initial Pitot Leak CheckTime of Survey Final Pitot Leak CheckAtmospheric Pressure Orientation of DuctAverage Stack Static Pressure Pitot Tube, Cp
Result of Pitot Stagnation Test Number of Lines AvailableAre Water Droplets Present? Number of Lines UsedDevice Used
0.915
27/09/2017
ValueUnits
0.84
S-Type Pitot with KIMO MP 200 (500Pa)
102.1
-
Wet Density
Pa
DepthPoint
100.2
Mean
0.30
100.23
100.2
3.24
3.46
-
Traverse
1-
-Swirl
No
Units
APPENDIX 2
kg/m³ -
Pass
PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID)
Pass
-
-
(1 of 1)
1
Value
∆P --
-69 -
--°-
Horizontal
Pass
m/sPa
0.915
m -°C-68.9
0.08
0.915
Velocity
STATIC (Units: Pa)
4
-0.915
7.92
1.12
100.2
100.20.906.8
11:30 - 11:40
Sampling Line A
kPa
-
-
-
-
-
-
0.9153.35 -7.4
1
-3.21
3.32
-
-
-
6.9
7.3 -
Temp
-
- - -- - -
-
-
-
-
-
-
--
-
-
-
-
- --
- -
-
-
-
-
--
-
--
-
-
-
- -
-
-
-
-
- --
----
-
-
---
-
- --
-
-
--
--------
-
---
--
--
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 13 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 41 of 54
2.318- 8.382
u(φO₂,d) 0.085
u(φCO₂,w) 0.270u(Tc) 1.904
1.054
PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID) - MEASUREMENT UNCERTAINTY(1 of 1)
APPENDIX 2
Standard uncertainty associated with the local velocities
u(Cf)
u(cal) 0.005
-
u(φCO₂,d) 0.306
- Static PressureStandard uncertainty associated with the density in the duct
Standard uncertainty associated with the stack temperature
-Pa
u(φH₂O) 0.826u(φO₂,w) 0.075
- φCO₂,w- Oxygen, dry- Carbon Dioxide, dry
u(fit) 0.021
Standard Uncertainty associated with the mean local dynamic pressures
- Calibration
u(M) 0.00009
0.242
- Drift- Lack of Fit
- Water Vapour- Oxygen, wet- Carbon Dioxide, wet
-
- Overall corrections to dynamic measurementsStandard uncertainty associated with the molar mass of the gas- φO₂,w
0.111
u(vi)
Ku(pc) 175.695 Pa
u(patm) 175.692u(pstat) 1.054
u(ρ) 0.00493
Standard Uncertainty on the coefficient of the Pitot Tube u(k) 0.005Pa
u(res) 0.00087u(∆pi)
- Resolution
-
Standard uncertainty associated with the absolute pressure in the duct- Atmospheric Pressure
u(drift) 0.083
Performance characteristics (Uncertainty Components) UnitsValueUncertainty
- u²(a)/a²- u²(qV,w)/q²V,w
-1149.3 m³/hr
- u²(qV,w)
Standard uncertainty associated with the local velocities
8.51
%
Pam/sStandard uncertainty associated with the mean velocity
0.00189- 343859- 586.4
Uc,rel(qV,w)
Standard uncertainty associated with the mean velocity (95% Confidence), relative
0.00053-
Uc(qV,w)
0.242u(v) 0.122
Uc(v)Standard uncertainty associated with the mean velocity (95% Confidence)Uc,rel(v) 7.21
0.239
u(vi)
m/s
- u(qV,w)Standard uncertainty associated with the volume flow rate (95% Confidence), relative %
Standard uncertainty associated with the volume flow rate (95% Confidence)
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 14 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 42 of 54
Sample Runs
General Sampling Information
Sample Runs
0.69
Concentration
MeanRun 1
±% v/v
A1-4 Boiler B
% v/v
Parameter
WATER VAPOUR: RESULTS SUMMARY
0.69
APPENDIX 2
Value
Parameter
Abbott Ireland, Cootehill
EN 14790
Uncertainty
Technical ProcedureStandard
Units
WATER VAPOUR: SAMPLING DETAILS
16.18
CAT-TP-05
16.18
Sample Runs
Where: MFC stands for Mass Flow Controller, MV stands for Mass View Flowmeter
16.18
Run 1
- MFC / MV
Sample Flow Rate0.1894
% v/v
1427.624.6Total Mass Of Water Vapour
Liquid Trap End MassLiquid Trap Start Mass
Sampling Device
0.1587
gg
Sampling Dates
5.12
13:12 - 13:41
Volume Sampled (STP, Wet)
g
1425.1
4204.0l/min
m³
4226.1
Sampling Times
Duration
Parameter
m³mins
-
30Volume Sampled (STP, Dry)
- 27/09/2017
Units
gCalculated Water Vapour
Silica Trap End Mass
gSilica Trap Start Mass
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 15 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 43 of 54
Sample Runs
Ambient Temperature Recorded?
Test Conditions
No
Yes
Units Run 1
Run 1
Units Run 1
-
Units
20.0
Water Droplets
Yes-
MU Acceptable % Yes
Less than 50% Faded %
Measurement Uncertainty
Silica Gel
l/min5.1
Measurement Uncertainty (MU) %
Run 1
Mean Sampling Rate
l/min 0.05
Are Water Droplets Present
Leak Test Results Units
Units Run 1
APPENDIX 2
WATER VAPOUR: QUALITY ASSURANCE
4.3
Leak Test Acceptable
-
%
Allowable Leak Rate
l/min
l/min
Pre-Sampling Leak Rate 0.05
0.10Yes
Post-Sampling Leak Rate
Allowable MU
Method Deviations
1
x
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Ambient Temperature Recorded?
There are no deviations associated with the sampling employed.
Nature of Deviation
Yes-
Run Number(x = deviation applies to the associated run)
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 16 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 44 of 54
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Sensitivity Coefficient
Vm
Measured Quantities
Run 1
Rw
Rb
L 0.09
Units
0.12
Measured Quantities
%
Units
Run 1
≤2%
uRw
uRb
0.10Rw
Symbol
Requirement of Standard
Uncertainty in Measurement Units
APPENDIX 2
Rb
0.0032
Run 1
0.41No RequirementNo Requirement
0.50
2.00
24.60
0.98
Run 1
Units
uVm
Symbol
≤2%
0.98
Run 1Standard uncertainty
L
%
g
%
m³
-
% v/vg
Uncertainty in Result
0.6624.60
Vm
0.66
m³
Symbol
WATER VAPOUR: MEASUREMENT UNCERTAINTY CALCULATIONS
ValueMeasured Quantities
101.95
0.1587
24.60
g
1.00
Uncertainty as a Percentage
%
24.60 g%
0.1587
Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak
Combined uncertainty
Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty
Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty 4.3%
N/A
% v/v 0.69
Units Run 1
4.3
Parameter
% v/v
% v/v% v/v 0.066
Run 1
0.081
0.324
Uncertainty in ResultMeasured Quantities
Units
% v/v 0.091
0.69
% v/v 0.35
%%
% v/v
% v/v% v/v N/A
0.69
%
4.3
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 17 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 45 of 54
Sample Runs
- -
- -
- -
- -
- -
General Sampling Information
OXIDES OF NITROGEN (as NO₂): RESULTS SUMMARY
Value
APPENDIX 2
Run 1
EN 14792
0.1µm Glass Fibre
Uncertainty
Heated Head Filter UsedFiltration Type / Size
CAT-TP-21
g/hr 573.8
67.91
Uncertainty ±mg/m³
Concentration mg/m³
Abbott Ireland, Cootehill
Yes
A1-4 Boiler B
Parameter Units Mean
78.378.3±g/hr
Parameter
573.8
67.91
Stainless Steel
Mass Emission
7.24
Probe Material
180°C
Technical Procedure
Heated Line Temperature
7.24
Standard
NOTE: Dilution performed to achieve correct span value
FORMAT: Number Used / Number Required
FORMAT: Number Used / Number Required
Reference Conditions
Reference Conditions are: 273K, 101.3kPa, dry gas, 3% oxygen.
Span Gas Type Nitrogen Monoxide
13/07/2019
04/04/2017 - 96.2%
400.3
Number of Sampling Lines Used 1 / 1Number of Sampling Points Used
Span Gas Start Pressure (bar) 160Gas Cylinder Concentration (ppm)Span Gas Uncertainty (%)
Sample Point I.D.'s
1 / 1
2
A1
Span Gas Reference Number CYL 12.0092Span Gas Expiry Date
180°C
Zero Gas Type Nitrogen (5 Grade)
Heated Line TemperatureDate & Result of Last Converter Check
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 18 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 46 of 54
Graphical Trend of Data
APPENDIX 2
OXIDES OF NITROGEN (as NO₂): DATA TREND
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
13:1
2
13:1
3
13:1
4
13:1
5
13:1
6
13:1
7
13:1
8
13:1
9
13:2
0
13:2
1
13:2
2
13:2
3
13:2
4
13:2
5
13:2
6
13:2
7
13:2
8
13:2
9
13:3
0
13:3
1
13:3
2
13:3
3
13:3
4
13:3
5
13:3
6
13:3
7
13:3
8
13:3
9
13:4
0
13:4
1
Conc
entr
atio
n (m
g/m
³)
Oxides of Nitrogen (as NO₂) At Reference Conditions
- Run 1
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 19 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 47 of 54
Sampling Details
Quality Assurance
Zero Drift 0 0 0
Zero Drift 0 0 0
Zero Drift 0 0 0
Instrument Range
Zero Down Sampling Line (Pre) ppm
ppm
Average Temperature °C 1.3
Sampling Times - 13:12 - 13:41
Units
APPENDIX 2
OXIDES OF NITROGEN (as NO₂): SAMPLING DETAILS & QUALITY ASSURANCE
Parameter
100.0
Run 1
Zero Down Sampling Line (Post)Zero Down Sampling Line (Pre)
Span Gas Value ppm
Run 1
4.0< °C
ppm 0.80
ppm
- 27/09/2017Sampling Dates250
- YesTemperature Acceptable
ppm 0.50
Allowable Temperature
0.30
Zero Drift Units
CAL
3CA
L 1
CAL
2
ppm
Run 1
Zero Down Sampling Line (Post) ppm
Zero Down Sampling Line (Post)
ppm
Units
Zero Down Sampling Line (Pre)ppm
ppm
Conditioning Unit Temperature
Zero Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Method Deviations
1
x
- - -
- - -
- - -
°C
ppm5.00
Span Drift Acceptable - Yes
Span Down Sampling Line (Post)
ppm
Span Down Sampling Line (Pre) ppm
(x = deviation applies to the associated run)
There are no deviations associated with the sampling employed.
15
Allowable Zero Drift
Units Run 1
CAL
1
± ppm 5.00
Run Ambient Temperature Range
Span Down Sampling Line (Pre) ppm 99.70
ppm
ppm
-
Span Drift
Allowable Span Drift
Test Conditions
Units
CAL
3CA
L 2
Span Down Sampling Line (Post)
Span Down Sampling Line (Post) ppm 102.80ppm 3.10
ppm
Nature of Deviation
ppm
Yes
Span Down Sampling Line (Pre)
Run 1
± ppm
Zero Drift Acceptable
Run Number
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 20 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 48 of 54
0.40
% of full scale
0.60
Performance characteristics RUN 1
Range Used
Lower of [A] or [B]
Converter efficiency
Number of readings in measurement 30 -Repeatability at zero 0.40 % full scale
Ration NO / NO₂Measured concentrationTGN M2 Allowable MULimit value
Cal gas conc. 100.0 ppmConversion 2.05 ppm to mg/m³MCERTS Range [B] 125.0 mg/m³
seconds
%68.80
mg/m³250.0
UnitsResponse time 60
mg/m³ (REF)10.0
200.0
mg/m³
OXIDES OF NITROGEN (as NO₂): MEASUREMENT UNCERTAINTY CALCULATIONS
mg/m³ (STP, dry)5 %
125.0
ppmRange Used [A] 513.1
% full scaleDeviation from linearity 0.34
Span drift 0.00
% full scale/10V96.2 %
% range
Losses in the line (leak)
% full scale
Atmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence 0.18 % full scale/10K
% full scaleVolume or pressure flow dependence 0.40
Dependence on voltage
% of value0.30
mg/m³Cal gas conc. 205.2
Performance characteristics RUN 1
% of valueZero drift 0.50
Repeatability at span level
Combined interference
0.40
APPENDIX 2
Units
k =
Expanded uncertainty (no O₂) - at 95% Confidence 3.79
% at ELVResult of Compliance with Uncertainty Requirement in M2 N/A -
RUN 1
use rep at span
% of value
mg/m³ (REF)
mg/m³0.08
mg/m³
Uncertainty corrected to std conds. (O₂) 2.57
0.25 mg/m³Drift
10.0
mg/m³
UnitsExpanded uncertainty (with O₂) - at 95% Confidence 10.66
0.79
mg/m³Dependence on voltage
mg/m³
Result of Compliance with Uncertainty Requirement in M2
mg/m³
RUN 1
% of Value
Expanded uncertainty (with O₂) - at 95% Confidence
0.59
Losses in the line (leak)
UnitsStandard deviation of repeatability at zero
Expanded uncertainty (no O₂) - at 95% Confidence 1.30
% at ELV
Overall Allowable uncertainty (with O₂) - at 95% Confidence 14.1 % at ELV
0.07
RUN 1
2.61
Uncertainty of calibration gas
Units% of Value
mg/m³Standard deviation of repeatability at span level
UnitsMeasurement uncertainty Result 68.80
% at ELV
Overall Allowable uncertainty (no O₂) - at 95% Confidence
mg/m³
% of value% of value
0.30
mg/m³Combined uncertainty 1.33
mg/m³Atmospheric pressure dependence 0.11 mg/m³
mg/m³Lack of fit
Uncertainty of calibration gas 2.00
Performance characteristic RUN 1
0.03 mg/m³Combined interference (from MCERTS Certificate) 0.43
Requirement for SRM is that Uncertainty should be <10% of the value at the ELV, on a dry gas basis, or if O₂ correction is applied less than 10% + the uncertainty associated with the O₂ correction (using sqrt of sum squares to add uncertainty components). Ref EA TGN M2.
Ambient temperature dependence
mg/m³Converter efficiencyLosses in the line (leak) 0.12
COMPLIANT -
mg/m³
Volume or pressure flow dependence 0.00
Expanded uncertainty 1.96
Uncertainty of calibration gas blending 0.56
0.05
10.05
Uncertainty of calibration gas blending 1.40
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 21 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 49 of 54
Sample Runs
- -
- -
- -
General Sampling Information
Span Gas Type Synthetic Air (5 Grade)Span Gas Reference Number
Units Run 1
Value
Standard
Mean
180°C
Parameter
Heated Head Filter Used YesHeated Line Temperature
CYL 11.0268
EN 14789Technical Procedure CAT-TP-21
Probe Material Stainless Steel
Uncertainty ±% v/v 0.28 0.28
A1-4 Boiler BAbbott Ireland, Cootehill
Filtration Type / Size
Parameter
Span Gas Expiry Date 07/12/2021
OXYGEN: RESULTS SUMMARY
APPENDIX 2
Concentration % v/v 2.77 2.77
0.1µm Glass Fibre
NOTE: Dilution performed to achieve correct span value
FORMAT: Number Used / Number Required
FORMAT: Number Used / Number RequiredNumber of Sampling Points Used 1 / 1
Sample Point I.D.'s
Nitrogen (5 Grade)
A1
Span Gas Uncertainty (%) 2
Span Gas Expiry Date 07/12/2021Span Gas Start Pressure (bar) 80Gas Cylinder Concentration (% v/v) 20.49
Number of Sampling Lines Used 1 / 1
Zero Gas Type
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 22 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 50 of 54
Graphical Trend of Data
OXYGEN: DATA TREND
APPENDIX 2
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
13:1
2
13:1
3
13:1
4
13:1
5
13:1
6
13:1
7
13:1
8
13:1
9
13:2
0
13:2
1
13:2
2
13:2
3
13:2
4
13:2
5
13:2
6
13:2
7
13:2
8
13:2
9
13:3
0
13:3
1
13:3
2
13:3
3
13:3
4
13:3
5
13:3
6
13:3
7
13:3
8
13:3
9
13:4
0
13:4
1
Conc
entr
atio
n (%
v/v
)
Oxygen Oxygen
- Run 1
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 23 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 51 of 54
Sampling Details
Quality Assurance
Zero Drift 0 0 0
Zero Drift 0 0 0
Zero Drift 0 0 0
Zero Down Sampling Line (Pre) % v/v
Span Gas Value
Sampling Times
Average Temperature
Zero Down Sampling Line (Post)
% v/v
Allowable Temperature < °C
0.06Zero Down Sampling Line (Post) % v/v 0.09
13:12 - 13:41
Parameter Units Run 1
Instrument Range
CAL
3
4.0
0.03
Zero Down Sampling Line (Pre) % v/v
CAL
1 Zero Down Sampling Line (Pre) % v/v
% v/v
Zero Down Sampling Line (Post)
% v/v
Units Run 1
% v/v
Sampling Dates - 27/09/2017-
Conditioning Unit Temperature Units Run 1
°C
% v/v 5.00
APPENDIX 2
OXYGEN: SAMPLING DETAILS & QUALITY ASSURANCE
1.3
Temperature Acceptable - Yes
CAL
2
% v/v
% v/v 25
Zero Drift
Zero Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Span Drift 0 0 0
Method Deviations
1
x
- - -
- - -
- - -
Span Drift Acceptable - Yes
% v/v
% v/v
Zero Drift Acceptable
Run 1
Run 1
Run Ambient Temperature Range °C 15
Span Down Sampling Line (Post) % v/v
Allowable Span Drift ± % v/v 0.25
CAL
3
% v/v
Yes
Run Number
(x = deviation applies to the associated run)
There are no deviations associated with the sampling employed.
% v/v
CAL
3
-
Nature of Deviation
Span Drift Units
Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post) % v/v
5.02
Test Conditions Units
% v/v -0.13
Allowable Zero Drift ± % v/v
% v/v4.89
Span Down Sampling Line (Pre)
0.25
CAL
2 Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post)
CAL
1
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 24 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 52 of 54
% rangeDependence on voltage 0.02 % full scale/10VLosses in the line (leak) 0.00
-0.07 % full scale/10KAtmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence
Volume or pressure flow dependence 0.20 % of full scale
Standard deviation of repeatability at zero use rep at span %volStandard deviation of repeatability at span level 0.01 %volLack of fit 0.01 %volDrift 0.07
% of valueUncertainty of calibration gas 2.00
Combined interference 0.56
%vol
Performance characteristics RUN 1 UnitsResponse time 60 seconds
N/A
-Repeatability at zero 0.04
%vol6.0 %
%volVolume or pressure flow dependence 0.00 %vol
0.00 % full scale
2.77 %volRange Used 25.0 %volCal gas conc. 20.5
% of value
Performance characteristic RUN 1 Units
0.05 % of valueZero drift 0.60
Number of readings in measurement 30
RUN 1 Units
Measured concentrationTGN M2 Allowable MULimit value
Span drift
Performance characteristics
% full scaleRepeatability at span level 0.04 % full scaleDeviation from linearity
% full scale
APPENDIX 2
OXYGEN: MEASUREMENT UNCERTAINTY CALCULATIONS
k =
Units
0.02Ambient temperature dependence -0.01 %vol
UnitsMeasurement uncertainty Result 2.77 %volCombined uncertainty 0.14 %vol
Result of Compliance with Uncertainty Requirement in M2Expanded uncertainty (no O₂) - at 95% Confidence 9.97 % of Value
Expanded uncertainty 1.96 0.28 %vol
RUN 1
%volLosses in the line (leak) 0.00
Volume or pressure flow dependence 0.00 %volAtmospheric pressure dependence %vol
COMPLIANT -
Requirement for SRM is that Uncertainty should be 0.5%vol absolute or 6% relative whichever is the lower, on a dry gas basis. Ref EA TGN M2.
Combined interference (from MCERTS Certificate) 0.08 %volDependence on voltage 0.00
%volUncertainty of calibration gas 0.03 %vol
RUN 1
Abbott IrelandCootehillA1-4 Boiler B
CAT-RT (Version BR)Page 25 of 25
Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017
Industrial Emissions Licence: PO687-02
Site Visit Report - SV10474 - Abbott Ireland Page 53 of 54
Summary
See report.
FOLLOW-UP ACTIONS
You are required to complete the instructions and actions, as outlined in this report, within the specified timeframe. Where required, you shall respond to actions specified in Compliance Investigations within the required timeframe.The licensee shall maintain documentary evidence, for review by the EPA, that the prescribed corrective actions were completed within the required timeframe.
(i) Compliance Investigations
You are not required to respond directly to items contained in this EPA site visit report; where an issue requires a direct response, the EPA will generate a Compliance Investigation through the EDEN system. You will receive notification when a Compliance Investigation instruction or action is generated.
(ii) Publication of reports and licensee response.
Please note that this Site Visit Report will be made available for public viewing via the EPA’s Licence Enforcement Access Portal within one day of the issue date and will be published on the Licence Details Page of the EPA’s website, www.epa.ie, that relates to your licence 60 calendar days after the issue date.
You may if you choose submit, within 45 calendar days of the issue date of this Site Visit Report, a Licensee Public Response that will be published alongside the Site Visit Report. This Response, should you wish to avail of it, provides you with an opportunity to inform the public about how you are implementing the actions set out in the report, activities underway, timescales and target completion dates. Please be aware that the content of your Licensee Public Response must be factual and should not breach the EPAs stated online publication standards.
If you wish to submit a Licensee Public Response to an EPA Site Visit Report, you should do this by clicking on the ‘Make a Response’ link on the Site Visits page in EDEN. A .pdf document containing your response can be attached and submitted from here.
(iii) Response to Site visit report
Where you do wish to respond directly to a site visit report, you should do this by generating a ‘Licensee Return’ of the type ‘Site Updates/Notifications’ and the sub-type ‘Response to EPA Report’ in EDEN.
Please note that you are required to comply with the conditions of your licence at all times, and where noncompliance occurs you must restore compliance within the shortest possible time. These actions will be verified during subsequent EPA visits.
Please quote the above Inspection Reference Number in any future correspondence in relation to this Report.
Site Visit Report - SV10474 - Abbott Ireland Page 54 of 54