SITE PLANNING

BRAD NILE, AIA

Andersen Construction

(Logistics, Safety,

Coordination & Planning)

Disclaimer: This Presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.

Page 2: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

1970s 1980s

1990s 2000s 2010s

BRAD NILE

5 decades of

building with

wood.

35-year

construction

career.

Page 3: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

• A beautiful building

• Rapid construction

• Minimal staging and

laydown needs

• Offsite fabrication

potential for all trades

THE PROMISE OF MASS TIMBER CONSTRUCTION:

District Office • Portland OR

Page 4: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Corvallis, OR

• A well managed and planned jobsite

• A well managed mass timber procurement and modeling effort

KEY FACTORS IN DELIVERING THIS PROMISE:

Page 5: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

• Building footprint compared to the available site.

• Crane location and hoisting plan

• Truck routing for materials in

• Trash, debris and recycling management

SITE ORGANIZATION CONSIDERATIONS:

District Office • Portland, OR

Page 6: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

SITE ORGANIZATION

Start planning early.

Refine and add every

relevant detail.

Page 7: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is
Page 8: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is
Page 9: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Total perimeter accessibility prepared for crane & facade access

Corvallis, OR

Page 10: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

No available site - all access via sidewalk & street closures.

Portland, OR

Page 11: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

No available site, except an easement just big enough for a tower crane.

CRANE PLAN

Page 12: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is
Page 13: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

CRANE PLAN

DOWNTOWN SITE

• Full-time sidewalk closure and part time street closure.

• RT crane for positioning flexibility and after-hours tuck away.

Page 14: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

PRE-CONSTRUCTION SITE

CONSIDERATIONS:

• Street and sidewalk closures

• Pedestrian protection

• No-fly zones

• Hoisting obstructions:

✓ Overhead power lines

✓ Trees

✓ Neighboring buildings

✓ Facade access

✓ Utility connections

Page 15: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Jurisdictional requirements and readymade options

PEDESTRIAN

PROTECTION

Page 16: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Trees, Power Lines and No-fly zones

HOISTING

OBSTRUCTIONS

Page 17: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

FACADE ACCESS

EXAMPLES

Page 18: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

TIMBER PROCUREMENT PRE-CONSTRUCTIONCONSIDERATIONS:

SCHEDULE

• Adequate time for modeling

• Confirmed Material Delivery Flow

DELIVERY PLANNING

• Truck sequence and cadence

• “Fly from truck” modeling and loading

• Factory center-of-gravity locating

• Hoisting and rigging provisions

• Worker Safety Provisions

• Guardrails

Page 19: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

TRUCK LOADING, SEQUENCE & CADENCE PLANNING

(CLT LOAD MODELING EXAMPLE)

Page 20: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

FLY FROM TRUCK

MODELING & LOADING

Essepi Systemi X-Lam Near Trento Italy

Page 21: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Hardware & Center of Gravity Locating

HOISTING & RIGGING PROVISIONS

Page 22: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

MOISTURE MITIGATION PLANNING

What to remember…

1. Have a plan:

Factory Sealers.

Stain Control

Moisture Control

Dry-out planning

Finishing

2. Build During the dry months

3. Study the connection details

4. Protect Critical details.

5. Expedite the envelop installation

6. Use a “vented” roof assembly.

Page 23: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

MOISTURE MANAGEMENT PLAN SUMMARY

1. SealersAll CLT Ends, edges and cuts.

UV protection on all beams and columns.

2. Stain PreventionOnly galvanized, aluminum or powder coated connectors.

NO cutting of steel around raw wood.

Remove all wrapping once on site.

3. Moisture ControlAdhesive tape at all joints and seams.

Regular bulk water removal and management.

Critical connection protection,.

4. Dry outAIR CIRCULATION (With no heat.)

Add heat slowly only after surface drying is complete.

Add humidity with heat. (With monitoring.)

14% moisture content MAX prior to any timber cover.

Page 24: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

SUMMARY –

PLAN EARLY & CONTINUOUSLY• Hoisting• Worker access and tie-off provisions while

the structure is underway• Guardrail provisions• Structure temporary bracing & stabilization

Page 25: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

PUBLIC SAFETY • Necessary traffic revisions• Pedestrian protection

Page 26: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

GENERAL ACCESS• Stair assemblies going up with the structure• Maintaining 2 paths of egress.

Page 27: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

MAXIMIZE OFF-SITE FABRICATION (BEYOND THE STRUCTURE)

• MEP systems• Facade Elements

Page 28: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

WORKER

SAFETY

PROVISIONS:

HAVE A PLAN!

THE 1978 PLAN:

Page 29: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

San Jose, CADinwiddie Construction

THE 1986 PLAN:

✓ Demolish and

rebuild facade

elements ON THE

GROUND!

Page 30: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

THE 2019 PLAN:

✓ Maximize off-site fabrication - Prefabricated Facade Panels

Page 31: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Maximize Off-site Fabrication - Plumbing and Piping Systems.

Newport, OR

Page 32: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Working the plan: Prefabricated Wall Elements,

shop installed roof vapor barrier.

Page 33: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Working the plan: Ground Installed Edge Protection

North Greenwich, UK North Greenwich, UK

Page 34: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

CONCLUSION Plan early and continuously.

● Crane type and location● Material Flow● Public Safety

● Temporary Bracing

● Moisture Management

● Model everything.

● Realize a no-sawdust jobsite.● If it is in the building, it is in the model.● Model truck loads for direct fly to position.

Maximize off-site fabrication (Beyond the Structure).

● MEP systems● Facade Elements

Page 35: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

EXCELLENT EXAMPLES OUTSIDE THE USA:

Brock Commons,

UBC

Urban One,

Structurlam,

Seagate

Vancouver,

British Columbia

Page 36: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

EXCELLENT EXAMPLES OUTSIDE THE USA:

Swatch Omega

Headquarters

Blumer Lehmann,

Gossau, Switzerland

Page 37: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

Thank you for your participation.

BRAD NILE, AIA

Andersen Construction

[email protected]

Page 38: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is

This concludes The American Institute of Architects Continuing Education Systems Course

QUESTIONS?

Brad Nile

Andersen Construction

[email protected]