SITE PLANNING
BRAD NILE, AIA
Andersen Construction
(Logistics, Safety,
Coordination & Planning)
Disclaimer: This Presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.
![Page 2: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/2.jpg)
1970s 1980s
1990s 2000s 2010s
BRAD NILE
5 decades of
building with
wood.
35-year
construction
career.
![Page 3: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/3.jpg)
• A beautiful building
• Rapid construction
• Minimal staging and
laydown needs
• Offsite fabrication
potential for all trades
THE PROMISE OF MASS TIMBER CONSTRUCTION:
District Office • Portland OR
![Page 4: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/4.jpg)
Corvallis, OR
• A well managed and planned jobsite
• A well managed mass timber procurement and modeling effort
KEY FACTORS IN DELIVERING THIS PROMISE:
![Page 5: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/5.jpg)
• Building footprint compared to the available site.
• Crane location and hoisting plan
• Truck routing for materials in
• Trash, debris and recycling management
SITE ORGANIZATION CONSIDERATIONS:
District Office • Portland, OR
![Page 6: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/6.jpg)
SITE ORGANIZATION
Start planning early.
Refine and add every
relevant detail.
![Page 7: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/7.jpg)
![Page 8: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/8.jpg)
![Page 9: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/9.jpg)
Total perimeter accessibility prepared for crane & facade access
Corvallis, OR
![Page 10: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/10.jpg)
No available site - all access via sidewalk & street closures.
Portland, OR
![Page 11: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/11.jpg)
No available site, except an easement just big enough for a tower crane.
CRANE PLAN
![Page 12: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/12.jpg)
![Page 13: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/13.jpg)
CRANE PLAN
DOWNTOWN SITE
• Full-time sidewalk closure and part time street closure.
• RT crane for positioning flexibility and after-hours tuck away.
![Page 14: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/14.jpg)
PRE-CONSTRUCTION SITE
CONSIDERATIONS:
• Street and sidewalk closures
• Pedestrian protection
• No-fly zones
• Hoisting obstructions:
✓ Overhead power lines
✓ Trees
✓ Neighboring buildings
✓ Facade access
✓ Utility connections
![Page 15: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/15.jpg)
Jurisdictional requirements and readymade options
PEDESTRIAN
PROTECTION
![Page 16: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/16.jpg)
Trees, Power Lines and No-fly zones
HOISTING
OBSTRUCTIONS
![Page 17: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/17.jpg)
FACADE ACCESS
EXAMPLES
![Page 18: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/18.jpg)
TIMBER PROCUREMENT PRE-CONSTRUCTIONCONSIDERATIONS:
SCHEDULE
• Adequate time for modeling
• Confirmed Material Delivery Flow
DELIVERY PLANNING
• Truck sequence and cadence
• “Fly from truck” modeling and loading
• Factory center-of-gravity locating
• Hoisting and rigging provisions
• Worker Safety Provisions
• Guardrails
![Page 19: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/19.jpg)
TRUCK LOADING, SEQUENCE & CADENCE PLANNING
(CLT LOAD MODELING EXAMPLE)
![Page 20: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/20.jpg)
FLY FROM TRUCK
MODELING & LOADING
Essepi Systemi X-Lam Near Trento Italy
![Page 21: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/21.jpg)
Hardware & Center of Gravity Locating
HOISTING & RIGGING PROVISIONS
![Page 22: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/22.jpg)
MOISTURE MITIGATION PLANNING
What to remember…
1. Have a plan:
Factory Sealers.
Stain Control
Moisture Control
Dry-out planning
Finishing
2. Build During the dry months
3. Study the connection details
4. Protect Critical details.
5. Expedite the envelop installation
6. Use a “vented” roof assembly.
![Page 23: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/23.jpg)
MOISTURE MANAGEMENT PLAN SUMMARY
1. SealersAll CLT Ends, edges and cuts.
UV protection on all beams and columns.
2. Stain PreventionOnly galvanized, aluminum or powder coated connectors.
NO cutting of steel around raw wood.
Remove all wrapping once on site.
3. Moisture ControlAdhesive tape at all joints and seams.
Regular bulk water removal and management.
Critical connection protection,.
4. Dry outAIR CIRCULATION (With no heat.)
Add heat slowly only after surface drying is complete.
Add humidity with heat. (With monitoring.)
14% moisture content MAX prior to any timber cover.
![Page 24: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/24.jpg)
SUMMARY –
PLAN EARLY & CONTINUOUSLY• Hoisting• Worker access and tie-off provisions while
the structure is underway• Guardrail provisions• Structure temporary bracing & stabilization
![Page 25: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/25.jpg)
PUBLIC SAFETY • Necessary traffic revisions• Pedestrian protection
![Page 26: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/26.jpg)
GENERAL ACCESS• Stair assemblies going up with the structure• Maintaining 2 paths of egress.
![Page 27: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/27.jpg)
MAXIMIZE OFF-SITE FABRICATION (BEYOND THE STRUCTURE)
• MEP systems• Facade Elements
![Page 28: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/28.jpg)
WORKER
SAFETY
PROVISIONS:
HAVE A PLAN!
THE 1978 PLAN:
![Page 29: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/29.jpg)
San Jose, CADinwiddie Construction
THE 1986 PLAN:
✓ Demolish and
rebuild facade
elements ON THE
GROUND!
![Page 30: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/30.jpg)
THE 2019 PLAN:
✓ Maximize off-site fabrication - Prefabricated Facade Panels
![Page 31: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/31.jpg)
Maximize Off-site Fabrication - Plumbing and Piping Systems.
Newport, OR
![Page 32: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/32.jpg)
Working the plan: Prefabricated Wall Elements,
shop installed roof vapor barrier.
![Page 33: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/33.jpg)
Working the plan: Ground Installed Edge Protection
North Greenwich, UK North Greenwich, UK
![Page 34: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/34.jpg)
CONCLUSION Plan early and continuously.
● Crane type and location● Material Flow● Public Safety
● Temporary Bracing
● Moisture Management
● Model everything.
● Realize a no-sawdust jobsite.● If it is in the building, it is in the model.● Model truck loads for direct fly to position.
Maximize off-site fabrication (Beyond the Structure).
● MEP systems● Facade Elements
![Page 35: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/35.jpg)
EXCELLENT EXAMPLES OUTSIDE THE USA:
Brock Commons,
UBC
Urban One,
Structurlam,
Seagate
Vancouver,
British Columbia
![Page 36: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/36.jpg)
EXCELLENT EXAMPLES OUTSIDE THE USA:
Swatch Omega
Headquarters
Blumer Lehmann,
Gossau, Switzerland
![Page 38: SITE PLANNING...SITE PLANNING BRAD NILE, AIA Andersen Construction (Logistics, Safety, Coordination & Planning) Disclaimer: This Presentation was developed by a third party and is](https://reader033.fdocuments.net/reader033/viewer/2022051408/5ff99da0dc50d3013759bd2f/html5/thumbnails/38.jpg)
This concludes The American Institute of Architects Continuing Education Systems Course
QUESTIONS?