Site Plan for: Krotz Springs Boat Launch Krotz Springs Boat Launch Town of Krotz Springs Town of Krotz Springs Greater Krotz Springs Port Greater Krotz Springs Port Commission Commission Presented by: Presented by: Mireya Laigast, Project Manager - U.S. Army Corps of Mireya Laigast, Project Manager - U.S. Army Corps of Engineers Engineers and and Daniel McElmurray, Landscape Architect – Perez, APC Daniel McElmurray, Landscape Architect – Perez, APC PEREZ, APC PEREZ, APC

description

Purpose of Meeting Provide you an overview of projects currently in Site Planning Phase Provide you an overview of projects currently in Site Planning Phase Present recommended boat launch improvements at Krotz Springs Present recommended boat launch improvements at Krotz Springs Solicit Feedback Solicit Feedback Determine level of support for the projects Determine level of support for the projects

Transcript of Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission...

Page 1: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Site Plan for:

Krotz Springs Boat LaunchKrotz Springs Boat Launch

Town of Krotz SpringsTown of Krotz SpringsGreater Krotz Springs Port CommissionGreater Krotz Springs Port Commission

Presented by:Presented by:

Mireya Laigast, Project Manager - U.S. Army Corps of EngineersMireya Laigast, Project Manager - U.S. Army Corps of Engineersandand

Daniel McElmurray, Landscape Architect – Perez, APCDaniel McElmurray, Landscape Architect – Perez, APC

PEREZ, APCPEREZ, APC

Page 2: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Topics of DiscussionTopics of Discussion

Purpose of MeetingPurpose of Meeting BackgroundBackground Recommended Plan for Boat Launch Recommended Plan for Boat Launch

– Constraints and OpportunitiesConstraints and Opportunities– Proposed ImprovementsProposed Improvements– Phasing and CostsPhasing and Costs

What’s the Next Step?What’s the Next Step? SummarySummary Open to Discussion and FeedbackOpen to Discussion and Feedback

Page 3: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Purpose of MeetingPurpose of Meeting

Provide you an overview of projects currently in Provide you an overview of projects currently in

Site Planning PhaseSite Planning Phase

Present recommended boat launch improvements Present recommended boat launch improvements

at Krotz Springsat Krotz Springs

Solicit FeedbackSolicit Feedback

Determine level of support for the projectsDetermine level of support for the projects

Page 4: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Project BackgroundProject Background This Project is part of the Atchafalaya Basin Floodway This Project is part of the Atchafalaya Basin Floodway

System Project, Louisiana as authorized in the Water System Project, Louisiana as authorized in the Water Resources Development Act (WRDA) of 1986.Resources Development Act (WRDA) of 1986.

– Under the Recreational ElementUnder the Recreational Element Project authorized construction of 15 boat landings “in the Project authorized construction of 15 boat landings “in the

vicinity of” the Atchafalaya Basin.vicinity of” the Atchafalaya Basin. Received limited funding on recreation projects until WRDA Received limited funding on recreation projects until WRDA

2000.2000. Krotz Springs Boat Launch is currently slated to be launch 5 Krotz Springs Boat Launch is currently slated to be launch 5

of 15.of 15.

Page 5: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

john eblen:

RPC input from RPC input from LynnLynn Krotz Springs Boat LaunchKrotz Springs Boat Launch

Access Access PointsPoints Parking AreaParking Area

Existing Existing LaunchLaunch

Page 6: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Steep grade of boat launch Poor condition of existing launch Limited width of parking area Limited number of parking spaces Limited property boundaries Adjacent pipeline Overhead electric lines Limited security features

Project IssuesProject Issues

Page 7: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Project IssuesProject Issues

Poor ConditionPoor Conditionof Existing Rampof Existing Ramp

Steep Grade of RampSteep Grade of Ramp

Inadequate Parking and Inadequate Parking and Turnaround AreaTurnaround Area

Page 8: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements

Coordinated SignageImproved Access from Service Road

New Three Lane Boat LaunchExpanded Gravel Parking Area & ADA-compliant

ParkingNew Floating Dock

Canoe LaunchLandscaping

Trash receptaclesSecurity Lighting

Page 9: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements

Page 10: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements

New SignageNew Signage

New SignageNew Signage

New SignageNew Signage

Page 11: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements

Expanded Parking Expanded Parking Area and Access Area and Access

RoadRoadNew Security LightingNew Security Lighting

Gravel Parking AreaGravel Parking Area

Page 12: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements

New ThreeNew ThreeLane LaunchLane Launch

Canoe LaunchCanoe Launch

Page 13: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements

New Floating DockNew Floating Dock

LandscapingLandscaping

Page 14: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Project PhasingProject Phasing

Construct new three lane launch and install new floating dock

Expand parking area and grade Install curbing Cover access lanes and parking areas with

limestone gravel Renovate existing launch into canoe launch Install security lighting Install landscaping

Page 15: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Krotz Springs $471,000Local match required, contributed on behalf of the Town of Krotz Springs and the Greater Krotz Springs Port Commission by DNR

Projected CostsProjected Costs

Page 16: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

What’s the Next Step?What’s the Next Step? Step 1 - Complete final layout by 31 August 2002, based on

your feedback tonight, via e-mail or regular mail. Step 2 - Begin project engineering design (plans and specs). Step 3 - Complete Engineering Documentation Report by 31

December 2002. Step 4 - Complete plans and specifications by 30 Sept 2003. Step 5 - Execute Project Cooperation Agreement with Port

Commission by 31 October 2003. Step 6 - BCOE Review completed by 30 November 2003. Step 7 - Construction in FY04 pending funding, scheduled to

take advantage of mid-year low water season.

Note: This schedule is tentative and is contingent upon federal

funding

Page 17: Site Plan for: Krotz Springs Boat Launch Town of Krotz Springs Greater Krotz Springs Port Commission Presented by: Mireya Laigast, Project Manager - U.S.

Contact:Daniel McElmurrayDaniel McElmurray

Perez, APCPerez, APC 909 Poydras St Suite 2250

New Orleans, LA 70112

[email protected]@e-perez.com

Phone: 504.584.5104Phone: 504.584.5104Fax: 504.584.5140Fax: 504.584.5140

We want your comments!We want your comments!