  Flexi Edge Multiradio BTS site folder Airtel project- Kenya 1  FLEXI MULTIRADIO BTS SITE FOLDER Project Name : Bharti Africa Customer Name : Airtel Kenya  Document No. : 01 Version : 1.1 Document Type : Site Folder Document Number : 01 Originator : Shubham Prasad Reviewed By : Kenneth Owuor Approved By : Sebastian Franke Date Approved : Function : Network Implementa tion Site Solutions - SEA

description

folder

Transcript of Site Folder Flexi MR_Sites_V02

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    1

    FLEXI MULTIRADIO BTS SITE FOLDER

    Project Name : Bharti Africa Customer Name : Airtel Kenya

    Document No. : 01

    Version : 1.1

    Document Type : Site Folder Document Number : 01 Originator : Shubham Prasad Reviewed By : Kenneth Owuor Approved By : Sebastian Franke Date Approved : Function : Network Implementation Site Solutions - SEA

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    2

    CONTENTS:

    1 Site Information

    2 Site Survey Checklist

    3 Equipments Installation Information & Checks

    4 Flexi Multiradio BTS Commissioning

    5 Flexi Multiradio BTS Integration

    6 Certificates of Completion

    CONTACT INFORMATION

    The following are the contact details of the key persons needed for

    escalation and coordination in the field as shown in Table 1 below.

    Project Manager David Munywoki +254733500288

    TI Manager Kenneth Owuor +254787507093

    Quality Manager Qamrosh Zia +254735400128

    NI SiSo Manager

    OH&S Manager Qamrosh Zia +254735400128

    Sub Region TI

    manager

    Revision History

    Date Rev. Originator Summary of Change

    Jan 24th 2011 01 Shubham Prasad Initial development Nov 26th 2014 02 Kenneth Owuor PCL, FIQB/FIYB, NOKIA logo, ESMC, NetAct

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    3

    1. SITE INFORMATION

    SITE INFORMATION

    Customer Name & Country

    Site Name & Site ID

    Site Address

    Site LAT/LONG

    Site Type (GBT/RTT/POLE)

    BTS Type (OD/Wall/Pole/Stack)

    Site Configuration

    ACCESS INFORMATION:

    Type of keys:

    Name of Site Engineer:

    Contact No.

    NOC contact Number:

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    4

    2. SITE SURVEY CHECK LIST

    The purpose of the site survey is to check the progress of applicable civil / RFI works &

    identifying any shortcomings or potential problems prior to installation.

    When applicable, civil / RFI works must be completed, before the site will be

    considered ready for the Installation.

    It is the responsibility of the Installation Supervisor to determine whether or not a site is

    ready for installation, and whether a Site Survey Report is necessary. A site could be

    rejected by NOKIA if:

    Safety to personnel may be compromised.

    Civil / RFI work is not of the required standard.

    Insufficient utilities.

    Following Documents needs to be enclosed along with Site Folder.

    A. Site Survey (RFI) Checklist, completed & sign Copy.

    B. Complete Site with BTS As-built Drawing.

    C. Few Photographs of installation (BTS, optical cable, Jumper & Antenna

    installation): Picture Checklist (PCL)

    D. Site Self Assessment Checklist with Zero Punch Points.

    E. SDR Checklist.

    F. BTS Commissioning Report.

    G. VSWR report (Antenna / Jumpers)

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    5

    3. Installation Details for Flexi MR & Checks.

    3.1 FLEXI MR BTS INSTALLATION DETAILS

    NO OF FLEXI RF MODULES

    NO OF FLEXI SYSTEM MODULES

    NO OF SECTORS

    TRX CONFIGURATIONS-

    NO OF

    TRX IN

    SEC-1

    1 2 3 4 5 6

    NO OF

    TRX IN

    SEC-2

    1 2 3 4 5 6

    NO OF

    TRX IN

    SEC-3

    1 2 3 4 5 6

    Transmission

    Unit

    YES NO

    Used Port (FIQB

    Only)

    FIFA FIQB/FIYB

    Type of Radio

    Used (FIFA

    Only)

    1 2 3 4 5 6 7

    Flexi Hooper Yes/No

    Any Other

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    6

    3.2 FLEXI MR BTS INSTALLATION CHECKS

    DESCRIPTION CHECK

    3.3.1 Preparations

    Delivery Checked and any shortcomings recorded

    Record Transport damages if any

    3.3.2 Site Preparation and cabinet / Modules installation

    Equipment Layout checked and differences recorded in the site plan

    BTS Modules Installation as per layout Plan & according to site specific

    documents

    BTS Modules are Grounded

    3.3.3 Cabinet / Modules External Cabling

    Install Cabinet / Modules earthling cables, between Cabinet / modules

    and earthling bus bar

    Connect the BTS input power supplies

    Connect the alarms/controls

    Connect A-bis interface

    Connect antenna Jumper

    Labelling of all cables (power, E1, Alarm & Grounding )

    Labelling of Jumpers Internal Jumpers

    3.3.4 DDF Installation & Cabling

    DDF Connected to equipments room bus bar.

    DDF Cross connections cables connected.

    2MB A-bis cables connected to the BTS and Labelled

    3.3.6 Finishing the Installation

    Install all the dummy panels in the cabinets / Modules.

    Clean the site.

    Fill the installation certificate of the BTS.

    Complete the site folder.

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    7

    3.3 POWER SYSTEM & BATTERY DETAILS

    3.3.1 POWER & BATTERY SYSTEM DETAILS

    ITEM DETAILS

    Power System Make

    Each Rectifier Module Capacity & No of

    Modules

    Supply Voltage to the Power System ( 1Ph/3 Ph)

    Power System Output Voltage

    Battery Make

    Numbers of battery strings ( -48V each String )

    Battery Ah capacity

    Power Cables Size used between PIU & SMPS

    MCB/Fuse Used for SMPS

    3.3.2 POWER CABLES & MCB/FUSE DETAILS

    DC Supply

    Fuses &

    Cables

    From

    TO

    (BTS

    Rack

    / MW

    IDU

    etc)

    LOAD

    (Critical

    /Non

    Critical)

    TYPE

    (MCB/

    Fuse)

    FUSE

    /MCB

    Rating

    (Amp)

    CABLE

    TYPE/

    SIZE

    (mm)

    LABEL NO.

    SMPS/DCDB BTS-1 MCB 2x16sq

    SMPS/DCDB BTS-2

    SMPS/DCDB FIU MCB 2x2.5sq

    SMPS/DCDB

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    8

    3.4 OPTICAL FIBER & ANTENNA DETAILS

    3.4.1 DETAILED INFORMATION ON ANTENNA & FEEDER SYSTEM

    Sectors

    Item

    Sec-1

    Sec-2

    Sec-3

    GSM Antenna Type TX

    RX

    GSM Antenna Beam

    Width (dgr)

    TX

    RX

    GSM Antenna Gain

    (dBi)

    TX

    RX

    GSM Antenna Height

    from Gnd ( M)

    TX

    RX

    Mechanical Tilting

    Angle (dgr)

    TX

    RX

    Electrical Tilting

    Angle (dgr)

    TX

    RX

    Optical Fibre Length

    (M)

    TX

    RX

    Antenna make

    (Andrew/Katherin)

    Azimuth in dgr.

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    9

    4. FLEXI MR BTS COMMISSIONING

    4.1 Preparations

    Description Checked

    Check the availability of necessary documents and test

    equipments needed for commissioning.

    Check the installation of plug-in units.

    Check all the interconnection cables for modules.

    Prepare test equipment ready.

    Check polarity of Power cable in the BTS and then power-up the

    BTS.

    Record DC Voltage at ESMC ..V

    Connect RJ45 /LAN Cable to ESMC Card and start BTS Manager

    4.2 Equipment Initialization

    Description Checked

    Create HW Configuration file. (File Name): .)

    Check BTS SW Version (SW Version): .)

    Check BTS Mgr SW version. (SW Version): ....)

    4.3 TRX Power Outputs

    Measure the power levels of each TRX ( Watts/dBm)

    TRX1 TRX7 TRX13 TRX19

    TRX2 TRX8 TRX14 TRX20

    TRX3 TRX9 TRX15 TRX21

    TRX4 TRX10 TRX16 TRX22

    TRX5 TRX11 TRX17 TRX23

    TRX6 TRX12 TRX18 TRX24

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    10

    4.4 VSWR Measurement ( Only For Antenna & Jumpers)

    TX1 RX1 TX/RX

    ANTENNA-1

    ANTENNA-2

    ANTENNA-3

    ANTENNA-4

    ANTENNA-5

    ANTENNA-6

    4.5 External Alarm

    FLEXI MR BTS SITE ALARM

    ALARMS NUMBER ALARM DETAILS ALARM DEFINITIONS POLARITY

    ALARM INTEGRATION

    TILL OSS

    ALARM 1 7401 CRITICAL

    ALARM 2 7402 MINOR

    ALARM 3 7403 CRITICAL

    ALARM 4 7404 CRITICAL

    ALARM 5 7405 CRITICAL

    ALARM 6 7406 CRITICAL

    ALARM 7 7407 CRITICAL

    ALARM 8 7408 CRITICAL

    ALARM 9 7409 CRITICAL

    ALARM 10 7410 CRITICAL

    ALARM 11 7411 CRITICAL

    ALARM 12 7412 CRITICAL

    4.6 Commissioning

    COMMISSIONING

    Manual Commissioning Under direction of RIC Complete IP Settings

    Interface Settings

    Transmission Module Settings

    Local Call Resources

    WCDMA Carrier & Scrambling code settings

    Feeder Loss

    Parameters saved

    BTS Testing Complete BTS Test State Site Tests

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    11

    COMMISSIONING

    BTS Loop Test Performed

    BTS BER Test Performed

    BTS Restart Parameters consistent!

    Mains Fail! 20W / 40W

    4.7 Finishing

    DESCRIPTION CHECKED

    Return the BTS to the operational state.

    Clean the Site.

    Fill in the Commissioning Certificate of BTS

    Complete the Site Folder

    Commissioning done by:

    Accepted by:

    (Place) (Date)

    (Customers Representative) (Signature)

    (NOKIA / TI Representative) (Signature)

    5. FLEXI MR BTS INTEGRATION

    5.1 FLEXI MR BTS Integration Preparation Check List

    Ref. Description Checked

    5.1.1 Transmission Plan/A-bis interface is checked to be

    available.

    5.1.2. Time slot Allocation Plan is checked to be available.

    5.1.3. The status of the commissioning is checked.

    5.1.4. Jumper connections are checked.

    5.1.5. Transmission settings are checked.

    5.1.6. Transmission connections are checked.

    5.2 Restarting BTS from BSC

    Ref. Description Checked

    5.2.1. ESMC SW downloaded successfully from BSC.

    5.2.2. All the units are checked to be in proper state.

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    12

    5.3 Reference Call

    Ref. Description Checked

    5.3.1. The call is made and used time slot

    noted.

    TSL:

    5.4 Main Power Break

    Ref. Description Checked

    5.4.1. Main power is switched off. The alarms are checked from

    NetAct.

    5.4.2. Main power is switched on. BTS is loaded correct from

    flash memory.

    5.4.2. Alarm status is checked from NetAct.

    5.5 External Alarms

    Ref. Description Checked

    5.5.1. All external alarms are tested.

    5.6 Handover

    Ref. Description Checked

    5.6.1. Inter-Cells call handover checked

    5.7 Test Calls

    Ref. Description Checked

    5.7.1. Calls are tested and results are noted in table below.

    5.8 Finishing the Integration

    Ref. Description Checked

    5.8.1. Fill in the Integration Report.

    5.8.2. Complete the Site Folder and submit to the Field

    Manager.

    5.8.3 The reports of the Factory Acceptance Test Reports

    have been handed over.

  • Flexi Edge Multiradio BTS site folder Airtel project- Kenya

    13

    Site Acceptance Certificate

    INSTRUCTIONS: A NOKIA Representative and Customer Representative complete this form upon acceptance of each site. File the completed form in the appropriate Site Folder.

    Customer Name: __________________________________ Date: ____________________

    Site Location/Number: ___________________________________________________________

    Project Description: _____________________________________________________________

    Nokia PO #s: ___________________________________________________________________

    Customer PO #s: _______________________________________________________________

    The above referenced site project (i) has passed all applicable Acceptance Tests, (ii) has been installed properly, subject to resolution of outstanding SDR items, and (iii) is ready to be placed in service.

    Any discrepancies are specified on the following SDR or attachment (s).

    Installation SDR Dated No Discrepancies Quantity of SDR Items Not Applicable

    Site Test Data Forms Dated No Discrepancies Quantity of SDR Items Not Applicable

    Customer Representative Nokia Siemens Networks Representative

    Signature: ____________________________ Signature: ____________________________

    Printed Name: _________________________ Printed Name: _________________________

    Title: _________________________________ Title: _________________________________