Transcript of Site Folder Flexi MR_Sites_V02
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
1
FLEXI MULTIRADIO BTS SITE FOLDER
Project Name : Bharti Africa Customer Name : Airtel Kenya
Document No. : 01
Version : 1.1
Document Type : Site Folder Document Number : 01 Originator : Shubham Prasad Reviewed By : Kenneth Owuor Approved By : Sebastian Franke Date Approved : Function : Network Implementation Site Solutions - SEA
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
2
CONTENTS:
1 Site Information
2 Site Survey Checklist
3 Equipments Installation Information & Checks
4 Flexi Multiradio BTS Commissioning
5 Flexi Multiradio BTS Integration
6 Certificates of Completion
CONTACT INFORMATION
The following are the contact details of the key persons needed for
escalation and coordination in the field as shown in Table 1 below.
Project Manager David Munywoki +254733500288
TI Manager Kenneth Owuor +254787507093
Quality Manager Qamrosh Zia +254735400128
NI SiSo Manager
OH&S Manager Qamrosh Zia +254735400128
Sub Region TI
manager
Revision History
Date Rev. Originator Summary of Change
Jan 24th 2011 01 Shubham Prasad Initial development Nov 26th 2014 02 Kenneth Owuor PCL, FIQB/FIYB, NOKIA logo, ESMC, NetAct
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
3
1. SITE INFORMATION
SITE INFORMATION
Customer Name & Country
Site Name & Site ID
Site Address
Site LAT/LONG
Site Type (GBT/RTT/POLE)
BTS Type (OD/Wall/Pole/Stack)
Site Configuration
ACCESS INFORMATION:
Type of keys:
Name of Site Engineer:
Contact No.
NOC contact Number:
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
4
2. SITE SURVEY CHECK LIST
The purpose of the site survey is to check the progress of applicable civil / RFI works &
identifying any shortcomings or potential problems prior to installation.
When applicable, civil / RFI works must be completed, before the site will be
considered ready for the Installation.
It is the responsibility of the Installation Supervisor to determine whether or not a site is
ready for installation, and whether a Site Survey Report is necessary. A site could be
rejected by NOKIA if:
Safety to personnel may be compromised.
Civil / RFI work is not of the required standard.
Insufficient utilities.
Following Documents needs to be enclosed along with Site Folder.
A. Site Survey (RFI) Checklist, completed & sign Copy.
B. Complete Site with BTS As-built Drawing.
C. Few Photographs of installation (BTS, optical cable, Jumper & Antenna
installation): Picture Checklist (PCL)
D. Site Self Assessment Checklist with Zero Punch Points.
E. SDR Checklist.
F. BTS Commissioning Report.
G. VSWR report (Antenna / Jumpers)
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
5
3. Installation Details for Flexi MR & Checks.
3.1 FLEXI MR BTS INSTALLATION DETAILS
NO OF FLEXI RF MODULES
NO OF FLEXI SYSTEM MODULES
NO OF SECTORS
TRX CONFIGURATIONS-
NO OF
TRX IN
SEC-1
1 2 3 4 5 6
NO OF
TRX IN
SEC-2
1 2 3 4 5 6
NO OF
TRX IN
SEC-3
1 2 3 4 5 6
Transmission
Unit
YES NO
Used Port (FIQB
Only)
FIFA FIQB/FIYB
Type of Radio
Used (FIFA
Only)
1 2 3 4 5 6 7
Flexi Hooper Yes/No
Any Other
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
6
3.2 FLEXI MR BTS INSTALLATION CHECKS
DESCRIPTION CHECK
3.3.1 Preparations
Delivery Checked and any shortcomings recorded
Record Transport damages if any
3.3.2 Site Preparation and cabinet / Modules installation
Equipment Layout checked and differences recorded in the site plan
BTS Modules Installation as per layout Plan & according to site specific
documents
BTS Modules are Grounded
3.3.3 Cabinet / Modules External Cabling
Install Cabinet / Modules earthling cables, between Cabinet / modules
and earthling bus bar
Connect the BTS input power supplies
Connect the alarms/controls
Connect A-bis interface
Connect antenna Jumper
Labelling of all cables (power, E1, Alarm & Grounding )
Labelling of Jumpers Internal Jumpers
3.3.4 DDF Installation & Cabling
DDF Connected to equipments room bus bar.
DDF Cross connections cables connected.
2MB A-bis cables connected to the BTS and Labelled
3.3.6 Finishing the Installation
Install all the dummy panels in the cabinets / Modules.
Clean the site.
Fill the installation certificate of the BTS.
Complete the site folder.
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
7
3.3 POWER SYSTEM & BATTERY DETAILS
3.3.1 POWER & BATTERY SYSTEM DETAILS
ITEM DETAILS
Power System Make
Each Rectifier Module Capacity & No of
Modules
Supply Voltage to the Power System ( 1Ph/3 Ph)
Power System Output Voltage
Battery Make
Numbers of battery strings ( -48V each String )
Battery Ah capacity
Power Cables Size used between PIU & SMPS
MCB/Fuse Used for SMPS
3.3.2 POWER CABLES & MCB/FUSE DETAILS
DC Supply
Fuses &
Cables
From
TO
(BTS
Rack
/ MW
IDU
etc)
LOAD
(Critical
/Non
Critical)
TYPE
(MCB/
Fuse)
FUSE
/MCB
Rating
(Amp)
CABLE
TYPE/
SIZE
(mm)
LABEL NO.
SMPS/DCDB BTS-1 MCB 2x16sq
SMPS/DCDB BTS-2
SMPS/DCDB FIU MCB 2x2.5sq
SMPS/DCDB
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
8
3.4 OPTICAL FIBER & ANTENNA DETAILS
3.4.1 DETAILED INFORMATION ON ANTENNA & FEEDER SYSTEM
Sectors
Item
Sec-1
Sec-2
Sec-3
GSM Antenna Type TX
RX
GSM Antenna Beam
Width (dgr)
TX
RX
GSM Antenna Gain
(dBi)
TX
RX
GSM Antenna Height
from Gnd ( M)
TX
RX
Mechanical Tilting
Angle (dgr)
TX
RX
Electrical Tilting
Angle (dgr)
TX
RX
Optical Fibre Length
(M)
TX
RX
Antenna make
(Andrew/Katherin)
Azimuth in dgr.
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
9
4. FLEXI MR BTS COMMISSIONING
4.1 Preparations
Description Checked
Check the availability of necessary documents and test
equipments needed for commissioning.
Check the installation of plug-in units.
Check all the interconnection cables for modules.
Prepare test equipment ready.
Check polarity of Power cable in the BTS and then power-up the
BTS.
Record DC Voltage at ESMC ..V
Connect RJ45 /LAN Cable to ESMC Card and start BTS Manager
4.2 Equipment Initialization
Description Checked
Create HW Configuration file. (File Name): .)
Check BTS SW Version (SW Version): .)
Check BTS Mgr SW version. (SW Version): ....)
4.3 TRX Power Outputs
Measure the power levels of each TRX ( Watts/dBm)
TRX1 TRX7 TRX13 TRX19
TRX2 TRX8 TRX14 TRX20
TRX3 TRX9 TRX15 TRX21
TRX4 TRX10 TRX16 TRX22
TRX5 TRX11 TRX17 TRX23
TRX6 TRX12 TRX18 TRX24
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
10
4.4 VSWR Measurement ( Only For Antenna & Jumpers)
TX1 RX1 TX/RX
ANTENNA-1
ANTENNA-2
ANTENNA-3
ANTENNA-4
ANTENNA-5
ANTENNA-6
4.5 External Alarm
FLEXI MR BTS SITE ALARM
ALARMS NUMBER ALARM DETAILS ALARM DEFINITIONS POLARITY
ALARM INTEGRATION
TILL OSS
ALARM 1 7401 CRITICAL
ALARM 2 7402 MINOR
ALARM 3 7403 CRITICAL
ALARM 4 7404 CRITICAL
ALARM 5 7405 CRITICAL
ALARM 6 7406 CRITICAL
ALARM 7 7407 CRITICAL
ALARM 8 7408 CRITICAL
ALARM 9 7409 CRITICAL
ALARM 10 7410 CRITICAL
ALARM 11 7411 CRITICAL
ALARM 12 7412 CRITICAL
4.6 Commissioning
COMMISSIONING
Manual Commissioning Under direction of RIC Complete IP Settings
Interface Settings
Transmission Module Settings
Local Call Resources
WCDMA Carrier & Scrambling code settings
Feeder Loss
Parameters saved
BTS Testing Complete BTS Test State Site Tests
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
11
COMMISSIONING
BTS Loop Test Performed
BTS BER Test Performed
BTS Restart Parameters consistent!
Mains Fail! 20W / 40W
4.7 Finishing
DESCRIPTION CHECKED
Return the BTS to the operational state.
Clean the Site.
Fill in the Commissioning Certificate of BTS
Complete the Site Folder
Commissioning done by:
Accepted by:
(Place) (Date)
(Customers Representative) (Signature)
(NOKIA / TI Representative) (Signature)
5. FLEXI MR BTS INTEGRATION
5.1 FLEXI MR BTS Integration Preparation Check List
Ref. Description Checked
5.1.1 Transmission Plan/A-bis interface is checked to be
available.
5.1.2. Time slot Allocation Plan is checked to be available.
5.1.3. The status of the commissioning is checked.
5.1.4. Jumper connections are checked.
5.1.5. Transmission settings are checked.
5.1.6. Transmission connections are checked.
5.2 Restarting BTS from BSC
Ref. Description Checked
5.2.1. ESMC SW downloaded successfully from BSC.
5.2.2. All the units are checked to be in proper state.
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
12
5.3 Reference Call
Ref. Description Checked
5.3.1. The call is made and used time slot
noted.
TSL:
5.4 Main Power Break
Ref. Description Checked
5.4.1. Main power is switched off. The alarms are checked from
NetAct.
5.4.2. Main power is switched on. BTS is loaded correct from
flash memory.
5.4.2. Alarm status is checked from NetAct.
5.5 External Alarms
Ref. Description Checked
5.5.1. All external alarms are tested.
5.6 Handover
Ref. Description Checked
5.6.1. Inter-Cells call handover checked
5.7 Test Calls
Ref. Description Checked
5.7.1. Calls are tested and results are noted in table below.
5.8 Finishing the Integration
Ref. Description Checked
5.8.1. Fill in the Integration Report.
5.8.2. Complete the Site Folder and submit to the Field
Manager.
5.8.3 The reports of the Factory Acceptance Test Reports
have been handed over.
-
Flexi Edge Multiradio BTS site folder Airtel project- Kenya
13
Site Acceptance Certificate
INSTRUCTIONS: A NOKIA Representative and Customer Representative complete this form upon acceptance of each site. File the completed form in the appropriate Site Folder.
Customer Name: __________________________________ Date: ____________________
Site Location/Number: ___________________________________________________________
Project Description: _____________________________________________________________
Nokia PO #s: ___________________________________________________________________
Customer PO #s: _______________________________________________________________
The above referenced site project (i) has passed all applicable Acceptance Tests, (ii) has been installed properly, subject to resolution of outstanding SDR items, and (iii) is ready to be placed in service.
Any discrepancies are specified on the following SDR or attachment (s).
Installation SDR Dated No Discrepancies Quantity of SDR Items Not Applicable
Site Test Data Forms Dated No Discrepancies Quantity of SDR Items Not Applicable
Customer Representative Nokia Siemens Networks Representative
Signature: ____________________________ Signature: ____________________________
Printed Name: _________________________ Printed Name: _________________________
Title: _________________________________ Title: _________________________________
Date: ________________________________ Date: _________________________________
Distribution: Customer Accounting Project Manager