STUDENT INDUSTRIAL TRAINING (SIT)PRESENTATION
NAME & ID: NUR AMIRA BTE MOHD RUBA’AI (16793)DEPARTMENT: PROJECT & TURNAROUND (PTA)SUPERVISOR: EN SHAFIQ BIN MOKHTAR
2
CONTENT
AUGUST 13,2014
OBJECTIVE
INTRODUCTION
COMPANY OVERVIEW
THE SIT EXPERIENCES
CONCLUSION
3
To give an overview of main projects undertaken during internship period in SRC & events participatedTo reflect challenges and skills acquired during internship periodTo establish close relationship between the industry and UTPTo reflect on upcoming projects for SIP
AUGUST 13, 2014
OBJECTIVE
4AUGUST 13,2014
SIT PERIOD 19TH MAY 2014 – 23RD DECEMBER 2014
HOST COMPANY Shell Refining Company (FOM) Berhad Port Dickson
DEPARTMENT / SECTION Engineering-Project & Turnaround
HC SUPERVISOR EN SHAFIQ BIN MOKHTAR Senior Engineer- Project & Turnaround
INTRODUCTION
5AUGUST 13, 2014
Learning Goals
To understand the function and working conditions of an oil and gas organization
To explore a possibility for my future career
To learn organizing a project in details
To enhance my communication skills
To build network
6AUGUST 13, 2014
1960Formerly known as Shell Refining Company (FOM) Port Dickson
125 kilo barrels per day (kbd) of crude processed
VisionTop Performing & Most admired Refinery in Asia
Mission To continuously deliver shareholder value by manufacturing and supplying oil products and service that satisfy the needs of our customer
COMPANY OVERVIEW
7AUGUST 13,2014
UPSTREAM
DOWNSTREAM
PROJECTS & TECHNOLOGY
CORE BUSINESS
8
Oil Movement & Jetty
Complex 1
Complex 2
Long Residue Catalytic Cracking Unit ( LRCCU)
HIJAU
AUGUST 13,2014
SRCPD process unit
PROCESS UNIT 1 (PU 1) PROCESS UNIT 2 (PU 2)
9
MAIN PROJECTS
DAILY ROUTINE WORK
FUTURE PROJECTS
HSSE & CX EVENTS
THE SIT EXPERIENCES AT SRCPD
AUGUST 13,2014
TRAINING INVOLVEMENT
10AUGUST 13,2014
HANDLING CABIN
CLEARANCE PROJECT
Challenges:
1. Required to plan, schedule and
understand of refining working
practices.
2. Carried the responsibility of
planning and execute works within
timeframe.
Skills/Experiences Gained:
1. Valuable communication skills
2. Initiatives on finding resource and
information by discussing with
experienced team (e.g. senior
engineer)
3. Analytical skill
MAIN PROJECTS
April 21, 2023 11
UPDATING EQUIPMENT
DATABASE OF TA
Challenges:
1. Required to identify and categorized
scope of work on each equipment’s
code.
2. Learned to read and interpret
technical drawings e.g. Process
Engineering Flow Scheme
(PEFS)
Skills/Experiences Gained:
1. Read and interpret PEFS
2. Ability to recognize equipment
tagging
3. Master in Microsoft Excel
DAILY ROUTINE WORK
12AUGUST 13,2014
2011 MTA DATABASE
April 21, 2023 13
RESULTS
14AUGUST 13, 2014
ATTACH TO ROTATING EQUIPMENT
DEPARTMENT
T-1109 INSPECTION
PRESENTATION TASK
DAILY ROUTINE WORKS
15AUGUST 13,2014
HSSE Induction Training Stand Down
Training
TRAINING involvement
16
ENVIRONMENT FUN RUN
CAR WASH CHARITY
LUNCH EVENT WITH UNDERPRIVILEDGED
KIDS
SHELL SAFETY DAY 2014
Hsse & cx EVENTS
17AUGUST 13,2014
OPERATION FIRE WATER
PUMP SYSTEM
TURNAROUND DATABASE
1) To study feasibility of Fire Water Pump system requirement during TA for cleaning service
2) To propose additional utility source to mitigate insufficient water capacity
3) Prepare complete document i.e. checklist for next Turnaround
1) As a visual management tools for turnaround’s equipment scope history
2) Identify & segregate plant equipment
3) To know equipment’s history
OBJECTIVE
OBJECTIVE
FUTURE PROJECTS
18AUGUST 13, 2014
Achieved the objectives and learning goals during internship
Experienced the real working environment of the industry
Relate the theoretical with practical applications
Able to explore career interest upon graduation
CONCLUSIONS
AUGUST 13,2014
Q & A SESSIONS
20
THANK YOU